7/23/2019 Fitness for Service Level 3 Assessment – CorrosionErosion http://slidepdf.com/reader/full/fitness-for-service-level-3-assessment-corrosionerosion 1/1 Case Study Fitness for Service Level 3 Assessment – Corrosion/Erosion Project Scope > Definition of safe working pressure envelope for corroded/eroded piping system based on high definition NDT scan data Key Features > Mapping of wall thickness data provided by the operator’s inspection service contractor to structural model > By using a linearisation approach the current utilisation factors were quantified to determine the maximum line pressure that could be handled. > Reduction in conservatism by using actual mapped data rather than a simplified (worst case) profile > Forward prediction also undertaken to determine change in wall loss over time and associated change in utilisation factor

Fitness for Service Level 3 Assessment – CorrosionErosion

Embed Size (px)

Citation preview

Page 1: Fitness for Service Level 3 Assessment – CorrosionErosion

7/23/2019 Fitness for Service Level 3 Assessment – CorrosionErosion

http://slidepdf.com/reader/full/fitness-for-service-level-3-assessment-corrosionerosion 1/1

Case StudyFitness for Service Level 3 Assessment – Corrosion/Erosion 

Project Scope

> Definition of safe working pressure envelope forcorroded/eroded piping system based on highdefinition NDT scan data

Key Features

> Mapping of wall thickness data provided by

the operator’s inspection service contractor tostructural model

> By using a linearisation approach the currentutilisation factors were quantified to determine

the maximum line pressure that could behandled.

> Reduction in conservatism by using actual

mapped data rather than a simplified (worstcase) profile

> Forward prediction also undertaken todetermine change in wall loss over time and

associated change in utilisation factor