1 FORM 1 I. Basic Information Name of the Project: Construction of North Cargo Berth-III & North Cargo Berth-IV and Dredging in front of North Cargo Berth-II, North Cargo Berth-III, North Cargo Berth-IV at V.O.Chidambaranar Port Location / site alternatives under consideration: V.O.Chidambaranar Port, Tuticorin District, Tuticorin Taluk, Latitude : 47’30” N Longitude : 78° 12’ 15” E There is no scope for any other alternate site. Size of the Project: * North Cargo Berth III :- 10.22 Million Tonne Per Annum North Cargo Berth IV :- 8.62 Million Tonne Per Annum Expected cost of the project: North Cargo Berth III : Rs. 586.89 Crore North Cargo Berth IV : Rs. 515.18 Crore Dredging : Rs.1747.00Crore Total : Rs. 2849.07 Crore Contact Information: Chairman, V.O.Chidambaranar Port Trust, Tuticorin 628 004 Tamil Nadu, Phone : 0461 2352500 Fax : 0461 2352160 E-Mail : [email protected] Screening Category: Category : ‘A’ Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,)

FORM 1 I. Basic Informationenvironmentclearance.nic.in/writereaddata/modification/... · 2016. 11. 16. · 1 FORM – 1 I. Basic Information Name of the Project: Construction of North

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    FORM – 1

    I. Basic Information

    Name of the Project: Construction of North Cargo Berth-III & North Cargo Berth-IV and

    Dredging in front of North Cargo Berth-II, North Cargo Berth-III, North

    Cargo Berth-IV at V.O.Chidambaranar Port

    Location / site alternatives under consideration:

    V.O.Chidambaranar Port,

    Tuticorin District, Tuticorin Taluk, Latitude : 8° 47’30” N Longitude : 78° 12’ 15” E There is no scope for any other alternate site. Size of the Project: *

    North Cargo Berth III :- 10.22 Million Tonne Per Annum North Cargo Berth IV :- 8.62 Million Tonne Per Annum

    Expected cost of the project: North Cargo Berth III : Rs. 586.89 Crore North Cargo Berth IV : Rs. 515.18 Crore Dredging : Rs.1747.00Crore Total : Rs. 2849.07 Crore Contact Information:

    Chairman, V.O.Chidambaranar Port Trust, Tuticorin – 628 004 Tamil Nadu, Phone : 0461 – 2352500 Fax : 0461 – 2352160 E-Mail : [email protected] Screening Category: Category : ‘A’

    Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,)

    mailto:[email protected]

  • 2

    (II) Activity 1. Construction, operation or decommissioning of the Project involving

    actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    1.1 Permanent or temporary

    change in land use, land

    cover or topography including

    increase in intensity of land

    use (with respect to local land

    use plan)

    No The proposed project site is within

    the existing Harbour Basin, 2 km

    away from the shore. Hence, there

    is no change in land.

    1.2 Clearance of existing land,

    vegetation and buildings?

    No The project site is sea (ie) 2 km away

    from the shore. There is no

    vegetation and buildings.

    1.3 Creation of new land uses?

    Yes The proposed project is construction

    of two berths namely North Cargo

    Berth-III, North Cargo Berth-IV and

    required dredging in front of North

    Cargo Berth-II, North Cargo Berth-III

    & North Cargo Berth-IV. New land

    will be developed by using materials

    to be generated from dredging.

    1.4 Pre-construction

    investigations e.g. bore

    holes, soil testing?

    Yes Sub-soil investigation in the

    proposed project area was carried

    out during February – March, 2013.

    1.5 Construction works? Yes The proposed project is construction

    of two berths with Reinforced

    Cement Concrete Piles and dredging

    the dock basin in front of the berths

    and turning circle.

    1.6 Demolition works? No There is no demolition works

    involved.

    1.7 Temporary sites used for

    construction works or

    housing of construction

    workers?

    Yes The temporary sites are to be used

    for construction works. The

    construction workers will not be

    permitted for housing in the project

  • 3

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    site. The proposed project will be

    carried out under PPP mode. If

    necessary, during construction

    period the workers will be permitted

    in the Harbour Estate on temporary

    basis which is situated 6 km away

    from the project site.

    1.8 Above ground buildings,

    structures or earthworks

    including linear structures,

    cut and fill or excavations

    Yes The proposed berths will be of piled

    foundation with reinforced cement

    concrete deck slab.

    1.9 Underground works including

    mining or tunneling?

    No The proposed project is construction

    of berths and dredging only.

    1.10 Reclamation works?

    Yes Sea and waste low lying area

    reclamation will be done with the

    materials to be generated from

    dredging. Necessary rubble

    protection bund with filtering system

    will be provided to retain the

    reclamation materials.

    1.11 Dredging?

    yes Approximately 6.10 Million cubic

    meters quantity will be dredged from

    the harbor basin area covering North

    Cargo Berth-II, North Cargo Berth-III,

    North Cargo Berth-IV, Shallow

    Draught Berths and turning circle etc.

    The dredging will be carried out by

    using heavy duty Cutter Suction

    Dredger(CSD) and / or Drilling &

    Blasting technique.

    1.12 Offshore structures? Yes The proposed project is construction

    of berthing platform to receive the

    ships in the enclosed break waters in

    the existing harbour basin. It is a pile

    foundation with reinforced cement

  • 4

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    concrete deck slab.

    1.13 Production and

    manufacturing processes?

    No The proposed North Cargo Berth-III

    and North Cargo Berth-IV will be

    used for handling of cargoes such as

    Thermal Coal, Containers and Clean

    cargoes from ships. No

    manufacturing process takes place.

    1.14 Facilities for storage of goods

    or materials?

    No There is no storage facility in the

    proposed berths for goods or

    materials. The Coal unloaded from

    the ship will be transported to the

    stack yard located about 3kms from

    the North Cargo Berth-III. Similarly,

    the containers and clean cargoes

    unloaded in the North Cargo Berth-IV

    will be stacked in the container stack

    yard located about 0.50kms from the

    berth.

    1.15 Facilities for treatment or

    disposal of solid waste or

    liquid effluents?

    Yes Port’s owned Sewage Treatment

    Plant is available in the Harbour

    Estate. Solid waste or liquid effluents

    are not allowed to be discharged in

    the Harbour basin / Port waters.

    1.16 Facilities for long term

    housing of operational

    workers?

    No The construction and operation of

    the proposed berths will be carried

    out by PPP operator. Port will not

    provide any facilities for housing of

    operational workers.

    1.17 New road, rail or sea traffic

    during construction or

    operation?

    No There is no need for creation of new

    road for the proposed berths. The

    existing road leading to North Cargo

    Berth-I & North Cargo Berth-II shall

    be used for the proposed North

    Cargo Berth-III and North Cargo

    Berth-IV during construction and

  • 5

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    operation stages.

    New rail connectivity from Port’s

    marshaling yard to the proposed

    stack yard at hare island about 3

    kms from the berths will be laid for

    evacuation of cargoes from the stack

    yard.

    1.18 New road, rail, air waterborne

    or other transport

    infrastructure including new

    or altered routes and

    stations, ports, airports etc?

    No The Port is already connected by a

    pucca road system. The port’s

    express road links the Port with NH

    7A connecting V.O.Chidambaranar

    Port and Tirunelveli and NH 45B

    connecting V.O.Chidambaranar Port

    and Madurai via Aruppukottai and

    Major District Road linking the Port

    with Kanyakumari via Tiruchendur

    along the East Coast.

    V.O.Chidambaranar Port is

    connected by Broad Gauge railway

    line with Tirunelveli in the west,

    Nagercoil and Trivandrum in the

    south, Madurai, Trichy, Chennai and

    Bangalore in the north.

    The nearest Airport is located at

    Vagaikulam 22 km west of

    V.O.Chidambaranar Port.

    1.19 Closure or diversion of

    existing transport routes or

    infrastructure leading to

    changes in traffic

    movements?

    No There will be no closure or diversion

    of the existing transport routes or

    infrastructure.

    1.20 New or diverted transmission

    lines or pipelines?

    No There is no necessity for diverted

    transmission lines or pipelines.

  • 6

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    1.21 Impoundment, damming,

    culverting, realignment or

    other changes to the

    hydrology of watercourses

    or aquifers?

    No There is no necessity as for as this

    project is concerned.

    1.22 Stream crossings?

    No The proposed Project site is 2 km

    away from the shore. There is, no

    stream crossing. Some rain water

    influx occurs during monsoon

    months, through Korampallam

    surplus course which is running 6 km

    away from the project site.

    1.23 Abstraction or transfers of

    water from ground or surface

    waters?

    No There is no abstraction or transfers

    of water from ground or surface

    waters.

    1.24 Changes in water bodies or

    the land surface affecting

    drainage or run-off?

    No The proposed berths will be

    constructed inside the Harbour Basin

    which is well protected by rubble

    bound breakwaters. Hence, there will

    be no changes in water bodies or

    land surface which could affect the

    drainage system or the run-off.

    1.25 Transport of personnel or

    materials for construction,

    operation or

    decommissioning?

    No Decommissioning of structure does

    not arise. The existing road leading

    to North Cargo Berth-I & North Cargo

    Berth-II will be used for

    transportation of personnel, materials

    for construction and operation of the

    proposed berths.

    1.26 Long-term dismantling or

    decommissioning or

    restoration works?

    No The proposed project is construction

    of berths and required dredging in

    front of berths. Hence, the question

    does not arise.

  • 7

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    1.27 Ongoing activity during

    decommissioning which

    could have an impact on the

    environment?

    No During decommissioning there is no

    environmental impact.

    1.28 Influx of people to an area in

    either temporarily or

    permanently?

    No There is no influx of people.

    1.29 Introduction of alien species? No There is no introduction of alien

    species.

    1.30 Loss of native species or

    genetic diversity?

    No There will be no loss of native

    species or genetic diversity since the

    proposed construction is within the

    existing Harbour Basin.

    1.31 Any other actions? No. No other action.

    2. Use of Natural resources for construction or operation of the Project (such

    as land, water, materials or energy, especially any resources which are non-

    renewable or in short supply):

    Sl. No.

    Information / checklist confirmation

    Yes / No

    Details thereof (with approximate quantities /rates, wherever

    possible) with source of information data

    2.1 Land especially undeveloped

    or agricultural land (ha)

    No The proposed project is well within

    the V.O.Chidambaranar Port’s limit.

    The project site is 2 km away from

    the sea shore inside the existing

    Harbor Basin. Hence, acquisition or

    utilization of undeveloped or

    agricultural land does not arise.

    2.2 Water (expected source &

    competing users) unit: KLD

    Yes The approximate quantity of water to

    be used for construction & drinking

    purpose will be 10 Kilo Liter per day

  • 8

    Sl. No.

    Information / checklist confirmation

    Yes / No

    Details thereof (with approximate quantities /rates, wherever

    possible) with source of information data

    during construction period. The

    proposed berths will be constructed

    by the PPP operators. Hence, the

    fresh water will be arranged by the

    PPP operators from outside the Port.

    2.3 Minerals (MT) No Does not arise

    2.4 Construction material – stone,

    aggregates, sand / soil

    (expected source – MT)

    Yes The nearby source for stone

    aggregate is Seethakulam /

    Thalayuthu which is 27 km / 72 km

    away from V.O.Chidambaranar Port

    and river sand from the river bed of

    Thamiraparani at Aathur about 27 km

    from V.O.Chidambaranar Port.

    2.5 Forests and timber (source –

    MT)

    No The project site is 2 km away from

    the sea shore inside the existing

    Harbour Basin. Hence, there is no

    availability of forest land.

    2.6 Energy including electricity and

    fuels (source, competing

    users) Unit: fuel (MT), energy

    (MW)

    Yes The power requirement in the

    construction stage is minimum. The

    estimated power requirement in the

    operation stage for North Cargo

    Berth-III will be 10,000 KVA and for

    North Cargo Berth IV will be 8000

    KVA for conveyors, equipment and

    illumination. The power supply will be

    taken from the nearest substation

    under the control of Tamil Nadu

    Electricity Board.

    2.7 Any other natural resources

    (use appropriate standard

    units)

    No Does not arise.

  • 9

    3. Use, storage, transport, handling or production of substances or

    materials, which could be harmful to human health or the environment or

    raise concerns about actual or perceived risks to human health.

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    3.1 Use of substances or materials,

    which are hazardous (as per

    MSIHC rules) to human health or

    the environment (flora, fauna,

    and water supplies)

    No There will be no hazardous

    substances or materials to human

    health or the environment. The

    proposed berths will be used for

    handling of Thermal Coal,

    Containers and clean cargoes.

    The Coal unloaded from the ship

    will be transported to the stack

    yard located about 3kms from the

    North Cargo Berth-III. Similarly,

    the containers and clean cargoes

    unloaded in the North Cargo

    Berth-IV will be stacked in the

    container stack yard located

    about 0.50kms from the berth.

    Suitable mechanized handling

    arrangements will be provided in

    the berths.

    3.2 Changes in occurrence of

    disease or affect disease vectors

    (e.g. insect or water borne

    diseases)

    No No chance of disease or affect

    disease vectors.

    3.3 Affect the welfare of people e.g.

    by changing living conditions?

    No Welfare of the people is not

    affected.

    3.4 Vulnerable groups of people who

    could be affected by the project

    e.g. hospital patients, children,

    the elderly etc.

    No The hospital and residential

    colony are situated 6 km away

    from the proposed project site.

    Hence, no sort of people could be

    affected during execution of the

    project or during operation of the

    Berths.

  • 10

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    3.5 Any other causes No No causes will be generated.

    4. Production of solid wastes during construction or operation or

    decommissioning (MT/month)

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source

    of information data

    4.1 Spoil, overburden or mine wastes No There is no overburden or mine

    wastes will be generated during

    construction or operation stages.

    The proposed North Cargo Berth-III

    will be provided with Grab

    unloader, Conveyor, Stacker, and

    Reclaimer. The North Cargo Berth-

    IV will be provided with RMQCs,

    RTGCs, Reach stackers, Harbour

    Mobile crane for unloading of cargo

    from the ships and conveying of

    cargoes from the berths. Therefore

    spillage of cargo is very minimum.

    However, during construction

    stage, the construction materials

    waste or surplus are expected.

    This will be cleared / removed from

    the site in time to time.

    4.2 Municipal waste (domestic and or

    commercial wastes)

    Yes The construction workers are not

    allowed for housing in the project

    site. They are only allowed in the

    residential area 6kms away from

    the Project site.

    The domestic wastes from the

    residential area and commercial

  • 11

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source

    of information data

    wastes from the operational area

    such as waste clothes, food waste

    are collected through contract and

    conveyed by lorry to the Port’s

    Sewage Treatment Plant which is

    well outside the residential area

    and disposal off in a proper

    manner. The district administration

    has banned the usage of plastic

    containers and the same rule has

    also been followed in the port

    areas.

    4.3 Hazardous wastes (as per

    Hazardous Waste

    Management Rules)

    No Does not arise.

    4.4 Other industrial process wastes

    No The proposed North Cargo Berth-III

    and North Cargo Berth-IV will be

    used for unloading cargoes such

    as Thermal Coal, Containers and

    Clean cargoes from ships. The

    Coal unloaded from the ship will be

    transported to the stack yard

    located about 3kms from the North

    Cargo Berth-III. Similarly, the

    containers and clean cargoes

    unloaded in the North Cargo Berth-

    IV will be stacked in the container

    stack yard located about 0.50kms

    from the berth. Hence there is no

    industrial process waste.

    4.5 Surplus product

    No The proposed berths will be used

    for handling of cargoes from the

    ships. Hence, there is no surplus

    product.

    4.6 Sewage sludge or other sludge

    from effluent treatment

    No The sewage or other sludge are

    not allowed to discharge in Port

  • 12

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source

    of information data

    water.

    4.7 Construction or demolition waste No The waste of construction materials

    or surplus construction materials

    are removed from the project site

    from time to time and conveyed

    through lorries to site outside the

    Port limit. No demolition occurs.

    4.8 Redundant machinery or

    equipment

    No There is no redundant machinery

    or equipment.

    4.9 Contaminated soils or other

    materials

    No The proposed project is

    construction of berths in the

    existing harbor basin which is 2

    kms away from the shore. Hence,

    the question of contamination of

    soil or other materials does not

    arise. However, the effluents and

    waste waters are not allowed to

    discharge in the land area of the

    Port.

    4.10 Agricultural wastes

    No The proposed project is

    construction of berths in the

    existing harbor basin 2 kms away

    from the shore. Hence, there is no

    agricultural wastes.

    4.11 Other solid wastes

    Yes All the solid wastes are collected

    and conveyed through lorries to the

    Port’s Sewage Treatment Plant

    which is well away from the

    township area and disposed off in a

    proper manner.

  • 13

    5. Release of pollutants or any hazardous, toxic or noxious substances to air

    (Kg/hr)

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    5.1 Emissions from combustion of

    fossil fuels from stationary or

    mobile sources

    No Does not arise.

    5.2 Emissions from production

    processes

    No The proposed berths will be used

    for unloading of cargoes from

    ships. Hence, no production

    processes.

    5.3 Emissions from materials

    handling including storage or

    transport

    No The proposed North Cargo

    Berth-III and North Cargo Berth-

    IV will be used for handling of

    cargoes such as Thermal coal,

    Containers and clean cargoes.

    Hence, no emissions take place.

    The Coal unloaded from the ship

    will be transported to the stack

    yard located about 3kms from the

    North Cargo Berth-III. Similarly,

    the containers and clean cargoes

    unloaded in the North Cargo

    Berth-IV will be stacked in the

    container stack yard located

    about 0.50kms from the berth.

    Sufficient sprinklers will be

    installed in the stack yard not

    only to control dust pollution but

    also to guard against self-

    ignition. The dredged materials

    will be pumped through pipes to

    the reclamation area.

    5.4 Emissions from construction

    activities including plant and

    equipment

    No During construction stage of the

    proposed North Cargo Berth-III

    and North Cargo Berth-IV the

  • 14

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    emission from Construction

    equipment shall be controlled by

    carrying out periodical

    maintenance and using of

    standard equipments.

    5.5 Dust or odours from handling of

    materials including construction

    materials, sewage and waste

    No The cargoes will be unloaded

    through suitable mechanized

    handling arrangements and

    conveyed to the designated stack

    yard.

    The proposed North Cargo

    Berth-III will be provided with

    Grab unloader, Conveyor,

    Stacker, and Reclaimer. The

    North Cargo Berth-IV will be

    provided with RMQCs, RTGCs,

    Reach stackers, Harbour Mobile

    crane for unloading of cargo from

    the ships and conveying of

    cargoes from the berths

    Hence, generation of dust due to

    cargo handling and transporting

    will be meager and negligible.

    However, sufficient dust

    controlling equipments will be

    installed. Similarly, the

    generation of dust during

    construction stage shall be

    prevented by taking necessary

    preventive measures. No

    sewage or waste materials will

    be allowed to discharge in the

    Port’s water or in the land area of

    the Port.

  • 15

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    5.6 Emissions from incineration of

    waste

    No There is no incineration waste.

    5.7 Emissions from burning of waste

    in open air (e.g. slash materials,

    construction debris)

    No The garbage and other waste

    collected from the proposed

    berths will be conveyed through

    lorries to the Port’s Treatment

    plant yard which is well outside

    the Township and buried.

    5.8 Emissions from any other

    sources

    No There is no other source for

    emissions. The ambient air

    quality monitoring in the Port’s

    operational area and residential

    area are being carried out once

    in three months. The same shall

    be carried out in future also.

  • 16

    6. Generation of Noise and Vibration, and Emissions of Light and Heat :

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data with source of information data

    6.1 From operation of equipment e.g.

    engines, ventilation plant,

    crushers

    No The noise level due to the cargo

    handling equipment and heavy

    machineries in the proposed

    North Cargo Berth-III, North

    Cargo Berth-IV and dredging is

    expected to be minimum.

    However, necessary steps will

    be taken to control the noise

    pollution.

    6.2 From industrial or similar

    processes

    No The proposed project is

    construction of berths and

    dredging the dock basin in front

    of the berths. It is not Industrial

    work.

    6.3 From construction or demolition No During construction and

    dredging, the noise level will be

    maintained within the prescribed

    limit. There is demolition work

    involved in this work.

    6.4 From blasting or piling

    No Noise generated during pile

    driving and dredging operations

    either by using Cutter Suction

    Dredger or drilling and blasting

    will be maintained within the

    prescribed limit.

    6.5 From construction or operational

    traffic

    Yes The noise which would be

    generated during construction

    would be meager. Vehicles are

    generally provided with noise

    reducing silencers. Heavy

    machineries / equipment are

    periodically serviced for any

  • 17

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data with source of information data

    exceedance of noise levels at

    site of work.

    Foundation bolts of all

    machineries are checked and

    tightened at regular intervals to

    control vibrations and noise.

    Preventive maintenance is

    being carried out as per

    schedule on all machineries to

    avoid vibration and noise.

    Periodical noise level monitoring

    has been carried out by the Port

    once in three months at

    operational area, roads and

    residential area. Corrective

    actions will be taken according

    to prescribed National and

    International Standards. The

    noise level monitoring will be

    continued in future.

    6.6 From lighting or cooling systems No. The proposed project is

    construction of berths and

    dredging the dock basin in front

    of the berths. Hence, lighting or

    cooling systems not involved in

    this work.

    6.7 From any other sources No There will not be any

    disturbance due to noise

    vibration heat etc,.

  • 18

    7. Risks of contamination of land or water from releases of pollutants into the

    ground or into sewers, surface waters, groundwater, coastal waters or the

    sea :

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    7.1 From handling, storage, use or

    spillage of hazardous materials

    No The proposed berths will not be

    used for handling of hazardous

    materials and will be used for

    handling of bulk cargoes like

    Thermal Coal, Containers and

    Clean cargoes. The cargoes will

    not be stored in the berth area.

    The proposed North Cargo Berth-

    III will be provided with Grab

    unloader, Conveyor, Stacker, and

    Reclaimer. The North Cargo

    Berth-IV will be provided with

    RMQCs, RTGCs, Reach

    stackers, Harbour Mobile crane

    for unloading of cargo from the

    ships and conveying of cargoes

    from the berths to stack yard.

    Hence, the spillage will be

    meager. However, operational

    care will be taken for limitation

    and prevention of spillage of

    cargoes.

    7.2 From discharge of sewage or

    other effluents to water or the

    land (expected mode and place

    of discharge)

    No The sewage water is not allowed

    to be discharged in land area or

    water area of the Port.

    The collected sewage water is

    pumped to the Sewage Treatment

    Plant which is far away from the

    township area and treated

    through primary and secondary

    trickling filters. Further, no effluent

  • 19

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    is allowed to be discharged from

    vessels into the Port water.

    The sea water quality parameter

    in various places in the Port area

    consists about 32 physico-

    chemical, biological parameters

    and heavy metal were carried out

    at 3 levels of sea water column

    including sea bed sampling, once

    in three months. This will be

    continued in future also.

    7.3 By deposition of pollutants

    emitted to air into the land or into

    water

    No Pollutant materials will not be

    used

    7.4 From any other sources No No other source to contaminate

    land and water.

    7.5 Is there a risk of long term build

    up of pollutants in the

    environment from these sources?

    No There is no risk of long term build

    up of pollutants in the

    environment from these sources.

    8. Risk of accidents during construction or operation of the Project, which could

    affect human health or the environment

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities/rates, wherever possible) with source of information data

    8.1 From explosions, spillages, fires

    etc from storage, handling, use or

    production of hazardous

    substances

    No The proposed berths will be used

    for handling Thermal coal,

    Containers and Clean cargoes.

    Hazardous cargoes will not be

    handled in the proposed Berths.

    Explosion or demolition is not

    envisaged in the proposed

  • 20

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities/rates, wherever possible) with source of information data

    project. The cargoes will not be

    stored in the proposed berths.

    The proposed North Cargo Berth-

    III will be provided with Grab

    unloader, Conveyor, Stacker, and

    Reclaimer. The North Cargo

    Berth-IV will be provided with

    RMQCs, RTGCs, Reach

    stackers, Harbour Mobile crane

    for unloading of cargo from the

    ships and conveying of cargoes

    from the berths to stack yard.

    The Port has three fire stations

    which are functioning round the

    clock and provided with all kinds

    of equipments. The Oil Jetty and

    Coal Jetties are provided with fire

    fighting pipelines and power

    pumps.

    8.2 From any other causes

    No V.O.Chidambaranar Port has vast

    experience in the construction of

    berths and dredging. The Port

    has not witnessed any serious

    accidents in the past years.

    There were no accidents like

    collisions, sinking of vessels,

    failure of crane operation,

    sabotage, failure of Harbour

    security etc., in the Port area.

    Many awareness and training

    programs are being conducted

    among the cargo handling

    labourers for prevention of

    accidents.

  • 21

    Sl. No.

    Information / Checklist confirmation

    Yes / No

    Details thereof (with approximate quantities/rates, wherever possible) with source of information data

    8.3 Could the project be affected by

    natural disasters causing

    environmental damage (e.g.

    floods, earthquakes, landslides,

    cloudburst etc)?

    No By nature, V.O.Chidambaranar

    Port is safe from natural

    disasters. In period of 93 years,

    three severe storms and six

    moderate storms have occurred

    in the Tuticorin region which gave

    a probability occurrence of severe

    storm once in 31 years and

    moderate storm once in 15.5

    years. The recent storm hit

    V.O.Chidambaranar Port was on

    13-11-1992 with a wind speed

    reaching upto 113 km / hour.

    Occurrence of fog is rare and

    insignificant. A detailed Disaster

    Management Plan approved by

    Ministry is adopted in the Port.

    9. Factors which should be considered (such as consequential development)

    which could lead to environmental effects or the potential for cumulative

    impacts with other existing or planned activities in the locality

    Sl. No.

    Information / Checklist confirmation

    Yes/No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    9.1 Lead to development of supporting

    facilities, ancillary development or

    development stimulated by the

    project which could have impact on

    the environment e.g.:

    • Supporting infrastructure

    (roads, power supply,

    No

    The supporting infrastructure

    facilities such as roads, power

  • 22

    Sl. No.

    Information / Checklist confirmation

    Yes/No

    Details thereof (with approximate quantities / rates, wherever possible) with source of information data

    waste or waste water

    treatment, etc.)

    • housing development

    • extractive industries

    • supply industries

    • other

    supply and waste water treatment

    plant are already available in the

    Port. Hence, there is no need to

    create these facilities afresh.

    This Project will be executed

    under Public Private Partnership

    (PPP) mode. Therefore, no need

    to develop housing facilities.

    No development of any industries.

    No.

    Nil.

    9.2 Lead to after-use of the site, which

    could have an impact on the

    environment

    No The proposed berths will be used

    for handling cargoes by installing

    suitable mechanized cargo

    handling equipments and

    conveyed to the stacking area.

    Hence, there would be no major

    impact.

    9.3 Set a precedent for later

    developments

    No Not applicable.

    9.4 Have cumulative effects due to

    proximity to other existing or

    planned projects with similar

    effects

    No No other type of projects.

  • 23

    (III) Environmental Sensitivity

    Sl. No.

    Areas

    Name / Identity

    Aerial distance (within 15 km.) Proposed project location boundary

    1 Areas protected under international

    conventions, national or local

    legislation for their ecological,

    landscape, cultural or other related

    value

    No The project site is within the

    existing Harbour Basin.

    There is no ecological,

    landscape, cultural or other

    related value.

    2 Areas which are important or

    sensitive for ecological reasons -

    Wetlands, watercourses or other

    water bodies, coastal zone,

    biospheres, mountains, forests

    No Not applicable.

    3 Areas used by protected, important

    or sensitive species of flora or

    fauna for breeding, nesting,

    foraging, resting, over wintering,

    migration

    No Not applicable.

    4 Inland, coastal, marine or

    underground waters

    No The proposed project site is

    in the sea 2km away from the

    shore.

    5 State, National boundaries

    No Not applicable.

    6 Routes or facilities used by the

    public for access to recreation or

    other tourist, pilgrim areas

    No Does not arise

    7 Defense installations

    Coast Guard Station is

    situated in the Harbour

    Estate.

    8 Densely populated or built-up area No The proposed site is 2 km

    away from the sea shore.

    Port’s residential colony is

    situated 6 km away from the

    proposed site.

  • 24

    Sl. No.

    Areas

    Name / Identity

    Aerial distance (within 15 km.) Proposed project location boundary

    9 Areas occupied by sensitive man-

    made land uses (hospitals,

    schools, places of worship,

    community facilities)

    No Does not arise. Since the

    hospital school, places of

    worship community facilities.

    10 Areas containing important, high

    quality or scarce resources

    (ground water resources, surface

    resources, forestry, agriculture,

    fisheries, tourism, minerals)

    No The proposed project site is

    in the sea 2 km away from

    the sea shore. No fresh

    water resources available

    nearby the Project site. The

    river Thamiraparani is about

    27 km from the Proposed

    Project site.

    11 Areas already subjected to pollution

    or environmental damage. (those

    where existing legal environmental

    standards are exceeded)

    No No environmental damage

    occurred near the project

    site. Port carry out periodical

    environmental monitoring

    once in three months.

    12 Areas susceptible to natural hazard

    which could cause the project to

    present environmental problems

    (earthquakes, subsidence,

    landslides, erosion, flooding or

    extreme or adverse climatic

    conditions)

    No No such area is available

    near the project site.

    (IV) Proposed Terms of Reference for EIA studies

    The proposed project site (i.e,) Construction North Cargo Berth-III, North Cargo

    Berth-IV and dredging the dock basin in front of North Cargo Berth-II, North Cargo

    Berth-III & North Cargo Berth-IV is within the enclosed harbour basin. It is a

    development of the existing available infrastructure in the harbour.

    V.O.Chidambaranar Port had filed an application seeking environment clearance

    during November, 2010. MoEF Vide letter dated 27.05.2011 issued the ToR for EIA

  • 25

    study. The EIA study was carried out by Centre for Environment, health and safety,

    Annamali University, Chidambaram, Tamil Nadu one of the accredited EIA

    consultants of Ministry of Environment & Forest (MoEF). The Consultant furnished

    EIA report during October, 2013. In the mean time, Port requested MoEF to extend

    the validity of ToR. MoEF in their letter dated on 7th November 2013, has extended

    the validity of ToR upto 26.05.2014. The Public hearing for the project was held on

    27th December, 2013 and the Tamilnadu State CRZ committee in their meeting held

    on 05.04.2014 had recommended the project. The Expert Appraisal Committee of

    MoEF&CC had considered the project and MoEF&CC issued Environmental & CRZ

    Clearance on 02.01.2015.