4
John Dunphy, CCIM, SIOR +1 813 387 1312 [email protected] Scott Altieri +1 813 387 1313 [email protected] For more information, contact: Jones Lang LaSalle Brokerage, Inc. a licensed real estate broker © 2018 Jones Lang LaSalle IP, Inc. All rights reserved. All information contained herein is from sources deemed reliable; however, no representation or warranty is made to the accuracy thereof. FOR SALE OR LEASE Cypress Business Park 12300 62nd St. N. Pinellas Park, FL 33773 20,000–208,000 square feet

FOR SALE OR LEASE - LoopNet...This project will create two new, four-lane, elevated, tolled roadways that will provide direct connections, with no intersections, between U.S. Highway

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FOR SALE OR LEASE - LoopNet...This project will create two new, four-lane, elevated, tolled roadways that will provide direct connections, with no intersections, between U.S. Highway

John Dunphy, CCIM, SIOR+1 813 387 [email protected]

Scott Altieri+1 813 387 [email protected]

For more information, contact:

Jones Lang LaSalle Brokerage, Inc. a licensed real estate broker© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. All information contained herein is from sources deemed reliable; however, no representation or warranty is made to the accuracy thereof.

FOR SALE OR LEASE

Cypress Business Park12300 62nd St. N.Pinellas Park, FL 33773

20,000–208,000 square feet

Page 2: FOR SALE OR LEASE - LoopNet...This project will create two new, four-lane, elevated, tolled roadways that will provide direct connections, with no intersections, between U.S. Highway

Development overview

Size (SF) 208,000 Sewer Pinellas County

Clear height 30’ Slab thickness 6”

Loading Rear Average # of docks/bay 3–4

Doors 66 dock-high doors Electric Duke Energy

Auto parks 209 Water City of Pinellas Park

Power 3-phase power Fiber Verizon

Sprinklered ESFR Phone Verizon

Building specifications

Page 3: FOR SALE OR LEASE - LoopNet...This project will create two new, four-lane, elevated, tolled roadways that will provide direct connections, with no intersections, between U.S. Highway

• State-of-the-art concrete tilt-wall construction

• Functional multi-building industrial park environment

• Class A

• Office-to-suit

• 3-phase power

• Dock-high, rear-load

• ESFR fire sprinkler system

• 30’ clear height

• 209 auto parks

• 6” slab thickness, 3,000 psi

• R-19 roof

• LED lighting

Neighboring tenants

118th Ave. N.

Bryan Dairy Road

66th St. N.

49th St. N.

UPS

Belcher Pharmaceuticals

Bryan Dairy East

Ven-Tel Plastics

Ulmerton Road

Additional highlights

Cypress Business Park

Icot Center

Modern Silicone Technologies, Inc.

Pinellas County School Board

Leader’s Casual Furniture

Honeywell Aerospace

Tampa Bay Extended StayParallon

Dunkin’ Donuts

Wendover Art Group

Page 4: FOR SALE OR LEASE - LoopNet...This project will create two new, four-lane, elevated, tolled roadways that will provide direct connections, with no intersections, between U.S. Highway

John Dunphy, CCIM, SIOR+1 813 387 [email protected]

Scott Altieri+1 813 387 [email protected]

Jones Lang LaSalle Brokerage, Inc. a licensed real estate broker© 2018 Jones Lang LaSalle IP, Inc. All rights reserved. All information contained herein is from sources deemed reliable; however, no representation or warranty is made to the accuracy thereof.

For more information, contact:

Cypress Business Park is in the heart of the Mid-Pinellas submarket, the largest and most convenient area in Pinellas County. The submarket’s location, along with a large road network (I-275, U.S. Highway 19, Ulmerton Road, Roosevelt Blvd., 49th St., 66th St. and Bryan Dairy Road/118th Ave. N) provides unparalleled access to employees and employers.

To make travel into and around Pinellas County easier and safer, changes to the existing roadway system are under way. The Gateway Expressway project will link I-275, U.S. Highway 19 and the St. Petersburg-Clearwater International Airport (PIE). This project will create two new, four-lane, elevated, tolled roadways that will provide direct connections, with no intersections, between U.S. Highway 19 and I-275, and between the Bayside Bridge (north of 49th St. N.) and I-275. Construction started in November 2017 and will run through late 2021. The Gateway Expressway project will enhance safety, add capacity and improve mobility.

Cypress Business Park resides within minutes of this highway network.

Locational overview

1 HOUR

3 HOURS

4 HOURS

Hardee

Hillsborough

Manatee

Pasco

Pinellas Polk

Sumter

St. Petersburg

Tampa

Lakeland

275

75

75

75

275

275

4

Polk PkwyHillsborough Ave

Howard Frankland Bridge SR 60

Gandy Bridge

Courtney Campbell Cswy US H

wy

301

US

Hw

y 19

US Hwy 3

01

Vete

r an s

Ex p

y

Selm

on C

ross

town Expy

4

4

SR 39

US H

wy 98

US Hwy 98

US Hwy 92

US Hwy 92

US Hwy 17

US Hwy 17

SR 60