Commissioning Guide
FIRST TIME COMMISSIONING PROCEDURESTEP 1• Ensureyouhavefilledthe
tankandpurgedalltheairbyopeningatapinsidethehouse.Thetankwillbepurgedwhenwaterrunsfreelyfromthetap.
• Turntapoff.
• Thecylinderhasnowbeenpurged.
STEP 2• Purgethecirculatingpumpby
loseningthebrass8mmnutontheundersideoftheheatpumpuntillwaterrunsfreelythentightenagain.
• Thecirculatingpumphasnowbeenpurged.
STEP 3• Initiateautopurgeandsystem
startup.
• Ensurethesystemcontrolleristurnedonandthetimeisdisplayed.
• Ensuretheheatpumpisolatorisintheonpositionandpowerisontoheatpumpunit.
• TheheatpumpLEDdisplaywillbeblank,don’tworryifnothingisdisplayedhere,thisdisplayonlydisplayserrorcodes.Alldisplaysareaccessedfromthesystemcontroller.
• Onthelefthandsideofthecontrollerare3buttons.
• Pushandholdthebottombutton“menu”untiltheword“purge”isdisplayedandflashing(approx5seconds).
• Nowletgoofthebutton.
• Inabout4secondsyoushouldheartheon-boardcirculatingpumpcomeon.
SYSTEM START-UP SEQUENCEThesystemisnowstartingupandwillgothroughthefollowingsequence:
1 Thesystemwillruna5minutepurgethatpushesanyairwithintheheatpumpunitintothetank.Notetheunitfanwon’tbeturningatthispoint).
2 Afterthis5minuteperiodthe
pumpwillstopandthefanwillturnslowly.Thesystemwillnotbeheatingupuntiltheuntilcanmaintainaconsistent63oC(thismaytakeupto4minutes).
3 Theunitfancomesonproperlyandthecirculatingpumpstartstocirculatethatconstant63oC waterthroughthetank. Duetothesmarttopdownheatreturnsystemyourcustomer
willhave50Lofhotwaterwithin20minutesandafulltankinabout3hours. After15minutestouchtheheatpumpreturnconnectiontothetankandensureitishottotouch,ifyoufeelgoodheathere you are done and can comfortablyleaveknowingyouhavecompletedtheinstallsuccessfully.
Propeller Fan
Evaporator
PCB(MAIN) Water HeatExchanger
Front Panel
Outlet Grille
Propeller Fan
Pump
Motor
Sensor(Temp. Return)
Sensor(Temp. Outgoing)
Reactor
Top Panel
Evaporator
Drain Elbow
Sensor(Temp. Defrost)
Sensor(Temp. Outdoor)
ExpansionValve
Coil(Expansion Valve)
Compressor
Water Heat Exchanger
PCB(MAIN)
Sensor(Temp. Suction)
Sensor(Temp. Discharge)
Accessories
PCB(DISPLAY)
Propeller Fan
Evaporator
PCB(MAIN) Water HeatExchanger
Front Panel
Outlet Grille
Propeller Fan
Pump
Motor
Sensor(Temp. Return)
Sensor(Temp. Outgoing)
Reactor
Top Panel
Evaporator
Drain Elbow
Sensor(Temp. Defrost)
Sensor(Temp. Outdoor)
ExpansionValve
Coil(Expansion Valve)
Compressor
Water Heat Exchanger
PCB(MAIN)
Sensor(Temp. Suction)
Sensor(Temp. Discharge)
Accessories
PCB(DISPLAY)
COLD MAINS
LOAD
Heat Pump Unit
Hot Outlet: 63c
Cold Inlet
PLV 500 kPa
Storage Tank
ECV 600 kPa (Check with a certified local plumber - not mandatory
from system perspective.)
Tempering ValveHeat Pump Return Port
PTRV: 850 kPa
Heat Pump Flow Port
RJ45 Cable
Temperature Sensor
Thermister