Upload
esmond-patterson
View
212
Download
0
Tags:
Embed Size (px)
Citation preview
First United Methodist Church
Katy, TexasPreliminary Master Plan
PresentationSeptember 29, 2009
Process
Site Analysis
Facility Assessment
Master Plan Options
Discussion
Agenda
Process
Economic Resources
Site Resources
User Group Needs
Facility Needs Study
Congregation
Stage One
Written Facility Needs
Assessment
Preschool
Process
Needs Assessment
Draft ofNeeds
NeedsDiscussion
Meeting
Town HallMeeting
Sunday Service
Youth
Adults
Staff
Fellowship
Finance
Contemporary Music
Music
Needs Assessment Method
OptionA
OptionB
OptionC
Facilities Development Plan & Next
Phase Schematic
Design Package
DesiredOption
Site & Existing Building Analysis
Congregation
Information Meeting
ProcessStage 2
Principle Goals of the Design
• Unified and inviting campus that presents strong image to the community
• Vehicular circulation system that is convenient and understandable
• “Way-Finding” clear understandable pedestrian circulation system, both interior and exterior
• Gathering Hall linked to the Worship for members and visitors to use for preparation, gather information and socialize with fellow worshippers
• Offices and meeting rooms that create a comfortable, pleasant, efficient and working environment for staff and members
• A nursery conveniently located that provides care, safety and security for small children as well as piece of mind for parents
• Adequate Sunday school classrooms easy to learn in as well as teach in for all ages
CHURCH CHURCH PROPERTPROPERTYY
SITE ANALYSIS
AA
BB
CC
LEGEND:LEGEND:
A EXISTING WORSHIPA EXISTING WORSHIP
B EXISTING FAMILY LIFEB EXISTING FAMILY LIFE
C EXISTING FELLOWSHIPC EXISTING FELLOWSHIP
CHURCH CHURCH PROPERTPROPERTYY
SITE ANALYSIS
55THTH STREET STREETA
VEN
UE B
AV
EN
UE B
4TH4TH STREET STREET
AV
EN
UE A
AV
EN
UE A
AA
BB
CC
CHURCH CHURCH PROPERTPROPERTYY
SITE ANALYSIS
AA
BB
CCEXISTING EXISTING PARKING PARKING “DEFICIENT“DEFICIENT
” (” (6464 OFF- OFF-STREET STREET SPACES AND SPACES AND 2222 ON- ON-STREET STREET SPACES)SPACES)
MIN. MIN. REQUIRED REQUIRED 100 OFF-100 OFF-SITESITE
CHURCH CHURCH PROPERTPROPERTYY
SITE ANALYSIS
AA
BB
CC
UTILITY UTILITY EASEMENTEASEMENT
CHURCH CHURCH PROPERTPROPERTYY
SITE ANALYSIS
55THTH STREET STREETA
VEN
UE B
AV
EN
UE B
4TH4TH STREET STREET
AV
EN
UE A
AV
EN
UE A
AA
BB
CC
OPTIMUM OPTIMUM PARKING PARKING LOCATIONSLOCATIONS•PUSH PARKING PUSH PARKING TO THE TO THE PERIMETERPERIMETER
CHURCH CHURCH PROPERTPROPERTYY
SITE ANALYSIS
55THTH STREET STREETA
VEN
UE B
AV
EN
UE B
4TH4TH STREET STREET
AV
EN
UE A
AV
EN
UE A
AA
BB
CC
OPTIMUM OPTIMUM BUILDING BUILDING LOCATIONLOCATION•TO PROMOTE TO PROMOTE “CAMPUS” “CAMPUS” ENVIRONMENTENVIRONMENT
Site Constraints:•Existing Utility Easement “limits” Building Options,
•Total Land Owned by 1st UMC : ~3.9 Acres,
•150 Off-Street Parking Spaces Required Currently (per city requirements) : ~1.1 acres (300 spaces future: ~ 2.2 acres),
•Available land for Buildings: ~2.8 acres (less setbacks),
•Existing Trees occupy 85% of the available land,
TREE ANALYSIS
AA
BB
CC
LEGEND:LEGEND:
A EXISTING WORSHIPA EXISTING WORSHIP
B EXISTING FAMILY LIFEB EXISTING FAMILY LIFE
C EXISTING FELLOWSHIPC EXISTING FELLOWSHIP
Congregation Survey Summary:
•Demolish Existing Classroom Building
•Preserve (if feasible) the Existing Fellowship Hall
•Preserve Existing Trees (if feasible)
•Prefer “Traditional” Architectural Style
Existing Facility Assessment Synopsis /
Deficiencies:•Asbestos Abatement (per State of Texas)
•Any Renovation would require entire facility to be brought to current code
•Life Safety, Building Code and Handicap Accessibility requirements supersede
•Existing Education Building “big” energy waste
•The majority of the campus is non accessible to the handicap individuals.
LEGEND:
• PROPOSED FACILITIES TO BE REMAIN
OPTIONS
• PROPOSED FACILITIES TO BE DEMOLISHED
PROS:
• ALLOWS CONSRUCTION W/O DISPLACEMENT OF CLASSROOM
• LIMITED TREE REMOVAL
CONS:
• FELLOWSHIP HALL RELOCATED
• BLDGS. BECOME DECENTRALIZED
• PEDESTRIAN VS. VEHICULAR CIRCULATION NOT IDEAL
• “CAMPUS” ENVIRONMENT COMPROMISED
• FOOTPRINT OF EDUCATION BLDG. LIMITED TO AVAILABLE LAND
PROS:
• ALLOWS CONSRUCTION W/O DISPLACEMENT OF CLASSROOM
• FELLOWSHIP HALL REMAINS
• LIMITED TREE REMOVAL
CONS:
• BLDGS. BECOME FURTHER DECENTRALIZED
• PEDESTRIAN VS. VEHICULAR CIRCULATION NOT IDEAL
• “CAMPUS” ENVIRONMENT COMPROMISED
• FOOTPRINT OF EDUCATION BLDG. LIMITED TO AVAILABLE LAND
PROS:
• ALLOWS CONSRUCTION W/O DISPLACEMENT OF CLASSROOM
• FELLOWSHIP HALL REMAINS
• MAJORITY OF BLDGS. CENTRALIZED
• PROMOTES “CAMPUS” ENVIRONMENT
• VEHICULAR VS. PEDESTRAIN CIRCULATION SEPARATED
• “WAYFINDING” IMPROVED
CONS:
• LIMITED TREES REMOVED
• PARKING IS EVENLY DISTRIBUTED
Proposed Architectural “Church Campus”
Aesthetic Concept…
Assembly of Buildings surrounding courtyard
organized with the intent of limiting impact to
existing trees!
Aerial View of Proposed Option 3 Master Plan
Aerial View of Proposed Option 3 Master Plan
Aerial View looking North
View from Family Life Center
View of Fellowship Hall from Avenue A
View of Playground from 4th Street
DISCUSSION