FM Area DiversionInternational Legislators Forum
June 27, 2014
Keith Berndt PECass County ND Administrator
2
Maple River Dam
Baldhill Dam
Orwell Dam
White Rock Dam
Valley City
Lisbon
Moorhead, MN
Fargo, ND
Total Drainage Area: 45,000 square miles
Red River Basin
North Dakota
South Dakota
Minnesota
Q 100 year = 34,700 cfsQ 500 year = 61,700 cfsQ max 2009 = 29,500 cfs
3
Red River Flooding History
Red River Flood Stage = 18 feet on the Fargo gage at 13th Ave. S.Exceeded in 50 of the past 111 yearsExceeded 20 of the last 21 years
Catastrophic damages have been prevented by emergency measures
8 of the 16 “major” floods on record have occurred since 2000
2009 was the flood of recordStage of 40.8 feet 2-percent chance (50 year) eventEmergency measures cost approximately $70M
2009 Flood Expedited Feasibility Study
Water Everywhere
Interstate 29Closed April 10. Reopened April 15, 2011.
Detour added = 22.8 miles
Commuting Challenges
6
heeds the call 2009A willing workforce
7
Volunteers fill the Fargodome
Building is 466,000 SF.
8
Lines of Defense Take Shape
FM Area Diversion Project
1,600 ft wide Diversion Channel in ND with 150,000 acre-feet of Upstream StagingOutlet near Georgetown, MNInlet north of Oxbow, NDProvides 1-percent (100-year) Risk Reduction Reduces 1-percent event by >5’Extreme Events are Flood- Fightable
10
1 in 5 of all North Dakotans will benefit from flood risk reduction
$14 Billion = Property Value Receiving Flood Risk Reduction Benefits
$4.3 Billion = Wages in the F-M Metro Area
$10 Billion = Annual F-M Gross Domestic Product
$200 Million = Annual Income & Sales Taxes Generated for North Dakota from F-M Metro
$71 Million = Annual Income & Sales Taxes Generated for Minnesota from F-M Metro
FM Diversion Economics
11
Diversion Channel Cross Section (Reach 1)
Total Width = 1,600 feet
12
JUNE 10, 2014 NEWS FLASH!
PRESIDENT OMAMA AUTHORIZED FM AREA DIVERSION PROJECT CONSTRUCTION
Overall Funding Approach
Federal Cost Share
Non-Federal Cost Share
13
$450MND State
$100MMN
$450MND Local$800M* $1,000M
*WRRDA Authorized $846 Million
14
Ongoing Efforts
Working with upstream interestsAdditional upstream storage opportunitiesCemetery mitigationOxbow, Hickson, Bakke Levee ConstructionFargo LeveesLand AcquisitionDesign