8
Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit

Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit

Embed Size (px)

Citation preview

Page 1: Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit

Flooding & Drainage Committee

March 30, 2010

Pavement Condition Assessments

Mobile Data Collection Unit

Page 2: Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit

Pavement Condition Assessments

Historically, Visual Inspection and Ratings– Different eyes, different ratings– Database of Values & Information

Currently, Data Mobile Collection Unit– Based on field measurements– Objective evaluation and assessment– Calculated Conditions for Database Use

Page 3: Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit

Condition Assessment Hardware

CrackScope

Road Profiler

Crackscope: Takes continuous images of pavement and determines extent and severity of cracking.

Road Profiler: Uses lasers and accelerometers to measure rutting and roughness

Page 4: Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit

Location and Distance Measurement Hardware

Distance Measuring Instrument

GPS Device

Page 5: Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit

360º Video Camera

11 cameras at 30 frames per second to capture 360º view of right-of-way

Page 6: Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit

Data Visualization

Page 7: Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit

Progress as of March 2010

Initial Effort/Testing Period Focus:

District I (proximate location to base)

Secondary Effort

Engineering & Construction requested update of Major Thoroughfare Conditions Citywide for CIP Planning

Page 8: Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit

Tentative Completion Schedule