Finishing Spotlight: NASF’s Sur-Fin 2009 Inside This Issue: • Adding too much ma- terial, resulting in scrap, rework and wasted material; • Adding too little ma- terial, resulting in scrap, rework and loss of business; • Inability to certify the process; • Difficulty in tracking process costs; and • Process control limits exceeding the specifi- cation limits. Reducing Variation Depleting bath chemi- cals occurs as a func- tion of time, tempera- A ll electroplating, anodizing and electro- coating baths require maintenance. One of the most frequent needs is replenishing depleted materials. There are several tech- niques to accomplish that… It has been and contin- ues to be common in the finishing industry to manually add bright- eners, plating solution, acid, caustic, pigment, resin and other materi- als based on existing conditions, educated FEBRUARY 2009 VOLUME 2, ISSUE 2 BETTER BATH MANAGEMENT 1 INDUSTRY EVENTS 2 NEWS & NOTES 3 FROM THE FORUMS 6 FINISHING SPOTLIGHT 9 THE LAST WORD 15 CONTENTS (page 6) BETTER BATH MANAGEMENT WITH METER CONTROLS BY: CRAIG HENRY Continued on page 4 (page 9) guesses or test-and- add methods. This can vary from measured amounts at prescribed times to a five-gal bucket-full whenever someone thinks of it. Some of the obvious disadvantages include the following: • Forgetting to add the materials; • Adding the wrong amounts; • Adding the wrong materials; • Peaks and valleys in bath chemistry be- cause of inconsistent additions; From the Forum Non-insulated Anodes Metal finishing and the fourth grade (page 15)

Finishing Talk - (February, 2009)

Embed Size (px)

DESCRIPTION

Monthly publication serving the metal and surface finishing industry. Learn more at www.finishingtalk.com.

Citation preview

Page 1: Finishing Talk - (February, 2009)

Finishing Spotlight:

NASF’s Sur-Fin 2009

Inside This Issue:

• Adding too much ma-terial, resulting in scrap, rework and wasted material;

• Adding too little ma-terial, resulting in scrap, rework and loss of business;

• Inability to certify the process;

• Difficulty in tracking process costs; and

• Process control limits exceeding the specifi-cation limits.

Reducing Variation Depleting bath chemi-cals occurs as a func-tion of time, tempera-

A ll electroplating, anodizing and electro-coating baths require maintenance. One of the most frequent needs is replenishing depleted materials. There are several tech-niques to accomplish that…

It has been and contin-ues to be common in the finishing industry to manually add bright-eners, plating solution, acid, caustic, pigment, resin and other materi-als based on existing conditions, educated

F E B R U A R Y 2 0 0 9 V O L U M E 2 , I S S U E 2

B E T T E R B A T H M A N A G E M E N T

1

I N D U S T R Y E V E N T S

2

N E W S & N O T E S

3

F R O M T H E F O R U M S

6

F I N I S H I N G S P O T L I G H T

9

T H E L A S T W O R D

1 5

C O N T E N T S

(page 6)

B E T T E R B A T H M A N A G E M E N T W I T H M E T E R C O N T R O L S B Y : C R A I G H E N R Y

Continued on page 4

(page 9)

guesses or test-and-add methods. This can vary from measured amounts at prescribed times to a five-gal bucket-full whenever someone thinks of it. Some of the obvious disadvantages include the following:

• Forgetting to add the materials;

• Adding the wrong amounts;

• Adding the wrong materials;

• Peaks and valleys in bath chemistry be-cause of inconsistent additions;

From the

Forum

Non-insulated Anodes

Metal finishing and the fourth grade

(page 15)

Page 2: Finishing Talk - (February, 2009)

Page 2 F I N I S H I N G T A L K

February 8-12, 2009 NASF Management Conference

Palm Beach, Aruba

www.nasf.org

February 15-18, 2009 PACE 2009

New Orleans, LA

www.pace2009.com

February 17-18, 2009 RadTech UV/EB West

Los Angeles, CA

http://www.uvebwest.com/

February 24–26, 2009

HOUSTEX 2009

Houston, TX

www.sme.org/houstex

March 2 – 3, 2009 COATING WEST,

Las Vegas, NV

www.thecoatingshow.com

March 4-5, 2009

SFA Powder Coating Course

Philadelphia, PA

www.surfacefinishingacademy.com

March 4-5, 2009

21st Century Cleaning Tech.

Philadelphia, PA

www.surfacefinishingacademy.com

March 17-19, 2009 Middle East Coatings Show 2009

Cairo, Egypt

middleeastcoatingsshow.com

March 22-26, 2009 American Chemical Society 2009

National Meeting & Expo

Salt Lake City, UT

www.acs.org March 30–April 2, 2009 WESTEC 2009 Exposition Los Angeles, CA www.sme.org March 31– April 2, 2009 European Coatings Show

Nuremburg, Germany

European-Coatings-show.com

For more calendar events,

please visit: www.finishingtalk.com/events

I N D U S T R Y E V E N T S 2 0 0 9

Page 3: Finishing Talk - (February, 2009)

Page 3 V O L U M E 1 , I S S U E 8

N E W S & N O T E S

Little Rock, AR Caterpillar Inc. an-nounced it will open a road grader plant in North Little Rock, where it will invest $140 million in its factory and hire 600 workers. Equipment and training at the plant will be state-of-the-art. Work will move from a plant in Illinois, which also makes mining equipment and needs to make room for extra production in that line. Caterpillar announced in June that it would spend $1 billion to upgrade five U.S. plants, money it was able to spend because of demand from other nations.

Beijing, China Aviation Industry Corp. of China is building a $1.2 billion heli-copter factory in Tianjin, east of Beijing, and should produce its first helicopter this year. Last week, AVIC obtained a 176 billion Yuan ($26 billion) line of credit from a group of 10 government-owned banks to finance product devel-opment and other ventures.

Washington, DC The EPA is finalizing changes and clarifications to air quality permitting rules to encourage greater use of flexible air permits. EPA’s assess-ment of flexible air permits demon-strated that they can enable significant environmental and economic benefits, while reducing administrative workload for permitting authorities and facilities. This final action affects both EPA’s op-erating permits and New Source Review programs. A facility with a flexible per-mit would explain its anticipated opera-tional and construction changes for the duration of the permit term. The state, local or tribal air quality permitting au-thority would include permit conditions to ensure protection of public health and the environment for all of those changes. These flexible permits do not provide approval for changes not within the scope of conditions considered at the time of the permit application. Fa-cilities must still meet their require-ments under the Clean Air Act.

Mississauga, Ontario Aerospace parts maker Cyclone Manufacturing is bucking the job-shedding trend. The company says it will create 133 jobs by investing in new technology with the help of a $7.7-million grant from the Ontario government. Overall, the com-pany plans to spend $50 million during the next five years to develop parts that are lighter. Company president Andrew

ence. The Fiesta, which made its debut at the North American International Auto Show in 2007 under the name, "The Verve," will go on sale in the U.S. some-time in 2010.

Charlotte, NC Goodrich and Rolls-Royce announced today that they’ve formed a joint venture company to de-velop and supply engine controls for Rolls-Royce aero engines. The joint ven-ture company, Rolls-Royce Goodrich En-gine Control Systems Limited, operates as Aero Engine Controls. Each of the con-tributing companies owns 50 per cent of Aero Engine Controls. Goodrich will retain the aftermarket products and services business associated with the joint ven-ture's products.

Washington, DC The Powder Coating Institute (PCI) has announced that Rodger Talbert will join the PCI team as Technical Director. This newly created role is aligned with PCI's goals to offer additional benefits to members by provid-ing technical expertise and support to the entire industrial coatings market place. As Technical Director, Rodger will act as the technical liaison between PCI and the market place, focusing on training and education. With Rodger's extensive ex-perience and background in the coatings industry, PCI will now be able to offer technical guidance, market research, speaking and training, coating evaluation and testing, and much more

Stennis Space Center, MS 27 high school teams from MS, LA, and FL gath-ered at Stennis Space Center’s Sten-niSphere for the regional kickoff of the 18th annual For Inspiration and Recogni-tion of Science and Technology Robotics Competition. It’s the first step towards the national and international competi-tion. Teams will participate in the Bayou Regional, March 19-21 at the University of New Orleans, to qualify for a place in April at the FIRST Championship in At-lanta.

Conklin, NY Impress USA, a global leader in the consumer metal packaging industry, will build a new manufacturing plant in Coklin, NY. The project will ini-tially bring 75 new, full-time employees to the location during the first phase of construction and initial operations.

Sochaj says the provincial support will allow Cyclone to speed up its growth plans and offer customers a broader range of products and services. The com-pany's customers have included Boeing, Bombardier and Embraer

Slidell. LA Northrop Grumman broke ground Wednesday on a new facility. Northrop in October 2008 bought 3001, a provider of geospatial data production and analysis, including airborne imaging, surveying, mapping and geographic infor-mation systems. The new office combines the existing Slidell 3001 office with the one at Stennis Space Center in Missis-sippi. The new 20,000 square-foot facility brings 85 jobs, including 50 new positions to St. Tammany Parish.

San Antonio, TX - The San Antonio Manufacturers Association (SAMA) awarded MetoKote Corporation, San An-tonio, Texas the Environmental Excel-lence Award in Industrial Pretreatment at the 2008 Environmental Seminar. This award is given annually to Significant Industrial Users (SIUs) that have met the general criteria established by the Divi-sion. This criteria includes: not having any reporting violations from January 1, 2007 through June 30, 2008 to indicate current compliance; the company has been permitted for at least two years; and the company has not been listed as Significantly Non-Compliant (SNC) in the past three years. In addition, award re-cipients must display environmental stew-ardship by recognizing best management practices, water conservation practices, pollution prevention and initiatives that are educational, innovative, cooperative, responsive, voluntary and effective. Meto-Kote had top honors this year and was one of only three companies selected.

Detroit, MI Ford Motor Co. began manufacturing the Fiesta subcompact car in China on January 16th as it aims to introduce the car around the world through 2010. The Fiesta will be built at the Changan Ford Mazda Automobile Co. manufacturing facility in Nanjing, China, the company said in a statement Wednesday. The car will go on sale late in the first quarter. Ford has been touting the Fiesta as its first "global car" since a version of the vehicle - with very little changes - will be available in almost every car market where Ford has a pres

V O L U M E 2 , I S S U E 2

Page 4: Finishing Talk - (February, 2009)

Page 4

C O N T I N U E D F R O M P A G E 1 … … B E T T E R B A T H M A I N T E N A N C E B Y : C R A I G H E N R Y , J P T E C H

bath is much less. This variation can be improved even more with more frequent additions.

Measuring the correct parameter (time, amp-hr, conductivity, pH) that correlates with the rate of depletion and replenishing the bath at the corresponding rate will minimize process variation. This manifests itself in optimizing both costs and quality because expensive chemicals are not wasted, scrap and rework are reduced, and process predictabil-ity is enhanced.

Amp-Hr Basis for Additions Using amp-hr to add materials is based on a direct correlation be-tween the depletion rate and the amount of product going through the bath. This is true whether you are an electro-plater, anodizer or electrocoater. The amp-hr measurement com-bines both time and current used and accommodates variances in load size as well as the time spent in the bath. The amp-hr meter constantly samples the amount of current used by the rectifier and generates an amp-hr measurement. The controller then sends a signal to the pump-ing system to add the required amount of material to the bath to replace the amount con-sumed. The length of time to pump and the frequency of addi-tions can be adjusted to provide the precise amount needed. Af-ter these adjustments, an opera-tor should find that the bath does not require testing as often

F I N I S H I N G T A L K

Continued on next page

added are correct. If the addi-tions are made less frequently, then the effect is even more pro-nounced.

Compare the previous variation to Figure 2 where additions are made once per hour. It is obvi-ous that the variation within the

ture and the number of items moving through the bath.

As you can see in Figure 1, if additions are made every 8 hr, the concentration of the bath varies significantly during the day. This illustration is based on the premise that the amounts

Page 5: Finishing Talk - (February, 2009)

Page 5

because the chemistry remains more consistent throughout the day, week and month.

• The meter will have several inputs and outputs:

• Power (110 or 220 VAC);

• Millivolts from the rectifier amp meter or shunt;

• Pump outputs from relays in the meter;

• Alarm outputs from the meter; and

• Level inputs from the additive container.

Basic meters will show cumula-tive amp-hr totals. Optional fea-tures will make the meter a more valuable tool as well as making the operation less labor intensive and reliable. Options can include the following:

• Resettable amp-hr totals for load, shift, day or weekly track-ing. This feature will allow you to track and trend productivity and compare different operators, shifts, bath chemistries or other factors.

• Non-resettable amp-hr totals. This feature is necessary to meet environmental compliance laws and regulations.

• Multiple pump operation. This feature allows you add two or more components to a bath at different rates based on the same rectifier and bath outputs.

• Multiple rectifier summing. This allows you to sum the amp-hr totals from one bath with multi-ple rectifiers so the additions can be based on the aggregate total.

• The capacity to add up pump cycles and pump run time. This

allows you to track the amount of material added to the bath, use this data for performance trends and generate precise cost data as a function of amp-hr, run time or product.

• Permanent memory retention without the use of batteries. This feature is essential to maintain the integrity of data.

• Material level alarms. This pro-vides warning before the reser-voir is empty so that bath chem-istries remain in tolerance.

• Fused pump outputs. These protect the meter in the event that a pump motor fails.

• PC network capability. This fea-ture allows the user to access all of the data in the meter from a personal computer or PLC,

Continued on page 8...

V O L U M E 2 , I S S U E 2

Continued on page 10

Page 6: Finishing Talk - (February, 2009)

This month we’re taking a look at an issue that edu-ardot00 in Venezuela is currently experiencing with

his cyanide zinc bath. He is has questions about insu-

lating his anode bars and is having some trouble with

burning. Forum members Dustin Gebhardt, and

Paul Fisher have pitched in to give their two cents

on the problem. Feel free to add your thoughts to

their ongoing discussion by visiting the forums at

www.finishingtalk.com/community and choosing the

Zinc Plating Forum.

For more “From the Forum” discussions, check out

our live internet television show, Finishing Talk Live, where hosts Paul Fisher and Paul Skelton bring

our bulletin boards to life on the only IPTV Channel

dedicated to the Metal Finishing Industry.

www.Finishing.TV

Page 6 F I N I S H I N G T A L K

F R O M T H E F O R U M : N O N I S U L A T E D A N O D E S

eduardot00

Hello, I’m running a cyanide zinc plating line in

Venezuela. We plate planar steel pieces of 4”x

4”x0.7mm average dimensions in a rack of 30pz

each, our baths dimensions are: 1x2x1meters, the

question is: The anode lead of the rectifier is at-

tached to the steel tank, and the zinc anodes are

hanging in a bar welded to the tank, yes they

aren’t insulated!! And I don’t now why because all

the theory says the opposite. We are unsatisfied

with the finishing quality, too many stained or

burned pieces. I would like to know if a reason ex-

ists in order that my installation is like that..

thanks!!

Paul Fisher

Hello Edwardo, Can you post some pics of your

tank configuration and of the stained and burned

parts? I think if you can do this there are many

here who could help you more.

eduardot00

The anode bar is attached to the tank, the cathode

is insulated from the tank and have a round end

where the rack stands an get the current, we have

four zinc anodes for each side of the rack, the av-

erage bath comp. is: cyanide: 70 g/l, caustic: 48 g/

l, zinc metal: 26 g/l. The pieces whit problem are

of mayor area like in the picture, the small area

pieces are ok. Thanks!!!

Dustin Gebhardt

A burned deposit can be caused by many things.

The parts may be too close to the anode (or the

tank walls in this case). The current may be too

high. The zinc metal may be too low. The caustic

may be too high (giving too much conductivity and

therefore too much current).

Also the bath agitation may be poor. I noticed

that you do not have any sort of mechanical agita-

tion or solution movement. Do you have a filter to

help move the solution? How about eductors?

You don't want to use air for agitation as this will

generate excess carbonates.

Posted in January 2009

Page 7: Finishing Talk - (February, 2009)

Page 7

eduardot00

Hello Dustin, we have no agitation at all, but we

filter the bath every two months. How can I now

the correct anode to cathode distance??? The cur-

rent density is: ± 4 A/dm2 , the bath comp is:

cyanide: 70 g/l, caustic: 48 g/l, zinc metal: 26 g/l.

What do you think about the tank configuration???

None of the zinc cyanide palter in my city use agi-

tation so I don’t think that could be the problem.

Looks like chemistry or contamination. Burn-

ing?.....mmmmm if it is due to high CD... parts too

close to anode....mmmm...or bath chemistry not

ok.

Dustin Gebhardt

I agree that many cyanide platers do not use bath

agitation, but I have seen remarkable improve-

ments in plating speed (via using higher current

densities) and bath brightness (for bright copper

cyanide baths). It stands to reason that agitation

will help flush away the "spent" solution near the

surface of the part and reduce burning in the HCD

areas.

You can increase the zinc metal slightly to see if

that helps. Also, where are your carbonates? 14-

25g/L is pretty common and at least 7-10 is re-

quired for proper bath performance. If this is an

established bath, I would suspect that you have

enough carbonates. Excessive carbonates cause

reduced bath efficiency, which may indirectly cause

you to increase current too high, which would burn

your parts.

Regarding the spacing of the parts to the anodes,

try to make the "flat" of the part facing the anode.

Try to keep the edges away from the anodes.

Edges naturally draw more current and are more

easily burned. You can also try to mask the edges

of the parts by using a robber or shield. It looks

like you are using copper wire for racking the

parts. Try to construct a cage of wire near the

edges of the part. It may take some time, but it

can help on a trial basis.

eduardot00

About the carbonates, our chemical supplier also

does the weekly analysis of our baths, but he didn’t

give me this value... so I don’t control this thing at

all.... how can you know if carbonates are giving

problems??? I presume for the things you said,

maybe we have too many carbonates... we plate

every day 24 hours…

Dustin Gebhardt

Here is the analysis I use for determining carbon-

ates. It is CRITICAL to rinse many times with step

#4. I usually rinse the filter paper 4 or 5 times.

V O L U M E 2 , I S S U E 2

Continued on page 8

Page 8: Finishing Talk - (February, 2009)

Page 8 F I N I S H I N G T A L K

F R O M T H E F O R U M , ( C O N T I N U E D F R O M P G 7 ) . . .

Sodium Carbonate Analysis

1) Pipette a 5 ml sample of the plating bath into a

250 ml beaker.

2) Add 50 ml of DI water to the beaker.

3) Set the beaker on a hot plate and heat to a

boil. Add 20 ml of 10% Barium Chloride while stir-

ring the sample. Allow the sample to settle. After

the sample has settled add several more drops of

Barium Chloride and observe if any more precipi-

tate is formed. If so, then add 10 mls more of

10% Barium chloride.

4) Filter the solution through a #2 Whatman filter

paper washing the flask and the precipitate with

hot DI water.

5) Remove the filter paper with the precipitate in

tact and place in a 250 ml flask. Add 100 ml DI

water to the flask and place on a hot plate and

bring the sample to a boil.

6)When the sample comes to a boil add 3 - 5 drops

of Modified Methyl Orange Indicator to the flask

and titrate the solution with 0.94N Sulfuric Acid to

a permanent purple endpoint.

Note: Re-boil sample if the color fades to green then continue titrating with 0.94N sulfuric Acid.

Calculation: mls of 0.94N Sulfuric Acid X 1.32 =

oz/gal; Sodium Carbonate oz/gal Sodium Carbon-

ate X 7.5 = grams/liter Sodium Carbonate

eduardot00

Thanks Dustin, very helpful, I’m going to do this

analysis... We prep the weekly additions using air

agitation before adding to the bath….. maybe this

method increase the sodium carbonate concentra-

tion???

Dustin Gebhardt

Yes, that is correct - air agitation can increase

carbonate formation.

Finishing Market

The sodium carbonate is formed by the adsorption

of carbon dioxide from the atmosphere by the so-

dium hydroxide in the plating solution. If your solu-

tion is air agitated this will increase the rate of ad-

sorption. Similarly, excessive turbulence from a fil-

tration system will, over a period of time increase

the concentration. We've sold Carbonate Removal

Systems on our website in the past. These sys-

tems allow for either continuous and/or batch

treatment for the removal of sodium carbonate in

plating baths.

Page 9: Finishing Talk - (February, 2009)

Page 9

F I N I S H I N G S P O T L I G H T : N A S F ’ s S U R - F I N 2 0 0 9 - L O U I S V I L L E , K Y

T he “ Bluegrass State” will roll out the “red” carpet for metal fin-ishers, suppliers, end users, and OEMs on June 16–17, 2009. That’s when the participants of SUR/FIN 2009—the North Ameri-can surface finishing industry’s premier trade show and technical conference—are expected to de-scend on the Kentucky Interna-tional Convention Center in Louis-ville to network, preview new products, and share best business and operational practices.

“Louisville is looking forward to hosting SUR/FIN 2009,” said Lou-isville Mayor Jerry E. Abramson. “Were a city on the move—our downtown is abuzz with activity, and we are a hub of manufactur-ing jobs. There’s a reason we call ourselves ‘ Possibility City,’ be-cause in Louisville, anything is possible.” The National Association for Sur-face Finishing—the show’s organ-izer and chief sponsor—hopes in-dustry members will “explore the possibilities” when next summer rolls around. And with all that Lou-isville has to offer, the case to come to Kentucky is very compel-ling. “The venue just fits SUR/FIN,” said Eric Olander, vice chair-man of the SUR/FIN 2009 Steering Committee. “ Louisville is a good convention town, has great ac-

commodations and area attrac-tions, and it’s easy to move around in. Plus, it’s a quick trip from the airport.” More importantly, the state of Kentucky in general is very “industry-friendly,” which is critical for manufacturing sectors such as metal finishing. In fact, Louisville was recently anointed as the “Southeast’s leader in manufactur-ing” by Manufacturers’ News magazine. Louisville’s auto manu-facturing sector is particularly ap-pealing to finishers. “It’s the gate-way to the automotive south,” said Olander, citing Ford, Toyota, and Corvette plants operating in the state. Louisville is also strate-gically located near some of the world’s largest OEMs and applica-tors, he added. The importance of Louisville’s role in the auto manufacturing sector was recently demonstrated when Ford Motor Company unveiled a $200 million investment plan to expand operations in the city. Spe-cifically, Ford plans an additional $100 million investment at its Ken-tucky Truck Plant—on top of the $200 million in retooling over the past two years—to allow the plant to produce the Navigator and Ex-pedition models starting in spring 2009. Ford also plans to invest at least $100 million in the Louisville Assembly Plant to provide the manufacturing flexibility to pro-duce a new, fuel-efficient car for the U.S. market by 2011. The allure of Louisville goes well beyond its industrial attributes. Dubbed America’s “ Most Liveable Large City” by the U.S. Conference of Mayors, Louisville offers world-class performing arts venues, sports and entertainment com-

plexes, fine dining establishments, and a bustling downtown area. Among the main attractions: the famed 4th Street Live District, Churchill Downs, Kentucky Derby Museum, Waterfront Park, Mu-hammad Ali Center, Speed Mu-seum, Louisville Slugger Museum, Kentucky Opera, Louisville Zoo, Louisville Science Center, and Six Flags/Kentucky Kingdom, among others. According to the Mayor’s office, more than $2.5 billion in invest-ment and development is currently under way for downtown Louis-ville. Recent highlights include the multi-purpose arena, $150 million in new development surrounding Louisville Slugger Field, the pro-posed Iron Quarter Development, and nearly a half-billion dollar pro-posed expansion of the Fourth Street entertainment district. “The Center City District will be an epicenter of electricity that con-nects the high-energy areas of our downtown—from the waterfront and throughout the heart of the city,” Mayor Abramson said. “It’s a quarter-of-a-billion-dollar invest-ment that takes our downtown to a new level—from a project-by-project approach to a system of strategically connected districts that serve as economic magnets to draw millions of people, and dollars, to Louisville.” For more information about SUR/FIN, log on to www.sur-fin.net or visit www.nasf.org.

V O L U M E 2 , I S S U E 2

Page 10: Finishing Talk - (February, 2009)

Page 10 F I N I S H I N G T A L K

download the data directly and integrate into spreadsheets and reports. It also allows the user to change meter settings and pre-vent tampering with the meter.

• Hand-held computer infrared data access. This is a different method of downloading data di-rectly from the meter or chang-ing parameters with the use of a hand-held computer.

• Integral pumps and controllers. This type of unit is very popular since it contains all of the com-ponents necessary to "plug and play." They come with one or two pumps and simplify the maintenance and installation of a system.

Not all meters will have these features or options. Should you need any or all of them, they may save you a considerable amount of time, money and ef-fort compared to a less versatile product.

Time Basis for Additions Some processes, such as clean-ing or electroless processes, de-plete materials proportionate to the length of time an item spends in the bath. In this situa-tion, an operator would benefit from a time-based controller. These units can replenish either with fixed additions every time a rack enters the bath or as a function of the total number of minutes that accumulate while parts are in the bath. When a rack is placed in the bath, it trips a limit switch, activating these units.

Most of the same features and benefits described for amp-hr based additions pertain to time-based additions.

Conductivity or pH Basis for Additions This approach af-fects not only the direct proc-esses involved in plating, ano-dizing or electrocoating, but also ancillary processes such as off-line generation or waste treatment, since many of these have portions of the process that are controlled by or sensi-tive to either pH or conductivity.

In these applications the proc-ess in question can either be 1) Monitored with alarm outputs for out-of-tolerance conditions; or 2) Controlled with pump out-puts.

In the latter case, the meter will constantly track the process parameter selected and when either a high or low level is reached, activate a pump to add the necessary material to bring the process back within tolerance. The more sophisti-cated meters will track the rate of change and add material at a variable rate to achieve process limits.

As before, the benefits of auto-mated control and the meter features will be very similar. Additional considerations in-clude temperature compensa-tion to maintain measurement accuracy and the ability of the meter to accommodate the range that you need to meas-ure.

Benefits of Automated Control

• Consistent bath chemistry;

• Reduced scrap and rework;

• Reduced costs;

• Increased productivity;

• Accurate process costs;

• Process control;

• Process certification; and

• Ability to sell to more demand-ing customers;

Many of these benefits provide significant tangible rewards in the form of increased profits as well as the intangible benefits of increased peace of mind know-ing that these critical process parameters are under control. As with any piece of equipment, periodic checks to ascertain that reservoirs are full, tubes are clear and power is still available.

Additional Meter Options Ripple Meters. These units measure the rectifier output and express their readings as a per-centage AC of DC voltage. This is significant for a number of reasons:

• Process susceptibility. This is important if you are operating a process that is vulnerable to high ripple such as electrocoat, bright chrome or nickel. Rectifier components may fail or degrade while the rectifier is still capable of providing output. Conse-quently your process may pro-duce unsatisfactory parts with-out warning and without an im-

C O N T I N U E D … . . . B E T T E R B A T H M A I N T E N A N C E B Y : C R A I G H E N R Y , J P T E C H

Continued on next page

Page 11: Finishing Talk - (February, 2009)

Page 11 V O L U M E 2 , I S S U E 2

mediately visible cause.

• Rectifier failure. Your rectifier may experience partial failure or component degradation that will ultimate lead to complete recti-fier failure. The ability to sense this before a catastrophic failure occurs can reduce repair costs, unscheduled downtime and loss of production.

• Power consumption. A rectifier operating with a defective com-ponent creates high ripple that also means that the rectifier is operating inefficiently, so your power bills are higher to produce the same amount of work.

Additional features to consider for this specific product include auto-ranging so that all voltages

can be measured and alarm out-puts set at adjustable settings.

Flow Meters. These units can both monitor and control the flow of material within the proc-ess. They can balance levels in baths, make additions based on the amount of material passing the measurement point and pro-vide summary data and alarm outputs to assure process con-trol.

Current Density Meters. The ability to measure current den-sity is an invaluable tool to de-termine if you are optimizing ion transfer within your bath. By measuring the current density over the entire surface of part racks, you can assess anode placement, anode to cathode ratios, bath efficiency and depo-sition rates.

Meter Selection Determining which brand and model of meter fits your needs should be based on several factors, including but not limited to ease of use, reli-ability, visibility of display, 110 or 220 VAC input, resistance to harsh environments, size and convenience of mounting and value. Of course, another critical factor is in choosing a vendor who knows your process and can supply reliable products.

This article was written by; Craig Henry of JP Tech, East Troy, MI and reprinted with permission from Products Finishing Magazine. The Resource For Product Finishing Pro-fessionals ® 2008 Gardner Publica-tions, Inc .

Page 12: Finishing Talk - (February, 2009)

F I N I S H I N G T A L K Page 12

free reclaim in multiple color finish-ing applications. "We wanted to install the best system possible," said Mr. Hall. "One that would allow us to become more diversified with regard to part sizes and color op-tions and remain flexible into the foreseeable future. We chose our supplier for a variety of reasons, not the least of which was the per-formance of its powder spray sys-tems. We were also comfortable with the company based on our past experience and the knowledge that they would provide the high level of customer service and tech-nical support we were likely to need before and after the sale."

Simply installing a new powder coating booth and some automated spray guns would not have com-pletely removed the stress on the company's existing powder coating system. Therefore, Royston also made the commitment to replace all related systems, including the overhead conveyor and racking system, five-stage cleaning system and bake ovens. "Our supplier worked closely with us and our other equipment and material ven-dors to design and install the opti-mal system and to train our per-sonnel to operate the new technol-ogy. As a result, we were able to deploy a staged conversion, replac-ing one system at a time without shutting down and with virtually no loss in productivity," proclaimed Mr. Hall.

Meeting the Demands Two Cyclo-Kinetic® roll-on/roll-off pow-der coating spray booths are the central piece of the new powder coating system. Each booth is equipped with 14 opposing Versa-Spray® II automatic guns and two Sure Coat® guns for penetration into Faraday cage areas.

convenience stores more conven-ient.

Following the trend of the general economy, the demand for the com-pany's merchandising systems in-creased dramatically during the 1990s. As demand increased be-cause of a number of new custom-ers, the number of colors that Roys-ton needed to spray increased as well.

For much of the decade, the com-pany's powder coating system served it quite well. But, as the sys-tem was asked to handle an ever-increasing workload, the company realized that its aging powder coat-ing system would no longer be able to keep up with all the new orders.

The roll-on, roll-off system The roll-on, roll-off system enables Royston to change colors six or more times per day. Jerry Hall, manufacturing engineering manager at Royston, explained that the exist-ing powder coating system was sim-ply too old and too inefficient to meet the increased demand and added colors. "We were definitely experiencing the strains of growth," stated Mr. Hall. "Most of the strain was coming from our powder coat-ing operation. Inconsistent powder coating coverage required excessive manual touchups, and slow color changes caused slow-downs and bottlenecks. Powder losses caused by poor recovery and contamination exceeded 100 lb/day."

The good news of the company's increased business was counter-acted by the bad news of its inade-quate powder coating system. How-ever, in July 1999, after 2 years of evaluation that included four facility tours and lab tests, Royston re-ceived more good news. It came in the form of an automatic powder coating system specially engineered for fast, efficient, contamination-

I ncreasing the capacity of its sys-tem made Royston more efficient. But, that's not the only way to in-crease efficiency. Check out Profit-ing from Control—The (Up) Right Way to find out more.

Stressful situations tend to exacer-bate an individual's faults. Take a golfer, for example. When playing alone or on the driving range, most golfers tend to make more techni-cally sound and efficient swings that lead to better shots. However, in the heat of competition, most golf-ers tighten up. The stressful situa-tion causes the golfer to revert to old swing faults that result in poor shots. You can see this phenome-non virtually every week (at least when Tiger Woods is not playing) on the PGA Tour when a relatively inexperienced player gets near the lead.

When finishing lines are pushed to-ward maximum capacity, they often operate like a golfer under stress. If the line is running at a given capac-ity, one that is not too taxing for the system's capabilities, you may not notice any faults. Perhaps you're coating at 3 mils instead of 2 mils, but at the given capacity the prob-lem isn't that great. But, as the ca-pacity increases and the finishing system is stressed, that 1 mil differ-ence in coating thickness is multi-plied. Instead of costing the com-pany a few thousand dollars, the increased coating thickness is now costing the company tens of thou-sands of dollars.

Good News, Bad News, Good News Royston LLC (Royston, GA) is a manufacturer of high-quality counters and merchandising sys-tems, including shelves, brackets, grids, inserts, moldings and acces-sories, that are designed to make

A U T O M A T I C P O W D E R C O A T I N G M E E T I N G C U S T O M E R S ' D E M A N D S B Y S T E V E N R . K L I N E , J R

Continued on page 14

Page 13: Finishing Talk - (February, 2009)

Page 13 V O L U M E 2 , I S S U E 2

setting provides an 18-hole championship course right on the doorstep of Sanibel and Fort Myers Beach.

The Annual Meeting concludes on Saturday night with the tra-ditional and popular Chairman’s Ball. Here, delegates can enjoy the Chairman's Reception fol-lowed by the Ball during which AEC will honor and acknowledge dedicated individuals for their service at the Volunteer Recog-nition Ceremony. This event provides an additional opportu-nity for business development and networking.

A brochure containing program information and registration de-tails will be mailed to members in December. Brochures will be available for viewing on the Council’s website section solely devoted to upcoming events, www.aecmeets.org. For more information on the Annual Meet-ing contact AEC at [email protected] or call 847.526.2010.

The Aluminum Extruders Council is the association of the world’s leading manufacturers of ex-truded aluminum profiles -- The Shapemakers. For more infor-mation, contact AEC at 1000 N. Rand Road, Suite 214, Wau-conda, IL 60084. Telephone: 8 4 7 . 5 2 6 . 2 0 1 0 ; f a x : 8 4 7 . 5 2 6 . 3 9 9 3 ; e - m a i l : [email protected]. Visit the Coun-cil’s website at www.aec.org.

scheduled during Friday’s pro-gram is David Weinberger. Weinberger offers numerous years of experience as a philoso-phy professor, a comedy writer and humor columnist, a strategic marketing consultant, and an early dot-com entrepreneur. His presentations cover how the internet has changed the mar-keting communication model for-ever and how to include every piece of information about a product to let the consumer de-cide what information to utilize.

Saturday’s program includes a presentation and a workshop which will feature Don Blo-howiak. Blohowiak’s presenta-tion Reorganized? Restructured? Reengineered? Here's How to Get the Work Done! will cover numerous tactics for enabling staff members to produce more high-value/high-impact work amid change. Following the General Session, Blohowiak will conduct the Leadership Work-shop.

This interactive workshop fo-cuses on how to make the best choice when hiring a candidate in order to create a resilient or-ganization. Delegates can learn new techniques and tactics on how to conduct better inter-views, which yield better new employees.

In addition to the exceptional presentations, on Friday atten-dees have the option to take part a golf tournament. This year the tournament will be held at the Shell Point Golf Club. This

T he Aluminum Extruders Council (AEC) will be offering aluminum extrusion personnel a chance to network and learn from one another at the 2009 Annual Meeting and Leadership Conference scheduled for Thurs-day, March 26 through Saturday, March 28 at the Sanibel Harbour Resort in Fort Myers, Florida. This popular industry event will provide practical information as well as industry insights.

The 2009 Annual Meeting begins a year long celebration leading up to AEC’s 60th Anniversary. In coordination with the 60th Anni-versary kick-off, AEC is inviting past Council leaders to the An-nual Meeting. “Inviting these industry veterans will provide members with an opportunity to discuss current issues with the people who have helped build the aluminum extrusion industry and who have faced many of the challenges now faced by current industry leaders,” noted AEC President Rand Baldwin, CAE.

The Conference begins on Thurs-day with the Outdoor Registra-tion Event featuring refresh-ments and camaraderie begin-ning in the afternoon. Sched-uled afterwards is the Welcome Reception where delegates can connect with friends and col-leagues in a relaxed atmosphere.

Friday’s preliminary program fea-tures two timely General Session presentations. Financial expert Terry Savage will present The Savage Truth on Money. Also

A E C 2 0 0 9 A N N U A L M E E T I N G A N D L E A D E R S H I P C O N F E R E N C E P R E V I E W

Page 14: Finishing Talk - (February, 2009)

Page 14 F I N I S H I N G T A L K

Depending on the size and shape of the parts, the new system can pow-der coat up to 1,200 parts per hour with a reject rate less than 1%. And a single shift of five workers can now handle three full shifts of manufacturing.

Even though the new system runs at faster line speeds to accommo-date the increase in demand, Roys-ton has realized a more consistent film build that has significantly re-duced powder use. "With the old system, mil thickness could range from 1-4 mils on a single part," stated Ted McCutchen, production supervisor at Royston. "The system gives us a controllable, consistent thickness of 1.5-2.0 mils from the top to the bottom of every part."

Royston's merchandising sys-tems Royston's merchandising sys-tems, which are used in conven-ience stores, are known for their image-enhancing appearance, flexi-bility and durable construction. In addition to meeting the increased production levels, the new powder coating system has also enabled Royston to handle the increased number of colors needed to satisfy its customers' demands. The previ-ous process typically required 4 hr of cleaning and preparation to change colors. Not only was the time to change colors too long, but Royston also estimated that it was losing 120 lb of powder to scrap on a daily basis, including 30-40 lb that were sprayed to waste. Aver-age cost of $3/lb, powder loss alone was costing the company $75,000-100,000/yr.

With the new spray booths, the company is able to change colors in the offline booth in an average of 1 hr and reclaim multiple colors with efficiencies as high as 98.5%. Spray-to-waste is eliminated, re-ducing Royston's overall powder-to-scrap to less than 25% of previous levels.

The roll-on, roll-off system enables the company to change colors six or more times a day. Six of the seven portable hoppers are dedi-cated to its most common colors, while the seventh hopper is used for frequent color changes. "In ad-dition, we maintain a small station-ary booth in which we manually coat smaller batches," said Mr. McCutchen.

The additional pressures created by the increased demand for the com-pany's product and the additional colors have been alleviated, making the new powder coating system a model of efficiency. From rack to unload, parts now travel 2,220 ft in 2 hr prior to being assembled or packaged and shipped to customers for on-site assembly.

According to Richard Edenfield, director of engineering at Royston, the new operation has exceeded the company's expectations. "The technology is more advanced and better supported than any other we have used," said Mr. Edenfield. "In less than a year, we've gone from running a ‘light' booth and a ‘dark' booth that severely restricted our ability to diversify, to an advanced system that enables us to produce as many parts in as many colors as we choose on any given day. That's the level of flexibility we were look-ing for. To produce a high quality product—which is what your repu-tation is about—you need high quality equipment and high quality service."

This article was written by Steven R. Kline, Jr. and reprinted with permission from Products Finishing Magazine. The Resource For Prod-uct Finishing Professionals ® 2008 Gardner Publications, Inc .

A U T O M A T I C P O W D E R C O A T I N G C O N T I N U E D

The American Society for Quality (ASQ), has learned that when it comes to kids’ dream jobs, engi-neering is not on the list. An over-whelming 85 percent of youth say they are not interested in a future engineering career, ac-cording to a recent survey of youth and adults conducted by Harris In-teractive on behalf of ASQ.

According to the survey, the top three reasons why kids aren’t inter-ested in engineering are Kids don’t know much about engineering (44 percent), kids prefer a more exciting career than engineering (30 per-cent) and they don’t feel confident enough in their math or science skills (21 percent) to be good at it. This is despite the fact that the larg-est number of kids ranked math (22 percent) and science (17 percent) as their favorite subjects.

In an effort to raise awareness, as well as promote engineering as a career choice, ASQ is developing a webinar for young people and par-ents that will be made available on the ASQ Web site, www.asq.org/manufacturing, during National En-gineers Week, February 15-21.

Page 15: Finishing Talk - (February, 2009)

Page 15

T H E L A S T W O R D M E T A L F I N I S H I N G A N D T H E F O U R T H G R A D E B Y : L E A H G R E E N E

into a partnership where we've pledged our efforts to try and source as many of the supplies, equipment, and other educational materials as we can. These items run the gamut from a full on 'States of Matter' Delta Science Module Kit to UV sensitive paper, oil spill absorbing polymers, and even a tub full of geodes. In re-turn for our support, the school has agreed to distribute the NASF brochure "What is Metal Finish-ing?" to each of the 4th grade students, schedule a day for us to give a presentation on metal fin-ishing and metallurgy, and make sure that all of the students leave the fourth grade knowing the im-portance of Metal Finishing in their everyday life.

As the project progresses, we will evaluate our time spent vs. our accomplishments and monitor the progression towards are goals. We will continue to document them here in our editorials over the course of the year. Be sure to keep an eye out for updates and posts about it on the Finishing Talk Bulletin Boards, as well as our quarterly IPTV show - Finish-i n g T a l k L i v e (www.finishingtalklive.com). It is our hope that you all will learn and benefit as much as we do from the data and experience we garner from launching this out-reach project; who knows, maybe you'll have the opportunity to im-plement a similar strategy in your community one day, too.

litmus paper.

It instantly dawned on us that this problem could be trans-formed into a wonderful opportu-nity; not only could we help out a school in need, but we could initi-ate an outreach project that util-ized the educational branch of our metal finishing enterprise, the Surface Finishing Academy, in an effort to teach the students about our industry. In addition to pro-viding them with all the equip-ment necessary to build a first class chemistry department to enhance their science lessons, we could initiate a collaboration - by this point, our readers know of our affinity to this word - with the purpose of developing mutual understanding between the metal finishing industry and the public education system.

What benefit do we gain from this liaison? Well, to put it plainly - a stake in the future of our indus-try. According to the annual 'Fabricating Update' survey (www.Fabricator.com) among the top concerns expressed by metal fabricators in 2008 was the short-age of skilled labor in their indus-try. Imagine what the labor force will be like ten years from now if something is not done to raise the next generation's awareness of metal finishing. For this very rea-son, it is increasingly important that we take action now by edu-cating our youth.

Our end of the bargain looks something like this: we agree to help provide the materials and equipment needed to assemble a top notch science program. What originally started with a few sur-plus beakers, test tubes, flasks, and pipettes has now developed

V O L U M E 2 , I S S U E 1

A s the economy continues to contract, school systems

across the country are having to tighten their belts a couple of notches. Our home state of North Carolina is no exception - we are expecting a 3 billion dollar deficit in our education budget. In Ruth-erford County, NC, the headquar-ters of Finishing Talk, County School Funding dropped 3 million dollars between 2007 and 2008. 2009 is expected to be even lower, and the fact that a huge percent of the funding is being spent on the construction of new schools only deepens the financial predicament. It has gotten to the point that staff cuts have taken the place of supply cuts - an all too familiar scenario for many businesses and organizations these past months.

Because of this harsh reality, schools are aggressively seeking new sources of funding. This is-sue recently hit home with us when a charter school in our com-munity approached our sister company, Finishing Market, seek-ing a local source for surplus lab equipment. During the subse-quent meeting between Finishing Market and Thomas Jefferson Classical Grammar School (a quick and easy appointment to arrange down here in 'Small Town Friendly') we learned that the school was seeking the equip-ment for an Introduction to Chemistry curriculum they wanted to introduce to their fourth grade students shortly after the holiday break. But the elementary school's plans to introduce these young minds to the wonderful world of science was out of reach due to lack of funding for even the smallest of lab items, such as

Page 16: Finishing Talk - (February, 2009)

PO Box 349

Rutherfordton, NC 28139

February 2009

Leah Greene, Editor

Phone: (828)-245-2601

[email protected]

www.FinishingTalk.com