4
FOGA ApS FISHERMENS INFORMATION OF OIL‐ AND GAS ACTIVITIES Trafikhavnskaj 19 DK‐6700 Esbjerg Tel.: +45 75 45 11 44 E‐Mail: [email protected] Web page: www.foga.dk NORTH SEA ACTIVITIES Week 33 August 11, 2020 FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities: © Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty’s Stationery Office and the UK Hydrographic Office (www.GOV.uk/UKHO). "Unter Verwendung von Datenmaterial des Bundesamtes für Seeschifffahrt und Hydrographie (BSH) hergestellt (Lizenznr. 2017‐06)". Signatures: Warning Safety zone Pipeline with 200 meter protective zone Buoy Existing installation Mobile rig 1 MAERSK RESOLUTE: Port of Esbjerg. 4 CROSSWAY EAGLE in position at DAN FA‐FE. 5 MAERSK GUARDIAN: Port of Esbjerg. 12 COLGA: Port of ESBJERG. A lost anchor and 6 schakles of chain is located on pos. 56°00.28N 007°57.7E Vessels: The vessel PIONEERING SPIRIT is at the TYRA Field for lifting the remaing topsides and jackets until approx. 13/8. The vessel FORTITUDE operating the TYRA Field. The vessel BOKA ATLANTIS conducting diving inspections at the DUC Fields. The vessel VESTLAND CYGNUS is working at the DUC Fields. The vessel MAERSK TRACKER conducting maintenance at the DUC Fields. The CTV's WORLD SKY, MHO GURLI, CONTENDER & RIX TIGER at the Horns Rev 3 OWF. The jack‐up L/B JILL is working at the THOR site. Info 1.0 Info 2.0 Info 8.0 Info 9.0 Info 2.1 Info 3.0 Info 4.0 Info 5.0 Info 10.0 Info 6.0 Info 3.0 Info 7.0 Info 11.0 1

FOGA ApS FISHERMENS NORTH SEA INFORMATION OF OIL‐AND … · Info 1.0 Info 2.0 Info 2.1 Info 3.0 FOGA ApS FISHERMENS INFORMATION OF OIL‐AND GAS ACTIVITIES Trafikhavnskaj 19 DK‐6700

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FOGA ApS FISHERMENS NORTH SEA INFORMATION OF OIL‐AND … · Info 1.0 Info 2.0 Info 2.1 Info 3.0 FOGA ApS FISHERMENS INFORMATION OF OIL‐AND GAS ACTIVITIES Trafikhavnskaj 19 DK‐6700

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Week 33August 11, 2020

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

© Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty’s Stationery Office and the UK Hydrographic Office (www.GOV.uk/UKHO). "Unter Verwendung von Datenmaterial des Bundesamtes für Seeschifffahrt und Hydrographie (BSH) hergestellt (Lizenznr. 2017‐06)".

Signatures:Warning

Safety zone

Pipeline with 200 meter protective zone

Buoy

Existing installation

Mobile rig

1 MAERSK RESOLUTE: Port of Esbjerg. 4 CROSSWAY EAGLE in position at DAN FA‐FE.5 MAERSK GUARDIAN: Port of Esbjerg.12 COLGA: Port of ESBJERG. 

A lost anchor and 6 schakles of chain is located on pos. 56°00.28N 007°57.7EVessels:The vessel PIONEERING SPIRIT is at the TYRA Field for lifting the remaing topsides and jackets until approx. 13/8.The vessel FORTITUDE operating the TYRA Field.The vessel BOKA ATLANTIS conducting diving inspections at the DUC Fields.The vessel VESTLAND CYGNUS is working at the DUC Fields. The vessel MAERSK TRACKER conducting maintenance at the DUC Fields.The CTV's WORLD SKY, MHO GURLI, CONTENDER & RIX TIGER at the Horns Rev 3 OWF. The jack‐up L/B JILL is working at the THOR site.

Info 1.0

Info 2.0

Info 8.0

Info 9.0

Info 2.1

Info 3.0

Info 4.0

Info 5.0

Info 10.0

Info 6.0

Info 3.0

Info 7.0

Info 11.0

1

Page 2: FOGA ApS FISHERMENS NORTH SEA INFORMATION OF OIL‐AND … · Info 1.0 Info 2.0 Info 2.1 Info 3.0 FOGA ApS FISHERMENS INFORMATION OF OIL‐AND GAS ACTIVITIES Trafikhavnskaj 19 DK‐6700

Rigs in the Port of Esbjerg

Info 1.0

Info 2.0

Info 2.1

Info 3.0

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Update of informationWeek 33August 11 ‐ 17, 2020Next FOGA Info to be distributed August 18, 2020

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

Rigs: COLGA, MAERSK RESOLUTE & MAERSK GUARDIAN

COLGA

MAERSK RESOLUTE

Total E&P Danmark A/S

Vessels:The vessel PIONEERING SPIRIT is operating at the TYRA Field for lifting the remaing topsides and jackets until approx. 13/8. More information on this project can be found on page 4.The vessel FORTITUDE is operating at the TYRA Field until approx. 15/8. The vessel BOKA ATLANTIS is conducting diving inspections at the DUC Fields.The vessel VESTLAND CYGNUS is working at the DUC Fields with well service at all satellite platforms. The vessel MAERSK TRACKER conducting maintenance at the DUC Fields.

TYRA FUTURE:From 15 May ‐ 15 September 2020, two prohibited areas around platforms TYRA E and TYRA W have beenestablished. In the area unauthorized navigation, diving, anchoring, fishing and work on the seabed will be prohibited.More information on this project can be found on page 4.

Rigmoves: The accommodation rig CROSSWAY EAGLE in position at DAN FA‐FE.

VESTLAND CYGNUS MAERSK TRACKER

CROSSWAY EAGLE

The safety zones are 500 mfrom the positions.

SIRI‐field:  56o 28.96' N  004o 54.67' E

CECILIE‐A field: 56o 24.13' N  004o 45.58' E

NINI A‐field:  56o 38.45' N  005o 19.27' E

NINI B‐field: 56o 40.49' N  005o 24.74' E

STINE field ‐ Subsea installations:STINE SCB‐1:  56o 30.96' N  005o 02.46' E

STINE SCB‐2:  56o 30.95' N  005o 03.56' E

Illustration of hose when idle.

SIRI tanker loading facility.

Hejre Project: 

In connection to the establishment of the HEJRE Platform a safety zone of 500 m has been established around the position: 56°14,809' N ‐ 003°57,534' E. 

HEJRE Field

FINO 3 ‐ Research PlatformThe research platform FINO 3 was established in 2007/2008 approx. 45 nautical miles west of the island Sylt at the position: 55° 11,7' N 007° 09,5' E. A 500 meter safety zone has been established around the platform. Please see the web page from the "Forschungs‐ und Entwicklungs zentrum, Fachhochschule Kiel Gmbh"  www.fino3.de for more 

DAN TYSK windfarThe DAN TYSK  windfarm has been etablised at the shown site.  

SANDBANK windfarm The SANDBANK windfarm has been etablised.  

BOKA ATLANTIS

FORTITUDE

MAERSKGUARDIAN

PIONEERING SPIRIT

2

Page 3: FOGA ApS FISHERMENS NORTH SEA INFORMATION OF OIL‐AND … · Info 1.0 Info 2.0 Info 2.1 Info 3.0 FOGA ApS FISHERMENS INFORMATION OF OIL‐AND GAS ACTIVITIES Trafikhavnskaj 19 DK‐6700

Info 4.0

Info 5.0

Info 6.0

Info 7.0

Info 8.0

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Update of informationWeek 33August 11 ‐ 17, 2020Next FOGA Info to be distributed August 18, 2020

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

SYD ARNE field

The storage tank and top site of  SOUTH ARNE field is installed at position 56o 04,72' N  004o 13,82' E, connected with a new bridge to the platform South Arne WHP E (Well Head Panel) at position 56o 04,693' N  004o 13,85' E.

The satellitplatform Syd Arne WHP N is installed at the position 56o 05,744' N  004o 13,154' E, where a safety zone of 500 meter is established acc. to Offshore safety order.  SOUTH ARNE's tanker loading  facility,  where tankers are  loaded at  8 ‐ 10 day  intervals  is located at WGS‐84 pos. 56o 05,55' N  004o 15,37' E. 

SYD ARNE tanker loading facility

Syd ArneSAL system56 05,549 N04 15,368 E

o

o

Syd ArneWHPN platform56 05,744 N04 13,154 E

o

o

Syd ArneWHPE platform56 04,694 N04 13,852 E

o

o

Syd ArneGBS platform56 04,702 N04 13,731 E

o

o

SYD ARNE Field

The Crew Transfer Vessels (CTV) WORLD SKY, MHO GURLI, CONTENDER & RIX TIGERare in the Horns Rev 3 area.

All 49 WTG's are installed. 

Horns Rev 3 Marine Coordination Centre has been established by Vattenfall and is in operation 24/7. HR3 MCC can be contacted by VHF ch 16 and 10 or by duty‐phone no.: +45 27 87 50 50. HR3 MCC is monitoring traffic in the area and at the construction site.

MHO GurliCONTENDERWORLD SKY

Danish navigational warning no. DK‐214‐16

At the below mentioned position a wreck of a submarine has been discovered containing dangerous ammunition.Due to safety reasons, Danish Maritime Authority prohibit all unauthorized fishing, anchoring and diving on and within 100 m radius of the wreck in pos. 55 30,62 N ‐ 007 56,84 E. Please note that the size of the prohibited area has been changed. Violation of the prohibition is punishable by fine or prison.

Orsted operates 3 pipelines in the Danish North Sea sector:

20” Oil pipeline from GORM to Filsø24” Gas pipeline from SYD ARNE to Blåbjerg. (via subsea Y‐connection with a split from HARALD)

The jack‐up L/B JILL conducting geotechnical drillings at the THOR from 25/6 ‐ 23/8‐2020. It is expected that each drilling will take 1 –3 days. (For positions see below). Mariners are advised to pass the jack‐up with a minimum distance of 1000m and with reduced speed. The jack‐up JILL is listening to VHF channel 16.On behalf of ENERGINET a met ocean buoy of the F‐LIDAR type (Light Detection and Ranging – buoy) have been deployed at the Thorsite. Dimensions of the buoy: L 5,1m / H 1,94 m / B 3 m / Weight 12 ton. The buoy would be able to move within a radius of 250 maround the anchor point. The buoy is deployed at the position: 56° 20,8 N ‐ 007° 36,3 E, WGS 84. Top marking: A yellow cross, radar reflector and a yellow light 5 flashes in a period of 20 seconds. The light is visible at a distance of 3 miles (FL (5) Y 20S).On behalf of ENERGINET, 4 x 4 yellow buoys have been deployed at the Thor site in order to monitor the wildlife. All in all 16 buoys to be deployed within the Thor site. Every position consists of 4 yellow buoys with a distance of 250 m between each other. The yellow buoys are special marks with yellow light and a yellow X as topsign. Please be aware that one buoy ismissing at below mentioned stations: T 02, T 03 og T04.

No. Name LAT N LONG E

1 Thor_T1 56 16.999 7 45.116

2 Thor_T2 56 17.049 7 33.317

3 Thor_T3 56 20.343 7 40.898

4 Thor_T4 56 24.734 7 44.734

F‐LIDAR Buoy56° 14.29524' N 7° 30.84771' E

56° 14.44715' N 7° 44.55109' E

56° 15.11670' N 7° 41.27519' E

56° 15.33613' N 7° 27.78546' E

56° 15.74554' N 7° 43.59793' E

56° 16.91686' N 7° 44.47005' E

56° 18.09507' N 7° 33.02760' E

56° 18.14807' N 7° 37.68032' E

56° 18.23149' N 7° 45.59042' E

56° 19.53354' N 7° 44.36473' E

56° 20.81843' N 7° 38.96212' E

56° 22.99828' N 7° 37.50603' E

56° 24.66980' N 7° 41.89605' E

56° 24.70360' N 7° 44.20563' E

56° 27.13951' N 7° 44.79099' E

56° 27.63363' N 7° 46.40153' E

56° 28.31601' N 7° 46.89839' E

56° 29.45513' N 7° 46.82660' E

L/B JILL 

RIX TIGER

3

Page 4: FOGA ApS FISHERMENS NORTH SEA INFORMATION OF OIL‐AND … · Info 1.0 Info 2.0 Info 2.1 Info 3.0 FOGA ApS FISHERMENS INFORMATION OF OIL‐AND GAS ACTIVITIES Trafikhavnskaj 19 DK‐6700

Info 9.0

The charts below shows the new pipelines between the TYRA Fields.

Info 10.0

Info 11.0

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Update of informationWeek 33August 11 ‐ 17, 2020Next FOGA Info to be distributed August 18, 2020

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

From 15 May ‐ 15 September 2020, two prohibited areas around platforms TYRA E and TYRA W will be established. In the area unauthorized navigation, diving, anchoring, fishing and work on the seabed will be prohibited. 

The vessel PIONEERING SPIRIT is operating at the TYRA Field for lifting the remaing topsides and jackets until approx. 13/8.

The company Alcatel Submarine Networks are laying a subsea cable between Denmark and UK, from Nov 2019 ‐ September 2020(Havhingsten subsea telecom system). 

Cable installation and ploughing will be resumed by the C/S Ile de Bréhat (sister ship of C/S Ile de Batz) end of August 2020, from Denmark / UK EEZ border towards UK coast.

C/S Ile d'Aix has left Danish waters. She is planned to perform Post Lay Burrial activities in the Danish North Sea from early August until end of September. 

Mariners are requested to keep clear of the vessels.

The cable route is shown on the chart.

C/S Ile d'Aix

This newsletter and infochart has been prepared on request from the operators in the North Sea and is distributed via E‐mail to all fishing vessels and interested parties around the North Sea. Please also visit FOGA's website www.foga.dk. E‐mail [email protected] to subscribe or unsubscribe. Please also notice that the size of the newsletter as a pdf file is approx. 1 mb.

Lift 1 – TWA IPF module  01/08/2020 

Lift 2 – TEA K‐module  02/08/2020 

Lift 3 – TEA topside 02/08/2020

TEA topside load‐in Frederikshavn  05/08/2020 

Lift 4 – TWA topside 08/08/2020

TWA topside load‐in Frederikshavn  10/08/2020 

Lift 5 – TED flare jacket 12/08/2020

Lift 6 – TWD flare jacket  13/08/2020 

 

Royal Danish Air Force and Fighter Wing Skrydstrup The Royal Danish Air Force and Fighter Wing Skrydstrup are planning the annual F‐16 live missile exercise FALCON in the North Sea. The missile shooting exercise will take place within calendar week 33 from Monday until Friday and a restricted/danger area are established, and mariners are requested to keep clear of the area. The restricted area will be in force from August 10 – 13, 2020 from 0830 – 1600 hrs. and August 14, 2020 from 0830 – 1230 hrs. (local time). The restricted area consists of an 18x22 NM wide area as mentioned below (WGS84 in Lat/Long Degrees, Decimal Minutes DDM): N56 53.30 E006 40.00N56 53.30 E006 07.00N56 31.30 E006 07.00N56 31.30 E006 40.00The exercise will include F‐16 fighter jets and Challenger airplanes and flares as targets for the missiles in the air space above the area. 