Outline
Introduction Generic Inspection and Variations Inspection throughout Development Cycle
FTR Metrics Tools Conclusion
FTR: What it is...
A method involving a structured encounter in which a group of technical personnel analyzes an artifact according to a well-defined process.
::Output::
A structured artifact that assesses or improves the quality of the artifact as well as the quality of the method.
::Input::
FTR: What it is...
A structured FTR is a forum for:
Finding defect information for the Author.
Educating peers about product.
Providing fault likelihood data for testers.
Providing detailed status report for managers.
Allowing process improvement group a test to measure.
FTR: What it isn’t...
Walk-through No Measurements Often informal, impromptu Main purpose is developer training
Why Review?
Improves overall product quality Early detection of defects Reduces rework and its associated costs Educate the participants and provide training Setting standards of excellence / maintain process
improvement momentum Improve schedule performance IBM reported 83% and AT&T 92% defect detection
through inspections
Inspection Process Overview
Planning
Overview
Defect Detection
Defect Collection
Defect Correction
Follow-Up
6 Steps Team
2 - 6 members Experienced and involved in product development Distinct and important roles
Inspection Process Overview
Planning
Overview
Defect Detection
Defect Collection
Defect Correction
Follow-Up
Roles: Organizer – plans the inspection activities Moderator – ensures that procedures are followed and moderates the meetings. Inspectors – responsible for detecting defects in the product Presenter – presents the product in logical fashion paraphrased at a suitable rate Author – author of the developed product. Recorder – records the defects during the meeting Collector – collects the defects if there is no meeting.
Planning
Planning
Overview
Defect Detection
Defect Collection
Defect Correction
Follow-Up
Objective – organize inspection Check to see if work products pass the entry criteria Select inspection participants and assign roles Schedule inspection meeting Distribute inspection material Prepare inspection documentation Ensure product inspection readiness
Objective
Planning
Overview
Defect Detection
Defect Collection
Defect Correction
Follow-Up
Objective – educate participants on the product being inspected
Author explains the inspection materials Can be beneficial when:
The inspection artifact is complex If the artifact is part of large system If new members participate in inspection
Could be rolled into previous or next phase if product is simple enough Communicate inspection goals!
Defect Detection
Planning
Overview
Defect Detection
Defect Collection
Defect Correction
Follow-Up
Objective – to find defects Can be divided into 2 phases:
Preparation (individual) phase. Meeting (group) phases.
Individual preparation with the goal of detecting defects can help inspectors to be more prepared.
Defect Collection
Planning
Overview
Defect Detection
Defect Collection
Defect Correction
Follow-Up
Objective – collectively agree and document the defects (triage)
Decide on further inspection needed or not Decisions made subjectively as a group.
Defect Collection
Planning
Overview
Defect Detection
Defect Collection
Defect Correction
Follow-Up
Objective – correct the defects collected in the previous phases
The author makes the detected changes and sends it for follow-up
Follow Up
Planning
Overview
Defect Detection
Defect Collection
Defect Correction
Follow-Up
Objective – to make sure all defects are resolved
Only one person involved and he/she verifies the defect resolution Verifier should “return and report” to inspection team
Formal Inspection Methods
Fagan Inspection Asynchronous Inspection Phased Inspections N-Fold Inspections
Fagan Inspection
Overview
Preparation
Inspection
Rework
Follow-Up
4 Roles Author Reader Moderator Scribe
Meeting centric – cost of scheduling and time Meetings add little to defect detection
Asynchronous Software Inspection
Initialization
Inspection
Review
Inspection
Compile Final Defect List
Team Author not involved Moderator and Inspectors
Re-Work Re-Work
Asynchronous Software Inspection
Initialization
Inspection
Review
Inspection
Compile Final Defect List
No meetings Easy to assess participation Process improvement from documenting all correspondences Allows parallel communication Can be distributed in space and time Eliminates group approval
Re-Work Re-Work
Asynchronous Software Inspection
Initialization
Inspection
Review
Inspection
Compile Final Defect List
Moderator sends out material Initial Individual Review – create list of defects Circulate the copy of defect list to all inspectors and discuss via email Individual Review – update defect list and send to Moderator Moderator compiles final defect list, send it to author and follow up – eliminates group approval
Re-Work Re-Work
Phased Inspections
Consists of several coordinated partial inspections called phases Each phase inspects for a specific property or small set of related properties Each phase responsible for thorough checking of the properties Some phases have single inspectors and others have multiple inspectors Reference documents are provided to inspectors at the beginning of each phase and each inspects using checklists
Domain specific checklists Application specific checklists
N-fold Inspection
N independent teams inspect the same product using traditional inspection method Collective effort of multiple teams more faults than a single team Moderator collects faults from independent teams and composes the final defect list
Requirements Inspection
Reading Techniques are techniques to analyze work product during defect detection Ad-hoc Checklist based reading Scenario based readings
Perspective based reading Defect based reading
Perspective based Reading
Inspectors stand in for specific stakeholders in the document to verify the quality of requirements.
Designer – detail for creating system components Tester – detail for constructing test plans User – correct functionality
For each perspective, reviewer creates high level work products from the requirements document
Code Inspections
Cognitive models for program comprehension Bottom-up Top-Down Integrated Systematic and as-needed comprehension
FTR Metrics
Helps you measure the effectiveness of the inspection Aids in continuous process improvement Provides feedback to management A unit of work product varies often:
Usually 1000 lines of source code (not including comments) Page counts and line counts for text
Some Generic Metrics
Average preparation effort and preparation rate per unit of material Average examination effort per unit of material Average explanation rate per unit of material Average number of defects and major defects found per unit of material Average hours per defect and per major defect
Nine Key Metrics by AT&T for Code Inspections
Total Non Comment lines of source code inspected, in KLOC
Average lines of code inspected Average preparation rate Average inspection rate Average effort per KLOC Average effort per fault detected. Average faults detected per KLOC Percentage of re-inspections Defect-removal efficiency
Tools
Various tools for different inspection methods. ICICLE – for inspection of C & C++ programs Scrutiny & InspeQ for specific inspection processes ASSIST –supports generic inspection process
Choosing a tool...
Threads of discussion Sharing of Information Train of thought Visual Cues Reaching a consensus Coordination
The Future of FTR
FTR adoption is slow: Managers see added cost of inspections instead of the benefits of greatly reduced defect leakage Practitioners already have tight schedules and reluctant to take on additional responsibilities Companies postpone adoption since peer reviews are part of CMM level 3.
FTR Barriers
Insufficient preparation Moderator domination Incorrect review rate Ego-involvement and personality conflict Issue resolution and meeting digression Recording difficulties and clerical overhead
Conclusion
Organization’s size, culture and industry should be considered in deciding on the FTR method to use. Review does not replace testing but can make it easier Success of inspection lies in:
Process Adherence Systematic Reading technique Optimization