Table of Contents
Cover SheetA001- Site PlanA101- Ground Floor PlanA102- Fire Life Safety PlanA103- Reflected Ceiling PlanA201- N& S ElevationsA202- E& W ElevationsA301- E-W Building SectionA302- Wall SectionsA501- DetailsA502- E-W Building SectionA601- Wall and Finish ScheduleA602- Schedules
Fire Station No. 3
Courtney EvansStudio 4- ARCH 30043
July 31, 2020
City of Mississauga9th Line, Mississauga, ONProject No. 0-001
Ref
riger
ator
Ran
ge
DW R
efrig
erat
or
Ref
riger
ator
UP
2 3 4
5b
6 9
4a
5
G
Ax
C
D
A
E
F
1
Cx
Ex
B
5a
Bx
7 8
3a
2400
3790
3100
2400
3400
3806
5250
1830 6450 4900 1950 5080 3600
1230
2800 4880 6700
7800
3220
1500
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1 P1 P1
P2
P2
P2
P2
P4
P4
P4
P4
P2
P1
P1
P1
P5
P5
P5P6
P5
P5
P5
P5
P5
P5
P5
P5
P5
P7
P7
P7
P7
P5
P5
P6P6
P6
P5
P5
P5
P6
P8
P6
P5
P8
P5
P5
P7P5
P6
P9
P5
P5
CW
CW
P8
P5
D5
CW D5
P8
D4
D3
D3
D2 D2
D2
D10
D2
D2
D2
D2D2
D2 D2
D10
D7
D10CW D5
P8
P8
D3
D3
P5
CW
CW
CW
CW
D5
D8
D8
D4
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2 W2 W2 W2
CW
CW
W2
W2
W2
W2
CW
CW
CW
P5
D3
CW
CW
D6
CW
D1
D1
D9 D9 D9
D9D9D9D4
D11
Note: All interior walls in the Dormintory are W5 Type
4700
Vestibule
1
Resource Room
2
Lobby
3
Meeting Room
4 Hose Tower
25
Work Room
24
Apparatus Bay
20
Generator Room
23
Floor Watch
22
Mech. / Elect. Room
21
Office
8
Captain's Office 1
13
Captain's Office 2
14
Universal WC
9Solarium
7
WC 1
10
WC 2
11
Janitor's Closet
12
Kitchenette
8.1
Locker Room
6
WC 3
17
Laundry Room
18
Gear Room
5
Dormitory
19
Kitchen & Living Area
16
Fitness Room
15
Decon Room
26
1316
1084
1084
1084
2286
1084
1084
1084
808
907
3107
731
785
3191
1099
1352
1508
1508
1508
1508
1665
1088
140
1315
1642
9090
50
2978
2
1830
1567 1410 1410 1410 1572 1989 1994 1654 11000 1769 744 2400 744 4857 4670 4639 2031 1260 2000 657
7368 3982 14423 3887 20113
49773
1858
512
427
7337 14644 8593 19200
51603
1830
1044 2900 4670 4639 5947
3207 4130 1336 12000 1308 8593
Corridor
27
WC 4
29
WC 5
30
1:10 Slopeto drain
1:10 Slopeto drain
1:10 Slopeto drain
1:10 Slopeto drain
1:10 Slopeto drain
1:10 Slopeto drain
Ex. Oil Seperator GratingEx. T
renc
h D
rain
Ex. T
renc
h D
rain
Ex. T
renc
h D
rain
9148
3782
2021
3508
1101
1
7024 1402 1165 2298
2298 1118
1293
020
0568
1225
2936
95
6958 4490 9400 4545 4346 2022 14540 3160
4346
1020
037
27
7680
7419
4616
3730
6428
6066 2215 2932 1968 1950 5680 2330 2330 1723 4376
2762
2473
2473
2473
3109
4294
1918
3698
2364
2900
2100
6383
3782
6085
2698
21003482
2000
443
2820
Floor Finish: Slip-Resistant and Abrasion Resistant Epoxy
Floor Finish: Epoxy
Floor Finish: Epoxy
Floor Finish: Epoxy
Floor Finish: Epoxy onConcrete Slab
Floor Finish: Epoxy
Floor Finish:Ceramic Tile
Floor Finish: Hardwood Laminate
Floor Finish:Carpet Tile
Floor Finish: Epoxy
Floor Finish: Epoxy
Floor Finish: Epoxy
Floor Finish: Epoxy
Floor Finish: Stamped Concrete
Floor Finish: Epoxy
Floor Finish:Carpet Tile
Floor Finish:Oak Flooring
Floor Finish:Oak Flooring
Floor Finish: Epoxy
Floor Finish:Ceramic Tile
Floor Finish: Hardwood Laminate
Floor Finish: Hardwood Laminate
Floor Finish: Epoxy
Note: Cermic tile floor finish in all washrooms, kitchenettes and laundry room.
4700 7800
503
1
A301
5c 5d
D8
D2
4A501
P5
583
522
W1
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
Courtney Evans
C:\Users\Admin\OneDrive - Sheridan College\@Portfolio 2021\Firehouse No.3\Revit Files\Fire Station No. 3.rvt
A101
Ground Floor Plan
07/14/20
0-001
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
26 Decon Room 10 2
25 Hose Tower 15 N/A
24 Work Room 6 N/A
23 Generator Room 12 N/A
22 Floor Watch 30 4
21 Mech. / Elect.... 10 N/A
20 Apparatus Bay 282 12
19 Dormitory 92 10
18 Laundry Room 5 N/A
17 WC 3 5 N/A
16 Kitchen & Livin... 115 12
15 Fitness Room 70 6
14 Captain's Office 2 21 2
13 Captain's Office 1 20 2
12 Janitor Room 4 N/A
11 WC 2 4 N/A
10 WC 1 4 N/A
9 Universal WC 12 N/A
8 Office 78 8
7 Solarium 40 8
6 Locker Room 24 6
5 Gear Room 33 7
4 Meeting Room 27 6
3 Lobby 26 7
2 Resource Room 33 7
1 Vestibule 15 N/A
RoomNumber Room Name Area
(sq.m.)Occupant
Load
Occupant Load Schedule
<varies>
1:100
Revision ScheduleNo. Description Date
2 3 4
5b
6 9
4a
5
G
Ax
C
D
A
E
F
1
Cx
Ex
B
5a
Bx
7 8
3a
1%
1%
[No Slope] 1%
1%
3%
1%
2%
1%
1%
1%
1%
2%2%
1%1%
1%1%
2%2%
[No Slope]
5%4%
4%4%
2%2% 1%1%
2%2% 1%1%
12%
13%
11%
1830 6450 503 4398 1950 5080 3600 2800 4880 6700 4700 7800
1230
1500
3220
2400
3790
3100
2400
3400
3806
5250
4180
5300
11700
7700
7700
4172
5300
5300
4172
5300
7055 4295 14110 4200 19800
5680
7400
13300 5680 30480
9050
3977
1829
3700
1091
3
5250
7680
2024
7400
1916
5200
1230
7024 14957 8280 19200
7024 6277 5680 3000 8280 18900 300
5250
7177
2527
7400
1916
6430
1242
718
272
R1: Green Roof R2: Built-Up Roof
R2: Built-Up Roof
Solarium Skylight
R2: Built-Up Roof
R2: Built Up Roof
SkylightsSolar Panels
Skylights Solar Panels
7150 Cooling Tower
Roof Access
Architectural Screen
1
A301
5c 5d
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
Courtney Evans
C:\Users\Admin\OneDrive - Sheridan College\@Portfolio 2021\Firehouse No.3\Revit Files\Fire Station No. 3.rvt
A102
Roof Plan
07/14/20
0-001
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
1 : 100A102- Roof Plan
11:100
Revision ScheduleNo. Description Date
Ref
riger
ator
Ran
ge
DW R
efrig
erat
or
Ref
riger
ator
UP
2 3 4
5b
6 9
4a
5
G
Ax
C
D
A
E
F
1
Cx
Ex
B
5a
Bx
7
2400
3790
3100
2400
3400
3806
5250
1830 6450 4900 1950 5080 3600
1230
2800 4880 6700
3220
1500
8
3a
21.0
m
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
F2 Occupancy
21.5m
20.2m
22.0m
1900
1850
1800
1800
1700
4372
3482
12.75m
1431
1887
Vestibule
1
Resource Room
2
Lobby
3
Meeting Room
4Hose Tower
25
Work Room
24
Apparatus Bay
20
Generator Room
23
Floor Watch
22
Mech. / Elect. Room
21
Office
8
Captain's Office 1
13
Captain's Office 2
14
Universal WC
9
Solarium
7
WC 1
10
WC 2
11
Janitor's Closet
12
Kitchenette
8.1
Locker Room
6
WC 3
17
Laundry Room
18
Gear Room
5
Dormitory
19
Kitchen & Living Area
16
Fitness Room
15
Decon Room
26
17.6m
C Occupancy
4700 7800
1
A301
5c 5d
24.9
m
FHC
33.0m
33.0m
FHC
FHC
583522503
EXIT
1 Hour Fire Rated Wall
2 Hour Fire Rated Wall
Exit Path of Travel
Building Exits
Fire Hose Cabinet
Hose Distance from FHC
Legend
FHC
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
Courtney Evans
C:\Users\Admin\OneDrive - Sheridan College\@Portfolio 2021\Firehouse No.3\Revit Files\Fire Station No. 3.rvt
A103
Fire Life Safety Plan
07/16/20
0-001
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
26 Decon Room 10 2
25 Hose Tower 15 N/A
24 Work Room 6 N/A
23 Generator Room 12 N/A
22 Floor Watch 30 4
21 Mech. / Elect.... 10 N/A
20 Apparatus Bay 282 12
19 Dormitory 92 10
18 Laundry Room 5 N/A
17 WC 3 5 N/A
16 Kitchen & Livin... 115 12
15 Fitness Room 70 6
14 Captain's Office 2 21 2
13 Captain's Office 1 20 2
12 Janitor Room 4 N/A
11 WC 2 4 N/A
10 WC 1 4 N/A
9 Universal WC 12 N/A
8 Office 78 8
7 Solarium 40 8
6 Locker Room 24 6
5 Gear Room 33 7
4 Meeting Room 27 6
3 Lobby 26 7
2 Resource Room 33 7
1 Vestibule 15 N/A
RoomNumber Room Name Area
(sq.m.)Occupant
Load
Occupant Load Schedule
<varies>
1:100
Revision ScheduleNo. Description Date
2
2
3 4
4
5b
6
6 9
9
4a
4a
5
5
G G
Ax
C C
D
A A
E E
F
1
1
Cx
Ex
B
5a
5a
Bx
7
7
8
8
3a
3a
1
A301
5c 5d
3300
2800
3436
5000
3000 1072531
24
3000
6000
9760
3600
1841
3603
2400
4420
Exposed Steel Framing
Exposed Steel Framing
1868
3886
3800
3600 3600
3800
3709
2720
2200
3050
3050
3050
3050
3005
3050
3050
3050
3050
3050
3050
2950
3709
Exposed Steel Framingwith Skylight
SD
SD
SD
SD
SD
SD
HD
HD
HD
HD
HD
2730
5620
6890
2400
7206
5250
1230
2400
3100
3400
1830 6450 4900 7030 11280 6700 4700 7800
503 1950 3600 2800 583 3776 522
Recessed Ceiling Light
600 x 600 Troffer Light
Diffuser
Return Grill
Sprinkler Head
Emergency LightingWall Mounted
Exit Sign
Directional Emergency Exit LightCeiling Hung
Wall Mounted Light
Legend
SD Smoke Detector
Alarm Speaker with Strobe Light
HD Heat Detector
600 x 600 Accoustic Ceiling Tile
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
Courtney Evans
C:\Users\Admin\OneDrive - Sheridan College\@Portfolio 2021\Firehouse No.3\Revit Files\Fire Station No. 3.rvt
A104
Reflected Ceiling Plan
07/30/20
0-001
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
1:100
Revision ScheduleNo. Description Date
Grade0
T/O Steel 13400
Level 1150
T/O Steel 24600
T/O Steel 37000
T/O Steel 411000
T/O Parapet 25300
T/O Parapet 14172
T/O Parapet 37700
T/O Parapet 411700
7700
11700
5300
4172
W2W2W2W2D1
D9D9D9
W3
Fiber Cement Board - WhiteCopper, matte finish
Copper, matte finishFiber Cement Board - Grey
Copper, matte finish
900
300
305
850
450
300
150
3250
772
428
700
1700
700
3300
700
T.O. Parapet 25440
Grade0
T/O Steel 13400
Level 1150
T/O Steel 24600
T/O Steel 37000
T/O Steel 411000
T/O Parapet 25300
T/O Parapet 14172
T/O Parapet 37700
T/O Parapet 411700
700
3300
700
1700
700
428
772
3250
150
7700
11700
7150
5300
4172
300
2550 32
5030
0
CW CW
D9 D9 D9
D4
150
4172
3772
Copper, matte finish
Fiber Cement Board - White
Copper, matte finish
Fiber Cement Board - White
Fiber Cement Board - GreyCopper, matte finishW3
914
1700
T.O. Parapet 25440
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
Courtney Evans
C:\Users\Admin\OneDrive - Sheridan College\@Portfolio 2021\Firehouse No.3\Revit Files\Fire Station No. 3.rvt
A201
North& South Elevations
08/10/20
0-001
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
1 : 100North Elevation
1
1 : 100South Elevation
2
Revision ScheduleNo. Description Date
Grade0
T/O Steel 13400
Level 1150
T/O Steel 24600
T/O Steel 37000
T/O Steel 411000
T/O Parapet 25300
T/O Parapet 14172
T/O Parapet 37700
T/O Parapet 411700
1
A301
4172
3620
7700 7700
W3
Fiber Cement Board - White
Copper, matte finish
Copper, matte finish
Fiber Cement Board - Grey
Wood Pergula
Grade0
T/O Steel 13400
Level 1150
T/O Steel 24600
T/O Steel 37000
T/O Steel 411000
T/O Parapet 25300
T/O Parapet 14172
T/O Parapet 37700Hose Tower Floor9100
T/O Parapet 411700
1
A301
W2 W2 W2 W2 W2 W2 W2W2 W2 W2 W2 W2 W2
CW CW
W3Copper, matte finishCopper, matte finish
Fiber Cement Board - White Fiber Cement Board - White
Copper, matte finish
1800
1000
2572
300
300
260018
0010
00
4172
7700 7700
Fiber Cement Board - Grey
700
1900
1400
700
1700
700
428
772
3250
150
D4
11700
T.O. Parapet 25440
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
Courtney Evans
C:\Users\Admin\OneDrive - Sheridan College\@Portfolio 2021\Firehouse No.3\Revit Files\Fire Station No. 3.rvt
A202
East& West Elevations
08/10/20
0-001
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
1 : 100East Elevation
1
1 : 100West Elevation
2
Revision ScheduleNo. Description Date
Grade0
T/O Steel 13400
2 3 4
5b
6 9
4a
51
Level 1150
T/O Steel 24600
T/O Steel 37000
T/O Steel 411000
5a
7 8
T/O Parapet 25300
3a
T/O Parapet 37700
T/O Footing-1200
T/O Parapet 411700
1
A302
1A303
5c 5d
Office
8
Vestibule
1
Lobby
3
Meeting Room
4
Hose Tower
25Apparatus Bay
20Floor Watch
22
2875
2875
4000
300
4000
6545
300
3250
4911 55
50
6350
195
800
800
800
300
3550
600
800
1800
800
1800
800
3550
600
W5
W5W5
W2
W9
W7
W4
W4
W4
D1
D1
W5
19 19 19 19
CW
W5 W5
4200
5400
7800
11800
R2 BUR Cool Roof - 3ply on
305 Open Web Steel Joist at 900 O.C.
Solar Panels
R2 BUR Cool Roof - 3ply on
305 Open Web Steel Joist at 900 O.C.13 Suspended Accoustic Ceiling Tile
(600 x 600)
R1 Green Roof on
305 Open Web Steel Joist at 900 O.C.13 Suspended Accoustic Ceiling Tile
(600 x 600)
700
3300
700
1700
700
1200
3250
150
1200
W1
CW
CW
587
9650
D10
D9 D9 D9
Precast concrete parapet
Precast concrete parapet
19
R2 BUR Cool Roof - 3ply on
305 Open Web Steel Joist at 900 O.C.13 Suspended Accoustic Ceiling Tile
(600 x 600)
R2 BUR Cool Roof - 3ply on
305 Open Web Steel Joist at 900 O.C.
150 Concrete Slab on 100 Rigid Insulation on 200 Coarse Gravel
3A501
Suspended LED 1200 x 600 lights
Suspended LED 1200 x 600 lights
706
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
C:\Users\12263\Sheridan College\Jasleen Dhaliwal - Phase 2\Working Drawings\Assignment 4\Courtney\Assignment 4.rvt
1 : 75A301
E-W Building Section
Evans andDhaliwal
07/22/20
0-001
Evans andDhaliwal
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
Revision ScheduleNo. Description Date
6
D
W7 2 HR. FRR - UL419
32 (2 layers 16) Gypsum Board (UL Type SCX)92 Steel Studs, EQ20 (0.020"), Spaced 24" O.C.89 Thick Glass Fiber Batt Insulation32 (2 layers 16) Gypsum Board (UL Type SCX)
W7
W7
600
W5 Interior Partition - Non Loadbearing
13 Gypsum Wall Board92 Metal Stud13 Gypsum Wall Board Steel FastenerHollow Metal Door Frame with
Fire Stopping Spray Foam Insulation
600
Hollow Metal Door with Fire StoppingSpray Foam Insulation
HSS 127x127x6.4
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
Evans & Dhaliwal
Evans & Dhaliwal
C:\Users\12263\Sheridan College\Jasleen Dhaliwal - Phase 2\Working Drawings\Fire Station No. 3.rvt
A501
Details
07/30/20
0-001
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
Revision ScheduleNo. Description Date
As Indicated
1 : 10Fire Rated Wall Plan Detail
4
T/O Steel 13400
2
16 Precast White Fiber Cement Board16 Metal Furring
Air Barrier100 Rigid Insulation16 Exterior Gypsum Wall Board152 Metal Stud with Batt Insulation
Vapor Barrier13 Gypsum Wall Board
Metal Flashing
Insulated Lintel
HSS 127x127x6.4
Metal Cap Flashing
Steel L-angle
Steel L-angle
Gravel
Galvanized Steel Retention T
Metal Flashing
Plantings
200
293
150
R1 Intensive Green Roof
150 Soil Substrate with Vegetation25 Resevoir Board
Root MembranePropriety Drainage MatAir Barrier
100 Rigid InsulationVapour Barrier
75 Concrete Topping on75 Corrugated Steel Deck on305 Open Web Steel Joist with13 Suspended Accoustic Ceiling Tile
301
Ceiling TileT-Section
Wire Suspender
Wide Flange 250x13.4Steel Beam
36
1 : 10Green Roof at Parapet
3
Grade0
A
Ground Floor150
W9
W2
W2
CW
Metal Flashing
Baseboard
Reinforcement Bars
17mm Laminate Hardwood300mm Concrete Slab on Grade75mm Rigid Insulation200mm Gravel Ballast
500
291
313
2
Ax80
80
White Fiber Cement Board Siding13mm Air Space75mm Rigid InsulationAir Barrier18mm OSB Sheathing250mm Metal Stud @ 300mm o.c. with Batt InsulationVapour Barrier13mm Gypsum Wall Board
313
Vertical Metal Fastener
Spray Foam Insulation
127x127 HSS w/ Spray Foam Insulation
Chase Surrounding Column
W1
W1
W5
W5
1 : 10Foundation @ Exterior Wall
11 : 10Exterior Wall Corner
2
W1 White Fiber Cement Board
16 Precast White Fiber Cement Board16 Metal Furring Air Barrier100 Rigid Insulation16 Exterior Gypsum Wall Board152 Metal Stud with Batt Insulation Vapor Barrier13 Gypsum Wall Board
W2 Copper Siding
16 Copper Cladding16 Metal Furring100 Rigid Insulation
Weather barrier16 Exterior Gypsum Wall Board152 Metal Stud with Batt Insulation Vapor Barrier13 Gypsum Wall Board
W3 Aluminium Siding
16 Dark Blue Vertical Aluminium Siding16 Metal Furring Air Barrier100 Rigid Insulation16 Exterior Gypsum Wall Board152 Metal Stud with Batt Insulation Vapor Barrier13 Gypsum Wall Board
W4 Dark Grey Fiber Cement Board
16 Dark Blue Vertical Aluminium Siding16 Metal Furring Air Barrier100 Rigid Insulation16 Exterior Gypsum Wall Board152 Metal Stud with Batt Insulation Vapor Barrier13 Gypsum Wall Board
W5 Interior Partition - Non Loadbearing
13 Gypsum Wall Board92 Metal Stud13 Gypsum Wall Board
W6 Plumbing Wall
13 Gypsum Wall Board203 Metal Stud13 Gypsum Wall Board
W7 2 HR. FRR - UL419
32 (2 layers 16) Gypsum Board (UL Type SCX)92 Steel Studs, EQ20 (0.020"), Spaced 24" O.C.89 Thick Glass Fiber Batt Insulation32 (2 layers 16) Gypsum Board (UL Type SCX)
W8 1 HR. FRR - UL419
16 Gypsum Board (UL Type SCX)92 Steel Studs, EQ20 (0.020"), Spaced 24" O.C.89 Thick Glass Fiber Batt Insulation16 Thick Gypsum Board (UL Type SCX)
R1 Intensive Green Roof
75 Corrugated Steel Deck with75 Concrete Topping Vapour Barrier
Weather Barrier200 Rigid Insulation Waterproof Membrane with Root Barrier25 Proprietary Drainage Mat75 Water retention cups150 Soil Substrate with Vegetation
R2 BUR Cool Roof - 3ply
75 Corrugated Steel Deck with75 Concrete Topping Vapour Barrier100 Rigid Insulation16 Roof Board Roof Membrane10 Asphalt Bitumen10 Roofing Felt10 BUR Cool Roof Cap Sheet
Wall Schedule Roof Schedule
W9 Interior Partition -Loadbearing
13 Gypsum Wall Board152 Metal Stud13 Gypsum Wall Board
CW Curtain Wall
30 triple glazing with aluminum frame
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
Courtney Evans
C:\Users\Admin\OneDrive - Sheridan College\@Portfolio 2021\Firehouse No.3\Revit Files\Fire Station No. 3.rvt
A601
Wall Schedule
07/16/20
0-001
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
As Indicated
Room Finish Schedule
Name Number Wall Finish Ceiling Finish Floor Finish
Vestibule 1 Gypsum Wall Board Gypsum Wall Board Ceramic TileResource Room 2 Gypsum Wall Board Gypsum Wall Board Laminate HardwoodLobby 3 Gypsum Wall Board Acoustic Ceiling Tile Ceramic TileMeeting Room 4 Gypsum Wall Board Acoustic Ceiling Tile Laminate HardwoodHose Tower 25 Gypsum Wall Board Exopsed Framing EpoxyWork Room 24 Gypsum Wall Board Gypsum Wall Board EpoxyApparatus Bay 20 Gypsum Wall Board Exopsed Framing Epoxy: Slip & Abrasion ResistantGenerator Room 23 Gypsum Wall Board Acoustic Ceiling Tile EpoxyFloor Watch 22 Gypsum Wall Board Acoustic Ceiling Tile EpoxyMech. / Elect. Room 21 Gypsum Wall Board Acoustic Ceiling Tile EpoxyOffice 8 Gypsum Wall Board Acoustic Ceiling Tile Carpet TileCaptain's Office 1 13 Gypsum Wall Board Acoustic Ceiling Tile Oak FlooringCaptain's Office 2 14 Gypsum Wall Board Acoustic Ceiling Tile Oak FlooringUniversal WC 9 Gypsum Wall Board Gypsum Wall Board Ceramic TileSolarium 7 Gypsum Wall Board Exopsed Framing Stamped ConcreteWC 1 10 Gypsum Wall Board Gypsum Wall Board Ceramic TileWC 2 11 Gypsum Wall Board Gypsum Wall Board Ceramic TileJanitor's Closet 12 Gypsum Wall Board Gypsum Wall Board EpoxyKitchenette 8.1 Gypsum Wall Board Acoustic Ceiling Tile Ceramic TileLocker Room 6 Gypsum Wall Board Gypsum Wall Board EpoxyWC 3 17 Gypsum Wall Board Gypsum Wall Board Ceramic TileLaundry Room 18 Gypsum Wall Board Gypsum Wall Board Ceramic TileGear Room 5 Gypsum Wall Board Gypsum Wall Board EpoxyDormitory 19 Gypsum Wall Board Acoustic Ceiling Tile Carpet TileKitchen & Living Area 16 Gypsum Wall Board Acoustic Ceiling Tile Laminate HardwoodFitness Room 15 Gypsum Wall Board Gypsum Wall Board EpoxyDecon Room 26 Gypsum Wall Board Gypsum Wall Board EpoxyCorridor 27 Gypsum Wall Board Gypsum Wall Board Epoxy: Slip & Abrasion ResistantWC 4 29 Gypsum Wall Board Gypsum Wall Board Ceramic TileWC 5 30 Gypsum Wall Board Gypsum Wall Board Ceramic Tile
Revision ScheduleNo. Description Date
D1 Sliding Door D2 Interior Door D3 Interior Door
2630
2560
2400
2550
Soda Lime Glass
2300
2200
1000
900
1000
900
2300
2200
2300
2200
1150
1050
2150
2000
1000 1000
2150
2300
2200
1000
900
1000
900
2300
2200
4931
4267
4051
Soda Lime Glass
Aluminum 6061
2300
2200
1150
1050
1900
1800
2200
2100
D4 Exterior Door D5 Double Curtain Wall Door D6 Single Curtain Wall Door
D7 Interior Door D8 1HR. FRR. Door D11 2HR. FRR DoorD9 Apparatus Bay Door D10 2HR. FRR. Door
1000
1000
Crash Bar
1000
Pull Handle
Panic Bar
1000
Crash Bar
1000
1000
1000
Paint finished steel
Soda Lime Glass
Soda Lime Glass
Soda Lime Glass
Soda Lime Glass
Soda Lime Glass
W2 Fixed Window
W1 Double Hung Window
SW1 Apparatus Bay Skylight
SW2 Solarium Skylight
1674
1800
749
825
1449
1525
474
600
1092
1200
1648
1800
3943
5943
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
Courtney Evans
C:\Users\Admin\OneDrive - Sheridan College\@Portfolio 2021\Firehouse No.3\Revit Files\Fire Station No. 3.rvt
A602
Door Schedule
07/30/20
0-001
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
As Indicated
Door Schedule
Type MarkFrame
Material Fire Rating Finish Width Height
Entrance Door - Automatic SlidingEntrance Door- AutomaticSliding
D1 Aluminium N/A 2400 2700
D1: 2
Interior DoorInterior Door D2 Aluminium N/A 900 2200D2: 11
Interior Door Two LiteInterior DoorTwo Lite
D3 Aluminium N/A 900 2200
D3: 5
Exterior DoorExterior Door D4 Aluminium N/A 1050 2200D4: 3
Curtain Wall Door - DoubleCurtain WallDoor - Double
D5 Aluminium N/A 1950 <varies>
D5: 4
Curtain Wall Door - SingleCurtain WallDoor - Single
D6 Aluminium N/A 950 2125
D6: 1
Interior Storage DoorInteriorStorage Door
D7 Aluminium N/A 900 2200
D7: 1
Interior Door - 1HR FRRInterior Door -1HR FRR
D8 Aluminium 1 HR 900 2200
D8: 3
Apparatus Bay DoorApparatus BayDoor
D9 Aluminium N/A 4000 5000
D9: 7
Interior Door - 2HR FRRInterior Door -2HR FRR
D10 Aluminium 2 HR 1050 2200
D10: 3
Interior Double Door - 2HR FRRInterior DoubleDoor - 2HRFRR
D11 Aluminium 2 HR 1800 2100
D11: 1Grand total: 41
26 Decon Room 10 2
25 Hose Tower 15 N/A
24 Work Room 6 N/A
23 Generator Room 12 N/A
22 Floor Watch 30 4
21 Mech. / Elect.... 10 N/A
20 Apparatus Bay 282 12
19 Dormitory 92 10
18 Laundry Room 5 N/A
17 WC 3 5 N/A
16 Kitchen & Livin... 115 12
15 Fitness Room 70 6
14 Captain's Office 2 21 2
13 Captain's Office 1 20 2
12 Janitor Room 4 N/A
11 WC 2 4 N/A
10 WC 1 4 N/A
9 Universal WC 12 N/A
8 Office 78 8
7 Solarium 40 8
6 Locker Room 24 6
5 Gear Room 33 7
4 Meeting Room 27 6
3 Lobby 26 7
2 Resource Room 33 7
1 Vestibule 15 N/A
RoomNumber Room Name Area
(sq.m.)Occupant
Load
Occupant Load Schedule
<varies>
Window Schedule
Type Mark Height Width
Skylight - Apparatus BaySkylight -ApparatusBay
SW1 800 1500
SW1: 8Solarium SkylightSolariumSkylight
SW2 6000 4000
SW2: 1Single Hung WindowSingleHungWindow
W1 1800 1200
W1: 1Fixed WindowFixedWindow
W2 1800 600
W2: 17
1 : 50Window Schedule
Revision ScheduleNo. Description Date
Sher
idan
Col
lege
| Fa
culty
of A
pplie
d Sc
ienc
e &
Tech
nolo
gy
Scale:
Checked By: Sheet No.:
Drawn By: Date:
Sheet Title:
Project No.: Revision No.:
Project:
Client:
Seals:
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE
Project North True North
Courtney Evans
C:\Users\Admin\OneDrive - Sheridan College\@Portfolio 2021\Firehouse No.3\Revit Files\Fire Station No. 3.rvt
A603
Room Finish Schedule
07/30/20
0-001
Fire Station No. 3
9th LineMississauga, ON
City of Mississauga
Room Finish Schedule
Name Number Wall Finish Ceiling Finish Floor Finish
Vestibule 1 Gypsum Wall Board Gypsum Wall Board Ceramic TileResource Room 2 Gypsum Wall Board Gypsum Wall Board Laminate HardwoodLobby 3 Gypsum Wall Board Acoustic Ceiling Tile Ceramic TileMeeting Room 4 Gypsum Wall Board Acoustic Ceiling Tile Laminate HardwoodHose Tower 25 Gypsum Wall Board Exopsed Framing EpoxyWork Room 24 Gypsum Wall Board Gypsum Wall Board EpoxyApparatus Bay 20 Gypsum Wall Board Exopsed Framing Epoxy: Slip & Abrasion ResistantGenerator Room 23 Gypsum Wall Board Acoustic Ceiling Tile EpoxyFloor Watch 22 Gypsum Wall Board Acoustic Ceiling Tile EpoxyMech. / Elect. Room 21 Gypsum Wall Board Acoustic Ceiling Tile EpoxyOffice 8 Gypsum Wall Board Acoustic Ceiling Tile Carpet TileCaptain's Office 1 13 Gypsum Wall Board Acoustic Ceiling Tile Oak FlooringCaptain's Office 2 14 Gypsum Wall Board Acoustic Ceiling Tile Oak FlooringUniversal WC 9 Gypsum Wall Board Gypsum Wall Board Ceramic TileSolarium 7 Gypsum Wall Board Exopsed Framing Stamped ConcreteWC 1 10 Gypsum Wall Board Gypsum Wall Board Ceramic TileWC 2 11 Gypsum Wall Board Gypsum Wall Board Ceramic TileJanitor's Closet 12 Gypsum Wall Board Gypsum Wall Board EpoxyKitchenette 8.1 Gypsum Wall Board Acoustic Ceiling Tile Ceramic TileLocker Room 6 Gypsum Wall Board Gypsum Wall Board EpoxyWC 3 17 Gypsum Wall Board Gypsum Wall Board Ceramic TileLaundry Room 18 Gypsum Wall Board Gypsum Wall Board Ceramic TileGear Room 5 Gypsum Wall Board Gypsum Wall Board EpoxyDormitory 19 Gypsum Wall Board Acoustic Ceiling Tile Carpet TileKitchen & Living Area 16 Gypsum Wall Board Acoustic Ceiling Tile Laminate HardwoodFitness Room 15 Gypsum Wall Board Gypsum Wall Board EpoxyDecon Room 26 Gypsum Wall Board Gypsum Wall Board EpoxyCorridor 27 Gypsum Wall Board Gypsum Wall Board Epoxy: Slip & Abrasion ResistantWC 4 29 Gypsum Wall Board Gypsum Wall Board Ceramic TileWC 5 30 Gypsum Wall Board Gypsum Wall Board Ceramic Tile
Revision ScheduleNo. Description Date