Hazen and Sawyer, P.C 1 November 2013 O:\44237-000-TPA\44237-001 Florida Department of Health Onsite Nitrogen Reduction Strategies Study Contract CORCL TASK B.6 Installation Report for Passive Nitrogen Reduction System B-HS7 November 2013 Task B of the Florida Onsite Nitrogen Reduction Strategies Study (FOSNRS) includes performing field experiments to critically evaluate the performance of nitrogen removal technologies that were identified and pilot tested in FOSNRS Task A. To meet this objective, full scale treatment systems will be installed at various residential sites in Florida, operated on septic tank effluent under actual onsite conditions, and monitored over an extended timeframe. The Task B Quality Assurance Project Plan (Task B.5) documents the objectives, monitoring framework, sample frequency and duration, and analytical methods to be used at the home sites. This report documents the installation of a passive nitrogen reduction system at a home site in Marion County, Florida (B-HS7). System Overview The B-HS7 passive nitrogen reduction system (PNRS) was installed in Marion County, Florida in November 2013. It consists of adding a 300 gallon concrete pump tank, low-pressure distribution network, and a lined Stage 1 and 2 drainfield. The existing 900 gallon dual chamber septic tank will continue to provide primary treatment for the new PNRS system. Figure 1 is a plan view showing the system components and layout of the installation. The complete as-built system drawings are included in Appendix A. Household wastewater enters the 1 st chamber of the primary tank and exits the second chamber as septic tank effluent through an effluent screen. Screened effluent is directed to the pump tank which contains the pump and float switches. Pump tank contents are discharged through a low-pressure distribution network installed inside Infiltrator EQ36-LP TM chambers. The low-pressure distribution network consists of a central manifold design with (4) 33-foot long, 1.25-inch diameter perforated laterals. The perforations are 0.25-inch in diameter and spaced 3-feet off-center. Below the infiltrators, 24-inches of native soil was installed. Below the native soil, 12-inches of lignocellulosic media was installed above a 30 mil PVC liner with a 6-inch lip around the outer perimeter. Therefore, approximately 6-inches of the lignocellulosic media is saturated promoting denitrification of the nitrified effluent. The treated effluent is discharged into the soil around the perimeter of the liner. A flow schematic of the system is shown in Figure 2.

Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 1 November 2013

O:\44237-000-TPA\44237-001

Florida Department of Health

Onsite Nitrogen Reduction Strategies Study

Contract CORCL

TASK B.6

Installation Report for Passive Nitrogen Reduction System

B-HS7

November 2013

Task B of the Florida Onsite Nitrogen Reduction Strategies Study (FOSNRS) includes performing field

experiments to critically evaluate the performance of nitrogen removal technologies that were identified

and pilot tested in FOSNRS Task A. To meet this objective, full scale treatment systems will be

installed at various residential sites in Florida, operated on septic tank effluent under actual onsite

conditions, and monitored over an extended timeframe. The Task B Quality Assurance Project Plan

(Task B.5) documents the objectives, monitoring framework, sample frequency and duration, and

analytical methods to be used at the home sites. This report documents the installation of a passive

nitrogen reduction system at a home site in Marion County, Florida (B-HS7).

System Overview

The B-HS7 passive nitrogen reduction system (PNRS) was installed in Marion County, Florida in

November 2013. It consists of adding a 300 gallon concrete pump tank, low-pressure distribution

network, and a lined Stage 1 and 2 drainfield. The existing 900 gallon dual chamber septic tank will

continue to provide primary treatment for the new PNRS system. Figure 1 is a plan view showing the

system components and layout of the installation. The complete as-built system drawings are included

in Appendix A.

Household wastewater enters the 1st chamber of the primary tank and exits the second chamber as

septic tank effluent through an effluent screen. Screened effluent is directed to the pump tank which

contains the pump and float switches. Pump tank contents are discharged through a low-pressure

distribution network installed inside Infiltrator EQ36-LPTM chambers. The low-pressure distribution

network consists of a central manifold design with (4) 33-foot long, 1.25-inch diameter perforated

laterals. The perforations are 0.25-inch in diameter and spaced 3-feet off-center. Below the infiltrators,

24-inches of native soil was installed. Below the native soil, 12-inches of lignocellulosic media was

installed above a 30 mil PVC liner with a 6-inch lip around the outer perimeter. Therefore,

approximately 6-inches of the lignocellulosic media is saturated promoting denitrification of the nitrified

effluent. The treated effluent is discharged into the soil around the perimeter of the liner. A flow

schematic of the system is shown in Figure 2.

Page 2: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 2 November 2013

O:\44237-000-TPA\44237-001

Figure 1

Plan view of B-HS7 PNRS layout installed in Marion county

Combination Stage 1 and 2

Lined drainfield (792 SF)

Pump tank

(300 gal)

Existing septic tank

(900 gal)

System flowmeter

Infiltration chambers (EQ36-LP)

32 chambers x 11.32 SF/chamber = 362 SF

33’ long, 1.25” diameter lateral

¼” perforations, spaced 36 inches

Page 3: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 3 November 2013

O:\44237-000-TPA\44237-001

Figure 2

Flow Schematic of B-HS7 PNRS installed in Marion county

EQ36-LP

24” native sand

12” lignocellulosic

Page 4: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 4 November 2013

O:\44237-000-TPA\44237-001

Installation

Installation of the system commenced November 13, 2013 and was completed on November 18, 2013. As previously discussed, the existing 900 gallon septic tank will continue to provide primary treatment. An access riser was installed above the second chamber of the primary tank (Figure 3) to allow for ease in maintenance of the existing outlet effluent screen. A two-way valve (Bull RunTM) (Figure 4) was installed following the septic tank outlet to allow the flow to either be completely directed to the new passive system (to the pump tank) or to the existing drainfield. A riser pipe was installed to grade over the valve, so that the valve can be turned after installation is complete. The valve is turned with a wrench on a rod which is long enough to reach within the riser installed.

Figure 3

Primary tank access riser and cover

primary tank cover

Page 5: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 5 November 2013

O:\44237-000-TPA\44237-001

Figure 4

Bull RunTM valve The remaining passive nitrogen reduction system components were installed (Table 1).

Table 1

Passive Nitrogen Reduction System Components Tank Volume

(gal) Surface Area

(ft2) Media

Primary Tank 900 none

Pump Tank 300 12 none

Lined Drainfield Area 11’ x 72’ (792) 24” native sand

12” lignocellulosic

The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet pipe connection was plugged since the pump discharge pipe was installed through the riser. A Liberty LE51A-2 submersible pump was installed (Figure 6). One wide-angle piggyback float switch attached to the pump controls the effluent level in the pump tank. The height of the float is adjustable to calibrate a target dose volume. An additional float switch is connected to an audible/visual alarm (Figure 7) installed next to the power meter box to alarm for a high water level in the pump tank (pump failure). One inline flowmeter was installed following the pump discharge (Figure 8) with a bypass for maintenance/cleaning of the flowmeter.

to existing drainfield

to pump tank

from septic

tank

Bull RunTM valve

Page 6: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 6 November 2013

O:\44237-000-TPA\44237-001

Figure 5

Pump tank (300 gallon)

Figure 6

Submersible Liberty pump

Liberty pump

2”D discharge

Page 7: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 7 November 2013

O:\44237-000-TPA\44237-001

Figure 7

High water level alarm

Figure 8

PNRS system flowmeter

The new treatment drainfield area was prepared for the 30 mil PVC liner installation (Figure 9). The liner was installed with a 6 inch lip around the outside perimeter. Above the liner, approximately a ½-inch sand layer (Figure 9) was installed to protect the liner during construction. Above the liner a 12-inch layer of lignocellulosic media, a blended urban waste wood from Wood Resource Recovery, Ocala, FL, was installed (Figure 9). Monitoring equipment surrounding the liner lip and inside the lignocellulosic media were installed (Figure 10). The various types of monitoring equipment installed

Page 8: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 8 November 2013

O:\44237-000-TPA\44237-001

include: stainless steel drivepoints, stainless steel suction lysimeters and ceramic cup suction lysimeters (Figure 11). To separate the top of the lignocellulosic media and bottom of the native sand layer a plastic mesh screen (1/16-inch) was installed above the lignocellulosic media (Figure 10). Following placement of the plastic mesh screen, a 24-inch native sand layer was installed (Figure 12). Ceramic cup suction lysimeters were installed above the mesh screen to represent water quality just after downward passage through the sand layer.

Figure 9

Lined area

Figure 10

Lignocellulosic media monitoring equipment

30 mil PVC liner

½-inch sand layer

lignocellulosic media

screened observation port

plastic mesh screen

lignocellulosic media

plastic mesh screen

stainless steel drivepoint and

stainless steel suction

lysimeters in pan

ceramic suction lysimeter

Page 9: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 9 November 2013

O:\44237-000-TPA\44237-001

Figure 11

Lignocellulosic media monitoring equipment

Figure 12

Native sand media

The 2”D pipe downstream of the flowmeter is reduced to 1.5”D in the center manifold of the low pressure distribution network (Figure 13). The manifold is connected to 4 laterals of perforated pipe (Figure 13) which distribute septic tank effluent over native sand inside Infiltrator EQ36-LPTM low profile chambers. The laterals were installed using pressure dosing pipe supports, so that a wet pressure test could be conducted (Figure 14) prior to installing the chambers over the laterals. Following the wet pressure test, the Infiltrator EQ36-LPTM low profile chambers were installed (Figure 15). Above the chambers, 12-inches of native sand cover (Figure 16) was installed to support wheel loads of 16,000 lbs per axle per the manufacturer. This will allow the homeowner to continue to operate a small tractor in the area. Hay and grass seed mix was placed above the sand (Figure 17).

stainless steel drivepoint

stainless steel suction lysimeter ceramic suction lysimeter

sand compaction

Page 10: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 10 November 2013

O:\44237-000-TPA\44237-001

Figure 13

Center manifold of low pressure distribution network

Figure 14

Wet pressure test

1.25”D lateral

1.5”D manifold

2”D pressure pipe

1.25”D lateral

1.5”D manifold

2”D pressure pipe

Page 11: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 11 November 2013

O:\44237-000-TPA\44237-001

Figure 15

Infiltrator chambers

Figure 16

Sand cover

Page 12: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 12 November 2013

O:\44237-000-TPA\44237-001

Figure 17

Hay and grass seed mix

Page 13: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

Hazen and Sawyer, P.C 13 November 2013

O:\44237-000-TPA\44237-001

Estimated Cost The final construction cost for the installed system was $13,836.66 as detailed in Appendix B.

System Start-up

The system was started up November 19, 2013, when all flow was diverted to the new passive system.

Preliminary sampling will begin in December to monitor nitrification.

Page 14: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

APPENDIX A

RECORD DRAWINGS

Page 15: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

FLORIDA ONSITE SEW AGE NITROGEN REDUCTION

B-HS7 RECORD STRATEGIES

DRAWINGS

LIST OF DRAWINGS

SHEET SHEET SHEET COUNT NUMBER TITLE

GENERAL

G-1 COVER SHEET AND INDEX OF DRA'MNGS

CIV1L

2 C-1 SITE PLAN J C-2 PROPOSED SYSTEM LAYOUT 4 C-J CROSS SECTIONS 5 C-4 SYSTEM FLOW DIAGRAM 6 C-5 MONITOOING NETWORK

-lI£S[ "RECORO DRAIIINGS' REPRESEljr 11£ ~I.l '~s BLLr' COMl~ONS (F 11£ CONSlROCT~ PRD.ECT BASED Uf>ON FI LD rnSI:!VA~ON I.NJ SI.f'POOTN3 PR().[CT I!ECCROS. UNLESS OTHrn'lllSE ~TED ON lI£ DRI.~S, II'DR~ SI-()\\N AS f'ROPOSED OR IDn.lmt: HAS ~!N COIoIP\.ETm, AND ot.lNSIONS SHO~ ~S PROPOSED DR TE~T.I~1t: loR[ f~ 1.L ~TES DRECll~ 'mE CONTRACTOR TO P[RfOOol SPl'CFl C TASKS ~~ ON 11£ DRAIIIiGS AS .I RECOI!O (F CONSlRUC~ON ACTMTE5.

, @) @

-';"00

"

I!.rinbow Sfxiw.I. SI.,.P",*, •

HNds"';og. .-B....ty1i0li.

@

'''''''''0

~ •

~.- ... ~l"'.

In~""" ~

In"""", H!'lhl ...... Soottw;

• , ,

@

CiI,.

• M~""""""

""'~ S~m S!>'mg. ,~ , ,

Ocll.w~

I§l The Viii_<}/:.

-'~

~r'II,,", .... ,1

'"

@ • Juru~ S",",g' fW'I •• """A,..

"

_!!'J..I r ••• ,. , · "'![)Or.

LOCATION MAP N.T.S,

R\zENAND SA\WER Environmental Engineers & Scientists

10002 Princess Palm Ave., Suite 200 Tampa, Florida 33619

Certificate of Authorilatian Number: 2771

IN ASSOCIATlON WI TH

m. £~NT"

(m 5!l.TANu, LlC AET _._-

• ~. ~

to __ o 1I,.v"' •• .., S,.,.P.

@

@

"'

\::-~-

STUDY

PIIOIBCT LOCJA.T1011 B-BB7 Oetla ...... PL

-

FLORIDA DEPARTMENT OF HEALTH 4052IWDCYP1ES5 WAY, BIN tal

TALlNWlBEf, Fl.OAI~ __ '11~

""""'"

Page 16: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

-

LD ~

Z --

::r:: f--

5: 0 w en ~ ~ ~ 0

~ W 5: w

> W 0 0 Z

~ UNDEVELOPED NO WELLS WITHIN 75'

---------.--.:...:....:::.....~~--

'0 0 cO

'" en w = ~

>-e-(l' w D-o (l' D-

PROPERTY LINE 400.00'

I GARAGE I

WORKSHOP I

------- "

,/////~~- -" ..... ,,"-"-'-'.,

/ PUMP HOUSE \ / POTABLE WATER \

/ WELL \ I __ I

, , I ,., 0 ... _ I

I ..... ... , , , , \ ! w~ __

\ I _"_

\\\ In /~ _o , I'- ' .... 9-"- ...

.......... -

POOL

... ~ -', "'_0 // 00

""'W- -~~;:;-y EXISTING 2BD HOUSE

PROPOSED PNRS OM

SYSTEM ~~

I C~21 ,.oM 7IJ. '-M~; r/J ::FENCE

PROPOSED PUMP T;;K 'I'M~11i EXI ;T~NG 900 GAL CONCRETE L SEPTIC TANK PROPOSED BULL RUN VALVE EXISTING DRAINFIELD

~I"

BENCHMARK ----------CONTROL POINT SET j' IRON ROD ELEVATION ~ 120.63

PROPERTY LINE 425.00'

DEVELOPED NO WELLS WITHIN 75'

'0 0 c:i 0 CD

w = ~

>-e-(l' W D-0 (l' D-

SAND DRIVE

THESE "RECORD DRA'MNGS' REPRESENT THE FINAL "AS BUILT" CONDITIONS Cf THE CDNSTRUCTI(]'J PROJECT BASED UPCJlj FIELD OBSERVATION AND SUPPORTING PROJECT RECORDS. UNLESS OTHERWISE NOTED ON THE DRAWINGS, WORK SHOWN AS PROPOSED OR TENTATIVE HAS BEEN COMPLETED , AND DIMENSIONS SHDiMIJ AS PROPOSED SITE PLAN PROPOSED OR TENTATIVE ARE FINAL. NOTES DIRECTING THE CONTRACTOR TO PERFORM SPECIFIC TA9<S

-

LD ~

Z --

::r:: f--

5: 0 w en ~ ~

0 ~ W

~ 5: W > W 0 0 Z

40 20 0 40'

1"=40'-0" Iwi liM ....J !

I~:R:E~M":N::~::TH:E:D:RA:W:N:GS:A:S:A::RE:C:DR~D:O:F:C:ON:SrTR:UC:T:'O:NrAC:T:'":T':ES~' ____ ~~-r __________________________________ --------------r---------------------l1r· ~-4_0_· -------------:~~~:_;:~:;~:;~;::;::~~::lr----------IR1lFliDAD~~TMENTC~~~HI----------~~;:~:;r,:;_~~~;_,~~i , I- FLORIDA DEPARTMENT OF HEALTH FLORIDA DEPARTMENT OF HEALTH mE SCALE BAR IDATE DECEMBER 2013 ,~=~========l===t=~ DRA,,"· __ ~'"'-_I IlAzENAND SAWYER ,.----.- 4052 BALD CVPRESSWAY, BIN A08 FLORIDAONSITE SEWAGE NITROGEN REDUCTION STRATIGIESSTUDY SHOIM BELOW H & S JOB ~ E nvi ro nm ental E nlll nurl 110 Sci Inlisll TALLAHAS(850S)E.,E45, F.L403237099-1713 I-----------------------------------------------l ~~:s~~~~ ~%E NUMBER 44237 - 001

_i<l CI)'>JTRACT NUMBER FOSNRS SITE B-HS7 mE ORIG 'NAL CORCL

DRA'MNG 10002 Prince"" Porn A...,.,u~

Registry One Building, Suite 200 Tampa, FIDrida 33619

Certificate of Autn orization Num ber: 2771 SITE PLAN DRAIMNG NUMBER

C-l ;

Page 17: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

30' OAK

o

NOTES: 1. ALL VALVES AND FLOWMETER SHALL BE INSTALLED

WITH VALVE BOX COVER, IIITH RISER AS APPLICABLE, FOR ACCESS AT GROUND SURFACE

2. ALL VALVES SHALL HAVE A MINIMUM PRESSURE RATING OF 90 PSI.

3. ALL TANK LIDS SHALL BE SEALED IIITH APPROPRIATE SEALANTS TO ENSURE WATER TIGHTNESS.

4. WET-RUN PRESSURE CHECK IS REQUIRED. THIS SHOULD BE DONE PRIOR TO CHAMBER INSTALLATION IIITH THE USE OF INFIL TRA TOR PRESSURE DOSING PIPE SUPPORT.

THESE "RECORD DRA'MNGS' REPRESENT THE FINAL "AS BUILT" CONDITIONS Cf THE CDNSTRUCTI(]'J PROJECT BASED UPCJlj FIELD OBSERVATION AND SUPPORTING PROJECT RECORDS. UNLESS OTHERWISE NOTED ON THE DRAWINGS, WORK SHOWN AS PROPOSED OR TENTATIVE HAS BEEN COMPLETED, AND DIMENSIONS SHDiMIJ AS PROPOSED OR TENTATIVE ARE FINAL. NOTES DIRECTING THE CONTRACTOR TO PERFORM SPECIFIC TA9<S REMAJN ON THE DRA'MNGS AS A RECORD OF CONSTRUCTION ACTIV1TIES.

INFILTRATION CHAMBER (EQ36-LP) ALL-IN-ONE END CAP IIITH OBSERVATION PORT TO GRADE

14" OAK

33', 1.25"0 PVC SCH 40 LATERQ

12" OAK

o

WITH 1/4' PERFORATIONS, SPACED 36 INCHES, HOLES UP INFILTRATOR PRESSURE DOSING PIPE SUPPORT SHALL BE USED

L-~f----- 1.5'0 MANIFOLD FROM PUMP TANK

INFILTRATION CHAMBER (EQ36-LP) ALL -IN-ONE END CAP WITH OBSERVATION PORT TO GRADE

33', 1.25"0 PVC SCH 40 LATERAL WITH 1/4' PERFORATIONS, SPACED 36 INCHES, HOLES UP INFILTRATOR PRESSURE DOSING PIPE SUPPORT SHALL BE USED

X 72'

j" SAND LAYER ABOVE LINER

LINED DRAINFIELD, 2 TRENCHES INFILTRATION CHAMBERS (EQ36-LP) 32 CHAMBERS X 11.32 SF/CHAMBER

INFILTRATION CHAMBER (E036-LP) ALL -IN-ONE END CAP IIITH OBSERVATION PORT TO GRADE

14" OAK

o

362 SF

PROPOSED SYSTEM LAYOUT

DETAIL ," = 5'-0" C-1

12" OAK o 14" OAK

o

EXISTING SEPTIC TANK (900 GALLON)--~

24"0 ACCESS RISER IIITH POL YLOK COVER

PROPOSED BULL RUN VALVE

PROPOSED PUMP TANK (300 GALLON)

20"0 ACCESS RISER IIITH POL YLOK COVER 2"D PRESSURE PIPE FROM PUMP TANK

24" OAK

o ELEVATION ~ 120.63

BENCHMARK ~J SET l" IRON ROD

T EXISTING DRAINFIELD

HAzEN AND SAWYER Environmental Enllinur, 110 SCilntisll

FLORIDA DEPARTMENT OF HEALTH 4052 BALD CYPRESS WAY, BIN A08

TALLAHASSEE, FL 32399-1713

FLORIDA DEPARTMENT OF HEALTH FLORIDA ONSITE SEWAGE NITROGEN REDUCTION STRATIGIES STUDY

10002 Prince"" Porn A...,.,u~

Registry One Building, Suite 200 Tompo, FI"'ido 33619

Certificote of Autnorization Number: 2771

(850)-245-4070 FOSNRS SITE B-HS7

PROPOSED SYSTEM LAYOUT

5 2,5 0 5'

1"=5'-0' ~ ~ ..J

mE SCALE BAR

SHOWN BELOW

MEASURES ONE INCH LONG ON

CI)'>JTRACT NUMBER mE ORIGINAL CORCL DRA'MNG

DRAlMNG NUMBER

C-2

Page 18: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

12' COVER 1.25'D LOW PRESSURE DISTRIBUTION LATERAL 1/4" PERFORATIONS, 36" SEPARATION INFILTRATION CHAMBER (EQ36-LP) -----~

4'D CLEAN-OUT TO GRADE 125"0 THREADED CAP ON LATERAL END

4"0 CLEAN-OUT TO GRADE 1.25"0 THREADED CAP ON LATERAL END

WITH ALL -I N-ONE EN D PLA TES 1 •• IMIIIMIIII ... !tIIII.IlllIfjIll.iI.fIIlM.M ....... IIIIMIIII.iI.lIIl11l1MrJ:~~ .... iIlIliIlllMlllltliI •• III • .. 1IiI1II1IJ •• IllIliM ...... IillIIiI .... ilMi III,; ----0-+ 24" NATIVE SAND ---;:;;;-========--___ ~f::::==11W r,," PLASTIC MESH SCREEN 12' LIGNOCELLULOSIC MEDlA--------====::::::::::::::::::~L~r

30 MIL PVC LINER, WITH 6' LIP ----~

wf ?V,

~-~- ~I ____ 2_.5_' _____ ~---2-' ____ +-___ 2_' ___ ~---2-'---~----2-.5-'---~

LINED DRAINFIELD

SECTION ," = l' C-2

THESE "RECORD DRA'MNGS' REPRESENT THE FINAL "AS BUILT" CONDITIONS Cf THE CDNSTRUCTI(]'J PROJECT BASED UPCJlj FIELD OBSERVATION AND SUPPORTING PROJECT RECORDS. UNLESS OTHERWISE NOTED ON THE DRAWINGS, WORK SHOWN AS PROPOSED OR TENTATIVE HAS BEEN COMPLETED, AND DIMENSIONS SHDiMIJ AS PROPOSED OR TENTATIVE ARE FINAL. NOTES DIRECTING THE CONTRACTOR TO PERFORM SPECIFIC TA9<S REMAJN ON THE DRA'MNGS AS A RECORD OF CONSTRUCTION ACTIV1TIES.

1.5" MANIFOLD 12" COVER

LINED DRAINFIELD

SECTION , " = 3'

1.25"0 LOW PRESSURE DISTRIBUTION LATERAL 1/4' PERFORATIONS, 36' SEPARATION, HOLES UP INFILTRATOR PRESSURE DOSING PIPE SUPPORT SHALL BE USED INFILTRATION CHAMBER (EQ36-LP), 2' TRENCH 2'D PRESSURE PIPE FROM PUMP TANK

NATIVE SOIL, NITRIFICATION MEDIA DENSITY OF THE SAND THROUGHOUT THE BED BE MAINTAINED

LIGNOCELLULOSIC, DENITRIFICATION MEDIA

SAND LAYER ABOVE LINER

HAzEN AND SAWYER Environmental Enllinur, 110 SCilntisll

10002 Prince"" Porn A...,.,u ~

Registry One Building, Suite 200 Tompo, FI"'ido 33619

Certificote of Autnorization Number: 2771

FLORIDA DEPARTMENT OF HEALTH 4052 BALD CYPRESS WAY, BIN A08

TALLAHASSEE, FL 32399-1713 (850)-245-4070

I.s"D MANIFOLD

CENTRAL MANIFOLD DISTRIBUTION NETWORK

DETAIL ," = 1'-0' C-2

1.25'0 LATERAL \11TH 1/4' PERFORATIONS SPACED 36 INCHES r INFILTRATION CHAMBER (EQ36-LP)

ALL -IN-ONE END CAP \11TH OBSERVATION PORT TO GRADE

WITH !' PERFORATIONS SPACED 36 INCHES

.25'D LOW PRESSURE DISTRIBUTION LATERAL /4 ' PERFORATIONS, 36 ' SEPARATION , PIPE FROM PUMP TANK X1.s" RFDUCER

-----F~----7'_FOh.L-~~-1.5"XI25" REDUCER , OBSERVATION PORT

CENTRAL MANIFOLD DISTRIBUTION NETWORK '"=3'-0'

~E=T~I~ 8J 12" 6 0

" ""=" ' "=1'-0 "

FLORIDA DEPARTMENT OF HEALTH FLORIDA ONSITE SEWAGE NITROGEN REDUCTION STRATIGIES STUDY

mE SCALE BAR 1--,--,---,.,-______ --1 ~ SHOWN BELOW

I-------------------------i MEASURES ONE

FOSNRS SITE B-HS7 CROSS SECTIONS

INCH LONG ON

mE ORIGINAL

DRA'MNG

CONTRACT NUMBER

CORCL

DRA'MNG NUMBER

C-3

Page 19: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

DESIGN CALCULATIONS A. FLOW CALCULATIONS

NUMBER OF BEDROOMS ~ 2 BUILDING AREA ~ 2112 SF F.A.C. MINIMUM DESIGN FLOW ~ 300 GPO

B. TREATMENT DESIGN

CONNECTION FROM HOME

TRENCH ABSORPTION SURFACE, SAND ~ 0.80 GAL/SF-DAY ~ 375 SF

EX SEPTIC TANK- 900 GAL ",GRADE EL. 121.22 TOP EL. 120.50 OUTLET INV EL. 119.04

INFILTRATOR CHAMBERS EQ36-LP ~ 32 CHAMBERS X 11.32 SF/CHAMBER ~ 362 SF LOW PRESSURE DISTRIBUTION ~ 4, 33 FT LATERALS LINED AREA ~ 11' X 72' ~ 792 SF

PUMP TANK- 300 GAL ~GRADE EL. 120.80 TOP EL 119.48 4" INLET INV EL. 118.89

-

fl

LINED DRAINFIELD ~GRADE EL. 118.30 1.25" LATERAL INV EL. 116.89 INFILTRATOR TRENCH EL. 116.63 1.5" MANIFOLD INV EL. 116.63 BOTTOM OF LINER EL. 113.53

(\--------+----r~ 1

--~

PUMP TANK (300 GALLON)

SECTlONfc\ 1" = l' \[;::3/

I

20"0 ACCESS RISER WITH POL YLOK COVER

2"0 DISCHARGE 2"0 VACUUM BREAKER VALVE 2"0 CHECK VALVE 2"0 PRESSURE REGULATING VALVE

FROM SEPTIC TANK

I ~LlBERTY LE50 SERIES v--- 1/2 HP SUBMERSIBLE SEWAGE PUMP

12" 5 0 l'

1'=1'-0" Iiiib~-IbiiiiiJ.....J"""iiiiiiiiiiiiiiiiiiiiil!

THESE "RECORD DRA'MNGS' REPRESENT THE FINAL "AS BUILT" CONDITIONS Cf THE CDNSTRUCTI(]'J PROJECT BASED UPCJlj FIELD OBSERVATION AND SUPPORTING PROJECT RECORDS. UNLESS OTHERWISE NOTED ON THE DRAWINGS, WORK SHOWN AS PROPOSED OR TENTATIVE HAS BEEN COMPLETED, AND DIMENSIONS SHOiMIJ AS PROPOSED OR TENTATIVE ARE FINAL. NOTES DIRECTING THE CONTRACTOR TO PERFORM SPECIFIC TA9<S REMAJN ON THE DRA'MNGS AS A RECORD OF CONSTRUCTION ACTIV1TIES.

I~========+==+~==--~~--------------------~--------II------~~~~~~~~r---~~~OOW~~~--~~~~~~~i , I- FLORIDA DEPARTMENT OF HEALTH FLORIDA DEPARTMENT OF HEALTH mE SCALE BAR IDATE DECEMBER 2013

t::=lt=========t===t=~ ~ FLORIDAONSITE SEWAGE NITROGEN REDUCTION STRATIGIESSTUDY SHOWN BELOW H & S JOB '~ DRAIIN ___ --'"~_I HAzEN AND SAWYER 4052 BALD CYPRESS WAY, BIN A08 I-------------------------i MEA5DRE5 ONE NUMBER 44237 -001 ~ Environmental Enllinur, 110 SCilntisll TALLAHASSEE, FL32399-1713 INCH LONG ON

:j'8S==~~, ~~~C=t3JZJt:JS~~~:=::=~I~~~EFIN Dote: ; I NO. ISSUED FOR rlorkla Proiessiond Engneer's Registration NUmb-.,°6M98"'35C-

.!:l 10002 Prince"" Porn A...,.,u~ I '!t' (850)-245-4070 FOSNRS SITE B HS7 mE ORIGINAL R~;"to "'" 8,;ld;,0. ~;t. 200 HrJ~n~JHa - DRA~NG

Certificate T~;~tn~I~~t~~J~~~ber: 2771 uu. SYSTEM FLOW DIAGRAM

CI)'>JTRACT NUMBER

CDRCL

DRA'MNG NUMBER

C-4

Page 20: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

PROPOSED MONITORING NETWORK

DETAIL ," = 5'-0' C-1

THESE "RECORD DRA'MNGS' REPRESENT THE FINAL "AS BUILT" CONDITIONS Cf THE CDNSTRUCTI(]'J PROJECT BASED UPCJlj FIELD OBSERVATION AND SUPPORTING PROJECT RECORDS. UNLESS OTHERWISE NOTED ON THE DRAWINGS, WORK SHOWN AS PROPOSED OR TENTATIVE HAS BEEN COMPLETED , AND DIMENSIONS SHDiMIJ AS PROPOSED OR TENTATIVE ARE FINAL. NOTES DIRECTING THE CONTRACTOR TO PERFORM SPECIFIC TA9<S REMAJN ON THE DRA'MNGS AS A RECORD OF CONSTRUCTION ACTIV1TIES.

~I~: Pro1esslond Engneer's Registration ~~~:b-""6M9B~35~

• 2"0 SUCTION LYSIMETER (SL) PACKED IN SAND

_ 6"L STAINLESS STEEL DRIVEPOINT (SST DP)

~ 6"L STAINLESS STEEL DRIVEPOINT (SST DP) IN PAN

6 4"D OBSERVATION PORT

NGRADE EL 118.30

TRENCH EL 116.63 •• ~ WITH l' WELL SCREEN l~l--~~--~+------t-1---- 4"0 OBSERVATION PORT

SL PACKED IN SAND

HAzEN AND SAWYER Environmental Enllinur, 110 Scilnlisll

10002 Prinoe"" Porn A...,.,u~

Registry One Building, Suite 200 Tompo, FI"'ido 33619

Certificote of Autn orization Number: 2771

10 MONITORING NETWORK SUMMARY BOTTOM ELEV

STE (1) PUMP TANK

STAGE 1, NITRIFICATION CENTER OF EACH TRENCH

A (4) SL PACKED IN SAND 114.63 B (1) SST DP & LY IN PAN PACKED WITH SAND 114.38

STAGE 2, DENITRIFICATION CENTER OF EACH TRENCH

C (4) SST DP 113.63

CENTER OF LINED AREA

D (1) SL PACKED IN SAND 113.63 E (3) SST DP 113.63 F (3) OBERVATION PORT TO LINER 113.63

TREATED EFFLUENT OUTSIDE LINER

G (4) SL 114.13 H (4) SST DP & L Y IN PAN PACKED \11TH SAND 113.88 5 2.5 0 5'

~~=~"""IiI'..J""iiiiiiiiiiiiii

la HEALTH

FLORIDA DEPARTMENT OF HEALTH 4052 BALD CYPRESS WAY, BIN A08

TALLAHASSEE, FL 32399-1713 (850)-245-4070

'"=5'-0'

FLORIDA DEPARTMENT OF HEALTH mE SCALE BAR

FLORIDAONSITE SEWAGE NITROGEN REDUCTION STRATIGIES STUDY SHOWN BELOW !---,--,...,"':"=--=-'-'-H, t-------------------------l MEASURES ONE

FOSNRS SITE B-HS7 MONITORING NETWORK

INCH LONG ON F=C"'=TRC"A-CT-N-U-MB-E-R-H

mE ORIGINAL CORCl DRA'MNG

DRAlMNG NUMBER

C-5

Page 21: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

APPENDIX B

CONSTRUCTION COSTS

Page 22: Florida Department of Health Onsite Nitrogen Reduction ...€¦ · The 300 gallon concrete pump tank was installed downgradient of the primary tank (Figure 5). The standard outlet

PROJECT: FOSNRS Study Field Site Installation B-HS7

CLIENT: FDOH

TOTAL 13,836.66$

ITEM NO. DESCRIPTION

ENGINEER OR

CONTRACTOR

SUPPLIED QUANTITY UNIT UNIT PRICE TOTAL

Existing STE Tank 221.32$

1 24"D access cover with riser installed on existing septic tank above outlet screen Contractor 1 EA 63.54$ 63.54$

2 Bull run valve installation and 4"D pipe to pump tank Contractor 1 LS 86.25$ 86.25$

3 Bull run valve Engineer 1 EA 71.53$ 71.53$

New Pump Tank 2,333.32$

4 Minimum 225 gallon pump tank with 20"D access cover with riser Contractor 1 LS 508.30$ 508.30$

5 Install Liberty LE50 pump and floats, plumb discharge pipe Contractor 1 LS 317.69$ 317.69$

6 Electrical service for pump and pump runtime meter, audio and visual alarm Contractor 1 LS 287.50$ 287.50$

7 Mini power meter Engineer 1 LS 293.99$ 293.99$

8 Electrician Contractor 1 LS 250.00$ 250.00$

9 Vacuum breaker valve, check valve, pressure regulating valve on pump discharge Contractor 1 LS 48.88$ 48.88$

10 Install flowmeter and bypass (2 ball valves) Contractor 1 LS 86.25$ 86.25$

11 Flowmeter Engineer 1 LS 521.62$ 521.62$

12 2"D Sch 40 pressure pipe Contractor 1 LS 19.09$ 19.09$

Stage 1 and 2 Combination Lined Area 3,680.04$ 13 1.5"D Sch 40 pressure manifold pipe Contractor 1 LS 50.83$ 50.83$

14 1.25"D Sch 40 pressure pipe, 33 ft length laterals with 1/4 inch perforations, with 3 ft spacing Contractor 1 LS 81.33$ 81.33$

15 1.25"D lateral Infiltrator pressure pipe support stakes Contractor 1 LS 97.75$ 97.75$

16 Wet - run pressure check Contractor 1 LS 86.25$ 86.25$

17 Infiltrator chambers EQ36-LP Contractor 32 EA 21.28$ 680.80$

18 Infiltrator all-in-one end caps with observation ports to grade Contractor 8 LS 28.35$ 226.78$

19 Installation of native sand nitrification media (24" layer) Contractor 1 LS 287.50$ 287.50$

20 Installation of plastic mesh screen Contractor 1 LS 86.25$ 86.25$

21 Plastic mesh screen Engineer 1 LS 364.58$ 364.58$

22 Installation of lignocellulosic denitrification media (12" layer) Contractor 1 LS 201.25$ 201.25$

23 Lignocellulosic media Engineer 1 LS 671.50$ 671.50$

24 Installation of 30 mil PVC liner 11' x 72' area with 6 inch lip Contractor 1 LS 230.00$ 230.00$

25 PVC liner Engineer 1 LS 557.72$ 557.72$

26 Installation of 1/2" layer of sand above liner Contractor 1 LS 57.50$ 57.50$

Miscellaneous 5,288.76$ 27 Labor (8 hr day onsite) Contractor 3 EA 1,713.00$ 4,282.51$

28 Mobilization Contractor 2 EA 460.00$ 920.00$

29 Hay and Bahia Argentine seed mix Contractor 1 EA $86.25 86.25$

Monitoring Equipment 1,473.22$ 30 Household water meter Engineer 1 LS 176.50$ 176.50$

31 Installation of household water meter Engineer 1 LS 97.00$ 97.00$

32 Suction lysimeters Engineer 9 EA 65.00$ 585.01$

33 SST drivepoints Engineer 12 EA 32.64$ 391.62$

34 Pans Engineer 1 LS 24.43$ 24.43$

35 monitoring equipment covers Engineer 1 LS 89.11$ 89.11$

36 Installation of monitoring devices Contractor 1 LS 57.50$ 57.50$

37 Observation ports with 1' of well screen to liner Contractor 1 EA 52.05$ 52.05$