Upload
beatrice-mitchell
View
214
Download
1
Embed Size (px)
Citation preview
Formalizing Project EMANI
Ithaca, July 26th, 2002
Task List (not complete)
• Mission Statement (Done)• Branding (Logo/Stationary
etc…)• Organization
– Web addresses, Coordination Project Planning
– Budget Planning (Funding Sources)
– Meeting Dates
• eNewsletter and other promotion• Links to other projects
• Registry (DOI?)• Open Space (Embargos)• Closed Space (Authentication)• Portal• Content
04/20/23
Mission (Goal)
“EMANI’s mission: international collaboration to support and coordinate the long-term preservation and open accessibility of mathematical publications in digital form.”
What is EMANI?
Strategic Need
Mathematicians need quick, reliable and integrated access to mathematical resources. Long-term availability of publications is of particular significance in mathematics.
Result
EMANI was initiated in 2001 and currently consists of academic libraries, editors, and publishers from the USA, Gemany, France, UK, Switzerland, and China.
Process
Strategy
Staff Systems
Electronic Mathematical Archiving Network Initiative
EMANI MISSION:
“An international collaboration to support and coordinate the long-term preservation and open accessibility of mathematical publications in digital form.”
Electronic Mathematical Archiving Network Initiative
Aims & Scope• Selecting relevant content
• Storing existing digitized mathematical content
• Digitizing older material
• Defining functional and user requirements
• Developing models and methods to achieve long term preservation
• Identifying tools for archiving, accessing, and searching
• Recommending formats for metadata, full text, and supplementary material
• Securing rights
• Developing awareness
• Creating acceptance
With the ultimate goal to serve the mathematics community
Group Structure
Review CommitteeImportant Considerations•how often will they meet?•how often will they be informed?•what feedback is required?
Advisory Board
Core Team
Specialized Working Group
Specialized Working Group
Specialized Working Group
Coordinator
04/20/23
H
M
L
HMLBenefitsBenefits
1 Priority
2 Priority
3 Priority
Package 4
Package 5
Package 1
Package 2
Package 3
Recommendation: Start with five to six work packages
Strategic Importance
Project Plan
Branding