GEOTECHNICAL ENGINEERING SERVICES REPORT
For the PROPOSED THREE SPAN BRIDGE NO: J2-8423{004)
OVER TURKEY CREEK STATE JOB NO: 28423 (04)
GARFIELD COUNTY, OKLAHOMA
Prepared for CIRCUIT ENGINEERING DISTRICT# 8
2901 N. VAN BUREN ENID, OKLAHOMA 73703
Prepared by MIDWEST ENGINEERING AND TESTING CORPORATION
2025 S. NICKLAS, SUITE 115 OKLAHOMA CITY, OKLAHOMA 73128
405-681-6737
METCO PROJECT NO: OGR-15029 APRIL 2015
MET CO l\ ll()WEST ENC INEF.RING ANO TESTING CORl'ORATION
Circuit Engineering District # 8 2901 N. Van Buren Enid, Oklahoma 73703 Phone: 580-237-4810 Fax: 580-493-2299
Attention: Mr. Tyler D. Schroder, Project Engineer
Subject: Geotechnical Engineering Services Report Proposed Three Span Bridge No: J2-8423(004) Over Turkey Creek State Job No: 28423 (04) Garfield County, Oklahoma METCO Project No: OGR-15029
Dear Mr. Schroder:
April 27, 2015
Midwest Engineering and Testing Corporation (METCO) is pleased to submit this Geotechnical Engineering Services Report for the above-referenced project. The purpose of our services was to assist the design team in designing general foundations and preparing plans and specifications for construction of the proposed project. Our services were completed in general accordance with the scope of work as outlined in METCO proposal number OGP-15050 dated March 11 , 2015. Written authorization was provided by Mr. Tyler D. Schroder P.E., Project Engineer, of Circuit Engineering District II 8, on March 12, 2015. A summary report along with our formal detailed geotechnical engineering services report is enclosed for your review. The entire report should be read in its entirety prior to utilizing any of the presented information for design or construction purposes.
Executive Summary
A total of 4 soil borings were drilled using truck-mounted hollow-stem type drilling equipment. As per the scope of work requested by Circuit Engineering District # 8, 4 borings were drilled within the general vicinity of the proposed replacement bridge. These borings were drilled to approximate depths of 60.0 feet in borings B-1 , B-3 and 8-4 and 58.0 feet in boring B-2. Locations of the proposed replacement bridge as well as the soil borings are shown on the Boring Location Plan. Logs of the borings are presented in the Appendix.
Below existing grade, the borings generally encountered soils consisting of clay, silt and sand to approximate depths of 39.0 feet below existing grade in boring B-1 , 38.5 feet below existing grade in boring B-2, 39.0 feet below existing grade in boring B-3 and 39.0 feet below existing grade in boring B-4. These layers were underlain by moderately hard to hard shale to boring termination depths of approximately 60.0 feet in borings B-1, B-3 and B-4 and 58.0 feet in boring B-2. Standard penetration resistance
Midwest Engincc1ing and Testing Corporntion P.O. Box 2704 18 Oklahoma City, OK 73 1J7-04 I8 Phone 405/681 -67]7 Pax 405/68 l-(l743
Proposed Three Span Bridge No. J2-8423(004) METCO Project No: OGR-15029
April 2015 Page 2
(N-Value) recorded in the soils ranged between 3 to 24 blows per foot of penetration indicating soft to very stiff consistencies in the cohesive soils and loose to medium relative densities in the cohesionless soils. Texas cone penetration test results in the shale bedrocks ranged from 100 blows for 3.8 inches of penetration to 100 blows for 0.2 inches of penetration indicating moderately hard to hard shale.
Groundwater was encountered in the borings at approximate depths of 22.0 feet to 30.0 feet below existing grade at time of drilling and end of day. Seasonal Variations of groundwater should be expected. The borings collapsed to various depths upon auger removal. The contractor should determine the actual groundwater levels prior to construction.
Summary of Recommendations
It is our understanding that H-piles and drilled piers are your preferred foundation systems for the abutments and interior supports, respectively for the proposed replacement bridge. Slope stability analysis was beyond the scope of this study. Slope failure can exert significant forces on the foundations and should be considered in the design. Adequate pile driving or pier drilling equipment should be utilized by the contractor. Dlfflculties may be encountered during the pile driving or pier drllllng due to the nature of the subsurface formations.
Reddish brown moderately hard to hard shale was encountered at approximate elevations of 1094.08, 1094.48, 1094.38 and 1096.38 in borings B-1, B-2, 8-3 and B-4, respectively. The Texas Cone Penetrometer was used to evaluate approximately 18 feet to 20 feet of these materials in the borings. Results are presented on the boring logs and in tables in the appendix.
Driven low displacement piles such as H-piles could be used due to their ability to withstand high driving stresses. The piles should be driven to practical refusal into the shale strata. A nominal resistance (ultimate pile capacity) of 200 tons, below approximate elevations of 1084 in borings B-1, B-2 and B-3 and 1086 in boring B-4, could be used for pile size HP 12X53. Actual driving criteria should be developed by matching the pile-driving hammer with the selected pile type and expected length. Proper drivability analysis should be performed to verify the actual pile capacity and piles should not be overstressed during driving. Proper precautions should be taken to protect the pile tips. Driving shoes or welded reinforcement could be utilized to lower the risk of damage during driving. To protect the integrity of the piles, the number of splices should be kept at a minimum, if splicing is required. The table in the appendix could be reviewed for pile penetrations and capacity. Actual penetrations may vary from presented Information depending on the type of hammer, site subsurface conditions, and hammer operating efficiency. A resistance factor of 0.40 should be utlllzed.
Alternatively, a drilled pier foundation system can be used to support the bridge structural loads. The base of the drilled piers should bear a minimum of 5 feet or one pier diameter, whichever Is deeper, into the shale strata. To compute nominal resistance, the drilled piers can be designed for a nominal (ultimate) end bearing pressure of 64,000 psf, based on dead plus design live loads. A nominal (ultimate) skin friction of 9,600 psf can be utilized for that portion of the pier extending more than 5 feet or one pier diameter, whichever is deeper, into the shale strata. The presented table should be utlllzed to determine the required foundation depths and sockets into the rock formations. A resistance factor of 0.55 and 0.50 should be utilized for skin side resistance and tip resistance, respectively for factored axial static capacity.
Proposed Three Span Bridge No. J2-8423(004) METCO Project No: OGR-15029
April 2015 Page3
The table in the appendix should be reviewed for end bearing capacity and skin friction values at various depths as obtained from the Texas Highway Department chart titled "Drilled Shafts Foundation Design" and dated 7172.
To reduce difficulties associated with sloughing and/or ground water related problems, casing could be used. A slurry displacement method could also be used. Once the casing is sealed into shale, the remaining soil can be removed and the excavation pumped to remove any groundwater or slurry from the shaft Alternatively, an appropriate tremie method can be used to place concrete should it be impractical to remove liquid from the excavation. Any loose material should be removed from the pier bottom. The pier bottom and the socket should be observed for continuity and to verify that the material is acceptable for support of the proposed loads and that the material is consistent with the materials encountered in our borings. When the drilling operations and inspection is complete, concrete should be placed immediately. Sufficient concrete head should be maintained inside the casing to offset the water hydrostatic head and to prevent groundwater and/or slurry intrusion into the pier.
All drilled piers construction and observation should be accomplished in accordance with the Standard Specifications of Oklahoma Department of Transportation (ODOT).
The weathering process of the shale is erratic and variations in the shale profiles can be expected in small lateral distances. The shale profiles should be completely defined prior to requesting lump sum bids. All shale depths should be confirmed at the time of construction.
Scour depth should be evaluated and accounted for by the design engineer.
For county bridge structures located in Divisions 5 and 6, water shall be taken from the surface pools and from at least one boring at a depth of 1 O feet below the water table. Also, water samples are required as indicated when the boring logs indicate shale. The water samples should be analyzed for:
CL ion (PPM) by AASHTO T260 SQ4 ion (PPM) by AASHTO T105 pH by ASTM G51
General
Proposed Three Span Bridge No. J2-8423(004) METCO Project No: OGR-15029
April 2015 Page4
The attached entire report should be read and the contents evaluated prior to utilizing our recommendations In the preparation of the design and construction documents. Please refer to the attached report for a more detailed summary of our analysis and recommendations. It is recommended that METCO be retained to provide observation and testing services during construction. Please do not hesitate to contact our office at 405-681-6737.
Respectfully Submitted,
Midwest Engineering & Testing Corporation CA No. 4198, Expire 30/2015
(3 copies submitted)
Table of Contents
1.0 Introduction 2.0 Project Description 3.0 Scope of Work
3.1 Subsurface Exploration 3.2 Laboratory Evaluation 3.3 Engineering Analysis
4.0 Surface and Subsurface Features 4.1 Site Description 4.2 Site Geology 4.3 Soil Subsurface Conditions 4.4 Groundwater
5.0 Evaluation and Recommendations 5.1 H-Piles 5.2 Drilled Piers 5.3 Excavations and Temporary Slopes 5.4 Weather Considerations
6.0 General 6.1 Use of Report 6.2 Level of Care
Appendix Figures: Site Location Map, Plan of Borings Boring Logs Tables
1 1 1 1 2 2 2 2 3 3 3 3 4 4 5 5 6 6 6
Geotechnlcal Engineering Services Report Proposed Three Span Bridge No: J2-8423(004)
Over Turkey Creek State Job No: 28423(04)
Garfield County, Oklahoma METCO Project No: OGR-15029
Aprll 2015
1.0 Introduction
Midwest Engineering and Testing Corporation (METCO) has completed a geotechnical exploration and evaluation of the subsurface conditions for the above-referenced project. The work was performed in general accordance with METCO proposal number OGP-15050 dated March 11, 2015. Written authorization was provided by Mr. Tyler D. Schroder P.E., Project Engineer, of Circuit Engineering District# 8, on March 12, 2015.
2.0 Project Description
Based on project information provided by Mr. Schroder of Circuit Engineering District# 8, we understand the proposed construction will consist of the following:
Bridge
Alignment
Grading
Three Span Structure Approximately 164.50 Feet in Length Precast Concrete Beam (PCB) Bridge Abutments and Interior Supports Supported on H-piles and Drilled Piers, Respectively
New Bridge Alignment Will Match The Existing Bridge Alignment
New Bridge Elevation Will Be Approximately 1 Feet to 2 Feet Higher Than The Existing Bridge
The location of the site is shown on the Site location Map.
3.0 Scope of Work
The purpose of this exploration and evaluation was to assess the subsurface soil conditions at the project site, at the boring locations, in order to help in the evaluation of acceptable foundation system for the proposed project.
Our scope of services included the items presented in the following sections.
3.1 Subsurface Exploration
A total of 4 soil borings were drilled using truck-mounted hollow-stem type drilling equipment. As per the scope of work requested by Circuit Engineering District # 8, 4 borings were drilled within the general vicinity of the proposed replacement bridge. These borings were drilled to approximate depths of 60.0 feet in borings B-1, B-3, B-4 and 58.0 feet in boring B-2. Locations of the proposed replacement bridge as well as the soil borings are shown on the Boring Location Plan. Logs of the borings are presented in the Appendix.
Proposed Three Span Bridge No. J2-8423(004) METCO Project No: OGR-15029
April 2015 Page 2
Soil samples were taken at regular intervals in all four borings during the drilling process. Samples were identified in the field, placed in sealed plastic bags, and transported to the laboratory for further classification and testing.
When the split spoon sampler was used, Standard Penetration Tests (SPT's) were performed at regular intervals in general accordance with ASTM Designation D1586, samples collected, and results presented on the boring logs. The SPT used in soil borings is performed by driving a 2-inch, 0.D., split-spoon sampler into the undisturbed formation located at the bottom of the advanced auger with repeated blows of a 140-pound, pin-guided, hammer falling a vertical distance of 30 inches. The number of blows required to drive the sampler one foot is a measure of the soil consistency.
When the Texas Cone Penetration test was used to evaluate the bedrock, it was performed in general accordance with the TXDOT requirements.
3.2 Laboratory Evaluation
Selected samples of the subsurface soils were tested in the laboratory to determine materials properties for further evaluation and approximate unified soil classifications were determined by visual inspection. The laboratory evaluation consisted of visual and textural examinations, moisture content, Atterberg limit tests, and percent passing the No. 200 sieve. Results of the tests are shown on the attached logs of borings.
3.3 Engineering Analysis
Engineering analysis and recommendations regarding general foundation design including allowable soil bearing pressures are included in this report.
This geotechnical engineering report presents recommendations derived from existing and available information pertaining to the proposed project; relevant laboratory data, information, and test results; subsurface materials encountered in our borings, and the proposed bridge location. The attached entire report should be read and the contents evaluated so that to facilitate any changes that may be desired. If any changes or corrections are desired, please inform METCO in writing so that we may amend the presented recommendations
METCO cannot be responsible for the Interpretation or Implementation of this report by others. METCO should be retained to provide observation and testing during construction. Foundations, earthwork, and all other construction related activities should be observed by METCO. METCO wlll not accept any responsibility for the performance of the subgrade, foundations or structure nor will it accept any responsibility for any conditions which deviated from those described in this report.
4.0 Surface and Subsurface Features
4.1 Site Description
The proposed Bridge over Turkey Creek is located on EW 54 Road, approximately 5.0 miles south and 2.4 miles east of Drummond in Garfield County, Oklahoma. Some utilities and trees existed in the general vicinity of the proposed bridge site. The existing bridge had some signs of
Proposed Three Span Bridge No. J2-8423(004) METCO Project No: OGR-15029
April 2015 Page3
distress. The surface conditions were relatively dry and our truck-mounted drill rig experienced little difficulty in moving around the site.
4.2 Site Geology
The site is underlain by the Cedar Hills Unit as documented in the Engineering Classification of Geologic Materials, Division Four, published by The Oklahoma Department of Transportation (ODOT). These materials consist of a heterogeneous mixture of reddish-brown blocky shale with siltstone and/or sandstone beds.
4.3 Soll Subsurface Conditions
Below existing grade, the borings generally encountered soils consisting of clay, silt and sand to approximate depths of 39.0 feet below existing grade in boring B-1, 38.5 feet below existing grade in boring B-2, 39.0 feet below existing grade in boring B-3 and 39.0 feet below existing grade in boring B-4. These layers were underlain by moderately hard to hard shale to boring termination depths of approximately 60.0 feet in borings B-1, B-3 and B-4 and 58.0 feet in boring B-2. Standard penetration resistance (N-Value) recorded in the soils ranged between 3 to 24 blows per foot of penetration indicating soft to very stiff consistencies in the cohesive soils and loose to medium relative densities in the cohesionless soils. Texas cone penetration test results in the shale bedrc:>cks ranged from 100 blows for 3.8 inches of penetration to 100 blows for 0.2 inches of penetration indicating soft to hard shale.
Laboratory tests indicated that the site soils had plasticity indices ranging from non-plastic (NP) to 27 and grain size distribution tests show that the tested soils contain about 4 to 99 percent fines (that material passing a No. 200 mesh sieve). The encountered soils were classified as CL, CL-ML, ML, SM and SP in accordance with the Unified Soil Classification System.
The above description of the subsurface conditions constitutes a generalization that emphasizes the subsurface stratification features and characteristics. The data and information at the specific boring locations are recorded in the boring logs. These logs present a description of subsurface soil and rock, applicable laboratory and field test results, sample location, and general stratification. Variations in the stratification presented in the boring logs should be expected across the site and between boring locations as the presented strata description is only indicative of the boring location.
4.4 Groundwater
Groundwater was encountered in the borings at approximate depths of 22.0 feet to 30.0 feet below existing grade at time of drilling and end of day. Seasonal Variations of groundwater should be expected. The contractor should determine the actual groundwater levels prior to construction.
5.0 Evaluation and Recommendations
It is our understanding that H-piles and drilled piers are your preferred foundation systems for the abutments and interior supports, respectively for the proposed replacement bridge. Slope stability analysis was beyond the scope of this study. Slope failure can exert significant forces on the foundations and should be considered in the design. Adequate pile driving or pier drilling equipment should be utilized by the contractor. Difflcultles may be encountered during the plle driving or pier drilling due to the nature of the formations. It is our understanding that
Proposed Three Span Bridge No. J2-8423(004) METCO Project No: OGR-15029
April 2015 Page4
the existing bridge will be removed. The design engineer should determine if any left in-place elements of the existing pipes would impact the new construction.
5.1 H-Plles
Reddish brown moderately hard to hard shale was encountered at approximate elevations of 1094.08, 1094.48, 1094.38 and 1096.38 in borings 8-1, 8-2, B-3 and 8-4, respectively. The Texas Cone Penetrometer was used to evaluate approximately 18 feet to 20 feet of these materials in the borings. Results are presented on the boring logs and in tables in the appendix.
Driven low displacement piles such as H-piles could be used due to their ability to withstand high driving stresses. The piles should be driven to practical refusal into the shale strata. A nominal resistance (ultimate pile capacity) of 200 tons, below approximate elevations of 1084 in borings 8-1, 8-2 and 8-3 and 1086 in boring 8-4, could be used for pile size HP 12X53. Actual driving criteria should be developed by matching the pile-driving hammer with the selected pile type and expected length. Proper drivability analysis should be performed to verify the actual pile capacity and piles should not be overstressed during driving. Proper precautions should be taken to protect the pile tips. Driving shoes or welded reinforcement could be utilized to lower the risk of damage during driving. To protect the integrity of the piles, the number of splices should be kept at a minimum, if splicing is required. The table in the appendix could be reviewed for pile penetrations and capacity. Actual penetrations may vary from presented information depending on the type of hammer, site subsurface conditions, and hammer operating efficiency. A resistance factor of 0.4 should be utilized In the foundation design.
The weathering process of the shale is erratic and variations in the shale profiles can be expected in small lateral distances. The shale profiles should be completely defined prior to requesting lump sum bids. All shale depths should be confirmed at the time of construction.
5.2 Drilled Piers
A drilled pier foundation system can be used to support the bridge structural loads. The base of the drilled piers should bear a minimum of 5 feet or one pier diameter, whichever is deeper, into the shale strata. To compute nominal resistance, the drilled piers can be designed for a nominal (ultimate) end bearing pressure of 64,000 psf, based on dead plus design live loads. A nominal (ultimate) skin friction of 9600 psf can be utilized for that portion of the pier extending more than 5 feet or one pier diameter, whichever is deeper, into the shale strata. The presented table should be utilized to determine the required foundation depths and sockets into the rock formations. Resistance factors of 0.55 and 0.50 should be utilized for skin side resistance and tip resistance, respectively for factored axial static capacity.
The table in the appendix should be reviewed for end bearing capacity and skin friction values at various depths as obtained from the Texas Highway Department chart titled "Drilled Shafts Foundation Design" and dated 7172.
To reduce difficulties associated with sloughing and/or ground water related problems, casing could be used. A slurry displacement method could also be used. Once the casing is sealed into shale strata, the remaining soil can be removed and the excavation pumped to remove any groundwater or slurry from the shaft. Any loose material should be removed from the pier bottom. The pier bottom and the socket should be observed for continuity and to verify that the material is acceptable for support of the proposed loads and that the material is consistent with the materials encountered in our borings. When the drilling operations and inspection is
Proposed Three Span Bridge No. J2-8423(004) METCO Project No: OGR-15029
April 2015 Pages
complete, concrete should be placed immediately. Sufficient concrete head should be maintained inside the casing to offset the water hydrostatic head and to prevent groundwater and/or slurry intrusion into the pier.
The weathering process of the shale is erratic and variations in the shale profiles can be expected in small lateral distances. The shale profiles should be completely defined prior to requesting lump sum bids. All shale depths should be confirmed at the time of construction.
All drilled piers construction and observation should be accomplished in accordance with the Standard Specifications of Oklahoma Department of Transportation (ODOT).
5.3 Excavation and Temporary Slopes
The contractor, designated as "responsible person" in OSHA Construction Standards for Excavations, 29 CFR Part 1926, is solely responsible for planning and implementing all safety procedures. All excavation height, slope, and depth must adhere to all specifications outlined in local, state, and federal safety regulations.
METCO does not assume any responsibility for construction site safety or any party's, Including the contractor, compliance with the applicable local, state, and federal safety regulations or any other applicable regulations.
5.4 Weather Considerations
The upper soils encountered at this site maybe sensitive to moisture variations and construction traffic disturbances during wet weather. The soil strength is significantly reduced when the soil is wet and significant delays in the grading and compaction activities can take place. Thus, it is advantageous to perform construction activities during periods of dry weather.
Proposed Three Span Bridge No. J2-8423(004) METCO Project No: OGR-15029
April 2015 Page6
6.0 General
The conclusions and recommendations presented in this report are subject to the following general conditions:
6.1 Use of Report
This report has been prepared for the exclusive use of Circuit Engineering District # 8, for the specific application to the proposed Three Span Bridge No: J2-8423 (004), over Turkey Creek, in Garfield County, Oklahoma. This report should not be appropriate for other structures or purposes. We recommend that parties contemplating other structures or purposes contact us. Unless our written approval is provided, we make no representation and assume no responsibility to other parties regarding this report.
6.2 Level of Care
The recommendations contained in this report are based on the available subsurface information obtained by METCO, and design details furnished for the proposed project. If there are any revisions to the plans for this project, or if deviations from the subsurface conditions noted in this report are encountered during construction, METCO should be notified immediately to determine if changes in the foundation recommendations are required. If METCO is not retained to perform these functions, METCO will not be responsible for the impact of those conditions on the project.
Services performed by the geotechnical engineer for this project have been conducted with that level of care and skill ordinarily exercised by members of the profession currently practicing in this area. No warranty, expressed or implied, is made.
APPENDIX
. ' ' . . : . . .
W Wood Rd (/)
(/) ::r .,, :::!. a. GI :;)
::0 a.
"O 0::: c
~ ..J
en
'fX Lucien Rd cos:io
(/) O"
~. ,g. :;)
::0 0.
W Sumner Rd
W Bison! Rd -1
Garfield County, Oklahoma, United States
W Wood Rd
W Lucien Rd __ ~---
132
N M "O
0::: >-ro Qi ~ ro .c 0) 0
J: ~ en en
(/)
3 0
W Wood Rd ~ E0510
"O 0::: a;-E 0 0
Q)
en
W Lucien Rd
[ OGR- 15029
/prox_:~te_R_~_ro~:-t-dl_o_c_at_1o_n_s_,....
l~
W Osborne Rd
W Sumner Rd
"O 0::: 0 § en
Omi Copyright C and (P) 1983-2012 Moerosofl CQfPOfatton and/0< its suppliers All ngnis rese!\'ed. http /twv.wmicrosoft comlstteGIS/
~ "O c ro ;:: ro
<!> enW Lucien Rd
r "O 0::: "O. c ro ;:: ro
<!)I (/)
2
Waukomis0
Drummond Rd W Wood Rd
(/)
0
l ::0 a.
"O 0::: "O 0 0
~ ro 0 en'
3
(/)
3: GI 5
!!2
(/). ____ (/)
r
U5 "O c ro Qi >, ~I o, en
() .DI 3 "O
~
Certa.n mapping and d.rectJOn data 0 2012 NAVTEO All nghts re5e!Ved The Data for areas of Canada onc:ludos 1nf0<maoon ta~en w11/1 P8'm1tsion Iran Caladoan aut~nties. including C Her Majesty tho Ouoon In RJgtt of CIWlod3 C Ouoon's Pnnler l::>r Ontano NAVTEO and NAVTEO ON BOARD 8fetrademarl<s of NAVTEO C 2012 TeleAIJas NoMAmerca. lne.AJ nghls rese<ved TolOAUas and Tele Alias Norl/IAmenca ete uademaf1<s of Tele Alias Inc; C 2012 by Apphed GeogrepNc: Solutions All nghts resorved PonJOns C Copyt.ght 2012 by Wlodal Publicanons Corp All nghl$ rese:ved
4
Station 121+00.00 Approx. 15.0' Lt. of Proposed CL. Approximate El. 1132.98' 82
Turkey Creek I Existi g Bridge
e 8M #3 Station 123+50.00 Approx. 59.19' Lt .. of Proposed CL. Approximate El. 1135.682
Station 122+50.00 Approx. 15.0' Lt.. of Proposed CL. Approximate El. 1135.38'
,- - - - ~------------ .- - - - - EJ, 84 Proposed I I I I
Bridge CL. _ .. - ··- .. _ .. _ .. _ .. l .. -·· _ .. _ .. _ J_ ··-·. -·· - ··- .. - ··- .. - .. - ··- . ·-·· - .. - ·~ - · · -· · - ·· -·· -·· -' ·-·· - ·· -·· - · · - · I I I I I I I I
Proposed Bridge ----7171
l,E9_ - - - 1...------------------------!Ee_ - - - - I
81 Station 120+86.00 Approx. 15.0' Rt. of Proposed CL. Approximate El. 1133.08' ;<rkey Creek
83 Station 122+38.00 Approx. 15.0' Rt. of Proposed CL. Approximate El. 1133.38'
PLAN OF BORINGS
Proposed Three Sapn Bridge No. : 12-8423(004) Over Turkey Creek
Ee Approximate Boring Location
Not to Scale
MET CO
State Job No.: 28423 (04) Garfield County, Oklahoma
METCO JOB#: OGR-15029 FIGURE J
LOG OF BORING B-1
PROJECT: Proposed Three Span Bridge J2-8423{004), Over Turkey Creek, Garfield County, Oklahoma Project No.: OGR-15029
Date Drilled: 413/2015 Location: Approx. Station 120+86.00, Approx. 15.0' Rt. of Proposed CL Elevation: 1133.08' -----Depth To Water At Completion: 22.0' Depth To Water On: ___ En_d_o_f_Da .... v __ _ Was: __ 2_1_.o_· _
Approximate Completion Depth: __ oo_.o_· _ Drilled By: Kalyn
;: Iii IL W ~I&.
NOTES:
SAMPLE TYPE
Logger: _____ Jo_rd_an ____ _
DESCRIPTION
Brown lean Clay with sand, stiff to soft (CL)
Brown silty Clay with sand, soft to stiff ML)
Brown sandy Silt, loose (ML)
Brown lean Clav, soft to stiff (CL)
Gray sandy lean Clay, stiff to soft (CL)
(CL·
MC LL PL Pl ·#200 swell pp 'l6 % 'l6 'l6 'l6 % TSF
17 25 18 7 81
33 19 15 3 68
28 42 18 24 94
20 28 15 13 67
Subsurface Conditions may significantly vary at other site locations Dltflcultles may be encountered during construction duo to the nature of the subsurface formaUons
METCO FIGURE 2
LOG OF BORING B-1
PROJECT: Proposed Three Span Bridge J2·8423(004), Over Turkey Creek, Galfiekl County, Oklahoma Project No.: OGA-15029
Date Drilled: 4/3/2015 Location: Approx. Station 120+86.00, Approx. 15.0' Rt. of Proposed CL. Elevation: 1133.08' -----Depth To Water At Completion: 22.0' Depth To Water On: End of Day Was: 27.0' -------- ----Drflled By: Kalyn Logger: _____ Jo_rda_n ___ _ Approximate Completion Depth: __ e_o_.o_· _
31
SAMPLE TYPE
100/0.3"
DESCRIPTION
Light brown silty Sand, loose to dense (SM)
Continuous collapse at an approximate depth of 35 feet
Reddish brown ~with sandstone seams and lenses, hard
TC @40.0': 50/0.3u, 50/0.2u
[email protected]': 50/0.2", 50/0.1"
100J0.e• TC@ 55.0': 50/0.5", 50/0.3"
MC LL PL Pl ·#200 swell PP % % % % % % TSF
20 NP NP NP 30
22 34 19 15 75
23 35 19 16 77
23 35 19 16 77
19 34 18 15 89
NOTES: Subsurface Conditions may significantly vary at other site locations Difficulties may be encountered during construction due to the nature of the subsurface formations
METCO FIGURE 3
LOG OF BORING B-1
PROJECT: Proposed Three Span Bridge J2-8423(004), Over Turkey Creek, Garfield County, Oklahoma Project No.: OGR-15029
Date Drilled: 4/3/2015 Location: Approx. Station 120+86.00, Approx. 15.0' Rt. of Proposed CL. Elevation: 1133.08' -----Depth To Water At Completion: 22.0' Depth To Water On: End of Day
-------''-----~ Was: 27.0' ----
Drilled By: Kalyn Logger: _____ Jo_rdan ____ _ Approximate Completion Depth: __ oo_.o_· _
i= Iii ..J 0 SAMPLE MC LL PL Pl -#200 swell pp Ill DESCRIPTION Q. w ::::E TYPE % % % % % % TSF !!l LL. ?ii
1oom,3• Reddish brown §haJft with sandstone seams 61 - ~ and lenses, hard (Continued) v 62_ TC @60.0': 50/0.2", 50/0.1" 63 -64 -~ 66 -67 -68 -69 -...!!! 71_
72 -73 -74 -i2 76_
77 -78_
79_
....!2 81_
82_
83_
84 -~ 86 -87 -00_
89_
90
NOTES: Subsurface Conditions may significantly vary at other site locations Dlfflcultles may be encountered during construction duo to the nature of the subsurface formations
METCO FIGURE 4
LOG OF BORING B-2
PROJECT: Proposed Three Span Bridge J2-8423(004), Over Turkey Creek, Garfield County, Oklahoma Project No.: OGR-15029
Bevation: 1132.98' Date Drilled: 4/3/2015 Location: Approx. Station 121+00, Approx. 15.0' Lt. of Proposed CL. -----Depth To Water At Completion: 23.0' Depth To Water On: ___ E_n_d_o_fD_a .... v ___ _ Was: 27.0'
Drmed By:
~ ti a..w ~u..
2
3
4
6
7
8
9
11
14
21
NOTES:
Kalyn
SAMPLE TYPE
----Logger: _____ J_o_rd_a_n ___ _ Approximate Completion Depth: __ s_a_.o_· _
DESCRIPTION MC LL PL Pl ·#200 swell PP % % % % % % TSF
Brown lean Clay with sand (CL)
16 37 16 22 83
Brown lean Clay (CL) 18 27 17 10 90
24 33 16 17 97
26 40 14 26 97
Gray lean Clay (CL) 30 45 18 27 96
Subsurface Conditions may significantly vary at other site locations Dlfflcultlas may be encountorad during construction due to tho naturo ot the subsurface formations
MET CO FIGURE 5
LOG OF BORING B-2
PROJECT: Proposed Three Span Bridge J2·8423(004), Over Turkey Creek, Garfield County. Oklahoma Project No.: OGR-15029
Date Drilled: 4/3/2015 Location: Approx. Slalion 121+00, Approx. 15.0' Lt. of Proposed CL. Elevation: 1132.98' -----Depth To Water At Completion: 23.0' Depth To Water On: ___ En_d_o_f_D_.ay.__ __ Was: 27.0' ----Drilled By: Kalyn Logger: ____ J_o_rd_an ___ _ Approximate Completion Depth: __ 5_8_.o_· _
:c ..... ..... w Q. w ~ u.
57
58
59
60
NOTES:
SAMPLE TYPE
DESCRIPTION
Gray lean Clay (CL) (continued)
Reddish brown sandy lean Clav, hard (CL)
Reddish brown sandy Shale with sandstone sesames and lenses, moderately hard to hard
[email protected]': 50/2.0", 50/1.8"
TC @45.0': 50/1.3", 50/0.5"
MC LL PL Pl ·#200 swell PP % % % % % % TSF
34 18 15 67
23 35 16 19 65
24 33 17 16 66
10011.o· Reddish brown Shale with sandstone seams 21 34 18 16 88
and lenses, hard (CL)
TC @so.a•: so10.s", so/0.5"
1ooro.3· TC @ 55.0': 50/0.2", 50/0.1" 22 40 19 21 88
100 .2' [email protected]': 50/0.1", 50/0.1" 21 38 19 19 89
Subsurface Conditions may significantly vary at other site locations Dlfllcultlea may be encountered during construction due to the nature of the subsurface formations
METCO FIGURE 6
LOG OF BORING B-3
PROJECT: Proposed Three Span Bridge J2·8423{004), Over Turkey Creek, Garfield County, Oklahoma Project No.: OGR-15029
Date Drilled: 3/21/2015 Location: Approx. Station 122+38, Approx. 15.0' Rt of Proposed CL. Elevation: 1133.38'
Depth To Water At Completion: 30.0' Depth To Water On: ___ En_d_o_f _Da-=y'"---- Was: ----30.0'*
Drilled By: Kalyn Logger: _____ Jo_r_dan ____ _ Approximate Completion Depth: __ eo_.o_· _
::c Iii ...I 0
Ii: w ID ~
~ ... ~
NOTES:
SAMPLE TYPE
DESCRIPTION
Brown sandy lean Clay, very stiff to stiff (CL)
Brown lean Clay, stiff to firm (CL)
Dark brown lean Clay, firm to stiff (CL)
Reddish brown lean Clay with sand, stiff to very stiff (CL)
MC LL PL Pl ·#200 swell pp
% % % % % % TSF
17 31 19 13 65
16 35 19 16 97
14 31 16 15 97
29 37 20 17 99
19 40 19 21 82
Subsurface Conditions may significantly vary at other site locations Dlrtlcultles may be encountered during construction due to the nature of the subsurface formations
* Boring collapsed to approximate depths of 30.0' feet below existing grade, upon auger removal.
METCO FIGURE 7
60
NOTES: Subsurface Conditions may significantly vary at other site locations DIHlcultles may be encountered during construction due to the nature of the subsurface formations
* Boring collapsed to approximate depths of 30.0' feet below existing grade, upon auger removal.
MET CO FIGURE 8
LOG OF BORING B-3
PROJECT: Proposed Three Span Bridge J2-8423(004), Over Turkey Creek, Garlle!d County, Oklahoma Project No.: OGA-15029
Date Drilled: 3/21/2015 Location: Approx. Station 122+38, Approx. 15.0' Rt of Proposed CL. Elevation: 1133.38' -----Depth To Water At Completion: 30.0' Depth To Water On: End of Day ---------- Was: __ 3_o._o_'*_ Drilled By: Kalyn Logger: _______ J_o_rd_a_n _____ _ Approximate Completion Depth: ___ eo_.o_· _
I= Iii ..J 0 SAMPLE MC LL PL Pl ·#200 swell pp m DESCRIPTION a. w ::!: TYPE % % % % % % TSF ~ IL > (/)
1oom.e• Reddish brown~ with sandstone seams 61 I v - and lenses, hard (Continued) 62_ TC@ 60.0': 50/0.5", 50/0.3"
63 -64 -~ 66 -67 -68 -69 -~ 71 -72 -73 -74 -.2 76_
11_
78_
79 -....!!! 81_
82_
83_
84_
...!! 86_
87 -ea_
89_
90
NOTES: Subsurface Conditions may significanUy vary at other site locations DlfflculUos may be encountered during construction due to the nature of tho subsurface formations
* Boring collapsed to approximate depths of 30.0' feet below existing grade, upon auger removal.
METCO FIGURE 9
LOG OF BORING B-4
PROJECT: Proposed Three Span Bridge J2·8423(004), Over Turkey Creek, Garfield County, Oklahoma Project No.: OGR·15029
Date Drilled: 4/3/2015 Location: Approx. Station 122+50, Approx. 15.0' U of Proposed CL Elevation: 1135.38' -----Depth To Water At Completion: 24.0' Depth To Water On: ___ En_d_o_f_D __ ay""---- Was: __ 2_8_.o_· _
Drilled By: Kalyn
NOTES:
SAMPLE TYPE
Logger: _____ J_or_da_n ___ _
DESCRIPTION
Brown lean Clav. firm to stiff (CL)
Brown lean Clay. stiff to firm (CL)
Brown sandy lean Clay, firm (CL)
Gray lean Clay, firm to stiff (CL)
Light brown sandy lean Clav. stiff to soft (CL)
Approximate Completion Depth: __ so_.o_· _
MC LL PL Pl ·#200 swell PP % % % % % % TSF
14 30 18 12 90
14 34 17 17 88
10 19 14 6 56
26 40 17 23 96
18 28 15 14 63
Subsurface Conditions may slgnlficantly vary at other site locations Dltflcultles may be encountered during construction due to the nature of the subsurface formations
METCO FIGURE 10
LOG OF BORING B-4
PROJECT: Proposed Three Span Bridge J2-8423(004), Over Turkey Creek, Garfleld County, Oklahoma Project No.: OGR-15029
Date Drilled: 4/3/2015 Location: Approx. Station 122+50, Approx. 15.0' U. of Proposed CL. Elevation: 1135.38' -----Depth To Water At Completion: 24.0' Depth To Water On: ___ E_nd_o_f_D_a .... y __ _ was: __ 2_0_.o_· _
Drilled By:
31
32
33
34
36
37
38
Kalyn
SAMPLE TYPE
1/6" 116" 3/6"
No sampling
Logger: _____ J_ord_an ____ _
DESCRIPTION
Light brown poorly graded Sand, loose to dense (SP)
Continuous collapse at an approximate depth of 35 feet
Approximate Completion Depth: 60.0' ----MC LL PL Pl ·#200 swell PP % % % % % % TSF
39-t~~~~==~-+=-~~~----~::-:---:-~~---=----t~:::--t~i:--1~...-1~:::--11-::-:::--tr---tr----t 501a.o· Reddish brown sandy Shale with sandstone 22 28 13 16 53
10011 .a· seams and lenses, hard {CL) 22 35 11 1a 63
TC@ 40.0': 50/1.0", 50/0.8"
100/0.5" TC@ 45.0': 50/0.3", 50/0.2" 21 35 18 17 66
NOTES: Subsurface Conditions may slgnlficantly vary at other site locations Dlfflcultles may be encountered during construction due to tho nature of tho subsurface formations
METCO FIGURE 11
LOG OF BORING B-4
PROJECT: Proposed Three Span Bridge J2-8423{004), Over Turkey Creek, Garfield County, Oklahoma Project No.: OGR·15029
Date Drilled: __ 4_/3"-/2_0_1 s __ Location: Approx. Station 122+50, Approx. 15.0' LI. of Proposed CL Elevation: 1135.38'
Depth To Water At Completion: 24.0' Depth To Water On: End of Day -------------- Was: 28.0' ----Drilled By: Kalyn Logger: _____ J_o_rd_an ____ _ Approximate Completion Depth: __ so_.o_· _
j: l;j ..J 0 SAMPLE MC LL PL Pl -#200 swell pp m DESCRIPTION Q. w ::t TYPE % % % % % % TSF ~ u. > en
.... 100/0.5" Reddish brown sandy Shale with sandstone 61 ;; - ~ seams and lenses, hard (Continued)
62_ TC @60.0': 50/0.3°, 50/0.2° 63 -64_
~ 66_
67_
68_
69 --2!? 11_
72_
73_
74_
-.:!! 76 -77 -78 -79 -
.......!!! 81 -82_
83_
84 --..!! 86_
87_
ee_
89 -90
NOTES: Subsurface Conditions may significantly vary at other site locations Difficulties may be encountered during construction due to the nature of the subsurface formations
MET CO FIGURE 12
~ a ~
-
KEY TO SYMBOLS & PATTERNS USED ON BORING LOGS
Lean Clay ~ Standard Penetration Test
Sandy Lean Clay
~ Bag Sample
Silty Clay
~ Texas Cone Penetrometer Test
Sandy Silt
l:m!ll:ll'I Silty sand
l'!::,l:l:l1lllillll Poo~ Graded Sand
§Shale
. '
Sandy Shale
ABBREVIATIONS USED
MC, % Moisture Content expressed in percentage LL,% Liquid Limit expressed in percentage Pl,% Plasticity Index expressed in percentage
DD, PCF Dry Density expressed in pounds per cubic feet -#200, % Soil Fraction Passing No. 200 Sieve expressed in percentage swell, % Free swell under overburden pressure expressed in percentage PP, TSF Pocket Penetrometer Reading expressed in tons per square feet
METCO FIGURE 13
Boring# Station & Offset Feet
B-1 120+86.00 Approx. 15' Rt. of Proposed
CL
B-2 121+00.00 Approx. 15' Lt. of Proposed
CL.
B-3 122+38.00 Approx.15' Rt. of Proposed
CL
B-4 122+.50.00 Approx.15' Lt. of Proposed
CL.
Ultimate H-Pile Capacity Proposed Bridge No. J2-8423(004)
Over Turkey Creek OGR-15029
Pile Surface Top of Type Elevation Rock
Feet Elevation Feet
HP12X53 1133.08 1094.08
HP12X53 1132.98 1094.48
HP12X53 1133.38 1094.38
HP12X53 1135.38 1096.38
*Approximated Value
Estimated Nominal Tip (Ultimate)
Elevation Design Feet Capacity
Tons 1084.00 200*
1084.00 200*
1084.00 200*
1086.00 200*
Boring# Test Depth (Feet)
B-1 40.0 45.0 50.0 55.0 60.0
B-2 40.0 45.0 50.0 55.0 58.0
B-3 40.0 45.0 50.0 55.0 60.0
B-4 40.0 45.0 50.0 55.0 60.0
Texas Cone Penetration Test Results Proposed Bridge J2-8423(004)
Over Turkey Creek OGR-15029
Texas Cone Elevation of Test Penetration (Feet)
Cin/100 blowsl
0.5 1093.08 0.3 1088.08 0.3 1083.08 0.8 1078.08 0.3 1073.08
3.8 1092.98 1.8 1087.98 1.0 1082.98 0.3 1077.98 0.2 1074.98
0.5 1093.38 0.3 1088.38 0.2 1083.38 1.0 1078.38 0.8 1073.38
1.8 1095.38 0.5 1090.38 0.8 1085.38 0.3 1080.38 0.5 1075.38
Nominal (Ultimate) Nominal (Ultimate) End Bearing Skin Friction
ctsn ctsn 60 9.0 60 9.0 60 9.0 60 9.0 60 9.0
32 4.8 60 9.0 60 9.0 60 9.0 60 9.0
60 9.0 60 9.0 60 9.0 60 9.0 60 9.0
60 9.0 60 9.0 60 9.0 60 9.0 60 9.0
l(