Flanders Crossing Bridge Project Overview Critical pedestrian and bicycle connection between the Pearl and Northwest Districts $6.4 million total project budget Construction start anticipated for late 2019 or early 2020

Flanders Crossing Bridge Project Overview · Construction Staging Plan Stage 1 – Assembly of bridge on NW Flanders between 14th and 15th Ave Stage 3 – Crane #1 hands off to crane

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Flanders Crossing Bridge Project Overview · Construction Staging Plan Stage 1 – Assembly of bridge on NW Flanders between 14th and 15th Ave Stage 3 – Crane #1 hands off to crane

Flanders Crossing BridgeProject Overview

Critical pedestrian and bicycle connection between the Pearl and Northwest Districts$6.4 million total project budgetConstruction start anticipated for late 2019 or early 2020

Page 2: Flanders Crossing Bridge Project Overview · Construction Staging Plan Stage 1 – Assembly of bridge on NW Flanders between 14th and 15th Ave Stage 3 – Crane #1 hands off to crane

Nicole Peirce, Project [email protected]

City of Portland, Oregon

NW Glisan St

NW Flanders St

NW Evere� St

NW

17t

h Av

e

NW

16t

h Av

e

NW

I-40

5 SB

-16t

h Av

e Ra

mp

Reconfigure roadway to create two lanes for the offramp and one lane for NW 16th Ave

Install a diverter at NW Flanders St. and 17th

Convert the left lane into a left turn only lane. Convert the middle lane to a left turn/thru lane

Convert NW Flanders to one-way eastbound between 15th Ave and 14th Ave

Realign the ramp to receive thru traffic from the right two lanes.

Install traffic signal at 14th Ave and Flanders

Install traffic Signal at the west end of the Flanders Bridge

Flanders Bridge One Way

Eastbound

Flanders Crossing Bike/Ped BridgeOther Project Elements

NW Everett St

NW

15t

h Av

e

NW

14t

h Av

e

Page 3: Flanders Crossing Bridge Project Overview · Construction Staging Plan Stage 1 – Assembly of bridge on NW Flanders between 14th and 15th Ave Stage 3 – Crane #1 hands off to crane

Flanders Crossing BridgeConstruction Staging Plan

Stage 1 – Assembly of bridge on NW Flanders between 14th and 15th Ave

Stage 3 – Crane #1 hands off to crane #2 Stage 4 – Final placement of bridge

Stage 2 – Bridge on casters, one end picked up by crane #1