Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
FLORID
DA AGRICU
G
ULTURAL AN In
Guide t
ND MECHAN
nstitutional Re
o IRBN
NICAL UNIV
eview Board (
Net:
VERSITY
(IRB)
Table of Contents Introduction 2 IRBNet User Registration 2 IRBNet ID Number 2 Training and Credentials 3 IRB Meetings and Deadlines 4 IRB Approval Letters and Board Documents 5 IRB Forms, Templates, and Guidance 5 IRBNet Actions 6 My Projects 6 Create New Project 6 Project Overview 6 Designer Revise an Existing Document 7 Add a New Document 8 IRB Documents 10 View/Update/Delete 11 Create New Package 12 Lock Status 12 Share this Project 12 Sign this Package 13 Submit this Package 13 Send Mail 14 Delete this Package 15 Submission Types 16 New Project 16
Sharing a project 19 Signing the Package 21 Submitting the Package 22
Revisions (modifications required) 22 Reportable Events 23 Non-Compliance 23 Protocol Deviation 23 Unanticipated Problems Involving Risk 24 Amendments 24 Contact Information 25
Introduction Effective November 8, 2014, Florida A&M University Institutional Review Board (IRB) will only accept new submissions electronically through IRBNet. The next step is to utilize IRBNet for IRB protocol amendments and extensions and we anticipate requiring use of IRBNet for such activities by December 2, 2014 (see Guide for Submitting Amendments and Extensions for Old Projects in IRBNet)
The purpose of this document is to provide guidance for processing IRB submissions electronically through IRBNet. Step-by-step instructions as well as snapshots are provided for each IRBNet transaction. Additionally, each instruction will include a list of required study documents and forms to be attached with a submission in IRBNet. These documents are necessary to facilitate your IRB reviewers’ knowledge of your study. Finally, this document will also provide some instructions on how to complete each of the FAMU IRB forms. Additional guidance, forms and information can also be found on the FAMU IRB website. The following transactions are to be submitted electronically through IRBNet: New Study Continuing Review/Extension Modification/Amendment Close/Final Report Reportable Events Response/Follow-up to IRB requests IRBNet User Registration To register as a new user, open the above IRBNet webpage. This is what the homepage will look like:
Web Address: www.irbnet.org
Click onComplet IRBNetIRBNet project.
n the “New User te the registration
t ID Number will automaticaTherefore, a ne
Registration” icn information. A
ally assign a 6-dewly created pro
on located belowA registration em
digit ID number oject will always
w the login at themail will be sent t
to each new pros be 6 digits then
e top right cornero the email addr
oject. The numbn a dash and the
r of the page. Thress you provided
ber following the number 1. The
he link is circled d.
he dash is the pae 1 refers to pack
in red in the ima
ckage number fkage 1 of the pr
age above.
for that roject.
For eachnumber TrainiPlease nidentifiaCITI traInvestigyour disAfter yobe necespackage There a1. Docum your 2. Includ this op Docume1. Comp2. Save a Train3. Log in4. Click
h subsequent pabefore the dashng and Cred
note that all PIs, able informationaining, you can dgators and Key Pscipline. For moou have completssary to save thee.
are two ways toment the CITI trCITI training vis
de a copy of youption you will ne
enting CITI on yplete the requireda copy of your C
ning documents nto IRBNet (wwUser Profile on
ackage submittedh will not changedentials Co-PIs, data co
n must be CITI cdo so by followiPersonnel” or thore information ated the required e CITI completi
o document youaining in your IRsible for all yourr CITI completioeed to submit a c
your IRBNet Ud CITI training (wCITI completion
ww.irbnet.org)
the top right han
d for that projece. For example,
ollectors, and pecertified in the ping this link: ww
he “Group 2 Socabout the CITI tCITI training, p
ion reports for a
ur CITI within RBNet User Profr projects) on report as attaccopy of your CIT
ser Profile: www.citiprogramreport on your c
nd side of the pag
ct in IRBNet, thea new project m
ersonnel who intprotection of humww.citiprogramcial Behavioral Rtraining requiremplease save a co
all project person
IRBNet: file (only needs t
chment on the DTI completion rep
m.org) omputer (directi
ge in IRBNet (se
e last digit follomight be #12345
teract or interveman subjects. If.org and compleResearcher Invements, please fe
opy of your comnnel to your com
to be done once
esigner page forport each time yo
ons in the FAQs
ee image below)
owing the dash w56-1. Revisions
ene with participf you or any of yeting either basiestigators and Keeel free to review
mpletion report somputer as they w
every 3 years an
r your project (if ou submit a new
s on FAMU IRB
will go up one. Hto that project w
pants and personyour study persoic course in “Gr
Key Personnel” Cw the FAQs on Fo that it can be u
will need to be s
nd will make
f you choose, w project).
CITI
However, the 6 would be #1234
nnel who have aonnel have not croup 1 BiomedicCITI training deFAMU IRB CITuploaded into IRsubmitted with y
digit project 456-2.
access to completed cal Research pending on TI Training. RBNet. It will your project
5. Scroll 6. Click 7. Documinformat
8. SelectAfter all 9. Scrollimage be
l down to the trai
Add a New Trai
ment the information can be found
t “Choose File” al the required fie
l down until you elow).
ining & credenti
ining & Credenti
ation about your d on the CITI co
after filling in thlds are complete
see the training
ials section,
ials Record
study (i.e., docuompletion report.
he other applicabed, click “Attach”
you just added t
ument type, effec. The description
le fields. Then fi” to upload the C
to your User Pro
ctive date, expiran and credits/cred
ind the file on yoCITI completion
file and then clic
ation date). The edit hour’s section
our computer andreport to your U
ck “Submit” to s
effective date is ns can be left bla
d click open on tUser Profile.
send it to the FAM
the date you pasank.
the pop-up once
MU IRB to appr
ssed CITI. All
it is selected.
rove (see
10. Selecyou Clicthat Wan IRB Me The convdates andstrongly review o IRB Ap IRB appon the leIRB’s dApprova
ct the Florida A&
ck submit, an em
nt connected to y
eetings and Sub
vened FAMU IRd deadlines. Thesuggested that y
of your project. O
pproval Letters
proval letters aneft hand side of etermination bual Letter and app
&M University a
mail will be sent t
your profile.
bmission Deadl
RB meets at varioe deadline for subyou submit your Only full board p
s and Other Bo
d board documeyour package in
ut it is the responproved docume
as the institution
to the IRB with i
lines
ous times througbmitting for revidocuments more
projects must be
ard Documents
ents can only ben IRBNet (see thnsibility of the rnt(s) are accessi
with which you
nformation abou
ghout the year. Plew at a convenee than 2 weeks previewed at a co
s
e accessed via IRhe IRBNet FAQresearch team toible. Approved
are sharing your
ut your training.
lease refer to thed meeting is gen
prior to a schedulonvened IRB mee
RBNet. You canQs for more infoo log into IRBNedocuments will
r CITI training. T
It will be necess
e Schedule on thenerally two weekled meeting in caeting.
n find the board ormation). You wet to address anycontain a stamp
There is no need
sary to click subm
e FAMU IRB Wks prior to a convase documents ar
documents by cwill receive an e
ny modificationsp and date to ind
d to write a mess
mit for each train
Website for a list ovened meeting. Hre missing that c
clicking the Revemail notificatios requested and/dicate approval.
age. After
ning/credential
of the meeting However, it is could delay the
views button on of the or verify the .
IRB Forms, Templates, and Guidance Some FAMU IRB forms are available on IRBNet for download and use. The FAMU – IRB Protocol application is available in this library and must be completed and adjusted on the Designer page in IRBNet (see the IRBNet FAQs for more information). More information about new submissions is included below. If you would like to access the forms and templates library, you can do so at any time by clicking on “Forms and Templates” option on the left-hand side of your screen under “Other Tools.”
IRBNet Actions This section will describe each IRBNet function. My Projects
Please note that the information in the picture shows multiple documents available when you access the library through IRBNet. You can access any document on the list by clicking the name of the document or the paper icon for each document. If you do not access the forms and templates library prior to beginning your submission, you will have another opportunity to download documents when you create a New Project.
IRBNet will automatically open to the My Projects page after you have logged in. This section allows you to view all studies that you have created or to which you have been shared access. You may sort the list of submissions by clicking on any of the heading options (e.g., Study Title, Status, IRBNet ID).
CreateA new ppackage
A packaa blankeand Res
e New Projecproject is createde. To create a ne
age is a bundle oet term for all ofsearch Integrity
ct d in IRBNet usi
ew project, follo
of documents (ef the packages th850-412-5246.
ng the “Create Now the instructio
.g., protocol apphat make up a su
New Project” mons in the section
plication, consenubmission. If y
menu option. Thin entitled New S
nt forms, measuyou need more in
is function only Study.
urement tools, trnformation, plea
y creates new stu
raining & credenase contact the O
udies. It does no
ntials). The termOffice of Anima
ot start a new
m “project” is al Welfare
ProjecThe Projproject aone subm
The proj P T L S S
Addition
D S S S D S P R
ct Overview ject Overview paas well as quick lmission. From th
ject overview paPersonal level ofThe status of theLock status Status of previouShared access pe
nally, the projectDesigner Share this projecSign this packagSubmit this packDelete this packaSend project maiPrevious packagReview details fo
age appears oncelinks to other funhe My Projects p
age lets membersf access to the pre current transact
us transactions (iermissions of oth
t overview page
ct e
kage (unless package (only availabil e(s) (if applicablor the current pa
e a project is creanctions within IRage you can reac
s of the research roject tion
if applicable) her users
allows you direc
kage is already suble for those with
le) ackage
ated and allows aRBNet. You can ch the project ov
team view inform
ct access to other
ubmitted) h “full” access)
a research team mget to the projec
verview page by
mation regarding
r administrative m
member to get gct overview pageclicking on a des
g the project, suc
menu pages, incl
general informatie only after you hsired project title
ch as:
luding:
ion regarding thehave begun worke.
e status of the k on at least
DesigThe DesIRB doc When yo“locked”you maydocumenpackageinformatexisting Revise anew verthe Docuhave not 1. From documen
2. Make 3. Click revised v
gner signer is used to cuments.
ou initially acces” and cannot be ry be asked to revnts for your subm. Always revise tion about submidocument or to
an Existing Dorsion of your document History. t uploaded mult
the list of Documnt under the head
any necessary con the pencil ico
version of the do
access FAMU IR
ss the designer itrevised. After th
vise your existingmission, the desia previous documitting a New Stuupload a new do
cument: Use thcument and retaYou may view
tiple version of t
ments from Prevding “Document
changes to the doon for the documocument.
RB forms, view
t will be to attache IRB has review
g package or yougner page also ament submitted i
udy is included bocument for revie
his option when ains all historicathe historical vethe same docum
vious Packages at Type” or on the
ownloaded documment you are upd
attached docume
h documents for wed your packagu may be asked toallows you to revif you have a cho
below. After the Iew. The followin
you want to addal versions as paersions of a docu
ment, you will no
t the bottom of te paper icon.
ment, and save thating in the Desi
ents for the curre
your submissionge and made a deo submit a new p
vise your existingoice – this maintIRB has made a ng details and ex
d or create a newart of your Docuument by clickinot see the docum
he page, downlo
he revised documigner. This will a
ent package, add
n package. After etermination (e.gpackage with revg project documetains the documedetermination, y
xamples are direc
w version of an ument History. Tng on the Docum
ment history ico
oad the documen
ment to your comallow you to repl
d new documents
you have submig., modifications vised documentsents or add entireent history propeyou may be requctly from IRBNe
existing projectThe new versionument History icon ( ).
nt to be revised b
mputer. lace the previous
s, and access rev
itted a package, trequired, projec. If you are revisely new docume
erly in the systemuired to make chaet:
t document. IRBn will be automacon. Please note
by clicking on the
s version with th
iew details for
that package is ct approved), sing nts to your
m. More anges to an
BNet creates a atically tied to that if you
e name of the
he newly
4. You wDocume
5. Whenrevision
will then be proment Type and Des
n you click Updahistory that refle
mpted to attach a scription as appr
ate, the revised doects versions of t
document. Browropriate, and click
ocument will appthat document fr
wse your computk the Update but
pear in the currerom previous pac
ter and select thetton. The page w
nt document pacckages.
e revised versionwill look like this
ckage (New and
n of the documens:
Revised Docum
nt to upload, mak
ments in this Pack
ke changes to
kage) with a
Add a New Document: Use the "Add New Document" option when the document you are adding is not a revised or updated version of an existing project document. The "new" document will not be tied to the Document History of any existing document, and it will not have any Document History of its own since it is a completely new addition to your project.
If you will use a template to generate your new document, you must first access the template in the forms and templates library. On the left-hand side of your screen, select “Forms and Templates.” Click on the name of the document or the paper icon for the template or form you wish to download. Save the template or form to your computer for completion. Complete downloaded forms or create documents to be submitted. Make sure you save your finished product. After your document is saved, you can now upload it to the package. Back on the designer page in IRBNet, use the “Add New Document” button to upload the completed document into the package. It will not have a revision history (stack of paper icon) at this time because it is new.
If you have already generated the document and it is saved on your computer, you do not need to download a template from the forms and
template library. You can go straight to the “Add New Document” button to upload the new document into the package. It will not have a revision history (stack of paper icon) at this time because it is new.
What about copies of existing documents? Committee members and administrators often need to access copies of existing project documents, such the previously approved Consent Form, when reviewing your new or revised documents. You do not need to attach these older, unchanged project documents to your current package. Committee members and administrators can automatically access these older documents as needed from the "Documents from Previous Packages" list. If you are unsure about the documents you are required to submit, you should contact your local research integrity administrator for more information.
1. You have a modified Consent Form that replaces the current version of your Consent Form from a previous package. What To Do: Access the designer page for your project by clicking the “my projects” button on the left-hand side of the screen. From there you can click on the title of the project you are revising. This will bring you to the project overview page where you can click “designer.” Locate your Consent Form in the "Documents from Previous Packages" list and click the "Revise this Document" icon which will look like a pencil. This will allow you to include a new version of your document in your current package while retaining your complete Document History. 2. You have a completely new document that is not a revised or updated version of any existing project document. What to Do: From the designer page, click the "Add New Document" button. This will allow you to add the new document to your current package. Please note that there are multiple ways that the Designer can be accessed:
1. Clicking on the “Continue” icon when creating a new project 2. Clicking on the “Designer” icon from the Project Administration menu 3. Clicking on the blue “Designer” link while in the “Project Overview” page 4. Clicking on the blue package type hyperlink while previewing the “Project History”
IRB DIRBNet IRBNet.click theletter) cadocumen
See the
View/UIcon
Attachedof projecwill comThese fupackage
Documents sends an automa. To access the IRe Reviews Buttonan be accessed frnt(s).
section Respons
Update/Deletn
U
d documents can bct documents. The
mpletely remove aunctions should oce instead of upda
atic email after aRB documents wn on the left handrom the last table
se/Follow‐up to a
te Icon Fu
View/downloa
Update/Revise/E
Delete do
See docume
be viewed at any e update function
a file from IRBNeccur before submating the one alre
a decision has bewithin IRBNet, lod size of the page “Board Docum
a request from t
nction
ad document
Edit document
ocument
ent history
time by any sharn will let you replet. The update and
mitting a project paeady submitted.
en made by the Fog into IRBNet, e. Board docume
ments”. Click on
the IRB for instru
red user. To viewace the current atd delete functionsackage. Using th
FAMU IRB and click the title of ents (e.g., acknoeither the blue h
uctions on replyi
attached forms, cttached documents can only be con
he update or dele
when IRB docuf the project for wwledgement lettyperlink text or
ng to modificatio
click on the viewt with a new revis
nducted by sharedete functions afte
uments such as apwhich you want tter, modificationthe document ic
ons requested b
w icon of the docused document. Th
d users with Full oer submitting wi
pproval letters arto see a board do
ns required letter,con to view and p
by the IRB.
ument from the lishe delete functionor Write privilegeill create a new
re published in ocument, then , approval print the
st n es.
Create New Package Please note that creating a new package is different than creating a new project. Another package may be prepared while a package or multiple packages are pending review. However we strongly recommend that you avoid doing this as it may delay the review of your protocol documents. Only an individual with Full access to the project can create a new package. To create a new package:
1. Log into IRBNet 2. Click into your project in IRBNet by clicking the title of the project. 3. Click the “Project History” button the left-hand side of your screen. 4. Click the “Create New Package” button in the middle of the page. 5. Click “Work in progress (Not submitted)” to access the Designer page for your new package (also may be called “New Document Package” in some instances).
IRBNet will now default to this package when you re-enter the project. Alternatively, a new package can be created from the “Designer” when you try to add a new document. Simply accept the warning to create a new package. Lock Status The IRB administrator may unlock a package if it is missing documents required for review or if requested by a PI (as long as the package is not already under review by an IRB member) Contact an IRB administrator via email to request the project package be unlocked. Please provide an accurate IRBNet ID and package # and a brief reason for the request in the message. Please note: your project will only be unlocked if no IRB action has occurred and the package is not being reviewed by the IRB at the time of the request. If the package is being reviewed, the package may not be unlocked.
Permissions Full: User may manage all aspects of the project. The user may give and change permissions associated with the project. You may have more than one manager to a project. Write: User may co-edit the project with owner, but not give or change permissions. Any changes a person with "write" access makes to a document using the project designer will automatically transfer across to the owner's copy. Read: User may only access a read-only PDF of the project. All other management features are disabled. Use this level of permission if you only need that person to sign the project.
Although any individual can sign the project, only an individual with Full access may submit the project to the IRB. The individual creating a new project will automatically be assigned Full permissions. Shared access for research team members can be changed at any time. Only individuals with full access may share a project with others. New staff should be entered as soon as they have met the FAMU IRB requirements for new research staff conducting research (e.g., CITI training). Departing staff should be removed promptly. The addition/removal of research staff share permissions does not involve review by the IRB if the project is exempt. However, if the project has been approved as expedited or full board, the addition of new personnel will require IRB review and approval. The PI should ensure share permissions are current and accurate to ensure unwarranted access by non-research team individuals. More information about project sharing is included below in the New Study section. Sign this Package The Principal Investigator must sign the initial package for each new project. If you are a researcher unaffiliated with FAMU, it will be necessary for you to designate a FAMU full time researcher for your project. This researcher will need to sign the package before it can be submitted to the FAMU IRB. If you are a student, it will be necessary for your faculty advisor to sign the package. If the principal investigator is different than the faculty advisor on a student project, both the PI and the faculty advisor must sign the package. Packages that have not received the proper signatures will be returned without review. More information about project sharing is included below in the New Study section of this document. Submit this Package A research team member with Full share access may submit the transaction to the IRB after the necessary individuals have signed the submission. To submit a project package: 1. Click on “Submit this Package” from the Project Administration menu options or click on the “here” hyperlink on the Project Overview page. 2. Ensure that the Florida A&M University, Tallahassee, FL IRB, IACUC or IBC is highlighted and then click the “Continue” icon. 3. Select the Submission Type from the drop down menu. If it is an entirely new submission, please select “New Project.” If you are responding with revisions based on a review memo, please select “Revisions” as the submission type. 4. Write a message if you would like to do so. However, there is no need to send comments when you submit. 5. Click on the “Submit” icon.
Send MThe Senda specific Please co1. Login 2. On the3. From ttitle. Thi4. After y5. Select research like to se The defacan selecthe “Prevaddress t
DeleteIf necesslost. Aftindefinittransacti
Mail d Mail page allowc project for whic
omplete the folloto IRBNet
e left-hand side othe list of your prs will bring you tyou have reachedt the message reciintegrity adminis
end mail to someo
ault message requct any member wiview” icon. Clickthat they used to r
e this Packasary, anyone witer a project has btely and used at tion.
The sender sh
ws research team ch you would like
owing steps:
f the screen, clickrojects, select theto the Project Oved the Project Overipients from the lstrators. Please seone who is not sh
uests the recipientith share access b
k the “Send” icon register with IRB
age h full access to abeen submitted, the next IRB tran
hould include th
members to comme to generate an e
k the button for “Me one that you wouerview page. rview page, clickist. If you have n
ee the New Studyhared on a project
t to login and viewby checking the b
at the bottom of BNet. Additionally
a package can dethe package willnsaction. It does
emselves on the
municate to eachemail.
My Projects” uld like to send a
k on the “Send Proot shared the proj
y section of this dot, you must use yo
w the transaction.ox next to that tethe email to sendy, a notice will ap
elete a created pal be locked and ynot necessarily n
e email list so th
h other regarding a
an email about. Y
oject Mail” buttonject with anyone,ocument for specour standard ema
. The email text mam member’s nam
d to the selected teppear in the recip
ackage; howeveryou will be unabneed to be delete
ey will receive a
a specific project
ou can select a pr
n on the left-hand, the only people cifics about how tail rather than the
may be modified me. The email caeam members. Thient’s “My Remi
r, any changes mle to delete or med should you no
a copy of the em
t. In order to use t
roject by clicking
d side of your scryou will be able to share a project IRBNet send ma
to fit your needs.an be previewed bhe message will binders” section in
made while the pamanipulate it. A po longer plan to s
mail sent through
the mail feature, y
g the blue link for
reen. to send mail to wwith someone. If
ail function.
. Within the pagebefore sending bybe sent to the reci
n IRBNet.
ackage was pendpackage can remasubmit the intend
h IRBNet for thei
you must open
r the project
will be the f you would
e, the sender y clicking on ipient’s email
ding will be ain open ded
ir records.
Submiss New ProAny indinot givenmembersIRBNet I How to c11. After
12. Left c) key wthrougho Create NTo createproject w
sion Types
oject ividual on the resn share access, yos to ensure the proID numbers, plea
create a new pror logging into IRB
click on the “Creords, d) sponsor,
out your submissi
New Project e a new project, f
with other users.
earch team may cou would not be aoject has not yet b
ase contact an IRB
oject: BNet, on the left-
eate New Project”and e) internal re
ion so make sure
first provide the b
create a new studable to view the pbeen created befoB administrator (I
-hand side of the s
” button. You willeference number.you check it for a
basic project infor
dy/project. Therefproject in the My ore creating a [email protected]).
screen you should
l be prompted to The title informaaccuracy.
mation below. On
fore, a project couProjects list. The
w project. If a pro
d see an option fo
enter informationation and principa
nce your project i
uld be created in Ie UNF IRB requeoject is accidental
or “Create New P
n about the studyal investigator inf
s created you ma
IRBNet without ysts that you contally duplicated suc
Project.”
: a) title, b) princformation you in
ay attach project
your knowledge. act all other reseach that one projec
ipal investigator clude here will be
documentation a
If you were arch team ct has two
name and title, e used
nd share the
Research Institution: Florida Agricultural and Mechanical University, Tallahas
Title:
*
Local Principal Investigator:
First Name:*Last Name:* Degree(s):
Keywords:
Sponsor:
You may specify an internal account number, billing identifier or reference number for this project.
Internal Reference Number:
Continue
Cancel
* required fields
13. The principal investigator (PI) is the individual who will be responsible for the conduct of the project. Although we strongly recommend that the PI be the individual generating the project paperwork, this is not a requirement. If project paperwork is being completed by someone other than the PI (e.g., research coordinator), please "share" this document with the PI so that both parties have full access. Directions on how to share are outlined below. Only faculty, are permitted to be PIs on IRB submissions.
14. In the keywords field, please specify keywords that can be used in a search to find this project. In the sponsor field, list the name of the funding agency sponsoring the project (if applicable) and upload the funding application and approval (when appropriate). If the project is unfunded, leave the sponsor field blank. Finally, we ask that you leave the institutional reference number field blank. After you have completed all the appropriate fields, click “Continue”. Clicking continue automatically saves your data. 15. On the next page (designer page), you will be able to download documents from the UNF documents library (step 1). Step 1 is optional and most researchers do not use it because they already completed the documents prior to accessing this page. If you use step 1, be sure to select the University of Florida Agricultural and Mechanical University in the “select a library” field. The documents library contains informational how-to documents, forms, templates, and checklists. Download any document that you will use in your submission. The Florida Agricultural and Mechanical University – IRB Protocol application cannot be accessed from the documents library. The application will be available electronically within IRBNet in the next section and outlined in Step 2 below. If you have generated your own supplemental documents (e.g., recruitment, consent, measurement tools), it will only be necessary to download the “Attachment A: Study Details for Expedited or Full Board Projects” document or the “Attachment B: Study Details for Exempt Projects” document for completion. Documents downloaded from the library should be saved to your computer, completed, resaved, and then uploaded into IRBNet. Please refer to the guides below for information about what documents are required to be included for a new project:
Documents Checklist - For Expedited or Full board projects Documents Checklist for Exempt Projects - Use only if you believe your project will be declared exempt from further review
16. after you have completed all of the supplementary documents (e.g., Attachment A or Attachment B, recruitment materials, informed consent documents, permiss[929200-1] IRBNet training test of submission process
Step 1: Download blank forms, document templates and reference materials to assist you in assembling your document package.
Select a Library:
Florida Agricultural and Mechanical University IRB, Tallahassee, FL
Select a Document:
Dow nload
Step 2: Assemble your document package. In addition to adding project documents to your package, IRBNet also allows you to link your project team's Training & Credentials to yo
Documents in this Package:
Document Type Description Last Modified
Consent Form Consent Letter 016-26.pdf 06/29/2016 11:47 AM
There are no Training & Credentials records linked to this package. | Link / Un-Link Training Records |
Add New Document
17. On thForm, andocumeninformataccess toaccess tosharing i18. Uplodocumen 19. Shawith anosign the
20. In or
he Attach Documnd Questionnaire/nt to the descriptiion about their tr
o identifiable infoo your project docis included belowoad the file by clicnt file from your c
aring a projectother person, theysubmission pack
If you arsignaturethe proje
If you ar If you ar If you ar
advisor iproject.
rder to share you
ment page, you sho/Survey). If you don field. Additionaining and creden
ormation are requicuments), you wil
w. cking “Choose Ficomputer, click th
: After you havey will have accekage. e a FAMU affilies from your depect with others if e not the PI for te unaffiliated wie a student works different from
ur project, click “
ould select the dodo not see an optinally, if you are intials. All Co-PIsired to complete Cll need to upload
ile” and then selehe “Attach” butto
created a new pss to the project.
ated faculty or stpartment chair, yf you wish (e.g., Cthis project, it wiith FAMU, it wilking on a project,the PI for your p
“Share this Proje
ocument type youon that describes ncluding other pe
s, data collectors, CITI training. If ytheir CITI compl
cting the documeon. You can only
project, you can s We recommend
taff member (noou are not requirCo-PI, other persill be necessary fll be necessary fo, it will be necesproject, you will
ect” on the left-ha
u are uploading fryour document t
ersonnel (e.g., respersonnel who inyou will not sharletion reports as s
ent from where it add one documen
share your projecd that you share t
n-student) who ired to share the psonnel, departmefor you to share tor you to share thsary for you to sneed to share th
and side of your
rom the drop dowtype, please choosearch assistants, nteract or intervene the project withsupplementary do
is saved on your nt at a time.
ct with relevant pthe project with
is also the PI on project with anyoent chair). the project with he project with t
share the project he project with bo
screen.
wn list (e.g., Trainse “other” and thdata collectors), ne with participanh these individualocuments. More i
r computer. After
personnel. As soany personnel w
this project and one else. Howev
the PI. the FAMU faculwith your facult
oth your faculty
ning/Certificationhen add a descript
it will be necessants, and personnels (i.e., give theminformation abou
you have selecte
oon as you share who will need to r
you are not requver, you may cho
ty member for yty advisor. If youadvisor and the
, Consent tion of the ary to include el who have
m read or write ut project
ed the correct
the project read, revise, or
uired to obtain oose to share
your project. ur faculty PI of the
21. In m“Florida22. Befo
23. You on the “S24. Afterteam me25. If yobottom o26. Finasubmitta
most cases, you wa Agricultural andore you can share
Register Complet Affiliate
can search for a
Search” icon. r you have ident
ember’s name. ou need the selecof this page askinlly, after reviewi
al.
will choose the “Sd Mechanical Une the study, the p
r with IRBNet (Ite the User Prof
e with the Florid
an individual by t
tified the individu
cted personnel to ng them to sign ting all document
Share” option ratniversity, Tallahperson you are sh
IRBNet.org) file da Agricultural
typing in the firs
ual to whom you
sign the packagthe package. Youts and verifying
ther than “Multi-assee, FL” from haring it with mu
and Mechanica
st letter of the ind
u would like to g
e (e.g., PI, facultu might also inclthat the submiss
-site” or “Transfethe drop down l
ust:
al University (un
dividual’s last na
give access, place
ty), please includlude instructionsion is just the wa
fer.” After you halist of organizatio
nless a Co-PI is
ame, any letter o
e a mark in the a
de a message to ts as to how they ay you want it, y
ave selected “Shons.
s located at a dif
of their full name
appropriate level
them in the “Yoassess and sign t
you can sign the
hare,” (blue text)
fferent institutio
e, or * to list all u
of access next to
ur Comments” sthe package. package in prepa
choose
on)
users and click
o the research
section at the
aration for
Signin‐ Select “your role
When yo Who is r
Submit A
t S S
cC
g the Package“Sign this Packae in the study fro
ou shared the pro
required to sign A
f A
in(th
I
tting the PackaAfter your projecthe Project AdmiSelect “Florida ASelect the submicomments that yComments” sect
e: age” from the Proom the drop dow
oject with other u
n the package? At a minimum, Ffor more informaAs noted above, investigator is difPlease note that hesis projects). f you are not a F
age: ct package is coministration bar on
Agricultural and ssion type from
you would like toion of the page.
oject Administrawn list and click “
users, you should
FAMU’s IRB reqation about how tif you are a studefferent than the fa faculty membe
FAMU affiliate, i
mplete and signen the left-hand siMechanical Unithe drop down m
o send to the rese
ation bar on the l“sign.”
d have specified
quires that the prto sign a packageent, it will be nefaculty advisor oer must be the PI
it will be necessa
ed by all necessaide of your screeiversity, Tallahasmenu. If this is a earch integrity ad
eft-hand side of
if you want them
incipal investigae. cessary for your
on a student projeI on non-thesis g
ary for the FAM
ary persons, you cen. ssee, FL” from thnew submission
dministrators and
your screen. Thi
m to sign the pac
ator (PI) sign eac
faculty advisor ect, both the PI agraduate projects
U sponsor to sig
can submit the p
he list of organizn, select “New Prd/or reviewers, p
is will allow you
ckage before it is
ch package befor
to sign the packaand the faculty ads and undergradu
gn the package b
package by clicki
zations and then roject” from the
please include tha
u to sign the pack
s submitted.
re it is submitted
age. If the princidvisor must sign
uate research incl
efore it is submi
ing “Submit this
click “Continuelist of options. Iat information in
kage. Select
d. See above
ipal n the package luding honors
tted.
s Package” on
.” f you have
n the “Your
‐ Click “Submit” when you are done. IRB Projects generally take between four to six weeks between the time of submission and the time of approval. If you are required to submit multiple revisions or if a large volume of projects have been submitted, the timeline for review and approval may be elongated.
Modifications Required: Revising your Project Documents: The IRB may request modification(s) to the protocol application or supplementary documents (e.g., attachment A or attachment B, recruitment materials, informed consent documents, CITI training). You will receive an email notification within IRBNet from the IRB informing you that a board document has been published in IRBNet. The board may publish a response to your submission by making a document available for you to review. This letter may ask you to make modifications or it may indicate that your project has been approved or disapproved. It is the responsibility of the research team to log into IRBNet to view these documents and address any modifications requested. To view the IRB’s determination and modification request: 1. Log into IRBNet 2. Select the project (click title of project) 3. Select the “Reviews” from the administrative menu (left-hand side of page) 4. Click on the blue hyperlink for the Decision Letter or other board documents from the IRB. This will download a copy of the letter to your computer. To make revisions: 1. Complete your revisions as requested. Save the revised documents to your computer. 2. Sign into IRBNet and select the correct project from the My Projects page. Do this by clicking on the title of the project you are revising. 3. On the toolbar on the left-hand side of the screen click on the “Project History” button. This will allow you to see all the packages that have been started for your project. 4. From the project history page, click “Create New Package.” 5. You should see a new entry in the list of packages. This entry should be titled “Work in progress (Not submitted).” Click on the link for “Work in progress (Not submitted)” to begin your new package. 6. Attach a revised document or add new project documents to the new package by following the instructions for adding new documents in the Designer section of this document. 7. Submit the documents to the IRB by following the Submit this Package instructions and designating the submission type as a “Revision.”
ReportaNon-Cofederal oNon-com
Non-Cofederal oNon-com ProtocoRecruitmpublishereceivedensuringthe partithe protoSubmiss
able Event ompliance: any aor state regulatiompliance reports
ompliance: any aor state regulatiompliance reports
ol Deviation: Anment, informed ces the stamped and a stamped and dg that the study dcipant. The PI mocol prior to consion Type during
action or activityns or institutionashould be desig
action or activityns or institutionashould be desig
n alteration/modiconsent, and datand dated approvadated approval fr
does not deviate fmust report any p
ducting the devig submission.
y associated withal policies and prnated as an “Oth
y associated withal policies and prnated as an “Oth
fication to the IRa collection are nal documents witfrom the IRB, plefrom the IRB-ap
protocol deviationation. Non-comp
h the conduct or orocedures governher Reportable E
h the conduct or orocedures governher Reportable E
RB approved pronot permitted witthin IRBNet. Thease contact a respproved protocolns or violations apliance reports sh
oversight of resening human subjvent” when sele
oversight of resening human subjvent” when sele
otocol that is not thout final IRB ae approval lettersearch integrity a, except in such and when possibhould be designa
earch involving hject research or tcting the Submis
earch involving hject research or tcting the Submis
approved by theapproval. Final IRr will outline the administrator forcases where it is
ble, should requeated as an “Other
human subjects tthe requirementsssion Type durin
human subjects tthe requirementsssion Type durin
e IRB prior to itsRB approval wilconditions of yo
r more informatis necessary to avest permission froer Reportable Eve
that fails to comps or determinationg submission.
that fails to comps or determinationg submission.
s initiation or impll be confirmed wour approval. If yion. The PI is resvoid an immediatom the IRB to deent” when select
ply with ons of the IRB.
ply with ons of the IRB.
plementation. when the IRB you have not sponsible for te hazard to eviate from ting the
Unanticipated Problems Involving Risk: any incident, experience, or outcome that meets the following criteria: a) Event is unanticipated, unforeseen, or unexpected b) There is a reasonable possibility that the problem is related or caused by the research, AND c) Participants or others are at an in increased risk of harm An Unanticipated Problem Involving Risk to Participants or Others could result from a protocol deviation. However, an Unanticipated Problem could also involve the loss of study forms, consents or a participant complaint. An Unanticipated Problem also needs to be reported to the IRB. The submission type for an unanticipated problem involving risk will be “Unanticipated Problem (UP)”. To submit a reportable event: 1. Download the event report form and save the form to your computer for completion. 2. Complete the form and save it to your computer. 3. Sign onto IRBNet and click on My Projects to access the project for which you are reporting 4. Select the correct project by clicking on the project title 5. Create a new package for your project 6. Go to the Designer page of your new package 7. Click the “Add New Document” icon and add the Event Report Form you completed along with any supporting documents, as applicable. Please see the Designer section of this document for more information about navigating through the Designer page. For document type select either “Reportable Event (Non-AE)” or “Unanticipated Problem Report” from the drop down list. 8. Have the PI sign the package by following the Sign this Package instructions 9. Submit the package to the IRB following the Submit this Package instructions, designating the submission type as either a Other Reportable Event or an Unanticipated Problem (UP) as applicable. In addition to the event report, you may be asked to submit additional documentation. For example, if you will revise any of your protocol procedures, it will be necessary to submit a revised protocol application with your report. If you will make changes to your informed consent documents, it will be necessary to submit those documents for review. Any additional or pertinent information should be submitted with your report as applicable. Modification/Amendment If your project has been approved and you would like to change your procedures or materials, it may be necessary to submit an amendment before engaging in the revised activities. Any change to an expedited or full board project must be submitted as an amendment. That amendment will need to be reviewed and approved before you begin your revised activities. If you plan to make changes to an exempt project, please note that only substantive changes will need to be submitted for exempt projects. Please refer to the FAMU Standard Operating Procedures for more information about changes to exempt projects that might necessitate an amendment. If you are unsure of whether your project requires an amendment, please contact a research integrity administrator before beginning your revised activities. The investigator is responsible for promptly submitting protocol amendments to the IRB. Amended procedures may not be implemented until the amendment has been reviewed and approved by the IRB unless the change is necessary reduce or eliminate harm. 1. Download the Amendment Request Form. Save the form to your computer for completion. 2. Complete the form and save it to your computer. 3. Sign onto IRBNet and click on My Projects to access the project that you would like to amend
4. Select the correct project by clicking on the project title 5. Access the designer page for the project 6. Click the “Add New Document” icon 7. Add the required amendment documents (see list below) 8. Have the PI sign the package by following the Package Signing instructions 9. Submit the package to the IRB following the Submit this Package instructions, designating the submission type as Modification/Amendment The following documents must be submitted for modification/amendment of expedited or fill board projects. Amendments to exempt projects are not required unless the change could increase risk to participants:
Amendment Request Form Updated protocol application New or revised materials (e.g., informed consent document, measurement tool) – anything that will be affected by the changes you are proposing in
your amendment Additional sections of this guidance document will be added as needed. If you have questions about information in this document or about research integrity in general, please contact one of the research integrity administrators.
Research Integrity Contact Information
Phone: (850) 412-5246 Email: [email protected] Mail: Office of Animal Welfare and Research Integrity Florida Agricultural and Mechanical University 1515 South Martin Luther King Room 308H Science Research Center Tallahassee, FL 32307 i Information in this guide was obtained from many sources including but not limited to the Code of Federal Regulations (45 CFR 46), the Office for Human Research Protections (http://www.hhs.gov/ohrp), the IRBNet forum, and the Anne Arundel Medical Center IRBNet User Manual.