Fort Stanwix National Monument Energy Audit. Week 2 Update: Customer Needs and Specifications Friday, December 12 th , 2008 Customer: FSNM, contact: Debbie Conway Guide: Brian Thorn P09453. Customer Needs 1 - 7. Customer Needs 8 - 13. Specifications. - PowerPoint PPT Presentation
Citation preview
Week 2 Update: Customer Needs and SpecificationsFriday, December 12th, 2008
Customer: FSNM, contact: Debbie ConwayGuide: Brian Thorn
P09453
Customer Needs 1 - 7Customer Need #
Rank Description Comments/Status
CN1 1 Reduce total cost of energy at FSNM
Not met – Willett Center: 64% of energy costs
CN2 1 Recommendation of potential energy saving opportunities
Not met – Divide short and long term opportunities
CN3 1 Evaluate impact of energy saving opportunities on budget
Not met –Economic analysis of savings (ROI)
CN4 1 Understand current energy use
Not met – Perform onsite energy audit to capture and determine energy use – Willett Center focus
CN5 1 Evaluate current gas and electricity billing structure
Not met
CN6 1 Investigate alternative ESCOs and billing structures
Not met
CN7 1 Analyze impacts of a 'green' billing structure
Not met – cost effects & tax breaks, part of FPS green initiative
Importance: Sample scale (1=must have, 2=nice to have, 3=preference only)Comment/Status: allows tracking of questions, proposed changes, etc; indicate if you are meeting the need ("met") or not ("not met")
Customer Needs 8 - 13Customer Need #
Rank Description Comments/
Status
CN8 1 Develop a pilot test of a renewable energy project
Not met – based on energy saving opportunities
CN9 1 Implement a pilot renewable energy demonstration-scale project
Not met – further customer refinement on 12/13 site visit
CN10 1 A comprehensive and cumulative final energy assessment report
Not met – annual savings, ROI, benefit-cost
CN11 3 Develop a training presentation on energy saving techniques for employees
Not met
CN12 2 Energy conservation software for tracking energy consumption
Not met – if possible, find & train on software
CN13 1 Environmental conditions of specified FSNM locations remains with tolerances
Not met – archives & artifact storage are climate controlled
Importance: Sample scale (1=must have, 2=nice to have, 3=preference only)Comment/Status: allows tracking of questions, proposed changes, etc; indicate if you are meeting the need ("met") or not ("not met")
SpecificationsA product specification has a metric and a
valueAn energy audit falls outside of traditional
product specifications terms2 approaches – traditional and ‘expectations’
Specifications – Traditional approach
Need #
Rank Description Metric Units Margi
nal Value
Ideal Value
CN1 1 Reduce total cost of energy at FSNM
Reduction in total projected monthly energy costs considering implementation costs
US$ >$350
CN2 1 Recommendation of potential energy saving opportunities
# of Energy Conservation Measure opportunities
# > 5 options
CN3 1 Evaluate energy saving opportunities budget impacts
Economic implications of the energy saving opportunities – ROI, investment costs
TimeUS$
CN4 1 Understand current energy use
Perform an energy audit of FSNM focused on the Willett Visitor Center- Highest Energy Use System Cost
CN5 1 Evaluate current gas and electricity billing structure
Electricity - ∆ monthly $/kWGas - ∆ monthly $/Therm
$/kW$/Therm
< 30% < 10%
CN6 1 Investigate alternative ESCOs and billing structures
Electricity - %∆ monthly $/kWGas - %∆ monthly $/Therm
$/kW$/Therm
< 30% < 10%
CN7 2 Analyze impacts of a 'green' billing structure
Change in ($/kW*yearly consumption) vs. tax incentives/year
Specifications – Traditional approachNeed #
Rank Description Metric Units Margi
nal Value
Ideal Value
CN8 1 Develop a pilot test of a renewable energy project
Projected energy savings per year (% of scale)
US$ > $500 (10%)
CN9 1 Implement a pilot renewable energy demonstration-scale project
N/A – further definition required
CN10 1 A comprehensive and cumulative final energy assessment report
N/A
CN11 3 Develop a training program on energy saving techniques for FSNM employees
Amount of per employee time required each 6 month period
Time < 2 hrs
CN12 2 Energy conservation software for tracking energy consumption
Approved by the DOE & EPA for energy management- Multiple options: cost base
US$ <$5k
CN13 1 Environmental conditions of specified FSNM locations remains with tolerances
Specified relative humidity ± 5%
%relative humidity
45 - 55%
49%
‘Expectation’ - SpecificationsDefined specifications in terms of an energy audit
Project specifications are the agreed upon expectations of the total energy assessment process and outcome – ‘What is included and captured’
FSNM specifications are expectations regarding the explicit actions, information, analyses and results that the entire energy assessment project will containDefinition of the content in the final assessment report
Specifics of Utility & Facility AnalysisObtain site schematics, system breakdown and
additional information required to conduct the auditCollect general site info:
Size, age, condition and general useDescription and envelope of site
Collect and summarize:Utility costs & consumption data for past 2 yearsEnergy & water usage for past 2 years
Impact of structural or energy system changesPrevious energy-related improvementsGenerate occupancy patterns and schedulesEstablish ‘base year’ average energy consumption
Analyze utility trends and/or anomalies Charts and graphs describing current energy use patterns