FOPS C-III Progress Report ,Q-2

Embed Size (px)

Citation preview

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    1/19

    Field Operations C-III

    Q-2 , Performance Review

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    2/19

    KPI Review - Q,2

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    3/19

    KPI Target Achieved Comments

    TCHAvailability

    99 .99 43

    DCR .1 28 .1 09

    CSSR 97 .98 13

    MPD 86 .82 84 MPD has improvedafter swap but

    still Abis and Ainterface dropsespecially at

    Sahiwal BSCscaused MPD

    degradation

    Q2 Overall KPI Figures

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    4/19

    Categorical TCH Availability

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    5/19

    Categorical DCR

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    6/19

    Sub-regional CSSR

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    7/19

    Improvement inMPD afterPost swap

    transcoder dropIssue resoluton

    Transcoder drops atSahiwal BSC02

    Causing degradation inMPD.

    Imrovement observed

    afterMGW upgrade.

    A and Abis interfaceDrops on Sahiwal

    BSC02and Sahiwal

    BSC03.

    Regional MPD

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    8/19

    Projects Review

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    9/19

    BTS SWAP Project

    Over all Project Status

    Project Status , Q-2

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    10/19

    Rollout Project Review , Q-2

    Category TP Built SharedTargeted 0 9

    Doables 0 9

    Achieved 0 9

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    11/19

    Decomissioning Project Review , Q-2

    01 Host Approved Sites has been rejected by SD due to unavailability of power requirement.by Host

    , -Decommissioning Q 2Total Allocated 23

    TSS Accepted 5

    TSS Rejected 3

    Host Approval Awaited 3

    RFI 1

    Rco 1

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    12/19

    Operational Excellence

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    13/19

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    14/19

    OE Savings Realized from Inhouse Genset Controllersites , Q-2

    * Cost of Diesel per Liter = PKR 62

    Quarter 02 OPEX Savings

    Total Sites with GEMInstalled

    10

    Total Fuel Consumptionwithout GEM

    .3924 5 Liters

    Total Fuel Consumed 725 Liters

    Total Fuel Saved 3200 Liters

    Total OPEX Savings PKR , ,1 98 400

    %Overall age Savings %82

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    15/19

    * Cost of Diesel per Liter = PKR 62

    OE Savings Realized on GEM sites , Q-2

    Quarter 02 GEM Savings

    Total Sites with GEMInstalled

    387

    Total Fuel Consumptionwithout GEM

    ,481 232 Liters

    Total Fuel Consumed ,245 041 Liters

    Total Fuel Saved ,236 191 Liters

    Total OPEX Savings , , *PKR 14 643 842

    %Overall age Savings %49

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    16/19

    * The total no.s are without the in house GEM solutions.

    OE Savings Realized on All GEM sites , Q-2

    May 10 OPEX Savings

    Total Sites with GEMInstalled

    486

    Total Fuel Consumptionwithout GEM

    ,603 290Liters

    Total Fuel Consumed ,305 618 Liters

    Total Fuel Saved ,297 672 Liters

    Total OPEX Savings , , **PKR 18 455 664

    %Overall age Savings . %49 3

    * Cost of Diesel per Liter = PKR 62

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    17/19

    OE GENSET Refueling , Q-2

    Refueling Target vs ActualMonths Avg Load Shedding Target Standardized Refueling Actual Refueling Fuel Saved Fuel Saved

    (Hrs/Site) (Litre) (Litre) (Litre) (%age)

    April 12.6 744,054 560,000 150,000 20%

    May 8.25 481,292 370,000 66,740 10%

    June 6.18 351,830 328,000 65,462 11%

    Q2 -2010 1,577,176 1,258,000

    282,20217.9%

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    18/19

    OE Electicity BillingElectricity Billing Cost (Forecasted VS Actual) April- 2010

    Months FC Load Shedding

    (Hr/Site)

    Load Shedding hours

    (Hr/Site)

    FC Electricity Billing

    (PKR)

    Actual Billing

    Excluding Taxes(PKR)

    Variation FC Vs Actual

    (%age)

    April 10 12.6 16482400 15224706 8%

    May 10 8.4 16482400 13,680,280 17%

    Electricity Billing Cost (Standard VS Actual) April 2010

    Months

    Load SheddingDuration

    (Hr/Site/Day)

    StandardBilling

    (PKR )

    Actual BillingExcluding Tax

    (PKR )

    Over Billing(PKR)

    Variation inStandard Vs Actual

    (%age)

    Variation excludingoverbilling

    (%age)

    April 12.6 16,170,425 15,224,706 - 5.85% 6%

    May 8.4 19,737,564 13,680,280 - 30.68% 31%

  • 8/7/2019 FOPS C-III Progress Report ,Q-2

    19/19

    Thank You