30
© ITER-India, IPR (India) First results – H - ion beam extraction in ROBIN in surface mode Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 1 M. Bandyopadhyay on behalf of K. Pandya et.al. (ROBIN operational group) Kaushal Pandya 1 , Agrajit Gahlaut 1 , Ratnakar K.Yadav 2 , Manas Bhuyan 2 , Mainak Bandyopadhyay 2 , B.K. Das 2 , P. Bharathi 1 , Mahesh Vupugalla 1 , K.G.Parmar 1 , Himanshu Tyagi 2 , Kartik Patel 1 , Jignesh Bhagora 2 , Hiren Mistri 1 ,Bhavesh Prajapati 1 , Ravi Pandey 1 and Arun.K.Chakraborty 1 1 Institute for Plasma Research, Gandhinagar- 382428, Gujarat, India 2 ITER-India, Institute for Plasma Research, Gandhinagar-382428, Gujarat, India

First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

First results – H- ion beam extraction in ROBIN

in surface mode

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 1

M. Bandyopadhyay on behalf of

K. Pandya et.al. (ROBIN operational group)

Kaushal Pandya1, Agrajit Gahlaut1, Ratnakar K.Yadav2, Manas Bhuyan2, Mainak Bandyopadhyay2, B.K. Das2, P. Bharathi1, Mahesh Vupugalla1, K.G.Parmar1, Himanshu Tyagi2, Kartik Patel1, Jignesh Bhagora2, Hiren Mistri1,Bhavesh Prajapati1, Ravi Pandey1 and Arun.K.Chakraborty1

1Institute for Plasma Research, Gandhinagar- 382428, Gujarat, India 2ITER-India, Institute for Plasma Research, Gandhinagar-382428, Gujarat, India

Page 2: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Outline

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 2

• Introduction about ROBIN

• Diagnostic and Monitoring system implemented in ROBIN.

Langmuir probe ( plasma parameter)

Optical Emission Spectroscopy (Cs and plasma impurity trace)

Residual Gas Analyser (Gas impurity)

• Parametric study of ROBIN

• Results from probe study.

• Preliminary results of beam characterization using

thermal differential calorimeter

Doppler Shift Spectroscopy

• Summary

• Future plan

Page 3: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 3

ROBIN

• 1MHz, 100kW, ICP type negative ion source

with 6.5 turn water cooled coiled antenna,

having 3 grid beam extraction and acceleration

system.

• Cs delivery system (1gm Cs ampules) is

attached in the lower side of the expansion

region.

• Source body temperature is maintained @ 40oC.

IPP design; Collaboration under License agreement

Page 4: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

ROBIN Bias plate and PG

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 4

Open Extraction aperture number = 146 out of Total 776;

Open extraction area= 73.38cm2

Plasma grid temperature is maintained at 150°C

Expansion chamber

30cm × 58cm × 19cm

Page 5: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

HVPS System for ROBIN

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 5

High voltage power supply system (APSS: -35kV, 15A DC; EPSS:-11kV35A DC)

commissioned in NNB HVPS Facility

Page 6: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Typical wave forms of ROBIN

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 6

• Maximum duration of a shot : 4 second shot

• Maximum power couple in surface mode 70kW.

• Maximum HV applied: 24kV (EPSS 10kV, APSS 14kV).

Page 7: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Diagnostics & Monitoring system

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 7

Page 8: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Complete system of ROBIN

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 8

Source DSS ports Cryopump RGA

TMP

Page 9: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Electrical current measurement

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 9

Page 10: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Source performance in surface mode

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 10

Different RF Power level. Max. beam

current density

~13mA/cm2

Min. e/H- ion

ratio ~ 2

All other parameters are varied.

Page 11: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Source performance in surface mode

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 11

Different gas pressure level.

Cs conditioning ?

Max. beam

current density

~13mA/cm2

Min. e/H- ion

ratio ~ 2

All other parameters are varied.

Page 12: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Source performance in surface mode

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 12

RF Power scan in ROBIN

Almost Linear relationship with power

saturation effect ?

Page 13: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Source performance in surface mode

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 13

Pressure scan in ROBIN

Gas cooling down effect in Electron part ?

Page 14: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Source performance in surface mode

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 14

Grid bias voltage scan

Optimum PG bias voltage ~ 24V.

Page 15: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Source performance in surface mode

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 15

Acceleration voltage scan

• Electron current nearly unaffected.

• GG current decreases.

- Is Beam quality getting improved ??

Current in Beam dump has decreasing trend in higher voltage.

- Any other effect (2ndary electron emission) ??

Page 16: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Source performance in surface mode

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 16

Fixed voltage (HV) ratio scan

• Electron current increases linearly.

• Current in Beam dump has decreasing trend in higher voltage after 5-6kV

extraction voltage.

Is Beam quality getting affected ??

Page 17: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Beam diagnostics

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 17

Thermal Differential Calorimeter

Beam facing side of the calorimeter

-40 -32 -24 -16 -8 0 8 16 24 32

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

Be

am

pow

er

den

sity (

W/c

m2)

position / cm

Vertical profile - data

Horizontal profile - data

Vertical - Gaussian Fit

Horizontal - Gaussian Fit

Shot# 26853

Copper calorimeter centre

Thermal calorimeter used for investigation of beam position, power deposition, beam divergence and beam optics study .

IPP design

Page 18: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Beam diagnostics

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 18

Preliminary results from calorimeter

Shot# High voltage DC

Beam divergence

26135 EPSS:5kV, APSS: 7kV

5.8°

26137 EPSS:5kV, APSS: 11kV

5.6°

26139 EPSS: 5kV APSS: 15kV

3.7°

Page 19: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Beam diagnostics

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 19

Specifications EMICON MC

Number of spectrometer channels

1-4

Wavelength range [nm] 200 - 1100

Spectral resolution [nm]

1.5

Signal resolution 16 Bit

Doppler shift Spectroscopy with EMICON MC spectrometer

Light from the

Beam

Page 20: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Beam diagnostics

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 20

Doppler shift Spectroscopy with EMICON MC spectrometer

Page 21: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Beam diagnostics

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 21

DSS with high resolution spectrometer

• Preliminary calculation suggests divergence is in the range 4 -5 degree in

beam total operational HV (EPSS+APSS) range 10 – 20 kV..

• Stripping observed

• Further calculation on going.

Page 22: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Plasma monitoring - Probe

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 22

• Online data analysis during each shot. 1. F.F. Chen, ‘Langmuir probe analysis for high density plasmas’, Phys. Plasmas, 8,3029, (2001).

2. S. Linnane and M. B. Hopkins, Plasma Sources Sci. Technol, 18, (2009) – error estimation.

Page 23: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Plasma monitoring - Probe

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 23

Plasma parameter variation with bias voltage

RF power: 60kW,

Pressure: 0.6Pa

Plasma non-uniformity

observed ~ one order

difference in density ?

Plasma density

~ (Top)1016 m-3 –

(Bottom) 1017 m-3.

Plasma temp ~ 2 – 4eV.

Cs distribution in the source and its conditioning ?

Page 24: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Plasma monitoring - OES

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 24

Typical Optical Emission Spectrum

Cs lines

observed.

Impurities like

Oxygen and OH

indicates presence

of moisture or

vacuum leak..

Leak detection

ensures leak rate

< 10-8 mbar l/s

Page 25: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Gas Monitoring

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 25

Residual Gas Analyser scan • Moisture

level high !

10-7 torr..

• Increases

when H2

gas is

injected.

Gas

quality

Effect on Cs

conditioning ?

Page 26: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

• RF generator and matching circuit is not behaving properly more than 70kW – Improved matching circuit to be connected.

• Cryopump operation (14000l/s) reduces the moisture level 5 times

between the shots compare to only TMP case (effective - 3500 l/s),

- However, beam dump current and DSS signal goes down.

beam blowup ??

• Cryopump operation needs almost double gas throughput to maintain same pressure in the source compare to only TMP case.

• Gas feed starts behaving erratic due to large reflected radiation.

New MFC installed which shows better behaviour.

• PG bias interlock is as reliable as H-alpha interlock for RF generator during the initial plasma breakdown impedance mismatch condition.

See poster - MonP12

Few difficulties & experience

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 26

Page 27: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

• Extraction grid (EG) rise in temp ~ 3oC only in 4 sec shot in spite of with higher e/H ratio – ~ 2 A electron current (42 lpm total flow rate in two grid halves).

– Is it correct ??

• EPSS is riding on APSS, so during breakdown, EPSS voltage shoots up

– To protect special spark gap based arrangement is made.

• Metallic valve bellow leakage in Cs oven (due to Cs corrosion ?)

Valve is removed at present.

• Source is kept in Ar environment when not operational.

– How it affects Cs conditioning ?

Concern over Quality of Cs conditioning in presence of impurities

Few difficulties & experience

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 27

Page 28: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

• Operation with Improved matching circuit to raise the power coupling further.

• Integration of a directional coupler to measure reflected power.

• Use higher purity gas along with a gas purifier in the gas feed line.

• Integration of RF shield around RF coil.

• Integration of a high resolution spectrometer including into DACS.

• Integration with Laser Photo-detachment diagnostics.

• Integration of dedicated Cs absorption line diagnostic system.

Ongoing activities and future plan

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 28

Page 29: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

• ROBIN is upgraded by integration of EPSS, APSS, Cs oven, Cryopump, RGA and a thermal calorimeter.

• Cs oven is integrated and source is operated in Hydrogen in presence of Cs injection.

• Maximum current density is observed as ~ 13mA/cm2

• Minimum e/H- ion ratio observed as ~ 2.

• Needs improvements in many fronts

(RF coupling, Cs conditioning, Gas impurities, Diagnostics).

Summary

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 29

Page 30: First results H ion beam extraction in ROBIN in surface modenibs2016.org/sites/nibs2016.org/files/MonO10.pdf · 2016-12-07 · First results – H-ion beam extraction in ROBIN in

© ITER-India, IPR (India)

Thank you

Mainak Bandyopadhyay; NIBS2016, Oxford,UK; 12th-16th Sep 2016 30