Xella Aircrete North America, Inc900 Schneider Dr. Cibolo, Texas 78108
“We found that AAC shaft went up faster, required only one inspection instead of three, and most importantly, because they are concrete, we were able to schedule installation before building dry in, removing the shafts from the critical path of construction.”
-Anthony RogersSuperintendent Balfour Beatty Construction
Fire Walls/ Shaft Walls Case Study
Peabody HotelProject Peabody Hotel
Location Orlando, FL
Architects SCA Design Group, Inc.
Scope 34 stories
AAC 4” Shaft Block