4
Eric Rapp sior Senior Vice President 952 837 3060 [email protected] colliers.com/msp ECOLAB UNIVERSITY OFFICE BUILDING 386 Wabasha Street North | St. Paul, MN For Lease > Accelerating success.

For Lease > ECOLAB UNIVERSITY OFFICE BUILDING … · include the installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS . Two enclosed

Embed Size (px)

Citation preview

Page 1: For Lease > ECOLAB UNIVERSITY OFFICE BUILDING … · include the installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS . Two enclosed

Eric Rapp siorSenior Vice President952 837 [email protected] colliers.com/msp

ECOLAB UNIVERSITY OFFICE BUILDING386 Wabasha Street North | St. Paul, MN

For Lease >

Accelerating success.

Page 2: For Lease > ECOLAB UNIVERSITY OFFICE BUILDING … · include the installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS . Two enclosed

ECOLAB UNIVERSITY OFFICE BUILDING386 Wabasha Street North | St. Paul, MN

> BUILDING INFORMATION

> BUILDING ADDRESS 386 Wabasha Street North St. Paul, MN

> BUILDING SIZE 154,604 SF

> YEAR BUILT 1971, renovated in 1997

> LOCATION The Property is located at the corner of 6th Street and Wabasha Street in St. Paul, MN.

> LAND SIZE 0.43 acres (18,731 square feet)

> NUMBER OF STORIES 16 stories with two lower levels used for mechanicals and storage. The 16th floor is also used for mechanical.

> PARKING No parking on site; however, it is directly adjacent and connected via skyway to expansive parking ramps adjoining the property.

> HVAC Heating and cooling is provided by District Energy, St. Paul.

> EMS The buildings HVAC systems are controlled and monitored by Trane Trace energy management control system, installed in 2001 and updated in 2011.

> WINDOWS The building has an aluminum framed curtain wall system above the second floor (skyway) level, with 1” insulating vision glass and glossy finish opaque panes backed with 2” insulation.

> ROOF Reinforced 60-mil EPDM roof replaced in 2001.

> ELEVATORS Four elevators serving lower level floors through floor 15. All elevators were updated in 2003 to include the installation of Schindler Miconic 10 elevator controls as well as updated cab finishes

> STAIRWELLS Two enclosed stairwells in the core of the building and one open air stairwell between the first lower level and the plaza area.

> FIRE PROTECTION 100% wet sprinklered

Page 3: For Lease > ECOLAB UNIVERSITY OFFICE BUILDING … · include the installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS . Two enclosed

ECOLAB UNIVERSITY OFFICE BUILDING For Lease >

> BUILDING INFORMATION

> SECURITY On-site security guard in place 6:30 a.m. - 8:00 p.m. Monday thru Friday 8:00 a.m. - 1:00 p.m. Saturday

> ADJACENT USES World headquarters building for Ecolab and Alliance Bank Building, both connected with inside common access points.

> SKYWAY Ecolab University is connected via skyway to Alliance Bank Building and is connected to the new Green Line transit station.

> ZONING Central Business District, per the City of St. Paul

> PARKING The skyway connected Alliance Bank Building’s parking structure features parking for 1,055 vehicles.

> NET RENTAL RATENegotiable

> 2018 TAX/ OPSTax/PSF: $2.82Ops/PSF: $10.20 Total: $13.02

Page 4: For Lease > ECOLAB UNIVERSITY OFFICE BUILDING … · include the installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS . Two enclosed

ECOLAB UNIVERSITY OFFICE BUILDING386 Wabasha Street North | St. Paul, MN

For Lease >

Eric Rapp siorSenior Vice President952 837 [email protected]

Accelerating success.

CONTACT US

Colliers International | Minneapolis-St. Paul900 2nd Avenue South, Suite 1575952 897 7700 | colliers.com/msp

386 WABASHASTREET NORTH