1
Drainage Renewal 7 Jamison Rd, Blaxland AWP 2013/14 (completed on February 2014) Project Cost: $ 15,800 Constructed 20meters of Rock-lined channel, 8meters of Grass Swales, well- graded Rock-lined basin and returfed the whole backyard. February 2012 February 2012 February 2014 February 2014 February 2014 February 2012

Flood Mitigation and Drainage Renewal Work, Blaxland

Embed Size (px)

Citation preview

Drainage Renewal – 7 Jamison Rd, Blaxland

AWP – 2013/14 (completed on February 2014)

Project Cost: $ 15,800

Constructed 20meters of Rock-lined

channel, 8meters of Grass Swales, well-

graded Rock-lined basin and returfed the

whole backyard.

February 2012 February 2012

March 2012 February 2014

February 2014

February 2014

February 2012