FLOODING OVERVIEW FLOWCHART
ExternalInvestigationof Flooding
Monitor ShipStability, Continue DCActions, Investigation
Determine Availabilityof Off-Ship Repair/
Salvage Teams
CompartmentAbove
Waterline
Set FLBs,Isolate Flooding
Dewater withInstalled Drains
DetermineDepth ofFlooding
LevelApproaching
Overhead
Secure SpaceSet FLBs
Rateof
Flooding
Flood BeforeSource
Determined
Secure SpaceSet FLBs
Set FLBson Affected
Compartment
Sourceof
Flooding
DetermineSource/Type
of Fluid
ElectricalPower inthe Space
ElectricalPower Poses Threat
to Personnel
SecureSpace, Set
FLBs
FloodingFluid
Temperature
Low TempPoses Exposure Threat
to Personnel
EnsurePersonnel Don
Protective ClothingBefore Entering
Space forExtendedPeriods
SendInvestigatorsInto Space
InternalInvestigation of
Flooding
IsolateSource ofFlooding
Flooding fromStructuralDamage
Floodingfrom PipeRupture
Go toChart “1”StructuralDamage
Go toChart “2”
PipeRupture
Flooding fromProgressive
Flooding
DewaterSpace
InvestigateNearby
CompartmentsExpand FLBs
Go toChart “3”
Dewatering
Yes
No
Yes
No
Yes
No
Yes
No
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
CHART 1 - FLOODING FROM STRUCTURAL DAMAGE
Flooding fromStructural Damage
Set FLBs(if not set)
SurveyFloodingSource
Caused byStructural Damage/
Pipe Ruptures
ExternalIsolation
Continue withFlooding from
Structural/DamagePath & PipeRupture Path
Isolate withoutSending Personnel
into Space
ConductExternalIsolation
Depth ofWater Prevents
Access
EvacuateSpace &Securing
Compartment
Patch/PlugFloodingSource
Dewater whilePatching/Plugging
in Progress
StructuralStrength
Compromised
ShoringRequired for
Plugging
Monitor Stability/StructuralIntegrity; Continue DC Actions/
Investigation of Damage
Go toChart “4”Shoring
Go toChart “4”Shoring
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
CHART 2 - PIPE RUPTURE
Flooding fromPipe Rupture
Set FLBs(if not set)
Fluid Type/Characteristics
(Type/Temperature/Pressure)
HazardousFluid?
HazardousJP5 CHT Hydraulic Fluid Lube OilFuel Oil Steam Refrigerant
Don PersonnelProtectiveEquipment
Redirector Cover
Fluid
Go toEOSS,
SDOSS,MSFD
RuptureLocation, Size,
Extent
CanRupture
Be Isolated withInstalledValves?
Is theSystem Supplied
by the Pipinga Vital System that
Must Stay OnLine?
Isolate Rupturewith Valves
WillRepair Be
Permanent orTemporary?
ShutAdditional
Valves WasIsolation Effective?
ConductPermanent Repair
When Time Permits
ApplyPatch
RestoreSystem, Check
for Leaks
SimultaneouslyUse Chart “3”
Dewatering
CanSystem Supplying
Pressure to ThePiping BeSecured
UnisolatableRupture
Apply Patch
OtherSystemPressure
SecurePressureSource
Permanent
Temporary
Yes
No
Yes
No
Yes
No
No
No
Yes
Yes
CHART 3 - DEWATERING
Space RequiresDewatering
Isolate FloodingSource/Establish
FLBs
EstablishDewatering
Priorities
InstalledDewatering Systems
Available
FiremainAvailable
ElectricalPower
Secured
RepairPersonnel Evacuate
Space
ExtraPersonnel Required
to OperatePumps
DewaterUsing P100 or P250
Portable Pumps
UseInstalled
DewateringSystem
DewaterUsing
PortableEductors
RigElectrical
SubmersiblePumps
ObtainAdditionalPersonnel
DewaterEffectiveness
Flooding LevelComparable to Ship’s
Waterline
WaterLevel
Increasing
WaterLevel
Decreasing
MonitorShip’s Stability
DewateringAdversely Affects
Ship’s Stability
ContinueDewatering/Restore
Vital System
Monitor Stability/StructuralIntegrity; Continue DC Actions/
Investigation of Damage
SecureSource/
Compartment ifSource Cannot
Be Isolated
SecureSource,
AugmentDewateringEquipment
AugmentDewateringEquipment
ReexamineStability/
DewateringPriorities
Yes
Yes
No
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
StructuralDamage
CHART 4 - SHORING
Can DirectCompression
Be Used?
DetermineShoring Type
Use KShore
Use I or HShore
DetermineAnchorPoints
Build AdditionalAnchor Supports
RapidSupport
Required
UseMetalShores
Use WoodShores
DetermineStaging/Cutting
Area
AdditionalSupport Structure
Required?
Measure/Cut Shores
ErectStructure
SetShoring Watch
Erect Wood,Metal, or
CombinationSupport/Anchor
Structure
TightenStructure
Yes
No
Yes
No
Yes
No