Flexible Pipe Integrity Management Ian MacLeod, CEng, FIMechE Engineering Manager, Technical Manager, Regional Technology Lead

Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

  • Upload
    others

  • View
    7

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

Flexible Pipe Integrity Management

Ian MacLeod, CEng, FIMechEEngineering Manager, Technical Manager, Regional Technology Lead

Page 2: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

Flexible Pipe Integrity Management

Page 3: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

3 - Wood Group Kenny

Overview• Introduction to Flexible Pipe

• Life Cycle Management of Flexible Pipe

• Design, Integrity Management, Operational Support

• Damage Degradation & Failure

• Technology Development

• Analytical methods

• Inspection / integrity guidance

• Case Study

Page 4: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

4 - Wood Group Kenny

Introduction to Flexible Pipe

• Early flexible pipe technology

• Project PLUTO

• PipeLine Under The Ocean

• Developed from subsea cable technology

• 3-inch ID pipe from England to France

• Fuel supply provision late in WW2

• First Pipelay 12th August 1944

• By end of WW2, 781,000m3 transferred

• Key technology enabler to dynamicfloating production applications

Page 5: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

5 - Wood Group Kenny

Introduction to Flexible PipeCarcass (Stainless / Duplex), [rough bore]

– External Pressure Resistance

Carcass Profile:

Internal Sheath (Polymer)

– Internal Fluid Containment Barrier

Pressure Armour (Carbon Steel), [re-inforced]

– Hoop Load Resistance

Armour Profile:

Tensile Armour (Carbon Steel)

– Tensile Load Resistance

External Sheath (Polymer)

– External Fluid Barrier

Page 6: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

6 - Wood Group Kenny

Introduction to Flexible Pipe, Layouts

Page 7: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

7 - Wood Group Kenny

Life Cycle Management of Flexibles

Concept

Definition

Operations

Detail Design

Guidance on

Inspection &

Monitoring

Historical

Data

Degradation

& Failure

Manufacture

Installation &

Commissioning

Project to

Operations

Handover

Risk Assessment &

Integrity

Management

Page 8: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

8 - Wood Group Kenny

Life Cycle Management of Flexibles

Integrity

Management

Strategy

Fitness for

Service

Summary

Periodic

Review of IM

Strategy

Implement

IM StrategyRisk Analysis

Data

Collection

Re-assess, Learn,

and Implement

Recommendations

Operational

Engineering

Support

Inspection &

Vacuum Test

Services

Co-ordinate

Inspection

Activity

Project Activities• Project Management & QC

• NEXUS Integrity Centre

• Data Management / Reporting

Page 9: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

9 - Wood Group Kenny

Damage, Degradation & Failure

• Industry statistics & guidance developed through SureFlex JIP

• “State of the Art Report on Flexible Pipe Integrity”

• “Guidance Note on Monitoring Methods and Integrity Assurance for

Unbonded Flexible Pipe”

• SureFlex originally ran in 2009-2010

• 12 members (predominantly operators, plus HSE and 1 operator)

• In the period since SureFlex…

• Increased operational experience gained

• New technology deployed; smooth bore gas risers, materials (various)

• Additional degradation / failures; sweet service 55deg pipe, corrosion

• New inspection & monitoring technologies developed and deployed

• SureFlex2015 JIP proposal currently issued to industry

Page 10: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

10 - Wood Group Kenny

Damage, Degradation & Failure

Page 11: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

11 - Wood Group Kenny

Damage, Degradation & Failure

Page 12: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

12 - Wood Group Kenny

Damage, Degradation & Failure

• Failure modes, layer by layer basis

• Focus is structural layers i.e. Not fabric / polymer tape layers

• Real examples / case studies given where available

• Flexible pipe layers reviewed

• Carcass

• Internal Pressure Sheath

• Pressure Armour (including backup layers)

• Tensile Armours

• Outer Sheath

• Ancillary Equipment

Page 13: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

13 - Wood Group Kenny

Damage, Degradation & Failure

• Carcass

• Rapid Gas Decompression / Collapse

• Older (pre 2001) multilayer PVDF designs

• Permeation through sheath in normal ops.

• Gas build-up between PVDF layers, polymersaturated with permeated gas

Carcass Profile

Carcass Manufacture

Outer Sheath

Flexible Pipe Bore

Tensile Armours

Pressure Armour

Multilayer PVDF

Pressure Sheath

Carcass

Permeation into

annulus during

normal operations

To annulus

vent system

Page 14: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

14 - Wood Group Kenny

Damage, Degradation & Failure

• Carcass (continued) RGD

• With excessive decompression rates, carcass collapse is possible due to expanding gas

Page 15: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

15 - Wood Group Kenny

Damage, Degradation & Failure

• Internal Pressure Sheath

Pint

Internal Sheath crack Failure initiation region of PVDF

Sacrificial Sheath failure

Page 16: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

16 - Wood Group Kenny

Damage, Degradation & Failure

• Internal Pressure Sheath (crack initiation next to carcass ridges

Page 17: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

17 - Wood Group Kenny

Damage, Degradation & Failure

• Pressure Armour (unlock)

Page 18: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

18 - Wood Group Kenny

Damage, Degradation & Failure

• Tensile Armour Defects

Page 19: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

19 - Wood Group Kenny

Damage, Degradation & Failure

• Outer Sheath, armouring annulus historicallydesigned for dry conditions

• Outer sheath integrity often compromisedduring installation e.g. shortly after damage

• Significant uptake in vacuum testing has identifiedfurther cases, a large proportion relating toinadequate annulus vent systems

Page 20: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

20 - Wood Group Kenny

Damage, Degradation & Failure

• Outer Sheath Damage Implications

1. Corrosion Fatigue

• Normally critical at bend stiffener interface

• Internal pressure armour often critical with high op. pressure

• Assessments normally based on deoxygenated environment,breach assumed distanced from fatigue critical area and repaired

Page 21: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

21 - Wood Group Kenny

Damage, Degradation & Failure

• Outer Sheath Damage Implications

2. General Corrosion

• May be prevalent if sheath breach located in oxygenated environment, proven cases of severe degradation or failure relating to this mechanism, and further cases which are currently being managed / investigated

• Particularly onerous for breacheswithin I-tubes / beneath ancillaryequipment where CP shieldingmay be an issue

• Example, ref OMAE2007-29382

Page 22: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

22 - Wood Group Kenny

Damage, Degradation & Failure

• Ancillary Equipment

Page 23: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

23 - Wood Group Kenny

Damage, Degradation & Failure

• Ancillary Equipment (riser hold-down failure)

Riser Base Pile

Upper Tether Clamp

Seabed

~10metres

Tophat / Swivel

Riser

~1 metre

Tethers

Page 24: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

24 - Wood Group Kenny

Damage, Degradation & Failure

• Ancillary Equipment (riser hold-down failure)

• Connection failure, riser displaced 75metres vertically upwards

Page 25: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

25 - Wood Group Kenny

Flexible Pipe Technology Development

Test FEA

Page 26: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

26 - Wood Group Kenny

Case Study, In-Service Riser Repair

• Galley Field, Northern Producer FPF

• Approx 120miles NE of Aberdeen

• Installed September 1997

• 10yr design life

• Flexible Riser System

• Lazy-S Configuration

• 3xProd., Oil Exp., Gas Exp., Water Inj., Umbilical

Page 27: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

27 - Wood Group Kenny

Case Study, In-Service Riser Repair

MWL

UPPER DECK

PONTOON

8 - inch Gas Export

Riser tie in

platform

Bellmouth

I -tube

Inverted Bellmouth

Damage

Page 28: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

28 - Wood Group Kenny

Case Study, In-Service Riser Repair

INVERTED

BELLMOUTH

Page 29: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

29 - Wood Group Kenny

Case Study, In-Service Riser Repair

• Bubbles identified from inverted bellmouth

• Routine GVI

• Checks indicate permeated gas levels of leakage

• Annulus flooded, confirmed by vacuum test

• Assumed breach withinlower bellmouth

• Borescope inspectioninconclusive

Page 30: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

30 - Wood Group Kenny

Case Study, In-Service Riser Repair

• Potential restriction at bellmouth

• Confirm riser not “jammed” at lower bellmouth

• Confirm tension not supported at pontoon

• Riser Pull Test – Lateral Displacement

• Lateral mid-span displacement associated with vertical lift at bellmouth

• Riser de-pressurised & isolated before test

• Conclusions

• Test results a good overall comparison with analysis

• Riser tension not supported at pontoon

• Riser can be lifted for inspection

Page 31: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

31 - Wood Group Kenny

Case Study, In-Service Riser Repair

• Riser Pull TestUPPER DECK

PONTOON

8-inch Gas Export

Webbing Sling

Riser tie in platform

Bellmouth

I-tube

Pulling wire

Tension Meter

Pulley arrangement

Winch

Page 32: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

32 - Wood Group Kenny

Case Study, In-Service Riser Repair

0.00 Te 0.75 Te 1.50 Te

Page 33: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

33 - Wood Group Kenny

Case Study, In-Service Riser Repair

Page 34: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

34 - Wood Group Kenny

Case Study, In-Service Riser Repair

• Riser Lift & Inspection

• At transit draft

• Inspection basketdeployed Prior to lift

Page 35: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

35 - Wood Group Kenny

Case Study, In-Service Riser Repair

• Small damage area with debris embedment

Page 36: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

36 - Wood Group Kenny

Case Study, In-Service Riser Repair

• Larger section of outer sheath removed to assess armours

Page 37: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

37 - Wood Group Kenny

Case Study, In-Service Riser Repair

• Gas Export Operations Halted

• Severity of damage & failure consequences

• Loss of Gas Export revenue

• Reduced Production

• Consent to flare

• Temporary Mitigation

• Gas Export swapped with Water Injection Service

• Early restart of Gas Export operations

• Technical integrity assessment

• Supported riser service swap

• Justification for in-service use of damage riser

• Economic consequences of Water Injection failure

• Water Injection repair before full winter season

Page 38: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

38 - Wood Group Kenny

Case Study, In-Service Riser Repair

• Permanent Repair

• Cut out damaged section and re-terminate

• Riser lift to hang-off deck to effect repair

• Weather window assessed for each stage

• Critical maximum lifts to +30m and +40m

• Vessel actively winched towards MWA

• Analysis predicted weather windows

• Hsig = 5m to 9m (+40m lift)

• Hsig = 12m (+30m lift)

Page 39: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

39 - Wood Group Kenny

Case Study, In-Service Riser RepairInitial Crane Lift on End Fitting 40metre Lifts : Dual Clamps & Strand Jacks

Page 40: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

40 - Wood Group Kenny

Case Study, In-Service Riser Repair

Page 41: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

41 - Wood Group Kenny

Case Study, In-Service Riser Repair

• Riser repair completed successfully

• Riser brought back into WI service

Conclusions / Key Lessons

• Damage worse than expectedfrom minor sheath breach

• Subsequent similar cases on otherassets have lead to full bore failures

• Vacuum testing and integritymanagement allowed timely repair

• Successful riser repair

• Inverted bellmouths and similardevices require debris protection

Top of LowerInverted Bellmouth(pontoon level)

Bottom of C-Clamp on RiserEnd Fitting at Tie-in Deck

3.00

95m

0.3m

21.4 m

etres (m

easured by divers, refer to e-mail,

20

/11/

05, 0

9:16 from G

alley OIM

)

Maxim

um Cut Length = 18.9 metres (21.4 - 2.5)

Water Line,Operating Draft,21.35m

NOT TO

SCALE

Bend Stiffener

Riser Tie-in Platform+32.29m TOS

0.3m(scaled)

Water Line,Survival Draft,18.29m

Min.0.7m

3.4m

6.5m

Page 42: Flexible Pipe Integrity Management - Institute of Corrosion · 2020. 6. 3. · Case Study, In-Service Riser Repair • Riser repair completed successfully • Riser brought back into

42 - Wood Group Kenny

Questions?