DEPARTMENT OF CITY PLANNING
RECOMMENDATION REPORT
Department of Transportation ReferenceCouncil FileNos.:
08-3193-S1,10-2385-S1,10-2385-S2
CEQA No.: ENV-2012-1470-EIRCouncil No.: 1-Cedillo, 9-Price,
14-HuizarPlan Area: Central City, South
Los Angeles,Southeast LosAngeles
Date: August 19, 2013
Public Hearing: Public Hearing heldFebruary 14, 2013
.
PROJECT LOCATION
The project area is located in portions of the Central City, South Los Angeles, andSoutheast Los Angeles Community Plans. The project is located in the public rights-of-way along the sidewalk and roadway segments identified in the project descriptionbelow.
PROPOSED PROJECT
The Figueroa Streetscape Project (Proposed Project) consists of 4.5 miles of new
bicycle facilities and streetscape improvements. The new bicycle facilities consists ofthree miles of a combination of new buffered bicycle lanes and cycle tracks along S.Figueroa Street, from 7th Street to Martin Luther King J r. Boulevard; a one-waywestbound buffered bicycle lane along six blocks of 11th Street, from Broadway toFigueroa Street; and new buffered bicycle lanes along Bill Robertson Lane betweenMartin Luther King J r. Boulevard and Exposition Boulevard. Cycle tracks are dedicatedbicycle lanes with additional separation form the adjacent travel lane. They are typicallyinstalled within the existing roadbed in the direction of adjacent traffic, either betweenthe curb and on-street parking, or separated from vehicular traffic lanes by physicalbarriers. Buffered bicycle lanes are similar to standard Class II bicycle lanes though withan additional painted buffered striping next to the adjacent travel lane.
The Proposed Project also includes, where cycle tracks area installed, modified trafficsignals to provide separate bike signal heads combined with two-stage left-turn queuingspace at signalized intersections to allow bicyclists to safely turn left from FigueroaStreet onto perpendicular streets. Demarcations, using colored paint and signage, willbe provided through intersections and conflict zones, such as driveways or at otherpotential bicycle/vehicle and bicycle/pedestrian mixing areas. Outboard bus platformswould be constructed between the cycle tracks and travel lanes to facilitate boardingand alighting of passengers without requiring buses to cross or block the cycle tracks.
7/30/2019 First Year(Figueroa) Staff Report 081913
2/45
7/30/2019 First Year(Figueroa) Staff Report 081913
3/45
0 0.25 0.5 0.750.125
Miles
Figure 1 - Project Location
Source: LADOT Bike Program
Proposed First-Year Bike Lanes
Existing Bike Lanes
Existing Bike Paths
Proposed Project
7/30/2019 First Year(Figueroa) Staff Report 081913
4/45
7/30/2019 First Year(Figueroa) Staff Report 081913
5/45
7/30/2019 First Year(Figueroa) Staff Report 081913
6/45
7/30/2019 First Year(Figueroa) Staff Report 081913
7/45
7/30/2019 First Year(Figueroa) Staff Report 081913
8/45
7/30/2019 First Year(Figueroa) Staff Report 081913
9/45
7/30/2019 First Year(Figueroa) Staff Report 081913
10/45
7/30/2019 First Year(Figueroa) Staff Report 081913
11/45
7/30/2019 First Year(Figueroa) Staff Report 081913
12/45
7/30/2019 First Year(Figueroa) Staff Report 081913
13/45
7/30/2019 First Year(Figueroa) Staff Report 081913
14/45
7/30/2019 First Year(Figueroa) Staff Report 081913
15/45
7/30/2019 First Year(Figueroa) Staff Report 081913
16/45
7/30/2019 First Year(Figueroa) Staff Report 081913
17/45
7/30/2019 First Year(Figueroa) Staff Report 081913
18/45
7/30/2019 First Year(Figueroa) Staff Report 081913
19/45
At tachment 1 - The Environmental Impact Report ENV-2012-1470-EIR
This document is on file with the City of Los Angeles, Department of City Planning andavailable online at:http://cityplanning.lacity.org/
Select Environmental on the left tab
Select Final EIR
Click on the title The Figueroa Streetscape Project
http://cityplanning.lacity.org/http://cityplanning.lacity.org/http://cityplanning.lacity.org/http://cityplanning.lacity.org/eir/BicyclePlan/BicyclePln_FigStScape_Frontpg.htmhttp://cityplanning.lacity.org/eir/BicyclePlan/BicyclePln_FigStScape_Frontpg.htmhttp://cityplanning.lacity.org/eir/BicyclePlan/BicyclePln_FigStScape_Frontpg.htmhttp://cityplanning.lacity.org/eir/BicyclePlan/BicyclePln_FigStScape_Frontpg.htmhttp://cityplanning.lacity.org/7/30/2019 First Year(Figueroa) Staff Report 081913
20/45
7/30/2019 First Year(Figueroa) Staff Report 081913
21/45
7/30/2019 First Year(Figueroa) Staff Report 081913
22/45
7/30/2019 First Year(Figueroa) Staff Report 081913
23/45
7/30/2019 First Year(Figueroa) Staff Report 081913
24/45
7/30/2019 First Year(Figueroa) Staff Report 081913
25/45
7/30/2019 First Year(Figueroa) Staff Report 081913
26/45
7/30/2019 First Year(Figueroa) Staff Report 081913
27/45
7/30/2019 First Year(Figueroa) Staff Report 081913
28/45
7/30/2019 First Year(Figueroa) Staff Report 081913
29/45
7/30/2019 First Year(Figueroa) Staff Report 081913
30/45
7/30/2019 First Year(Figueroa) Staff Report 081913
31/45
7/30/2019 First Year(Figueroa) Staff Report 081913
32/45
7/30/2019 First Year(Figueroa) Staff Report 081913
33/45
7/30/2019 First Year(Figueroa) Staff Report 081913
34/45
7/30/2019 First Year(Figueroa) Staff Report 081913
35/45
7/30/2019 First Year(Figueroa) Staff Report 081913
36/45
7/30/2019 First Year(Figueroa) Staff Report 081913
37/45
7/30/2019 First Year(Figueroa) Staff Report 081913
38/45
7/30/2019 First Year(Figueroa) Staff Report 081913
39/45
7/30/2019 First Year(Figueroa) Staff Report 081913
40/45
7/30/2019 First Year(Figueroa) Staff Report 081913
41/45
7/30/2019 First Year(Figueroa) Staff Report 081913
42/45
7/30/2019 First Year(Figueroa) Staff Report 081913
43/45
7/30/2019 First Year(Figueroa) Staff Report 081913
44/45
7/30/2019 First Year(Figueroa) Staff Report 081913
45/45