FORM 1
APPLICATION FOR
PRIOR ENVIRONMENTAL CLEARANCE
For
Expansion of Coal Mine from 0.30 MTPA to 0.333 MTPA (Normative Capacity) /
0.42 MTPA (Peak Capacity)
Marki Mangli - I Coal Mine Area -731.42 Ha.
Topworth Urja & Metals Limited
Office No. 126-128, 1st Floor
Shriram Tower, Kingsway
Near NIT Office, Sadar
Nagpur - 440 001.
Prepared By
ENVIRO TECHNO CONSULT PRIVATE LIMITED 68, MAHAKALI NAGAR 2,
NEAR MANEWADA SQUARE
NAGPUR - 440 024
Accredited by NABET/QCI and Listed at Sr. No. 50 February,2019
February - 2019
Page | 1
APPENDIX - I
(See Paragraph – 6) FORM - 1
Sl.
No. Item Details
I. Basic Information
1 Name of the Project
Expansion of Marki Mangli-I Coal Mine
from 0.30 MTPA to 0.333 MTPA
(Normative)/0.42 MTPA (Peak Capacity)
without change in Lease hold area, Mining
Method
2 S. No. in the schedule 1 (a)
3
Proposed capacity/area/ length /tonnage
To handled /command area/lease
area/number of wells to be drilled
Area-731.42 Ha.
Proposed Mining -@ 0.333 MTPA
(Normative) / 0.42 (Peak) Capacity
4 New/expansion/modernization
Expansion from 0.30 MTPA to 0.333 MTPA
(Normative) / 0.42 MTPA (Peak Capacity)
without change in Leasehold area and
Mining Method
5 Existing Capacity, area, etc 0.30 MTPA / 0.42 (Peak) Capacity
Area- 731.42 Ha.
6 Category of the Project i.e. A or B A
7 Does it attract the general condition? if
yes, please specify Yes, as per MOEF&CC Circular
8 Does it attract the specific condition? if
yes, please specify Yes, as per MOEF&CC Circular
9
Location Marki Mangli - I Coal Mine
Plot/survey/Khasra No. As per Annexure -1
Village Pardi, Pandharkawda (Lahan), Marki (Bu),
Marki (Kh) & Ganeshpur (Kh)
Tehsil Jhari Jamni
District Yavatmal
State Maharashtra
10 Nearest railway station/ airport along with
distance in kms.
Railway Station: Kayar - 24 km. to SE
Airport-: Nagpur, 190 km. to N
11 Nearest town, city, district headquarters
along with distance in kms.
Town – Mukutban 5.4 KM SE City - Wani
Page | 2
Sl.
No. Item Details
12
Village Panchayats, Zilla Parishad,
Municipal Corporation, Local body
(Complete postal address with telephone
numbers to be given)
Panchayat - Pandharkawda(Lahan), Marki
(Bu),
Panchayat Samiti, Jhari Jamni
Tahsil - Jhari Jamni,
Zilla Parishad, Yavatmal
13 Name of the applicant Topworth Urja & Metals Ltd.
14 Registered Office Address
Topworh Urja & Metals Ltd,
308, 3rd Floor, Ceejay House,
Dr. Annie Bascent Road, Worli,
Mumbai – 400 018.
15 Address for Correspondence
Topworth Urja & Metals Ltd.
Office No. 126-128, 1st Floor,
Shriram Tower, Kingsway, Near NIT Office,
Sadar, Nagpur - 440 001
Name Shri. H. S. Khare
Designation (Owner/ Partner/ CEO) Authorized Signatory / Chief Mining
Address
Office No. 126-128, 1st Floor, Shriram
Tower, Kingsway, Near NIT Office,
Sadar, Nagpur.
Pin Code 440 001
Telephone Number 0712-2527120/121/122
Fax number 0712-2527120/121/122
16
Details of alternative sites examined, if
any. Location of these sites should be
shown on a topo –sheet
Alternative sites cannot be examined as it
is a working coal mine based on lease
granted for specific mineral explored by
Govt. of India and Vested by Ministry of
Coal.
Location- Please see Annexure 2
17 Interlinked Projects
Yes, coal mined from Marki Mangli - I Coal
Mine will be used at TUML’s End Use Plants consisting “Sponge Iron Plant & Captive Power Plant” at Mouza- Ukkarwahi Tah-Umred, District- Nagpur.
Page | 3
Sl.
No. Item Details
18 Whether separate application of
interlinked project has been submitted?
Both the interlinked units referred at Sl. No.
17 are running since 2006 onwards with
valid Environmental Clearances and other
requisite permissions and licenses.
19 If yes, date of submission N. A.
20 If no, reason N. A.
21
Whether the proposal involves
approval/clearance under : If yes,
details of the same and their status to
be given.
No, E.C. has been granted for production
@ 0.30 MTPA vide MOEF Letter No.J -
11015/256/2006 - IA. II(M) dtd 17.05. 2007
which has been transferred to TUML on
09.02.2016 copy of above letters are
enclosed as Annexure 3
a) The Forest (Conservation) Act, 1980? N.A.
b) The Wildlife (Protection) Act, 1972? N.A.
c) The C.R.Z. notification, 1991? N.A.
22 Whether there is any Gowvvernment
order/Policy relevant/relating to the sites?
Topworth Urja & Metals Ltd. has been
vested Marki Mangli - I Coal Mine vide
Vesting Order dated 30.09.2015 by
Ministry of Coal, Government of India.
Annexure 4
23 Forest Land involved (Ha.) No
24
Whether there is any litigation pending
against the project and/or land in which
the project is propose to be set up?
There is no litigation
(a) Name of the court N.A.
(b) Case No. N.A.
(c) Orders/directions of the court, if any
and its relevance with the proposed
project.
N.A.
25 Expected Project Cost Rs. 10,000 Lakhs
Page | 4
II. Activity
Sr.
No. Information/Checklist confirmation Yes/No?
Details thereof (with
approximate quantities / rates,
wherever possible) with source
of information data
1.
Construction, operation or decommissioning of the Project involving
actions, which will cause physical changes in the locality (topography, land
use, changes in water bodies, etc.)
1.1
Permanent or temporary change in
land use, land cover or topography
including increase in intensity of land
use (with respect to local land use
plan)
Yes
Total area of OC & UG Mining is
731.42 Ha. out of which 119.16 Ha.
area is proposed for excavation,
safety zone, embankment, 40 Ha. is
for OB and Soil Dump dumps,
33.12 Ha for Mining infrastructure
etc. Remaining area will be
undisturbed.
1.2 Clearance of existing land, vegetation
and buildings? Yes
As above, land will be cleared from
vegetation and used for
excavation. Out of which 46.20 Ha
land is already cleared for existing
excavation, infrastructure purposes.
1.3 Creation of new land uses? Yes Existing & Proposed Mining will
create new land use.
1.4 Pre-construction investigations e.g.
bore houses, soil testing? No N.A.
1.5 Construction works? No N.A.
1.6 Demolition works? No N.A.
1.7
Temporary sites used for construction
works or housing of construction
workers?
No N.A.
1.8
Above ground buildings, structures or
earthworks including linear structures,
cut and fill or excavations
No N.A. Since mine is already in
operation.
1.9 Underground works including mining
or tunneling? Yes As per approved Mining Plan
1.10 Reclamation works? Yes As per approved Mining Plan
1.11 Dredging? No N.A.
1.12 Offshore structures? No N.A.
Page | 5
Sr.
No. Information/Checklist confirmation Yes/No?
Details thereof (with
approximate quantities / rates,
wherever possible) with source
of information data
1.13 Production and manufacturing
processes? Yes
It is proposed to achieve
production @0.333 MTPA
(Normative) / 0.42 MTPA (Peak) by
both OC & UG mining.
UG will commence after 9th year of
grant of E.C.
This proposal is as per Approved
Mining Plan.
1.14 Facilities for storage of goods or
materials? No
Existing facility will be utilized as
per Approved Mining Plan.
1.15 Facilities for treatment or disposal of
solid waste or liquid effluents? No
Out of 23.21 Mm3 of Soil & OB
dump, 3.09 Mm3 of soil will be
dumped at one external and three
internal dumps whereas 20.12 Mm3
of OB will be dumped externally at
one site each. And externally at
three sites each. These dumps will
be properly stabilized and a
garland drain of 1x1x1 m3 will be
made. Out of proposed dumps,
one Soil dump of 1.79 ha is created
where as one dump of 7.80 ha &
other of 0.84 Ha for OB are created
of sizes 195.35m x 235.58m x
29.70m and 262.0m x 133.93m x
27m.
ETP of treatment capacity 30
m3/day is proposed to treat
domestic and proposed workshop
(vehicle washing) discharge.
1.16 Facilities for long term housing of
operational workers? No Not required
1.17 New road, rail or sea traffic during
construction or operation? No Not required
1.18
New road, rail, air waterborne or other
transport infrastructure including new
or altered routes and stations, ports,
airports etc?
No Not required
Page | 6
Sr.
No. Information/Checklist confirmation Yes/No?
Details thereof (with
approximate quantities / rates,
wherever possible) with source
of information data
1.19
Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
No Not required
1.20 New or diverted transmission lines or
pipelines? No Not required
1.21
Impoundment, damming, culverting,
realignment or other changes to the
hydrology of water courses or
aquifers?
No Not required
1.22 Stream crossings? No Not required
1.23 Abstraction or transfers of water form
ground or surface waters?
CGWA approval for 827 m3/day for
different mining operations like
recharge, green belt development,
dust suppression, agricultural
purposes from seepage during OC
& UG operations and potable
water requirement of 12 m3/day
from two nos. of tube wells is
obtained.
1.24 Changes in water bodies or the land
surface affecting drainage or run-off? No
Present day operation has not
affected drainage within lease.
1.25
Transport of personnel or materials for
construction, operation or
decommissioning?
No
No construction activity is involved
being working coal mine. However,
there is a transport system for
transportation of Mine Workers &
Coal Evacuation.
1.26
Long-term dismantling or
decommissioning
or restoration works?
No
Total of 158.62 Ha. area will be
green belt and a decoaled void of
15.24 ha. will be converted into
water reservoir at the end of mine
life.
1.27
Ongoing activity during
decommissioning which could have an
impact on the environment?
No Not envisaged
Page | 7
Sr.
No. Information/Checklist confirmation Yes/No?
Details thereof (with
approximate quantities / rates,
wherever possible) with source
of information data
1.28 Influx of people to an area in either
temporarily or permanently? No
Influx of people has taken place
due to direct and indirect
employment opportunities. This
will continue throughout the life of
the mine.
1.29 Introduction of alien species? No Not envisaged
1.30 Loss of native species or genetic
diversity? No Not envisaged
1.31 Any other actions? No -
2.
Use of Natural resources for construction or operation of the Project (such
as land, water, materials or energy, especially any resources which are non-
renewable or in short supply)
2.1 Land especially undeveloped or
agricultural land (ha) No
About 260.27 Ha. of Non Forest
agricultural land will be required
for mining operations. Out of
which 46.20 Ha. land is already in
possession of project and mining
is under operation.
2.2 Water (expected source & competing
users) unit: KLD No
CGWA approval for 827 m3/day
for different mining operations
like recharge, green belt
development, dust suppression,
agricultural purposes from
seepage during OC & UG
operations and potable water
requirement of 12 m3/day from
two nos. of tube wells is obtained.
2.3 Minerals (MT) Nil Not required
2.4
Construction material – stone, aggregates, sand / soil (expected
source – MT) Yes
Material required for U.G. entry is
available at site
2.5 Forests and timber (source – MT) No Not required
2.6
Energy including electricity and fuels
(source, competing users) Unit: fuel
(MT), energy (MW)
Yes
Connected load is 11 KvA from
MSEB.
Standby D.G. Set Capacity of 500
kVA will meet requirement.
2.7 Any other natural resources (use
appropriate standard units) No Not required
Page | 8
Sr.
No. Information/Checklist confirmation Yes/No?
Details thereof (with
approximate quantities / rates,
wherever possible) with source
of information data
3.
Use, storage, transport, handling or production of substances or materials, which
could be harmful to human health or the environment or raise concerns about
actual or perceived risks to human health.
3.1
Use of substances or materials, which
are hazardous (as per MSIHC rules) to
human health or the environment
(flora, fauna, and water supplies)
No Not required
3.2
Changes in occurrence of disease or
affect disease vectors (e.g. insect or
water borne diseases)
No Not applicable
3.3 Affect the welfare of people e.g. by
changing living conditions? No Not envisaged
3.4
Vulnerable groups of people who could
be affected by the project e.g. hospital
patients, children, the elderly etc.,
No Not envisaged
3.5 Any other causes - -
4. Production of solid wastes during construction or operation or decommissioning
(MT/month)
4.1 Spoil, overburden or mine wastes Yes
Out of 20.96 Mm3 of OB dump,
13.18 Mm3 of OB will be
accommodated in externally and
6.78 Mm3 is to be accommodated
internally in the void Quarry itself.
4.2 Municipal waste (domestic and or
commercial wastes) No No.
4.3 Hazardous wastes (as per Hazardous
Waste Management Rules) Nil Not envisaged
4.4 Other industrial process wastes No Not envisaged
4.5 Surplus product No Not envisaged
4.6 Sewage sludge or other sludge from
effluent treatment No
Not Applicable, being no colony
is proposed.
4.7 Construction or demolition wastes No Not envisaged
4.8 Redundant machinery or equipment No
Old equipment & machinery will
become redundant after the end
of useful life and will be surveyed
off & sold as scrap.
4.9 Contaminated soils or other materials No
Not applicable. Existing O.B.
dump will be used. Top soil will
be used for reclamation of
backfilled area.
4.10 Agricultural wastes No Not applicable
4.11 Other solid wastes No Not applicable
Page | 9
Sr.
No. Information/Checklist confirmation
Yes/No?
Details thereof (with
approximate quantities / rates,
wherever possible) with source
of information data.
5. Release of pollutants or any hazardous, toxic or noxious substances to air
(Kg/hr)
5.1
Emissions from combustion of fossil
fuels from stationary or mobile
sources
Yes
Only during power failure, D.G.
set is operated. The SO2 and NOx
are generated from fossil fuel
(mainly Diesel) burning. It is
within permissible limits from the
coal mine.
5.2 Emissions from production processes No
Dust emissions will take place
from drilling / blasting in OB
benches, surface mining
operation in coal benches,
loading, unloading and
transportation of coal and OB.
Three nos. of mobile water
sprinklers and dust suppression
system has been provided.
5.3 Emissions from materials handling
including storage or transport Yes
Particulate Matter during coal &
O.B. handling
5.4 Emissions from construction activities
including plant and equipment No N.A. as it’s an operating coal mine
5.5
Dust or odours from handling of
materials including construction
materials, sewage and waste
No N.A. as it’s an operating coal mine
5.6 Emissions from incineration of waste No N.A.
5.7
Emissions from burning of waste in
open air (e.g. slash materials,
construction debris)
No N.A.
5.8 Emissions from any other sources No -
6. Generation of Noise and Vibration, and Emissions of Light and Heat
6.1 From operation of equipment e.g.
engines, ventilation plant, crushers Yes
Noise will be generated during
drilling & blasting, operation of
HEMM, CHP, transportation,
ventilation fan. Suitable
measures of noise control will be
adopted. Ambient Noise level
outside the lease area is not
likely to exceed the permissible
limit of 55 dBA during day-time
and 45 dBA during night-time.
6.2 From industrial or similar processes No Not applicable
Page | 10
Sr.
No. Information/Checklist confirmation
Yes/No?
Details thereof (with
approximate quantities / rates,
wherever possible) with source
of information data.
6.3 From construction or demolition No No
6.4 From blasting or piling Yes Blasting for O.C. mining will
continue.
6.5 From construction or operational traffic No
Present traffic activities will
continue which has noise levels
well within limits. No extra traffic
load will be added due to
expansion.
6.6 From lighting or cooling systems Yes
During D.G. operation. DG will
be operated during power
failure only.
6.7 From any other sources No -
7.
Risks of contamination of land or water from releases of pollutants into the
ground or into sewers, surface waters, groundwater, coastal waters or the
sea.
7.1 From handling, storage, use or spillage
of hazardous materials No
Hazardous material except LDO /
Diesel will not be used. Burnt oil
generated from workshop
maintenance activity of HEMM
will be collected and stored
safely for further disposal.
7.2
From discharge of sewage or other
effluents to water or the land (expected
mode and place of discharge)
No Sewage will be used for
plantation after treatment.
7.3 By deposition of pollutants emitted to
air into the land or into water. No
Control measures and
implementation of approved
Environmental Management
Plan activities like water
spraying, plantation will help in
reducing the fugitive dust
emission.
7.4 From any other sources No Existing O.B. has garland drain to
collect run offs.
7.5
Is there a risk of long term build up of
pollutants in the environment from
these sources?
No
Semi-arid conditions are not
favorable for built up of
pollutants.
Page | 11
Sr.
No. Information/Checklist confirmation
Yes/No?
Details thereof (with
approximate quantities / rates,
wherever possible) with source
of information data.
8. Risk of accidents during construction or operation of the Project, which
could affect human health or the environment
8.1
From explosions, spillages, fires etc
from storage, handling, use or
production of hazardous substances
No
The magazine house for storage
of explosives will be maintained
as per the condition of explosive
license.
8.2 From any other causes No
(i) Slope failure in OB dump
and mine pit,
(ii) mine inundation,
(iii) blasting,
(iv) fire in coal / shale /
workshop area. These are
managed as per Safety
Management Plan based on
DGMS guidelines.
8.3
Could the project be affected by natural
disasters causing environmental
damage (e.g. floods, earthquakes,
landslides, cloudburst etc)?
No
None reported till date.
However, project does not fall
under seismically active zone or
landslide prone area. Apart from
above, the mine is equipped to
deal with any eventuality like
mine inundation and slope
failure in OB dump and mine pit.
Page | 12
Sr.
No. Information/Checklist confirmation
Yes/No?
Details thereof (with
approximate quantities / rates,
wherever possible) with source
of information data.
9
Factors which should be considered (such as consequential development)
which could lead to environmental effects or the potential for cumulative
impacts with other existing or planned activities in the locality.
9.1
Lead to development of supporting
utilities, ancillary development or
development stimulated by the project
which could have impact on the
environment e.g.
• Supporting infrastructure (roads, power supply, waste or waste water
treatment, etc.)
• housing development • extractive industries • supply industries • other
Yes
Infrastructure hitherto created
will continue to be useful after
commencement of U.G. mining.
The region is already semi
urbanized as coal mining, power
houses and other industrial
activities are operating for
decades. Additional
infrastructure facilities of the
mine will support development
of ancillaries and other related
activities.
9.2
Lead to after-use of the site, which
could have an impact on the
environment
Yes
The Coal Mine will continue to
be used for mining for next 30
years. The mined out area will be
partly backfilled and converted
to forestry & water body in post
mine closure phase.
9.3 Set a precedent for later developments Yes
Properly reclaimed area will be
converted into forest land which
will help the society after
cessation of mining. Activities at
9.1 & 9.2 above will lead to over
all socio economic growth of the
area. Socio-economic benefits of
the project will accrue to local
population largely.
9.4
Have cumulative effects due to
proximity to other existing or planned
projects with similar effects
No Not envisaged
Page | 13
Environmental Sensitivity
Sr.
No. Areas
Name /
Identity
Aerial Distance (within 15 km.)
Proposed project location
boundary
1.
Areas protected under international
conventions, national or local legislation
for their ecological, landscape, cultural
or other related value
No -
2.
Areas which are important or sensitive
for ecological reasons - Wetlands,
watercourses or other water bodies,
coastal zone, biospheres, mountains,
forests
No
Do not exist within Mining Lease
Area. Nearest Forest is at 2.00
Km.: Paunar Reserve Forest.
However, Ardvan R.F., Sekapur
R.F., Matharjun R.F. Junoni R.F.,
Dongargaon R.F. are within 10
km of project area.
3.
Areas used by protected, important or
sensitive species of flora or fauna for
breeding, nesting, foraging, resting,
over wintering, migration
No Not Reported.
4. Inland, coastal, marine or underground
waters No N.A.
5. State, National boundaries No N.A.
6.
Routes or facilities used by the public
for access to recreation or other tourist,
pilgrim areas
No N.A.
7. Defense installations No N.A.
8. Densely populated or built-up area No Mukutban is at 10 Km SE
9.
Areas occupied by sensitive man-made
land uses (hospitals, schools, places of
worship, community facilities)
No
Mukutban is at 5.4 Km SE.
School is at Village-
Pandharkawada (Lahan) at 1.09
KM and Marki Bu at 2.52 Km
10.
Areas containing important, high quality
or scarce resources (ground water
resources, surface resources, forestry,
agriculture, fisheries, tourism, minerals)
No N.A.
11.
Areas already subjected to pollution or
environmental damage. (those where
existing legal environmental standards
are exceeded)
No N.A.
Page | 14
Sr.
No. Areas
Name /
Identity
Aerial Distance (within 15 km.)
Proposed project location
boundary
12.
Areas susceptible to natural hazard
which could cause the project to
present environmental problems
(earthquakes, subsidence, landslides,
erosion, flooding or extreme or adverse
climatic conditions)
No N.A.
IV. Proposed Terms of Reference for EIA Study
This proposal is submitted for one time expansion of Coal Mine for production of coal
from 0.30 MTPA to 0.333 MTPA (Normative) and 0.42 MTPA (Peak) i.e. 11% vide OM
Dated J-11015-30-2004-IA.II (M) Dated 28.07.2014 & Dated 11.08.2014.
I hereby give an undertaking that the data and information given in the application and
enclosures are true to the best of my knowledge and belief and I am aware that if any
part of the data and information submitted is found to be false or misleading at any
stage, the project will be rejected and clearance give, if any to the project will be
revoked at our risk and cost.
Date : 18.02.2019
Shri. H.S. Khare
Chief Mining
Topworth Urja & Metals Ltd.
Marki Mangli - I Coal Mine
126-128, 2nd Floor,
Shriram Tower, Kingsway,
Nr. NIT Building, Sadar
Nagpur - 440 001 (Maharashtra) Place : Nagpur
1
PART I
THE AREA OF THIS LEASE
LOCATION AND AREA OF THE LEASE:-
All that tract of lands situated at,
District Tahsil Village Sur./Gat No. Area (Ha.)
YAVATMAL
JHARI
JAMNI
PARDI
As per
description
given below :
87.28
PANDHARKAWADA 225.75
MARKI (BK) 235.32
MARKI (KHU) 21.48
GANESHPUR 112.95
TOTAL 682.78
Lease area of 682.78 Ha., breakup of which is mentioned below :-
VILLAGE - PARDI, TAHSIL - JHARI JAMNI, DIST. YAVATMAL
Sr.
No. Kh. No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
1 3/1 3.04 3.04 Bapuji Rama Gonde
2 3/2-A 2.11 2.11 TOPWORTH URJA & METALS LTD. Mutated
3 3/2-B 1.21 1.21 Gajanan Latari Vichu
4 3/3 2.86 2.86 Ramkrishna Maroti Gedekar
5 3/4 1.60 1.60 Gopal Sakharam Choudhari & 2 Others
6 3/4-A 1.62 1.62 TOPWORTH URJA & METALS LTD. Mutated
7 4/1 1.21 1.21 TOPWORTH URJA & METALS LTD. Mutated
8 4/1 Paiki 1.22 1.22 TOPWORTH URJA & METALS LTD. Mutated
9 4/1-A 3.20 3.20 TOPWORTH URJA & METALS LTD. Mutated
10 4/1-B 1.41 1.41 TOPWORTH URJA & METALS LTD. Mutated
11 4/2 2.49 2.49 TOPWORTH URJA & METALS LTD. Mutated
12 4/2-A 1.62 1.62 TOPWORTH URJA & METALS LTD. Mutated
13 5/1 1.21 1.06 Dilip Devanand Valke & 5 Others
14 5/1-A 2.02 2.02 Anandrao Yadav Valke & 1 Other
Annexure-1
Page | 15
2
Sr.
No. Kh. No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
15 5/1-B 1.23 1.23 Ashok Punaji Sonarkhan & 2 Others
16 5/1-C 1.21 1.21 Valmik Janardhan Sonarkhan
17 5/2 1.88 0.13 Ambadas Govinda Khadse
18 5/3 1.96 1.36 Damodhar Shankar Khadse & 1 Other
19 5/4 1.89 1.89 Ganpat Krishna Khadse
20 6/2 2.43 0.28 Chaban Sadashiv Shedame & 1 Other
21 6/3 2.03 0.89 Kanhoba Vothoba Dohe & 1 Other
z22 6/3-A 1.24 0.37 Mandabai Gajanan Kadukar & 3 Others
23 8/2 4.86 0.20 Anuradha Kailash Milmile & 2 Others
24 8/3 4.85 0.77 Narayan Maroti Bodhe & 1 Other
25 9/1 3.55 1.09 Dattu Krishna Hingane & 7 Others
26 9/1-A 3.44 1.51 Vitthal Maroti Vichu & 3 Others
27 9/2 3.61 0.93 Mahadeo Muknda Pimpalkar & 3 Others
28 22/1 4.79 4.34 Anil Baliram Pote
29 22/2 4.80 1.29 Satish Baliram Pote
30 23/1 3.71 3.71 Ramkrishna Maroti Gedekar
31 23/2 2.02 2.02 Ramkrishna Maroti Gedekar
32 23/3 2.02
10.30
Bhimrao Govinda Chunarkar & 7 Others
33 23/4 2.42 Parmeshwar J. Sonarkhan & 3 Others
34 23/5 3.29 Ramchandra Narayan Warke
35 23/6 4.21 Ramkrishna Maroti Gedekar
36 24/1 1.34 1.34 Kusum Namdeo Khade & 6 Others
37 24/1-A 2.02 2.02 TOPWORTH URJA & METALS LTD. Mutated
38 24/2 1.94 1.94 Baban Sadashiv Shedame & 2 Others
39 24/3 1.94 1.94 TOPWORTH URJA & METALS LTD. Mutated
40 25 10.13 8.92 TOPWORTH URJA & METALS LTD. Mutated
41 26/1 6.56 6.56 Samba Arjuna Pote & 1 Other
42 26/2 4.57 4.57 Sindhu Shivram Chunarkhan & 1 Other
T O T A L 87.28
Page | 16
3
VILL. - PANDHARKAWADA, TAHSIL - JHARI JAMNI, DIST. YAVATMAL
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
1 1 2.97 2.97 Gajanan Ambadar Gode
2 2/1 2.11 2.11 Dasaru Ramchandra Ghugul
3 2/2 1.47 1.47 Ramesh Dattu Hingane
4 2/2-A 1.31 1.31 Dilip Waman Bhongale & 1 Other
5 2/2-B 1.22 1.22 Raju Bhaurao Vinchu
6 3 0.81 0.81 Mangesh Bhaurao Vinchu
7 4 1.21 1.21 Parvatabai Vishvanath Vaidya
8 5/1 5.20 5.20 Bhaurao Dhuma Vinchu
9 5/2 1.23 1.23 Mangesh Bhaurao Vinchu
10 6 1.25 1.25 Anil Shrihari Nibrad
11 7 1.21 1.21 Madhukar Lodu Rajurkar
12 8 1.21 1.21 Lodu Govinda Rajurkar
13 9 2.02 2.02 Santosh Devrao Vaidya
14 10 0.77 0.00 Government Gaothan F- Class (0.40)
15 11 1.62 0.00 Government Gaothan F- Class
16 12/1 2.00
3.50
Rajeshwar Dattu Gore
17 12/2 1.35 Ramchandra Dattu Gore & 1 Other
18 12/3 1.67 Gajanan Dattu Gore
19 16 4.16 4.16 Minabai Sukhdeo Pote & 1 Other
20 17 4.59 4.59 Girjashankar Shivramji Tiple & 1 Other
21 18/1 1.62 1.62 Ashok Punaji Sonarkhan & 2 Others
22 18/2 2.35 2.35 Ishwar Mahavev Davare & 1 Other
23 18/3 2.35 2.35 Subhash Sambha Davare & 1 Other
24 19/1 1.62 1.62 Manohar Ganpat Hingane
25 19/2 1.36 1.36 Prakash Manohar Hingane
26 19/3 1.37 1.37 Chatrapati Manohar Hingane
27 20/1 1.22 1.22 Ramkrishna Tukaram chandurkar
28 20/2 1.22 1.22 Indrakala Ramkrishna chandurkar
29 20/3 3.50 3.50 Ashish Ramkrishna chandurkar
30 21/1 7.52 7.52 Gajanan Ambadas Gode & 4 Others
31 21/2 2.02 2.02 Malubai Murlidhar Thakare
Page | 17
4
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
32 22/1 2.44
12.22
Ramesh Gajanan Ghugul & 1 Other
33 22/2 2.44 Ganpat Sambashiv Ghugul
34 22/3 2.45 Shila Manohar Pote
35 22/5 2.44 Ahilya Bhaskar Ghugul & 1 Other
36 22/6 2.45 Divakar Sambashiv Ghugul
37 23/1 2.65 2.65 Baban Krishnaji Ghugul
38 23/2 2.42 2.42 Surendra Bapurao Khadse & 1 Other
39 24 1.21 1.21 Vaman Latari Pote & 4 Others
40 25/1 1.21 1.21 Jitendra Dashrath Bhoyar
41 25/2 1.70 1.70 Rajendrakumar Dashrath Bhoyar
42 26 7.70 7.70 Vaman Latari Pote & 1 Other
43 27/1 2.00 2.00 Kalpana Shravan Pote
44 27/2 2.00
6.89
Kalpana Shravan Pote & 4 Others
45 27/2-A 1.22 Mukesh Shravan Pote
46 27/2-B 1.22 Prashant Shravan Pote
47 27/2-K 1.23 Santosh Shravan Pote
48 27/2-D 1.22 Sulbha Vinod Khandalkar
49 28/1 1.70
3.94
Manda Chandrakant Bhoyar & 3 Others
50 28/2 3.00 Durgesh Mahadeo Pote
51 28/3 3.00 Prajwal Arun Pote
52 46/1 1.73 1.73 Vaman Jagannath Pawade
53 46/1-A 1.62 1.62 Nitin Vamanrao Pawade
54 46/1-B 1.62 1.62 Jaiprakash Vamanrao Pawade
55 46/2 1.41 1.41 Ushatai Vaman Pawade
56 47 7.24 7.24 Vaman Jagannath Pawade & 9 Others
57 48 1.72 1.72 Bhaurao Karnu Jhagjhap
58 49 1.72 1.72 Anandrao Karnu Jhagjhap
59 50 2.52 2.52 Bapurao Karnu Jhagjhap & others
60 51 3.50 3.50 Laxman Karnu Jhagjhap
61 52/1 1.40 1.40 Gajanan Manohar Jivtode
62 52/2 1.60 1.60 Mahesh Manohar Jivtode
63 53 2.02 2.02 Lilabai Manoharrao Jivtode
Page | 18
5
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
64 54 1.43 1.43 Vitthal Dadaji Vinchu
65 55 1.44 1.44 Vitthal Dadaji Vinchu
66 56 1.89 1.89 Ashok Ghularam Wankhede
67 57 2.30 2.30 Sunita Arun Pote & 3 Others
68 58 3.27 3.27 Anil Baliram Pote & 6 Others
69 59 1.21 1.21 Vaman Latari Pote
70 60 2.43 2.43 Sambu Sakharam Kadukar
71 61 1.24 1.24 Gajanan Manohar Jivtode
72 62/1 1.51 1.51 Dinesh Tatyaji Sidame
73 62/2 1.24 1.24 Manohar Dadaji Jivtode
74 63/1 1.52 1.52 Tarabai Ramkrishna Gohokar & 2 Others
75 63/2 1.22 1.22 Nirmala Tatyaji Sidame
76 64/1 1.41 1.41 Bapurao Govinda Tikle
77 64/2 1.41 1.41 Kusum Bapurao Tikle
78 65/1 1.62 1.62 Mangesh Ganpatrao Ghugul
79 65/2 1.29 1.29 Yagnik Ramesh Ghugul
80 65/3 1.21 1.21 Rohit Girjashankar Tiple
81 65/4 1.21 1.21 Ashok Ganpatrao Ghugul
82 65/5 1.21 1.21 Mangesh Ganpat Derkar
83 66 2.81 2.81 Jhibla Sadashiv Gohokar
84 67/1 1.21 1.21 Doulat Dasaru Ghugul
85 67/1-A 1.21 1.21 Mangesh Tatyaji Shedame
86 67/1-B 1.22 1.22 Smita Doulat Ghugul
87 67/2 3.20 3.20 Chandrakant Dashrath Ghugul & 1 Other
88 68 1.74 1.74 Jairam Gujoba Nakhate & 4 Others
89 69 1.67 1.67 M. P. Bhudan Yagya Mandal & 1 Other
90 70 3.54 3.54 Sanjay Parshram Chikankar & 5 Other
91 71 4.86 4.86 Devrao Malhari Bhongale & 2 others
92 72 1.68 1.68 Ankit Dilip Asutkar
93 73/1 2.23
5.03
Eknath Arjuna Nakhate
94 73/2 1.40 Kalinda Anandrao Nakhate
95 73/3 1.40 Gajanan Anandrao Nakhate
Page | 19
6
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
96 74/1 1.62 1.62 Sudhakar Namdev Tonge & others
97 74/2 1.62 1.62 Bhaskar Namdev Tonge & Others
98 74/3 1.85 1.85 Namdev Madhav Tonge
99 75 2.08 2.08 Urkuda Sitaram Tonge
100 76/1 2.00 2.00 Malatai Vasudev Tonge
101 76/1-A 5.60 5.60 Vasudev Urkuda Tonge
102 76/2 2.00 2.00 Yugal Vasudeo Tonge & 3 Others
103 77 2.45 2.45 Pandurang Govinda Rajurkar
104 78/1 5.05 5.05 Parag Bhalchandra Thakare
105 78/2 4.05 4.05 Pawan Bhalchandra Thakare
106 79/1 1.84 1.84 Parag Bhalchandra Thakare
107 79/2 1.41 1.41 Shamlata Bhalchandra Thakare
108 79/3 4.29 4.29 Gita Bhalchandra Thakare
T O T A L 225.75
VILL. – MARKI (BK.), TAHSIL - JHARI JAMNI, DIST. YAVATMAL
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
1 1/1 2.11 2.11 Anil Ramchandra Ringole & 1 Others
2 1/2 2.00 2.00 Krishna Ramchandra Rengole
3 2/1 2.39 2.39 Satish Maroti Yedme
4 2/2 2.00 2.00 Baby Maroti Yedme
5 3-A/1 2.00 2.00 Magala Ashok Vidhate & 2 Others
6 3-A/2 1.41 1.41 Anandrao Ganpatrao Vidhate
7 3-B/1 1.46 1.46 Prakash Anandrao Vidhate
8 3-B/2 1.46 1.46 Chandrashekar Ramesh Vidhate
9 3-B/3 1.46 1.46 Suresh Anandrao Vidhate
10 4/1 1.85 1.85 Gajanan Narayan Gazalwar
11 4/2 1.85 1.85 Savita Charandas Vasekar & 1 Other
12 4/3 1.42 1.42 Sushila Nararayan Gazalwar
13 5/1 5.89
9.00
Laxmibai M. Shekbandiwar & 7 Others
14 5/1-A 2.02 Tai Madhukar Kelzalkar
15 5/1-B 1.61 Shrihari Uddhav Balki
16 5/2 2.02 Natthu Mahadeo Gohokar
Page | 20
7
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
17 6 2.56 2.56 Ragnath Ashanna Polshettiwar
18 7 2.57 2.57 Vittal Ashanna Polshettiwar
19 8 2.39 2.39 Vilas Shamrao Polshettiwar & 4 Others
20 9 3.36 3.36 Gajanan Estari polcheettiwar & 5 Other
21 10 1.41 1.41 Amar Tulshiram Balki
22 11 1.96 1.96 Suman Vitthal Raout
23 12 1.62 1.62 Hanumantu Shakaram Ulmale
24 13 2.02 2.02 Namdeo Devaji Yemjelwar
25 14/1 1.28 3.53
Raju Hanumantu Ulmale
26 14/2 2.25 Vijay Hanumantu Ulmale
27 15 2.40 2.40 Vilas Shamrao Polshettiwar
28 16/1 1.51
4.55
Laxmibai Estari Polchettiwar
29 16/2 1.52 Pandurang Estari Poshettiwar
30 16/3 1.52 Gajanan Estari polcheettiwar
31 17/1 2.21
5.05
Jamuwant Namdeo Kurmelwar
32 17/2 1.41 Chandralekha Jamuwant Kurmelwar
33 17/3 1.43 Jamuwant Namdeo Kurmelwar
34 18 3.08 3.08 Gajanan Bapurao Barshetiwar & 3 Others
35 19 3.18 3.18 Shantabai Maroti Gazalwar & 2 Others
36 20 2.83 2.83 Laxman Somanna Tatewar
37 21/1-B 2.03 2.03 Anil Namdeo Zatte
38 21/1-A 1.21 1.21 Namdeo Damaji Zatte
39 21/2 1.21 1.21 Ramesh Namdeo Zatte
40 22 5.08 5.08 Bhonanath Laxman Tatewar
41 23 2.48 2.48 Sunil Vittal Payghan & 6 Others
42 24 1.21 1.21 Ranjana Ganpat Payghan 1 Others
43 25 1.28 1.28 Lilabai Hanumantu Ulmale
44 26/1 1.62 1.62 Gokul Ghularam Navde
45 26/2-A 1.21 1.21 Sangita Chetan Payghan
46 26/2-B 2.15 2.15 Chetan Janardhan Payghan
47 27 2.22 2.22 Bapurao Ganpat Rakude
48 28/1 1.21 1.21 Ziblabai Ramdas Lande
49 28/2 3.15 3.15 Sudham Ganpat Rakhunde
Page | 21
8
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
50 29 1.62 1.62 Vijay Mahado There
51 30/1 1.73 4.84
Suresh Anandrao Vidhate
52 30/2 3.11 Ramesh Anandrao Vidhate
53 31 4.34 4.34 Gaourav Suresh Vidhate
54 32 3.85 3.85 Gajanan Istari Pangantiwar & 4 Others
55 33 1.82 1.82 Laxman Krishna Kelzalkar
56 34 1.65 1.65 Janardhan Ramchandra Madavkar
57 35 1.66 1.66 Shobha Tai Uttam Madavkar
58 36 1.76 1.76 Bhaskar Vasudo Madavkar
59 37/1 1.73
8.19
Baby Mohan Turankar
60 37/2 1.28 Gajanan Shivram Raout
61 37/3 1.28 Namdeo Shivram Raout
62 37/4 1.28 Vitthal Shivram Raout
63 37/5 1.40 Waman Shivram Raout
64 37/6 1.22 Ganpat Shivram Raout
65 38/1 4.90 4.90 Shuhas Jivan Vidhate
66 38/2 2.06 2.06 Gajanan Laxman Vidhate
67 39 0.81 0.81 Mukhayadhyapak Adiwasi Ashram Shala Marki B
68 40/1 1.99 3.40
Vijay Krishanarao Vidhate
69 40/2 1.41 Shalikrao Tukaram Nandurkar
70 45 3.84 3.84 Vittal Lachmanna Barlawar
71 46/1 2.21 3.83
Krishta Laxman Barlawar
71-A 46/2 1.62 Sharwan Krishta Barlawar
72 47/1 3.04 3.04 Panchfula Purshotam Madavi
73 47/2 3.03 3.03 Shankar Kishan Muke
74 49 1.51 1.51 Bhavna Uddhav Muke
75 50 2.43 2.43 Suresh Vithu Balki
76 51/1 1.22 1.22 Subhash Vithu Balki
77 51/2 1.21 1.21 Sachin Subhash Balki
78 52/1 1.58 3.16
Panchfula Maroti Balki & 2 Others
79 52/2 1.58 Harichandra Maroti Balki
80 54 1.62 1.62 Trivna Narayan Musale & 6 Others
Page | 22
9
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
81 55/1 2.59
8.25
Santosh Vyankati Rasamwar
82 55/2 2.00 Krishnarao Ganpatrao Vidhate
83 55/3 1.22 Jyoti Chandrashekhar Nagpure
84 55/4 1.22 Pravin Ganpatrao Vidhate
85 55/5 1.22 Gitabai Pravin Vidhate
86 86/1 1.62 1.62 Bayabai Raghunath Vidhate
87 86/2 1.62 1.62 Gajanan Shamrao Tonge
88 87 3.24 3.24 Anil Raghunath Vidhate & 1 Other
89 120 2.83 2.83 Nitesh Bandu Ulmale & 1 Other
90 121 3.50 3.50 Aadku Vishvanath Dahaki & 1 Other
91 122/1 1.22 1.22 Dadaji Ramu Ulmale & 5 Others
92 123/1 1.82 1.82 Kavdu Balaji Mohitkar
93 123/2 2.40 2.40 Vijay Kisan Roge & 1 Other
94 124/1 3.02 3.02 Kejaji Vishvanath Dahaki
95 124/2 1.21 1.21 Atul Madhav Ulmale
96 125 2.83 2.83 Bandu Ganpat Ulmale & 2 Other
97 154 2.21 0.25 Purushottam Mukinda Deulkar
98 157/1 4.22
10.34
Sindhu Janardan Badkhal & 4 Others
99 157/2 4.04 Madhukar Madhav Badkhal & 4 Others
100 157/3 3.20 Ravindra Yadav Badkhal & 3 Others
101 158 4.95 0.80 Santosh Kavdu Ulmale & 3 Other
102 169/1 1.21 1.21 Shankar Ravindra Badkhal
103 169/2 1.46 1.46 Haridas Uddhav Mohitkar
104 169/3 1.45 1.45 Shobhabai Ramdas Mohitkar
105 170 3.55 3.55 Sindhu Bandu Ulmale
106 171 3.53 2.70 Hariram Bandu Ulmale & 1 Other
107 172/1 2.23 2.23 Bandu Ganpat Ulmale
108 172/2 1.82 1.82 Sandeep Maroti Yedame
109 173 1.62 1.62 Rajeshwar Vithu Payghan & 2 Others
110 174 1.76 1.76 Anil Kavdu Bobate
Page | 23
10
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
111 175 1.07 1.07 Bahurao Malhari Bhongale
112 176/1 1.62 1.62 Surekha Kavdu Mohitkar
113 176/2 1.82 1.82 Kavdu Balaji Mohitkar & 3 Others
114 177 2.36 2.36 Badu Namdev Gohokar
115 178 2.44 2.44 Anandrao Karnu Hajari & 1 Others
T O T A L 235.32
VILL. – MARKI (KH.), TAHSIL - JHARI JAMNI, DIST. YAVATMAL
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
1 25 2.02 2.02 Jagdish Natthuji Kapse & 1 Other
2 26 1.41 1.41 Jagdish Natthuji Kapse
3 27 2.02 2.02 Janrao Ramaji Thokne
4 28 1.82 1.82 Trivenibai Yadav Badkhal & 1 Other
5 29 1.42 1.42 Sindhu Janardhan Badkhal & 4 Others
6 30 2.46 2.46 Sombai Punaji Madavi & 2 Others
7 31/1 1.31 1.31 Vaibhav Vinod Burhan
8 31/2 1.31 1.31 Ravindra Pundlik Shekbandiwar
9 31/3 1.30 1.30 Valmik Jairam Jhade
10 32 2.31 2.17 Laxman Karnuji Aatram
11 36 1.72 0.14 Pramod Pandurang Shekbandiwar & 2
Others
12 41/1 1.92
3.31
Devrao Anandrao Devalkar
13 41/2 1.41 Subhash Anandrao Devalkar
14 41/3 1.41 Vinod Anandrao Devalkar
15 42/1 1.36 0.79
Anil Tanba Bodhe
16 42/2 1.36 Gajanan Nagoba Balki
T O T A L 21.48
Page | 24
11
VILL. – GANESHPUR (KH.), TAHSIL - JHARI JAMNI, DIST. YAVATMAL
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
1 1/1 2.25
7.00
Maroti Kanhoba Devalkar
2 1/2 1.98 Vasanta Laxman Devalkar
3 1/3 2.70 Kamalbai Ramdas Devalkar & 2 Others
4 1/4 1.24 Ramrao Kanhoba Devalkar
5 1/5 1.21 Maroti Kanhoba Devalkar & 1 Other
6 3 4.99 1.50 Manjula Pandurang Jumnake & 2 Others
7 18/1 7.67
5.96
Kavadu Krishnaji Ghugul
8 18/2 1.52 Pranita Chandrakant Ghugul
9 18/3 2.02 Chandrakant Dashrath Ghugul
10 28 1.16 1.00 Gosai Vithoba Tonge, Bhudan Yagya
Mandal
11 39-1-A 1.28
11.25
Ramchandra Mahadev Pawade
12 39-1-B 1.27 Taibai Ramchandra Pawade
13 39-1-C 1.27 Ganesh Kanchan Pawade
14 39-1-D 1.27 Kanchan Ramchandra Pawade
15 39-1-E 1.27 Rajat Anil Pawade
16 39-1-F 1.27 Anil Ramchandra Pawade
17 39/2 6.61
18 40 3.81 2.25 Devidas Keshavrao Balki & 1 Other
19 41 1.04 1.04 Lodba Mahadev Devalkar
20 42 2.96 2.70 Devrao Shankar Devalkar
21 43 7.24 7.24 Jhibla Bhaduji Devalkar & 5 Others
22 44 1.75 1.75 Sambu Dasaru Maraskolhe
23 45 1.41 1.13 Lodba Mahadev Devalkar
24 46 1.62 1.62 Shankar Lingu Maraskolhe & 2 Others
25 47 1.45 1.45 Manohar Soma Maraskolhe
26 48 2.04 2.04 Ashok Malku Maraskolhe & 6 Others
27 49 1.14 1.14 Vaman Baliram Bhogale
28 50 1.14 1.14 Vasudev Sadu Jhungare & 1 Other
29 51 1.38 1.38 Aatmaram Sakharam Petkar
Page | 25
12
Sr.
No.
Kh.
No.
Area as
per 7/12
Applied
Area Name of Land Owners Remakrs
30 52/1 2.00
5.20
Arun Latari Phuse
31 52/2 1.99 Mohandas Latari Phuse
32 52/3 1.21 Jijabai Latari Phuse
33 53 1.14 1.14 Atul Vaman Bhogale & 1 Other
34 54 2.02 2.02 Vishvanath Ganpat Vaidya
35 55 1.62 1.62 Purushottam Ramchandra Kale & 5
others
36 56 1.23 1.23 Keshav Punjaraj Nibrad & 1 Other
37 57 3.21 3.21 Latari Sadu Dhurve & 6 Others
38 58/1 1.61 3.22
Anil Ramrao Devalkar
39 58/2 1.61 Kamlakar Ramrao Devalkar
40 59/1 1.42 1.42 Janabai Shankar Matte
41 59/1-1 1.40 1.40 Madan Shankar Matte
42 59/1-2 1.23 1.23 Shankar Hiram Matte
43 59/1-A 1.42 1.42 Rajendra Shrihari Balki
44 59/2 1.62 1.62 Uttam Ramchandra Mandavkar
45 60/1 1.53 1.53 Mahadev Dada Vinchu
46 60/2 2.23 2.23 Pandurang Jhigu Pimpalkar
47 60/3 2.22 2.22 Vaman Gajanan Junagari
48 61 2.01 4.02
Rajendra Ramdas Devalkar
49 61/1 2.01 Ramesh Ramdas Devalkar
50 62/1 1.23 1.23 Radho Shivaji Dhengale
51 62/1-1 2.23 2.23 Gajanan Radho Dhengale
52 62/1-2 2.23 2.23 Pandit Radho Dhengale
53 62/2 4.88 4.88 Sindhubai Balaji Dhengale & 2 Others
54 63 2.44 2.44 Pandhari Sakharam Upare & 2 Others
55 64 2.12 2.12 Santosh Govinda Uike
56 65 2.13 2.13 Nanaji Keshav Uike
57 66 4.48 4.48 Purshottam Ramchandra Kale & 2 others
58 67/1 1.54 1.54 Vaman Dadarao Balki
59 67/2 1.54 1.54 Bhauji Dadarao Balki
60 67/3 1.81 1.81 Rohit Madan Matte
T O T A L 112.95
Page | 26
MARKI MANGLI-I
COAL MINE
MARKI MANGLI-I COAL MINE, DIST-YAVATMAL, MAHARASTRA
P. P. TOPWORTH URJA & METALS LTD.
Page | 27
Page | 28
Sanjay DakTypewritten Text
Sanjay DakTypewritten Text"ANNEXURE - 3"
Page | 29
Page | 30
Page | 31
Sanjay DakTypewritten Text"ANNEXURE - 3-A"
Page | 32
Page | 33
Page | 34
Page | 35
Page | 36
Page | 3
7
Sanjay DakTypewritten Text"ANNEXURE - 3"
Sanjay DakTypewritten Text
Page | 3
8
Page | 3
9
Page | 4
0
Page | 4
1
Page | 4
2
Page | 4
3
Page | 4
4
Page | 4
5
Page | 4
6
Page | 4
7
Page | 4
8
Page | 4
9
Page | 50
Page | 51
Page | 52
Page | 53
Page | 54
Page 1Page 2Page 3Page 1 (1)Page 2 (1)Page 1 (2)Page 2 (2)Page 3 (1)