11
The Return of Carbon Finance for Renewable Energy Projects: When? What? How? Really? William Greene Senior Advisor - RE [email protected]

for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.com

The Return of Carbon Finance

for Renewable Energy Projects:

When? What? How? Really?

William Greene

Senior Advisor - RE

[email protected]

Page 2: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.com

multiconsult.no

Page 3: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.com

Multiconsult ASA: full service engineering & technical consultancy

• JVs to support Energy and Oil & Gas projects

• Permanent presence through subsidiary

Sales offices

Founded 1908 (listed 2015, OSL:MULTI)

Employees 2.450

Operating revenues 2.968 MNOK (2016)

Headquarters Oslo, Norway

Page 4: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.com

4

multiconsultgroup.com

Carbon finance: extra revenues to project owners where projects produce «additional» GHG reductions

Offset credits (tCO2e)

$/€/ ¥

Project Developer Covered Emitter

DEMANDSUPPLY

Page 5: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.com

That’s had its share of ups

€ 0.22/tCO2e

and downs…

0

2

4

6

8

10

12

14

16

€/T

CER Futures Price (ICE)

Page 6: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.com

And now promises a rebound…

S Korea KOCs -55Mt p/a?China CCERs -

400Mt p/a?

+ CORSIA (2021+) – 100 Mt p/a?+ New Mechanisms under Paris Agreement (2020+) - ?

Source: IETA, 2017

Japan JCM –50Mt p/a?

Page 7: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.com

But what have we learned?

Multiconsult & OEKO institute, 2016

Likelihood of being real, measurable, additional

Potential CER supply To 2020, Mt CO2e

Low: 3527 Medium: 943 High: 359

Hydro power

Wind power

Fossil fuel switch

Waste heat recovery

Efficient lighting

Cook stoves Adipic acid

HFC-23 abatement

Coal mine methane Landfill gas

Biomass power

HFC-23 abatement Nitric acid

1669 1397 232 222 4 2 257 191 170 163 162 184 175

85 %

13 %2 %

# CDM projects

Low Medium High

73 %

20 %

7 %

CER supply 2013 to 2020, (Mt CO2e)

Low Medium High

Page 8: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.com

Do we need this complexity?

1. Project DesignProject Concept Note,

Methodology, Stakeholder Consultation, Project Design

Document (PDD)

2.1 Host Country Approval

Letter of Approval

2.2 ValidationValidation Report, PDD

3. Registration

4. MonitoringMonitoring Report

5. VerificationVerification Report

6. Certification and Issuance of Credits

CER7. Commercialization

Designated Operational Entity 1

CDMExecutive Board

Project Developer

Designated Operational Entity 2

CDMExecutive Board

Project Developer Credit Buyer

Project Developer

Project Developer

Page 9: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.commulticonsultgroup.com

«We are what we do.And what we do is what we become.»

wig @multiconsult.noWilliam Greene

Page 10: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.com

10

multiconsultgroup.com

Status of the industry 2017

5000+ projects. 1.75 bn+ tCO2e reductions (?)

の基本コンセプト规则

Page 11: for Renewable Energy Projects: When? What? How? …...2017/06/03  · 2.1 Host Country Approval Letter of Approval 2.2 Validation Validation Report, PDD 3. Registration 4. Monitoring

multiconsultgroup.com

All RE projects have suspect additionality

Oeko Institute & Carbon Limits, 2016

SLIDE