    NATIONAL GRIDCORPORATION OF THEPHILIPPINES

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    RIGHT-OF-WAY NEGOTIATIONS

    ANDVEGETATION MANAGEMENT

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    2/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    OUTLINE

    RIGHT OF WAY (ROW)

    LEGAL BASIS IN LAND AND LAND RIGHTSACQUISITION

    DEFINITION OF TERMSKEY OBSERVATIONS PERTAINING TO RIGHT OF WAY

    RIGHT OF WAY OF CLEARANCERIGHT OF WAY CLEARING

    HAZARDOUS IMPROVEMENTSSTANDARD CLEARING WIDTHS

    ROW NEGOTIATIONS PROCEDURES

    FOOT PATROL REPORTDOCUMENTARY REQUIREMENTS OF IMPROVEMENTSROW LEGAL FORMSPUBLIC RELATIONS

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    3/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    Refers to the set standard of boundaryor limit for a particular transmission linedepending on its voltage level, wind

    span, design wind velocity, configuration/type o transmission line structures, andminimum safety clearances as requiredby the Philippine Electrical Code.

    RIGHT OF WAY (ROW)

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    4/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    LEGAL BASIS ON LAND AND LANDRIGHTS ACQUISITION

    Substantive Laws:

    - Constitution (Bill of Rights)

    - Section 1, Art. III-due Process and Equal Protection

    - Section 9, Art. III-Eminent Domain (JustCompensation

    General and Special Laws:

    - R.A. No. 6395 (NPC Charter)

    - R.A. No. 8974 (Law on Acquisition of ROW, Site orLocation of Govt Project)

    - Civil Code of the Philippines (esp. Book II PropertyOwnership and Possession and Easements

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    5/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    - Others-Local Govt Code, Water Code of thePhilippines

    Administrative Orders and ExecutiveIssuances:- Executive Order No. 1035- Circular No. 98-11 (Documentary Requirements to

    Support Payments of land, Land Rights,

    Improvements and Resettlement/RelocationCompensation)

    Executive Orders:- Executive Order No. 132, as amended (Procedure

    in Acquisition of Private Property for Public Use andPurpose and Creating Appraisal Committee)

    Others:- ROW Manual- Manual of Approvals

    - Legal Opinions DOJ or OGC

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    6/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    HAZARDOUS IMPROVEMENT/S Refers toany improvement (crops, plants, & trees)which are outside/inside the right of wayof the transmission line but due to their

    height or characteristics may adverselyaffect the line.

    ORIGINAL/TRANSFER CERTIFICATE OF

    TITLE - Document issued by the Registryof Deeds evidencing ownership of aproperty.

    DEFINITION OF TERMS

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    7/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    CLAIMANT - One who claims or asserts

    a right, demand or claim over an affectedproperty and/or improvements thereon.

    CUTTING Cutting of tree trunks with

    the intent to eliminate the treeEASEMENT An encumbrance imposed

    upon immovable for the benefit ofanother immovable belonging to adifferent owner.

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    8/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    RIGHT OF WAY (ROW) An easement or

    right given to the Company either by law,judicial order or by the landowner uponpayment of proper compensation to enterthe affected property, implement its power

    transmission projects and/or conduct thenecessary maintenance/clearing activities.

    TENANT - May refer to one who has the

    temporary use and occupation ofagricultural land (agricultural tenant) ortenements belonging to another (houserenter).

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    9/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    EMINENT DOMAIN The right of thenation of the state, or of those towhom the power has been lawfullydelegated, to condemn privateproperty for public use, and to

    appropriate the ownership andpossession of such property for suchuse, upon paying to the owner the

    just compensation, to be ascertained

    according to law.

    EXPROPRIATION - Is the procedurefor enforcing the right of Eminent

    Domain.

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    10/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    PRUNING Cutting of major treebranches.

    PUBLIC DOMAIN Land owned directly bythe Republic of the Philippines and notsubject to private ownership.

    PUBLIC LAND - Lands belonging to the

    government which are subject to sale orother disposition.

    ROW CORRIDOR - The standard of

    boundary or limit defined for a particulartransmission line based on its voltagelevel, wind span, design velocity,configuration type of transmission line

    structures and minimum safety clearances

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    11/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    TILLER - A person who is in actual

    personal cultivation of the land, regardlessof whether such a person is a bona fidetenant or otherwise.

    VEGETATION - Refers to all plantmaterials, growing or not, living or dead.

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    12/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    WHY THERE IS A NEED OF ARIGHT-OF-WAY IN TRANSMISSION

    LINE?

    This is to set a standard of aerial

    clearance and/or distance for a HighVoltage Transmission Lines againstintroduction of vegetation, structureand other man made object which willthen be considered as hazardous forits operations & maintenance.

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    13/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    KEY OBSERVATIONS PERTAINING TORIGHT OF WAY

    1.There is a wide range of vegetationmanagement practices and procedures;2.Very little uniformity in right of way practicessuch as ROW width, vertical line clearance,inspection frequency, minimum pruning distance

    and standards used;3.From a grid reliability perspective, the ultimategoal is the elimination of preventable transmissionline outages due to vegetation;

    4.Many transmission owners face obstacles ingetting local permits to maintain the right of way;5.Hesitant landowner/s;6.Safety of utility workers and the public;

    7.Reliability and availability of transmission lines.

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    14/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    Minimum Horizontal Distance from Centerof Structure (both sides) in meters

    RIGHT OF WAY CLEARANCERIGHT OF WAY CLEARANCE

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    15/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    WHY ROW/VEGETATION

    MANAGEMENT?

    1.Vegetation can be managed easily.

    2.Improve line reliability.3.Customer satisfaction.4.Save time/ earlydetection/restoration.

    5.Less effort and cost.

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    16/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    RIGHT WAY OF CLEARING

    We are a transmission company thatprovides reliable power services. It isimportant that these lines be kept clearof trees, other vegetations andobstructions to avoid any potential

    disruption of power, thus avoid revenueloss for the Company/Cooperative.

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    17/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    HAZARDOUSHAZARDOUS

    IMPROVEMENTSIMPROVEMENTS

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    18/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    19/45

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    20/45

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    21/45

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    22/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    STANDARD CLEARING WIDTHS

    VOLTAGE LEVEL NGCP STANDARD WIDTH

    69 KV 15 meters

    115KV 30 meters138 KV 30 meters230 KV 40 meters

    350 KV 50 meters500 KV 60 meters

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    23/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    ROW NEGOTIATIONS PROCEDURESROW NEGOTIATIONS PROCEDURES1.Secure ROW defects/Foot Patrol Report from

    Line Foreman/Lineman2Verification of hazardous improvements

    stated in ROW defects. Make an ocular

    inspection in the area

    3.Identification of hazardous

    improvements/Counting of hazardous

    improvements.

    4.Assess the valuation/price of identified

    hazardous improvements.

    5.Verify Address and location of landowner

    6.Double check the ownership of land and

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    24/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    7. Locate the Landowner/owner of

    improvements

    8. Explain to landowner/owner of

    improvements the purpose

    9. Present the valuation of

    improvements

    10. Explain to landowner/owner of

    improvements the row documents

    needed for payment11. Process the documents

    12. Payment of the damaged or to be

    damage hazardous improvements

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    25/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    FOOT PATROL REPORT

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    26/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    Payment of Crops, Plants and Trees thru

    Negotiation (NGCP)

    Approved Report on Count of Improvements,

    i.e., crops, plants and trees duly acknowledged

    by the owner or his representative.

    If claimant is the landowner, notarizedAffidavit of Ownership/ Undertaking with

    Waiver of Rights/ Quit Claim.

    If payment will be made to claimant other

    DOCUMENTARY REQUIREMENTSDOCUMENTARY REQUIREMENTS

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    27/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    If landowner is unknown orlandowner does not want to

    execute the required documents,Joint Affidavit of 2 adjoininglandowners or 2 elective Barangayofficials of the place where theproperty is located, attesting tothe ownership of theimprovements.For registered land, certified

    photocopy of Land Title (OCT/TCT)For unregistered land:

    a. Certified photocopy of TaxDeclaration

    b. Notarized Affidavit of LandOwnership

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    28/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    29/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    30/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    31/45

    MINDANAO OPERATIONS ANDMAINTENANCE

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    32/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    33/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    34/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    35/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    36/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    37/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    38/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    39/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    40/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    41/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    42/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    43/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    PUBLIC RELATIONPUBLIC RELATION

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    44/45

    MINDANAO OPERATIONS AND MAINTENANCEDISTRICT 6 Southwestern Mindanao

    A CLIENTA CLIENT

    A client is the most important visitor

    on our premises.

    He is not dependent on us --- we aredependent on him. He is not an

    outsider in our business --- he is a part

    of it. We are not doing him a favor byserving him he is doing us a favor

    by giving us the opportunity to do so.

  • 7/27/2019 Final_Presentation Materials for Linemen's Trang_ROW

    45/45

    Thank You!Thank You!