38
Filipa Leal de Carvalho

flcarvalho

Embed Size (px)

DESCRIPTION

experience landscape architecture

Citation preview

Page 1: flcarvalho

Filipa Leal de Carvalho

Page 2: flcarvalho
Page 3: flcarvalho

registered architect in the Portuguese Architects College, worked recently

at Dominique Perrault Architecture (Paris), where she had the opportunity

to participate in global projects. After graduating in Architecture in

the University of Coimbra in 2008, she worked at “carlorattiassociatti”

studio in italy (directly related with the MIT Senseable City Lab in Boston)

where she had also the opportunity to collaborate with important studios

as Kengo Kuma Associates (Tokio), AgenTer (Paris) and ARUP (Italian

branch), During her 4 years experience she was involved in master

planning, residential, offi ces, educational and cultural sectors.

Page 4: flcarvalho
Page 5: flcarvalho

rehabilitation of EPFL campus dominique perrault architecture

quartier de l’etang dominique perrault architecture

ka-care carloratti associatti

manifattura domani carloratti associatti - kengo kuma associates

4 ribbons park carloratti associatti - agenceter

social club fi lipa carvalho - tânia teixeira

unesco dialog center lands architetture studio

4

12

18

22

22

28

32

Page 6: flcarvalho

4

benchmarks and identification of the camus heart the 3 sites of intervention

displacement of the Teaching Lab to the heart of the campus final project

ME

CL

TL

congress center

train station

rolex learning center

square

REHABILITATION OF EPFL CAMPUSDominique Perrault Architecture

Lausanne, Switzerland 2011-2015

program offi ces, research laboratories and public services

engineering Felix construction and Préface (facades),

Tecnoservice (CVC), Duchein SA (sanitary system), Daniel Willi SA

(structure), Protectas SA (security)

site area 15 500 m2

built area 4500 m2 Central Library / 14 000 m2 Mechanical

Engineering Halls

responsabilities prepare and develop drawings, models, images

and other documents relating to Design Development Phase

and Construction Documents Phase; assist in the co-ordination

of the internal design team; take responsibility for specifi c areas

of the design and project development; liaise with members of

the external design team and other associated organisations or

companies.

In 2010, Steiner SA Group Switzerland’s leading total

services contractor combined with Dominique Perrault

Architecture won the competition driven by the EPFL

to achieve the “Campus Plan” modernization project

by implementing the Center for Neuroprosthetics and

the headquarters of the Federal School. This project

includes the renovation of two existing buildings on

campus, the former Mechanical Engineering Halls

and Central Library, and the creation of an iconic new

building, the Teaching Bridge.

Parallel to urban redevelopments already led by the

EPFL at the North and South of the site, architecture

must refl ect the will to reinforce connections between

the natural ground and the artifi cial soil. In this sense,

the rehabilitation of the former Mechanical Engineering

Halls and the Central Library buildings, but also the

new Teaching Bridge, are involved in the campus

re-urbanization process by breaking the existing

separation between the technical ground-fl oor and the

university life taking place several meters higher.

Page 7: flcarvalho

fl carvalho 5

MECHANICAL ENGINEERING HALLS

CENTRAL LIBRARY

TEACHING BRIDGE

Page 8: flcarvalho

6

south façade

laboratories

offices

plan type

RESEARCH BUILDING - OLD MECHANICAL ENGINEERING HALLS

Page 9: flcarvalho

fl carvalho 7

the “atrium is a

interior views of the atrium

principle of the facade opening

The building is designed in layers,

like a onion. At the heart, there

is the central atrium, a dynamic

space with many bridges and

platforms that enable the flow

of ideas.

Around this space there are the

laboratories and after, the offices

to the outside to take advantage

fo the natural ligh.

the old building is coated with

metal sliding panels that give

dynamis to the facade

connection through

the atrium

Page 10: flcarvalho

8

CENTRAL ADMINISTRATION (OLD CENTRAL LIBRARY)

plan type

Through a colorfull architecture, there is the intention

to remark clearly the consolidation of the central

administration at the heart of the campus. The building

will be covered with opaque and glazed colored strips like

a rainbow. The volumetry and the supporting structure of

the old library has been preserved. In order to offer light

to central spaces, as to the common circulations, two

courtyards were created.

view from avenue Piccard

Page 11: flcarvalho

fl carvalho 9

transverse section

offices surfaces

vertical accesses

common circulations

connections with Piccard avenue

organizing principle of the plan type

Page 12: flcarvalho

10

frame with

metal mesh

frames guide

frames fixation

metal panel

thermal

insulation

triple glass

facade detail - building ME

Page 13: flcarvalho

fl carvalho 11

thermal

insulation

simple glass

metal perforated

suspended ceiling

double glass

venetian blind

black sheet

metal coating

facade detail - building BI

Page 14: flcarvalho

12

QUARTIER DE L’ETANGDominique Perrault Architecture

Geneva, Switzerland 2010-2015

program housing, offi ces, public equipements, craft,

administrative, hotel, commerce, leisure

team Edms SA (ingénieur civil) , Transitec (mobility), AAB J.

Stryensky & H. Monti SA (acustics), Karakas & Français SA

(geotechnical), Ecoscan (environment), Protectas SA (fi re safety),

Buffet Boymont (geometer), Sequoia & Gardens (forester)

site area 111 081 m²

built area 232 200 m²

responsabilities develop urban analyses, general planning and

volume concept; prepare drawings, models, images and other

documents relating to Programming and Schematic Design Phase;

take responsibility for all the feasability study; liaise with members

of the external design team and other associated organisations or

companies.

This urban redevelopment project called “Quartier de

l’Etang”, is located in the heart of urban dynamics, at

just two kilometers from the historic heart of Geneva.

The site has been developed around industrial, craft

and commercial activities taking advantage of the

infrastructure network which is in the periphery of

the urban core. Today overtaken by the city, this site

will mutate to meet the needs of the citizens. This

change must take place within a project that requires

the highest standards of spaciousness, comfort and

security for its future inhabitants. The geometry of

the islets in the site is based on existing axes located

outside the perimeter: the road network on the one

hand, with the “chemin de l’Etang”, and pedestrian and

cycle networks on the other hand, relying on existing

routes. The project was organized with the intention

of offering to the city a new set of public spaces

(boulevard, pedestrian areas, squares, parks) that are

not only related to the existing road network but also

act as key elements linking the landscape structures

in the city.

Page 15: flcarvalho

lac léman

A1

GARE DE CORNAVIN

SAINT GENIS POUILLY

SAINT JULIEN EN GENEVOIS

ANNEMASSE

fl carvalho 13

The Boulevard, organized around a system

of planted boulevard with a high quality

landscape, will be the structural element of

the project. A transition space, that offers

access to important spaces: the city hall

square and the neighbourhood square.

islet area high limit48 m

sun

context

privacy

buildingpossible building insertion

urban outline

The City Hall Square as a link between the

different parts of site. Assumes the role of

keystone of the urban system, allowing the

connection between the fi rst two macro-

geographical areas: the north commercial

showcase and the neighbourhood heart at

the south.

The Neighbourhood Square, the second space

of centrality, more intimate, is mainly designed

to local residents. Built as a rectangular plaza

bordered by residential and craft buildings, it

includes in the ground fl oor local shops and a

Neighbourhood Association.

Page 16: flcarvalho

14

HOUSING ....................................

HOUSING / ACTIVITIES ............. APPART’HOTEL .........................

HOTEL ........................................ ADMINISTRATIVE....................

ARTISANAT ...............................

COMMERCE/LEIURE/ .................

PUBLIC EQUIPEMENTS..............

TOTAL

SURFACE

COS

RATIO EMPLOI/LOGEMENT

89 940 m2

12 500 m2

8 000 m2

10 760 m2

50 200 m2

49 300 m2

32 570 m2

12 520 m2

265 790 m2

111 081 m2

2,39

1,3

green spaces

Page 17: flcarvalho

fl carvalho 15

gree

n sc

reen

ind

ustr

ial c

omp

lex

sid

ewal

k

sid

ewal

k

pla

nted

par

king

byci

cle

lane

byci

cle

lane

two

way

lane

bus

sto

p

bus

sto

p

neig

hbou

rhoo

d s

qua

re

hous

ing

bus

onl

y la

ne

zoom of neighbourhood square

Page 18: flcarvalho

16

typology 1 The Forum

commerces / loisirs

administration

hotel

housing

activities and retail

urban galery

cinema

commerce

restaurant

hotel reception

apartment hotel services

Page 19: flcarvalho

fl carvalho 17

typology 2 The islets

public equipements

activities / commerce

housing

ground floor

activities and retail

local shops

common spaces

housing to the islet heart

leisure

bicycle parking

housing to the islet heart

Page 20: flcarvalho

18

The crucial innovation is the

core contemporary use of the

latest digital technologies to

produce an interactive digital

model inseparable from both

the design and operations of

the city. It absorbs lessons

from the past as much as it

charts paths for the future.

analysis of environmental resources in order to identificate best location

slopesproximity to watershadowing

the parametric urban growth scenarios the land cover algorithm

KA-CARECarloratti Associatti

[COMPETITION, 3TH PRIZE]

Riyadh, Saudi Arabia 2010

program residential, offi ces, research, industrial parks, energy

production, logistics parks, HQ/ administration, hotels, public

facilities, recreational and retail

team Accenture (consulting), AgenceTer (landscape architecture),

Atkins (engineering), Ecologic Studio (digital computational

design), MIT Senseable city lab

built area 10 931 000 m2

responsabilities understand the project generated by the

parametric design; develop connections and programm

distribution; prepare the feasability study developing different use

typologies; assist in the co-ordination of the internal design team;

take responsibility for specifi c areas of the design and project

development; liaise with members of the external design team and

other associated organisations or companies.

This new city in the Gulf aims to be the most

sustainable city on the planet.

The design emerges from detailed analysis of the local

microclimate, using computer simulations and digital

site modelling to assess and exploit the exact behaviour

of local wind conditions, the precise availability of

water, the subtle variations in diurnal shade and the

opportunities for connectivity. A delicate network

of lightweight roads and terraces emerge to follow

the wadis and the natural lines of the terrain. The

project offers an inverted city, overturning outmoded

conventions, reversing destructive energy patterns.

While the roads and urban infrastructure are placed

on the exposed plateau, the city itself develops in

the shade beneath it, a landscaped oasis of elegant

terraces, cool squares, private courtyard houses and

dramatic public bridges.

By creating a balanced mix of uses it is possible

to achieve a good quality of life, integrating the

commercial, research and educational areas ith the

lmore community-based areas.

Page 21: flcarvalho

fl carvalho 19

whennowthen The model is inspired by the

traditional way of building

cities. For instance, organic

unplanned cities or informal

settlements developed

with limited resources and

simple rules. We propose

a new complex city growth

algorithm.the complex citythe planned citythe organic city

Page 22: flcarvalho

20

full city

reed beds

planted hardscape

food production

softscape

city edgesparkway

inside city

main street

canopy

cool “cool spot”

thematic garden

uppergarden

Page 23: flcarvalho

fl carvalho 21

Land use plot

Inner Spine

-Public spaces

-Connections

-Structure

Function cells

-retails

-university

-research

-hotel

-residential

KA-Care will be an exemplar of electrical micro-

generation where over 80% will be produced by

the canopy.Designed to be fl exible the canopy will

accommodate any type of solar renewable and be

a perfect research test bed, and – it is dynamic and

provides a benefi cial micro-climates by casting shade

and directing cool air where needed.

The canopy fl oats ethereally above the inhabited areas,

producing vital energy and improving thermal comfort

beneath it, threaded with systems and services for

nourishing and optimising the city.

research

cultural

hotels

green

residential

commercial

administrative

great mosque

mosques

canopy

neighborhood

and landscape

streets and

public space

voronoi

tessellation

wadi

Page 24: flcarvalho

22

situation city plan

MANIFATTURA DOMANIKengo Kuma associates with Carloratti Associatti

Rovereto, Italy 2010

program offi ces, research, industrial park, public facilities and

recreational.

team Kanso (consulting), ARUP (engineering)

built area 69 890 m2 + 18 900 m2 (parking)

site area 86 090 m2

responsabilities understand the design project; prepare and

develop drawings, models, images and other documents relating

to the design; assist in the co-ordination of the internal design

team; take responsibility for specifi c areas of the design and project

development; liaise with members of the external design team and

other associated organisations or companies.

At the beginning it will be the Park. A green area

of fi ve hectares, which will take immediately the

place of asphalt and warehouses constructed in the

60s and 70s. This fi rst phase will see in parallel the

reconstruction of historic buildings of the factory and

the creation of leisure facilities along the border south

to the river Leno. The future presence of industrial

buildings, will be revealed in the landscape of the park,

through parallel strips as the surrounding vineyards,

hiding the invisible predispositions infrastructure

under the ground. New production structures will be

raised from its impression on the ground, designed

by vegetation. A system with an organic development

that will minimize the drawbacks of traditional yards,

returning immediately a large proportion of industrial

land to the territory and the city.

A system with an organic development that will

minimize the drawbacks of traditional yards, returning

immediately a large proportion of industrial land to the

territory and the city.

Page 25: flcarvalho

fl carvalho 23

airports location

general location

highway network

train network

Page 26: flcarvalho

24

green park

section AA

section BB

green park with public spaces through the river

green technologic parkgreen buffer zone

Page 27: flcarvalho

B

A

fl carvalho 25

Page 28: flcarvalho

26

4 RIBBONS PARKcarlorattiassociatti with agence Ter

Milan, Italy 2010

program urban park with public facilities and recreational

activities.

team Agence Ter (landscape architects), Buro Happold

(engineering consultants)

built area 69 890 m2 + 18 900 m2 (parking)

site area 86 090 m2

responsabilities understand the whole design project; prepare and

develop drawings, models, images and other documents relating

to the design;

The park is in the new residential area of CityLife, a

redevelopment project of the historical district Fiera di

Milano, and aims to complete the overall design of the

block giving to the complex a fi nal grade of excellence

and quality. The park “dei Quattro Nastri” born from

the dance of four green tapes that dialogue, talk to

themselves and with the existing buildings, play in

space and create the place design, connect themselves

to the city joining the context and showing themselves

as a true instrument of spatial unity. A connection

between the park and the human presence, a space of

interaction with people, a connection between tradition

and innovation, and fi nally a connection of the park with

the city at different scales.

The Park of four tapes will be a nature park that will

donate to Milan a exemplar stimulus of how to build and

recreate nature in the city.

wall climbing giant slide belvedere interactive totem

the follies catalog of the Art Ribbon

80 m400

Interactive Ribbonor ribbon of the “Raggio Verde”

Art Ribbon

Waterproof Ribbonor the fresh garden ribbon

Sport and Game Ribbon

Mitigation of ventilation grilles, infrastructures, technical

systems: barriers become spectacle. The principle of

grouping emergency exits and ventilation grilles.

Page 29: flcarvalho

fl carvalho 27

1. wall climbing2. giant slide3. belvedere4. interactive totem5. interactive water games6. children’s play rug7. bar-kiosk

8. ventilation grille9. basket fi eld10. entrance to Tca Tower-footbridge11. entrance to mall-footbridge12. sparks pavilion13. Entrance to the underground

2

3

4

1

56 7

1516

16

17

18

1920

2324

15

15

B

The Art Ribbon

The Art Ribbon

The Sport and Game Ribbon

The Waterproof Ribbon

The Waterproof Ribbon

6

6

78

9

10

11

12

13

14

21

22

20 m151050

A

The Interactive Ribbon

The Interactive Ribbon

road14. the butterfl ies oasis15. the fl owering prairie16. the free prairie17. sport fi eld18. the terrace on the park19. entrance to mall

20. connection park-terrace. Footbridge21. Tca tower22. residential lot Rc223. residential lot Rc124. residential lot Rb1

Rc1 water-proofribbon

water-proofribbon

free prairie interactiveribbon

sportribbon

terrace on the park

section B

Rc1 water-proofribbon

interactiveribbon

sportribbon

Tca tower

section A

Page 30: flcarvalho

28

different modules configurations

transversal section

SOCIAL CLUBFilipa Leal de Carvalho and Tânia Teixeira

Milan, Italy 2011

program reading spaces, kitchen, cafeteria, meeting spaces.

built area 65 m2

responsabilities understand the whole design project; prepare

and develop drawings, models, images and other documents

relating to the design; take responsibility for all the project design

development.

The social club is a temporary pavilion that will shelter

different activities to the small village close to Milan

as to the public in general. How to do an hierarchy of

“spaces” in the middle of the void? A hut in the middle

of the desert already creates hierarchy and defi nes two

spaces, one internal and one external. If we extend this

hut we will have instead three spaces, two external and

one internal.

So, we propose a fl exible pavilion that can adapt

different spaces to specifi c uses. An organic

“corridor pavilion”, which provide a serie of outdoor

plazas, between nature and housing. The building

is dematerialized in a modular structure that allows

its adaptation to the surrounding and allow a large

programmatic diversity. The exterior is privileged

in detriment of its internal taking the ability to

accommodate more people, more organizations, more

diversity and responding to changes of the program and

target public, that the contemporary urban condition

demands the contemporary urban condition. The

pavilion designs, through its organic and adaptable

shape, natural squares, that receves and put in relation

to youth, seniors, environmentalists, disabled people,

artisans, activists in a meeting point that claims

universal.

The proposed construction method is based on

a modular system capable of being combined in

numerous forms.

Page 31: flcarvalho

fl carvalho 29

0 2 m

Percorso Orte Urbane

Percorso Sporte Acquatici

cafeteria

art gallery “the citizens”

multifunctional space NGO, library

toilets

urban garden club

Page 32: flcarvalho

30

21 x20 x

20 x

20 x

20 x

16 x

32 x

20 x

step 1: main structure step 2 : beams step 3: panels

Page 33: flcarvalho

fl carvalho 31

20 x20 x 20 x

montage of main structure montage of wooden sticks

groove of OSB panels membrane in tension

step 4: doors step 5: sticks step 6 : membrane

Page 34: flcarvalho

32

UNESCO DIALOG CENTERLands Architetture

Naters, Switzerland 2009

program offi ces, seminars, research, hotel, housing, recreational

and retail

built area Dialog Center 3 200 m2, hotel, offi ces and retail 12 800

m2

site area 8 185 m2

responsabilities understand the design project; prepare, develop

and edit drawings, models, images and other documents relating

to the design.

Rarely, when a glacier melts reveals treasures of the

Nature, Crystals, order and perfection.

Crystals are light, color, energy, information. They are

the interactive , emotional and physical elements of the

project.

The Project rises from the assumption that the Glacier

is an element of the Nature that blossom life within

its environment. Crystals sparse around the terrain,

among grass and fl owers, denote a new landscape

made up of sensations, emotions and memories.

Memories are the patrimony to highlight, and in this

specifi c case, Nature is the center of the Project. The

new DialogCenter is a place of tourist promotion and

simultaneously is a place of the village of Naters. It is

an instant of Naters’ urban development. It is a place

coming from the knowledge of the mountains, from

geology, as an example of the movement in time.

The Mountain has to be penetrate to discover the

DialogCenter, to allow getting surprised. The Mountain

has to be climbed to discover the Kräutergarten and the

Themenpark, the landscape of the new DialogCenter.

Page 35: flcarvalho

Naters 673.00 m.ü.M

Alpen

Aletsch Glacier

main entrance

exit

exit

cafeteria

betuletree

herbs

second entrance

Theme park

Pinus tree

fl carvalho 33

Page 36: flcarvalho

8 m6420

kristall 1

kristall 2

kristall 3

34

12

3

4

5

6

7

8

91112

13

14

10

1. bilderwelten

2. administration

3. meeting

4. lesson room

5. seminars

6. offi ce

7. workshops

8. reception

9. labs

10. maintenabce

11. UNESCO

12. senses room

13. rundgang

14. exhibitions:

fl ora

fauna

geologie

landschaftschutz

glaziologie

wasser

Page 37: flcarvalho

interactive panorama

meeting places exhibitions

fl carvalho 35

Page 38: flcarvalho

36

Filipa Leal de Carvalho

Architektin

[email protected]

+44 (0) 176 75751524