1 RELIABILITY • AFFORDABILITY • ENVIRONMENTAL STEWARDSHIP Florida Public Service Commission 2011 Hurricane Season Preparation Briefing OUC—The Reliable One May 4, 2011 Byron Knibbs Vice President, Sustainable Services (407) 434-2194 [email protected]

Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

1

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

Florida Public Service Commission 2011 Hurricane Season Preparation Briefing

OUC—The Reliable OneMay 4, 2011

Byron KnibbsVice President, Sustainable Services

(407) [email protected]

Page 2: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

2

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

Florida Municipal Electric Utilities

Winter Park

Page 3: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

3

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

OUC Electric System

Orlando Service AreaOrlando Service AreaOrange CountyOrange County

St. Cloud Service AreaSt. Cloud Service AreaOsceola CountyOsceola County

OUC System StatisticsService Area = 394 Square Miles

Electric Customers = 235,559222,512 Residential13,047 Commercial

Water Customers = 91,70483,985 Residential7,719 Commercial

Page 4: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

4

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

OUC Electric Distribution SystemOUC Electric Distribution System Overhead vs. Underground StatisticsOverhead vs. Underground Statistics

Overhead Pole Miles

1,358 (40%)Wood poles = 77%

Concrete poles = 23%

Underground Conduit Miles 1,939 (60%)

Total Miles 3,297

Page 5: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

5

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

OUC Electric Transmission SystemOUC Electric Transmission System StatisticsStatistics

Total 69 kV Transmission Miles

48Total 115 kV Transmission Miles

276

Total 230 kV Transmission Miles

70Total Transmission Miles 394Wood poles = 15%

Steel or Concrete poles = 85%

Substations 36Distribution Feeders = 269

Page 6: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

6

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

OUC System Design & Hardening Standard Construction Standards

80% of new distribution construction is underground

Transmission and Distribution facilities are constructed to NESC

120 mph extreme wind loading standards (NESC 140 mph extreme wind loading at the coast)

Ensure “foreign”

utility attachments meet OUC design and wind loading standards

Loop Design distribution underground circuits

Redundant circuits to key critical customers with automatic transfer scheme

All new and replacement transmission poles are steel or concrete

Page 7: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

7

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

OUC Reliability-Centered Maintenance Program Vegetation Management

Davey Tree –

10 crews–

Four-year Distribution System trimming cycle

1,296 Miles of overhead Distribution Lines

Trim 324 Miles per year–

Annually inspect trees on main feeders for fast growers–

Three-year Rural and One-year Urban Transmission System trimming cycle

362 Miles of overhead Transmission Lines•

Trim 100 Miles per year

Page 8: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

8

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

OUC Reliability-Centered Maintenance Program Preventive and Predictive Preventive and Predictive

MaintenanceMaintenance

-6.7°C

16.6°C

-5

0

5

10

15AR01

30.3°C

37.0°C

32

34

36

AR01

Overhead■ Visually & Infrared Inspect

all main feeders annually

Underground■ Infrared manholes and

devices of commercial areas on predetermined cycle

Facilities Maintenance (Distribution and Transmission)

Four Inspectors (Vegetation, Pole inspection, Pole electrical hardware)

Five Distribution Maintenance Crews–

Two Transmission Maintenance Crews

Inspect wood poles based on an eight-year cycle

Annual visual and infrared inspection of all main feeders

Page 9: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

9

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

Typical Overhead Distribution Inspection Results

Identified Work Orders Complete

Pole Replacement 654 585

Lightning Arresters 298 298

Primary Connections 60 60

Primary Insulators 50 50

Secondary 108 108

Primary Static 21 21

600A Primary Switches 33 33

Primary Insulating T- Bracket 65 65

Cross Arm 124 124

Transformer 100 100

Totals 1,471 1,444

OUC Reliability-Centered Maintenance ProgramFacilities Maintenance (Distribution and Transmission)

Produces an average of 1,471 Distribution system work orders per year

Produces an average of 60 Transmission system work orders per year

Page 10: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

10

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

OUC Reliability PerformanceOUC Reliability Performance Tracking Performance

Daily outage reports via email to the CEO, Vice Presidents, Key Customer Accounts Representatives and Media Relations –

7 a.m., 2 p.m. and 10 p.m.–

Instant notification via email to the CEO and Operations Vice Presidents for circuit feeders lockouts and power plants unscheduled outages

Outage Map on OUC Website (www.ouc.com)–

Track Performance using Florida Public Service Commission Reliability Index

Page 11: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

11

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

0

10

20

30

40

50

60

Min

utes

SAIDI 9-Year Average = 43 Minutes

SAIDI 42.6 54 47.5 54.2 36.9 41.8 32.6 37.6 38.2

2002 2003 2004 2005 2006 2007 2008 2009 2010

System Average Interruption Duration Index

SAIDI = Sum of all customer minutes interruptedTotal number of customers served

OUC Reliability Performance TrendingOUC Reliability Performance Trending

Page 12: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

12

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

0

2

4

6

8

10

12

14

Mom

enta

ry In

terr

uptio

n Ev

ents

MAIFIe 9-Year Average = 8.6 Events

MAIFIe 13.4 10 8.8 8.8 7.8 7.6 7.3 7.5 6.7

2002 2003 2004 2005 2006 2007 2008 2009 2010

Momentary Average Interruption Frequency Index - Event

MAIFIe = Sum of all customer momentary interruption eventsTotal number of customers served

OUC Reliability Performance TrendingOUC Reliability Performance Trending

Page 13: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

13

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

Storm Preparation Emergency Operations–

Adopted the National Incident Management System (NIMS)

Operates under Incident Command System (ICS)

Constructed a new Incident Command Center

Established liaisons at Cities and Counties Emergency Operations Center (EOC)

Purchased Logistics Tracking software –

“Resources on Demand”–

Installed new 800 MHz Radio System–

Updated Integrated Voice Response (IVR) System

Page 14: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

14

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

Emergency Operation Plan–

Annual review of Emergency Operation Response Procedures–

Procedures are updated as needed–

Employee storm assignments reviewed annually–

Training/Refresher classes conducted annually–

Critical customer list reviewed and updated–

Annual Hurricane tabletop exercises –

Due to the critical nature of the electric and water facilities,

OUC will be holding terrorist tabletop exercises with the Orlando and Orange County EOC’s

Plan established to walk neighborhoods, if necessary (ex. damaged weatherhead)

Storm Preparation

Page 15: Florida Public Service Commission 2011 Hurricane Season ...€¦ · OUC System Design & Hardening Standard . Construction Standards – 80% of new distribution construction is underground

15

R E L I A B I L I T Y  • A F F O R D A B I L I T Y  • E N V I R O N M E N T A L   S T E W A R D S H I P

Mutual Aid Agreements reviewed annually•

Florida Municipal Electric Association•

Florida Municipal Utilities•

American Public Power Association •

National Municipal Utilities•

Florida Electric Coordinating Group •

Florida Municipal, IOU and Cooperative Utilities–

Contracts are established or renewed annually with Electrical and Tree Trimming Contractors•

Terms and pricing are settled prior to Hurricane season–

Annual review of potential equipment and material vendors•

Terms and pricing are settled prior to Hurricane season–

Contracts established with local radio and television stations for before, during and after the storm “customer communication”

Community storm preparation meetings

Storm Preparation