Durability checks Following checks were introduced in 2002 in addition to earlier structural details. Fatigue design for steel members Concrete cover depth design for structures near the shoreline Deck slab design (fatigue design) Water-proofing for deck No specific design method or safety factors in terms of redundancy

Following checks were introduced in 2002 in addition to

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Following checks were introduced in 2002 in addition to

Durability checks Following checks were introduced in 2002 in addition to earlier structural details.

• Fatigue design for steel members • Concrete cover depth design for structures near the shoreline • Deck slab design (fatigue design) • Water-proofing for deck

No specific design method or safety factors in terms of redundancy

Page 2: Following checks were introduced in 2002 in addition to

Theory for the chloride ingress time-evolution and nation-wide observation of flying chloride reached to the surface of bridges

2

Minimum cover depths to prevent reinforcement from corrosion over 100 years for each regions

Page 3: Following checks were introduced in 2002 in addition to

e.g Minimum cover concrete depths for cast-in-place prestressed concrete superstructures

Regional category Cover Concrete Depth (mm)

S 70 + α A 70 B 50 C 35

3

Page 4: Following checks were introduced in 2002 in addition to

Fatigue tests using a moving wheel loading machine

Durability --- a function of (Load)12

Page 5: Following checks were introduced in 2002 in addition to

Water proofing for decks

Page 6: Following checks were introduced in 2002 in addition to

Hole for inspection (No manhole on the other side)

Considerations requested in design for maintenanceability

Page 7: Following checks were introduced in 2002 in addition to

Need to design for maintenanceability in initial design

Sag at the mid-span hinge

Built in 1977

7

Collapse of Koror–Babelthuap, Palau, in 1996 (Burgoyne & Scantlebury, The Structural Engineer – 6 June 2006)

Page 8: Following checks were introduced in 2002 in addition to

8

Page 9: Following checks were introduced in 2002 in addition to

Remedial work in 1996.

9

Page 10: Following checks were introduced in 2002 in addition to

PC-cables were originally congested at the top flange

Little reinforcement surrounding PC cable anchorages

Concrete quality was not good Larger creep factors.

Concrete deck material was partially removed prior to resurfacing.

Localized stress and crack could appear at the top flange.

2-year after the retrofit

10

Page 11: Following checks were introduced in 2002 in addition to

Japan-Palau Friendship Bridge, 2002 (Aided by Japan)

11