add energy Well Management Page: 1 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
PERSONAL INFORMATION
Name: CRISTEA, Florin
Qualifications: Master of Science in Well Drilling and Exploitation of Oil and Gases Deposits
Position: Senior Drilling and Completion Engineer
Nationality: French
PROFESSIONAL SUMMARY
25+ years working experience in Oil & Gas Industry. Extensive experience in Well design and planning, directional drilling, torque and drag
analysis. Familiar with Vertical, deviated, horizontal, extended reach ERD, HPHT and multilateral wells.
Project Management experience in multiple onshore, offshore and deep water drilling projects.
Has knowledge of the engineering software from Landmark Graphics with proficient skills in Compass, StressCheck, WELLCAT, Wellplan, WellCost and OpenWells. Knowledge of the drilling engineering software from Techdrill (DSP-One, DDR –One, AFE-One)
Experience working with multi-disciplinary teams. Ability to solve complicated drilling problems.
DEEPWATER SUMMARY
2006-2008: Sinezneftegaz Nambia Ltd. – Namcor– PetroSA, West Africa - deepwater exploration project. Two deepwater exploration wells, ~ 1000 m water depth.
PROFESSIONAL EXPERIENCE
Jan 2013-Present: Senior Drilling and Completion Engineer - RWE DEA Turkmenistan
RWE DEA Project – Block 23 Offshore Turkmenistan Design several exploration wells in Block 23 Offshore
Turkmenistan Work with geosciences and engineering staff to optimize wells
design Define exploration well types and profile Preparation of Application to Drill, Complete & Test documents Preparation of detailed procedures and drilling programs Design of drilling fluids, drilling bits and cement programs Call of tender preparation and tender evaluation Preparation of the Drill Well on Paper, exercise Generate drilling time curves and forecasting costs Support drilling operations
add energy Well Management Page: 2 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
Jul 2012-Jan 2013: Senior Drilling and Completion Engineer - Total E&P Uganda, Kampala, Uganda
West Nile Project – Block EA1 Uganda Preparation of Basis of Design documents for West Nile wells Design several exploration wells in Block EA1 Uganda Work with geosciences and engineering staff to optimize wells
design Define several exploration well types Preparation of Application to Drill, Complete & Test documents Preparation of detailed procedures and drilling programs Design of drilling fluids, drilling bits and cement programs Completed the casing design calculations with Stress Check Preparation of the ”Drill Well on Paper” exercise Review the Drilling and Completion risks for each design Generate Drilling time curves and forecasting costs Prepare well design and preliminary single well cost estimate
(AFE) for each well type Support drilling operations
Feb 2012-Jul 2012: Senior Drilling and Completion Engineer - Halliburton PM, Pointe
Noire Congo
Assigned to: Total Congo Pointe Noire - Tchendo Offshore Project TCHENDO Project – Congo Compiles TEPCO offset wells data and review the drilling
performance Preparation of Wells Basis of Design documents Design a Conceptual prototype well for the field development Define several offshore well types (carbonate reservoir with few
% H2S) Compare the feasibility of each horizontal (Long reach) ERD
wells type to be drilled Review the Drilling and Completion risks for each design Work with geosciences and engineering staff to optimize well
design Study current rig options and define requirements for the drilling
rig. Elaborate casing program for the best and worst case with
casings points and specs Review of the T&D analyses performed during the Field Study (all
wells). Carry out a synthesis and possibly correct/modify trajectories, BHA assemblies so as to reduce/mitigate drilling risks and obtain feasible wells
Prepare well design and preliminary single well cost estimate (AFE) for each design
Coordination with all Halliburton Product Lines working in the project
add energy Well Management Page: 3 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
Oct 2009-Feb 2012: Senior Drilling and Completion Engineer - Weatherford Oil Tools, Dubai, UAE, Project Management - Well Engineering Centre of Excellence (WECOE)
Assigned to: BP Iraq Project Petronas Iraq Project - Garraf field Saudi Aramco - Shaybah Field Shell Iraq Project - Majnoon Field Qatar Petroleum – Well Integrity Project South Oil Company – Rumaila field Iraq Missan Oil – Buzurgan field Iraq Japan Consortium (Nippon Oil, INPEX Corporation) Iraq Project Lukoil Overseas /Statoil - Iraq project Integrated Drilling Projects for different Oil and Gas companies in
MENA area. Advise on drilling & completion technical issues in project(s)
development Evaluation and implementation of new drilling technologies in
order to improve the performance and capital efficiency Ensured that the best solutions are implemented for the well
engineering process Integrate the Risk management process into the drilling projects Lead and supervise the drilling engineering team Deputize for Project Manager when is needed BP IRAQ Project – South Rumaila field Integrated Drilling project management for several wells, hard rocks, sour gas environment. Compiles well data and review the drilling performance of offset
wells Preparation of the “Drill Well on Paper” exercise, inputting all risks
and learning to enhance the well operations. Identify max achievable drilling rate without risking drilling safety
’’Technical limit” process Preparation of detailed procedures and drilling programs Design of the bits and mud programmes Completed the casing design with Stress Check software Establish the procedures for the risk mitigation and the cost
involved Generate Drilling time curves and forecasting costs AFE Operations support during drilling activity Supervise the drilling engineering team Ensure that all lessons learnt are investigated and closed out Saudi Aramco Shaybah Field Maximum Reservoir Contact wells Horizontal Producers - TAM
Level 1 and 2 (fishbone wells) Compiles well data and review the drilling performance of offset
wells
add energy Well Management Page: 4 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
Preparation of the ,,Drill Well on Paper,, exercise, inputting all
risks Generate Drilling time curves and costs Capital budgeting and forecasting AFE Qatar Petroleum – Wells Integrity Management system Integrated Project Management for wells integrity management onshore and offshore wells Preparation of Well Integrity Management System feasibility study Technical study Well Integrity for offshore wells Lead investigations into well integrity failures and other significant
life of well integrity issues Casing design, completion design, risk assessment, barriers
philosophy Consideration of annular pressure build-up Wellhead movement (WHM) analysis for offshore wells
(WELLCAT) Defined scope of work for the WI project Build the cost estimate (AFE) for the project Coordination and work with all WTF Product Lines South Oil Company – Rumaila field Iraq Integrated Project Management for 20 wells, hard rocks, sour gas environment. Preparation of detailed procedures and drilling programs Design of the mud and drilling bits programmes Completed the casing design calculations with Stress Check
software BHA optimization – Well Drill software Torque and drag simulations – Well Plan software Drill Well on Paper, exercise, inputting all risks and learning to
enhance the well operations Operations scheduling & forecasting potential risk for NPT Capital budgeting and forecasting AFE Lead the upkeep of the well cost tracking system Generate and maintain project plans and contribute to weekly and
monthly reports Supported operations during drilling Supervise the drilling engineering team Prepared and conduct AAR’s (After Action Reviews) and capture
all lessons learned Prepare the recommendations for next drilling campaign SHELL IRAQ Project – Majnoon field Project Management for several production wells, hard rocks, sour gas environment Review of existing well designs and recommend well design
optimizations Preparation of Wells Basis of Design documents Preparation of the “Drill Well on Paper” inputting all risks and
learning to enhance the well operations
add energy Well Management Page: 5 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
Identify and development of a standard “Technical limit” process Completed the casing design calculations with Stress Check
software Preparation of detailed procedures and drilling programs BHA optimization – Well Drill software Generate Drilling time curves and forecasting costs (AFE) Coordination with all WTF Product Lines working in the project Japan Consortium Project – Nasiriyah Field, Iraq Several appraisal and production wells, hard rocks, sour gas environment Preparation of Wells Basis of Design and the detailed Drilling
programs Design of the mud and drilling bits programmes Completed the casing design calculations with Stress Check
software Preparation of the ,,Drill Well on Paper ,, exercise, inputting all
risks and learning in order to enhance the drilling operations Preparation of detailed procedures and drilling programs Recommendations for Drilling optimization, Casing while drilling Operations scheduling & forecasting potential risk for NPT Capital budgeting and forecasting AFE
Sep 2008-Oct 2009: Managing Consultant, Drilling and Completion - Halliburton
International Inc, Atyrau, Kazakhstan
Assigned to: KPO Project – Real Time Drilling project AGIP KCO Project - HPHT wells Kashagan field, Caspian Sea Kazakh Oil Aktobe Project Kazakhmys Petroleum LLC – HPHT drilling project Oil Tecno Group LLC – Deep drilling project Advise the Business development team on drilling & completion
technical issues Integrated Drilling projects for different Oil & Gas companies in
Caspian region Provide technical expertise and solutions to the customers Identify and develop processes that continuously reduce drilling
costs and time to drill Integrate appropriate processes from “No NPT ” to Drilling
operations Lead and supervise junior drilling engineers Kazakh Oil Aktobe - Well Construction optimization and Production Enhancement project Several Field development scenarios using the latest ideas in well design/completion in order to improve oil recovery Development of well engineering and completion programs for
several horizontal wells. Different reservoir stimulation scenarios (low permeability
carbonate reservoirs)
add energy Well Management Page: 6 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
Well construction design, planning, performance prediction, (mud,
cement , logging , bit , coring ) Performed the casing design with WellCat software. Use of new drilling technologies, Rotary Steerable System , MWD
and LWD tools Drilling bits optimization Generate Drilling time curves and forecasting costs (AFE) Operations scheduling & forecasting potential risk for NPT Kazakhmys Petroleum -Well Construction and Production Enhancement project Several deep exploration wells (HPHT), hard rocks, sour gas environment Review of the drilling programs, recommendations for drilling
optimization Re-design of drilling bits and mud programmes Casing design was optimized with WellCat software (HPHT wells) Use of Rotary Steerable System (RSS), MWD and LWD
technology Preparation of the, Drill Well on Paper, inputting all risks and
learning in order to enhance the well operations Introduction of new technologies, especially UBD, CPD (mud
window very small) Preparation of detailed procedures and drilling programs Operations scheduling & forecasting potential risk for NPT Generate Drilling time curves and forecasting costs (AFE ) Liaise with each business units to ensure drilling program(s) meet
the objectives. Oil Techno Group LLC. Two deep exploration wells, TD 7300 m, hard rocks, sour gas environment Review of the drilling programs, drilling optimization Completed the casing design with WellCat software (HPHT wells) Preparation of the ,,Drill Well on Paper ,, exercise, inputting all
risks and learning in order to enhance the well operations Preparation of detailed procedures and drilling programs Operations scheduling & forecasting potential risk for NPT Capital budgeting and forecasting AFE Preparation of the HAZOP Study Ensure that all lessons learnt are investigated and closed out Prepare recommendations for next drilling campaign
2006-Sep 2008: Managing Consultant, Drilling and Completion - Halliburton
International Inc., Landmark, Moscow, Russia
Assigned to: TNK - British Petroleum Projects ENI-Arctikgaz project Wintershal –Achimgaz project Sinezneftegaz – Namcor– PetroSA – Offshore West Africa,
deepwater exploration project
add energy Well Management Page: 7 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
TatNeft -Timano-Pechora Project – Offset well study, drilling
optimization Advise on drilling & completion technical issues in project(s)
development Identify and develop processes that continuously reduce costs
and drilling time Supervise and lead junior drilling engineers Enineftegaz – Arctikgaz project Development of the Drilling programs for 5 deep gas exploration wells in Western Siberia Reviewed offset wells and identified risks and hazards “Drill Well on Paper”inputting all risks and learning in order to
enhance wells operations Preparation of detailed procedures and drilling programs Well construction design, planning, performance prediction, (mud,
cement, logging, bit, coring) Completed the casing design with Sterss check and WellCat
software Capital budgeting and forecasting AFE Operations scheduling & forecasting potential risk for NPT Call of tender’s preparation Wintershal – Achimgaz project Offset well analysis (deep gas exploration wells in Western
Siberia) Well construction design, planning, performance prediction, (mud,
casing, cement, logging, bit, coring…) Recommendations on rig requirements, supported by technical
and economical justification Drilling cost scenario analysis with Well Cost software for
Achimgaz field development wells Recommendations on rig requirements, supported by technical
and economical justification Sinezneftegaz Nambia Ltd. – Namcor– PetroSA, West Africa - deepwater exploration project Two deepwater exploration wells, ~ 1000 m water depth, Well construction design, well planning, ( mud, cement, logging,
bits, coring ) Work closely with geoscience team for offshore pore
pressure/fracture gradient prediction and formation evaluation/test program
Prepared the programs for directional drilling, drilling fluids, cementing, and well control
Completed the casing design with WellCat software Preparation of detailed procedures and drilling programs Depth vs. time performance predictions Preparation of the “Drill Well on Paper” exercise Developed drilling cost estimates ranging from simple scoping
estimates to probabilistic cost estimates – Monte Carlo simulation Capital budgeting and forecasting AFE
add energy Well Management Page: 8 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
Prepared several presentations about the progress of the deep-
water project to Senior management Operations scheduling & forecasting potential risk for NPT Preparation of Calls of tenders documentation and specific
tendering procedure Operations support during drilling operations These wells were drilled to a total depth of 5000 meters below
sea level and tested the syn-rift (Barremian stage in geological time)
The wells were drilled offshore Namibia using a Dynamically positioned drill ship (Deep Venture)
TNK - British Petroleum Projects Preparation of Drilling and Well Strategy studies for: Verknechonskoye and Russkoye Fields taking into account: Recommendations on rig requirements, supported by technical
and economic justification. Modifications/upgrades to existing rigs Evaluate new technologies for cost-effective application,
especially Batch drilling, Casing while drilling, UBD, CPD Identify and development of a standard “Technical drilling limit”
process Provide cost estimate projections for the proposed new drilling
technologies Integrate the Risk management process, including identification
and mitigation, into technology projects Worked with geoscientists and engineering staff to design several
field development scenarios for the exploration prospects Ensure that the best drilling practices are efficiently integrated
into project processes Developed detailed probabilistic time and cost estimates for all
wells design Detailed drilling design for several horizontal wells. Define well
trajectory, torque & drag analysis to confirm ability to achieve 1000 m length of horizontal section
Define different kind of multi-lateral wells that may be applicable in the field
Assess the feasibility of each kind of multi-lateral wells. Carry out cost-benefit analysis
Side-track design for several wells in VC Field and Kammenoi Field
Operations scheduling & forecasting potential risk for NPT Supported the operations during drilling Ensured that all drilling lessons learnt are investigated and closed
out Prepared a Feasibility study of drilling multilateral wells in
Russkoye field -well types: o Multilateral well with 1000m step out with 2 branches of
500m o Fishbone well with 1000m horizontal parent and three lateral
branches of 500m o Fishbone well with 1000m horizontal parent and four lateral
branches of 500m
add energy Well Management Page: 9 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
Verkhnechonskoye field, is one of the largest oil field in Eastern Siberia, which is being developed by Verkhnechonskneftegaz Company (VCNG) owned by TNK-BP. One of the main challenges of this field is the hard rocks and sour gas environment. He worked closer with VCNG management in Irkutsk for drilling optimization. He did several changes in the wells construction design. Changes were done in the casing design, drilling bits selection, drill string design, cement design, mud design etc. He did also recommendations for the rig changes and rig re-designs. 4 appraisal wells drilled in 2006, (2500 – 3500 m TVD) 13 wells drilled in 2007- 2008, high angle wells and horizontals wells drilled. Kammenoi field Western Siberia. - 2 appraisal and 4 horizontal wells drilled. Russkoye field Western Siberia , - 3 appraisal and 2 horizontal wells drilled
2003-2006: Senior Drilling and Completion Engineer (Project Manager) - Dietswell Engineering SA; Voisins les Bretonneux (78); France
Assigned to: KNOC, South Korea Lundin Petroleum AB, France GDF International, Drilling Campaign on Touat gas field, southern
Algeria Provide technical expertise and solutions to the customers. Supervise junior engineers Designed and follow the drilling operations for several exploration and developments wells. The profiles of these wells were vertical, deviated and horizontal, onshore and offshore. He did the well engineering design and follow up the drilling for two offshore exploration wells (South Korea) Professional experience includes Project planning and management Review offset wells and identified risks and hazards “Drill Well on Paper” inputting all risks and learning in order to
enhance wells operations Well construction design, planning, performance prediction, (bits,
casing, cement, logging, mud) Drilling optimization Preparation of Calls of tenders documentation and specific
tendering procedure Evaluate contractual proposals and assist in evaluation of
technical proposals Provided advice to Company on contractual issues Capital budgeting and forecasting AFE Operations scheduling & forecasting potential risk for NPT Supervision of day-to-day drilling operations
add energy Well Management Page: 10 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
Achievement: Supervision of about 70 persons and one 1500 HP drilling rig He did the well design and follow up the drilling operations for 4
horizontal and 2 vertical wells in Paris basin area (located 80 -100 km east of Paris)
Several wells side-tracked in Villeperdue field, 1200 HP drilling rig Coordination of Service companies including Rig contractor,
Baker Hughes, Schlumberger, Smith, Weatherford and local French wire logging company.
1998-2003: Drilling and Completion Engineer - Compagnie Française pour la Géothermie Orléans; France
Designed and follow up the work-over operations for several
geothermal wells. Well construction design, planning, performance prediction,
geothermal wells Preparation of tender’s scope of work for drilling services &
materials. Capital budgeting and forecasting AFE Several Well integrity projects, planning and management of
operations Supervision of several Wire line logging operations for well
integrity Work over for several geothermal wells in Paris basin area Casing patch operations, Cladding operations Supervision of day-to-day drilling or work over operations; Design of Plugs & Abandonment program for several coal bed-
methane wells in accordance with French regulations. (Four casing string, TD from 1800 - 2500 m depth)
Supervision and management of the Plugs & Abandonment operations in these 2 fields (32 coal bed-methane wells).
Several job for Electric Submersible Pumps replacement, run and install new ESP
Preparation of End of well reports
1988-1998: Drilling and Completion Engineer, Crew Deputy Chief - PETROM SA, MARGHITA, Romania
Production, supervision and maintenance of 3 onshore fields: Ensure that oil production targets are achieved as required by the
company development plan Experience of production engineering including wire line,
completions, tubular, wellheads and well servicing. Work over and special operations design and supervision Design of stimulation programs Supervision of drilling operations for new wells in the area Deviated & vertical well completion Water - flooding operations design and implementation Acidizing & Fracturing operations for well productivity increment Sidetracking, fishing jobs, etc. Supervision of daily production of oil and gases , maintenance
operations
add energy Well Management Page: 11 of 11 Florin Cristea Rev.: 0 Date: 01/07/2013
Supervision of 120 persons; 3 work-over rigs and one 1500 HP
drilling rig
1985-1988: Well Site Engineer, responsible for Special operations - PETROM SA, MARGHITA, Romania
Participated in the following operations: Wire line operations Swabbing operations Work over and re-completion operations Acidizing & Frac operations Sand control , Water Shut off, Gas Shut off Installation of new completions and perforations jobs Plug & Abandonment operations for old wells Special operations , fishing jobs Supervision of 15 persons; 2 work-over rigs
TRAINING
2011: Weatherford Abu Dhabi: Geomechanics course 2011: Petro Edge Kuala Lumpur: Well Integrity Management 2011: Landmark Aberdeen: Advanced WELLCAT software 2010: Weatherford Abu Dhabi: Project Management course 2008: Landmark Houston: Well Design and Engineering Course, Well Cost 2007: Landmark Houston: Decision Space, Casing Seat, Stress Check, Well
Plan, WELLCAT 2006; Landmark Houston: Compass, Decision Space, Open Wells, Well
Plan, Well Cost 2004: ENSPM IFP (French Institute of Petroleum)
Directional and horizontal drilling Drilling fluids, Cement fluids
2003: ENSPM IFP (French Institute of Petroleum) International IWCF Certificate - Surface BOP stack
QUALIFICATIONS
1975-1979: Technical College No 5 BUCHAREST (Romania) Specialization: Electrotechnics
1980-1985: Graduated from Oil and Gas Polytechnic Institute PLOIESTI (Romania) Department: Oil and Gases Exploitation Master of Science in Well Drilling and Exploitation of Oil and Gases Deposits
Languages: French, English, Romanian, Russian
REFERENCES