31
Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Embed Size (px)

Citation preview

Page 1: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

A Tool for EnvironmentalScheduling, Accountability andPerformance Measurement

TxECOS

Page 2: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Table of Contents

2

What is TxECOS?

How are things documented in the system?

System Architecture

How was TxECOS built?

Demo

1

2

3

4

5

Training6

Where we’re going7

Questions?8

Page 3: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

What is TxECOS?

3

Official File of Record

Project Documentation

Project Decisions

NEPA

Approval

Page 4: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

How are things documented in the system?

4

• Tracks, who , when , howTask

• Collects data of technical analysis and reviewsForms

• TxDOT’s environmental commitments to follow pre, during, and post construction EPICs

• Communication and approval with external and internal resource agency approvals.Coordination's

• Allows to store all documents associated to the project digitally in one location Documents

Page 5: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

System Architecture

5

Integration links to SQL Replicated Databases

Texas ECOS Application

External Web Server•Middleware

•DOT Java File

•JSP Files

•Java Beans

•Business Logic

Oracle Database Server• DBMS

•Tables

•Packages

•Types

Desktop or Laptop Computers•Internet Browser > URL to Texas ECOS

Internal Server•Data Management

DBMS

Page 6: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Database Interface Diagram

6

Page 7: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Application Architecture

7

Page 8: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

How was the system built?

8

Page 9: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

TxECOS - Business Analysis Team

9

Page 10: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Demonstration of TXECOS: Login

10

Page 11: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Communication

11

Page 12: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Reports

12

Page 13: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Administration

13

Page 14: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Search

14

Page 15: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Projects

15

Page 16: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Project Definition

16

Page 17: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Project Definition

17

Page 18: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Project Definition

18

Page 19: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Project Definition

19

Page 20: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Project Definition – Project Associations

20

Page 21: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Project Summary

21

Page 22: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Tasks

22

Page 23: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Forms

23

Page 24: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Coordination

24

Page 25: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: EPICs

25

Page 26: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Documents

26

Page 27: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Screen Capture: Journal

27

Page 28: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Training

28

Page 29: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Where are we going?

29

• Update reports to reflect new CE classification types.

• Creating a 8 to 5 work space environment.

• Improved overall performance.

Portability and StandardizationTechnical Functionality & Reporting

Scope Development

• Retire older screening forms and develop a single project level scope form.

• Automate the CE checklist and include new business rules.

• Documents Approval times.

• Measures review times for document clearances.

Portability and StandardizationNew Forms

• Develop GIS viewer to aide in technical analysis.

• Viewer includes agency related tools for analysis – Storm Water, Natural Diversity Database.

• Consume layers and map services from external agencies.

GIS Interface

• Early risk identification.

• Automation of scope development.

• Reduce redundant data entry.

Page 30: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Questions?

30

Page 31: Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS

Footer Text

Contact Information

31

Michael RhodesEnvironmental Specialist,Environmental Affairs DivisionTexas Department of TransportationEmail: [email protected](254) 867-2739 Sai Kolla, PMP®

Business Analyst,Environmental Affairs DivisionTexas Department of TransportationEmail: [email protected] (512) 416-2774

Troy D. SykesBusiness Analyst,Environmental Affairs DivisionTexas Department of TransportationEmail: [email protected](512) 416-2571