Page 1: Floats in the AoA network Project management (lecture)

Floats in the AoA network

Project management(lecture)

Page 2: Floats in the AoA network Project management (lecture)

Activity and event times

• Activity times:– EST– LST– EFT– LFT

• Event times:– EET– LET

Page 3: Floats in the AoA network Project management (lecture)

Float• Time available for an activity or path in

addition to its duration.• It can be positive or negative• It is a property of activities (and available only

at given activities)• In case of more succeeding activities, the

minimum have to be taken.• Types of float:– Total float– Free float

Page 4: Floats in the AoA network Project management (lecture)

Total float• The total float possessed by an activity. • Calculation for activity j:

Total floatj = LFTj – EFTj

• Identify the activity possessing float below, and calculate the total float.

10

?

2?

?

a

12

4?

35

c

10

3?

?

b

15

d

8

Page 5: Floats in the AoA network Project management (lecture)

Total float• The total float possessed by an activity. • Calculation for activity j:

Total floatj = LFTj – EFTj = LFTj – (ESTj + Dj)

• Identify the activities possessing float below, and calculate the total float for each.

10

0

25

11

a

5

423

23

c

12

315

15

b

15

d

8

Total float = 23 – (5+12) = 6Total float =

= 11 – (0+5) = 6

Page 6: Floats in the AoA network Project management (lecture)

Calculating free float• The float possessed by an activity which, if used,

will not change the float in leater activities.• Free floatj = ESTj+1 – EFTj = EEThead – EETtail - D

10

0

25

11

a

5

423

23

c

12

315

15

b

15

d

8

Free float = 23 – 5 – 12 = 6Free float =

= 5 – 0 – 5 = 0

Page 7: Floats in the AoA network Project management (lecture)

Negative float• If the target time (deadline) for the project (or for a part

of the project) is grater than TPT, than the float will appear on the critical path or even on some other paths.

• Negative float = the time by which activities on the path or paths concerned must be reduced if the TPT is to be met.

• Negative float is a type of the Total Float.

10

?2

?

?a

10 3?

?c

10

30

Page 8: Floats in the AoA network Project management (lecture)

Negative float• If the tartget time (deadline) for the project (or for a

part of the project) is grater than TPT, than the float will appear on the critical path or even on some other paths.

• Nagative float = the time by which activities on the path or paths concerned must be reduced if the TPT is to be met.

• Negative float is a type of the Total Float.

10

-52

10

5a

10 320

15c

10

15

Total float: -5Total float: -5

Page 9: Floats in the AoA network Project management (lecture)

Slack• Refers to events and not to activities.• Slack = LET - EET

Slack: 0

10

0

25

11

a

5

423

23

c

12

315

15

b

15

d

8

Total float = 23 – (5+12) = 6Total float =

= 11 – (0+5) = 6

Slack: 0

Slack: 0

Slack: 6

Page 10: Floats in the AoA network Project management (lecture)

Readings

• Lockyer – Gordon (2005) Chapter 13

Page 11: Floats in the AoA network Project management (lecture)

Thanks for the attention!

Page 12: Floats in the AoA network Project management (lecture)

10

0

27

11

a

7

423

23

c

10

315

15

b

15

d

8