22
FODDERGROW LTD

FODDERGROW LTD. Factory Installation Inspection form Manufacturing & Installation Transport

Embed Size (px)

Citation preview

FODDERGROW LTD

• Factory

• Installation• Inspection form

Manufacturing & Installation

• Transport

BioBooster material • Plastic• Sun energy • Low running costs• Advantages of the plastic

Cooling

• Evaporative Cooling system

Maintenance and Hygiene

• BioBoost Spore buster • Guaranties • Lime control • Filter

• Draining holes

Electrical• Single phase or DC power • 0.75kw irrigation pump• 0.42kw fans

Irrigation• Pump

• Non-dripper valves• Sprayers

• Solenoid valves• Timer for irrigation

Irrigation (continue)• Water gets pumped• Intervals for watering • Water usage

Seed and seeding• Purchasing• Weighing • Soaking (1hour)• Measuring cup• Seeding the trays

Harvesting the fodder• Grow for 5-7days• Harvest from day 5-7• Can combine seed

Feeding and additional feed• Fodder• Roughage • Bacteria

Feeding• Weight gain • Milk production

• Overall health

Client needs the following

• Concrete slab• Power supply or DC solar

• Water point

• Floor plan The plan for the slab

• Day 1

• Day 2

• Day 3

Seed to feed

• Day 4Seed to feed (continue)

• Day 5• Day 6

• Day 7

Different feed• Barley and Maize

• Barley

• Canola

Different feed (continue)

• Lupens

• Sunflower

• Oats

Feed for variety of animals

• Cattle

• Goats

• Pigs

Feed for variety of animals (continue)

• Sheep

• Ostrich

Feeding in extreme conditions

• Suitable for all weather circumstances

Thank you