14
1 FINAL YEAR PROJECT FINAL YEAR PROJECT 2004/2005 2004/2005 16 16 th th - July July - 2004 2004 9.30 am 9.30 am By : By : Dr. Dr. Aminuddin Aminuddin Ab Ab . . Ghani Ghani Supervisor : Supervisor : Dr. Nor Dr. Nor Azazi Azazi Zakaria Zakaria Student : Student : 1. 1. Nasruddien Nasruddien Bin Bin Mohd Mohd Nor Nor Saidi Saidi Supervisor : Supervisor : Dr. Dr. Aminuddin Aminuddin Ab Ab . . Ghani Ghani Student : Student : 1. 1. Aishahturizdah Aishahturizdah Bte Bte Ashgul Ashgul 2. 2. Fakrul Fakrul Fahmy Fahmy Bin Bin Taufiak Taufiak 3. 3. Mahadi Mahadi Bin Bin Baharudin Baharudin 4. 4. Mohamad Mohamad Ansar Ansar Bin Bin Derani Derani 5. 5. Tengku Tengku Saiful Saiful Tengku Tengku Shariff Shariff

FINAL YEAR PROJECT 2004/2005 - USMredac.eng.usm.my/html/IAHR_SC-USM/academic/FYP20042005_ppt.pdf · 1 FINAL YEAR PROJECT 2004/2005 16th - July July -- 2004 9.30 ... Pembangunan Peta

  • Upload
    vannhi

  • View
    216

  • Download
    1

Embed Size (px)

Citation preview

1

FINAL YEAR PROJECTFINAL YEAR PROJECT2004/20052004/2005

1616thth -- July July -- 20042004

9.30 am 9.30 am

By : By : Dr. Dr. AminuddinAminuddin AbAb. . GhaniGhani

Supervisor :Supervisor : Dr. Nor Dr. Nor AzaziAzazi ZakariaZakaria

Student :Student :1.1. NasruddienNasruddien Bin Bin MohdMohd Nor Nor SaidiSaidi

Supervisor :Supervisor : Dr. Dr. AminuddinAminuddin AbAb. . GhaniGhani

Student :Student :1.1. AishahturizdahAishahturizdah BteBte AshgulAshgul

2.2. FakrulFakrul FahmyFahmy Bin Bin TaufiakTaufiak

3.3. MahadiMahadi Bin Bin BaharudinBaharudin

4.4. MohamadMohamad AnsarAnsar Bin Bin DeraniDerani

5.5. TengkuTengku SaifulSaiful TengkuTengku ShariffShariff

2

Student : Student : AishahturizdahAishahturizdah BteBte AshgulAshgul

Facilitator : Facilitator : PnPn. . KhairulKhairul RahmahRahmah AyubAyub

Pollutant Removal Capability of An Pollutant Removal Capability of An Ecological SwaleEcological Swale

Scope of WorkScope of WorkData Collection : Water sampling by grab Data Collection : Water sampling by grab –– 2 Set @ 10 2 Set @ 10 minitminit / 4 / 4 botolbotol

Data Analysis : TP, TSS, Data Analysis : TP, TSS, PbPb

ReferenceReference1. Chew Ying Ying

Chew, Y.Y., (2004). Stormwater Treatment Using BIOECODS’ Ecological Pond (Wetpond, Detention Pond & Wetland), Final Year Project Thesis, Universiti Sains Malaysia, Penang, Malaysia.

2. Maznah Makhtar

Makhtar, M., (2004). Rawatan Kualiti Air Larian Menggunakan Sistem Saliran Bio-Ekologikal (BIOECODS), Final Year Project Thesis, Universiti Sains Malaysia, Penang, Malaysia.

Pollutant Removal Capability of An Pollutant Removal Capability of An Ecological SwaleEcological Swale

3

Pollutant Removal Capability of An Pollutant Removal Capability of An Ecological SwaleEcological Swale

Distance between 2 sections = Minimum 60 m

Downstream

Upstream

Student : Student : FakrulFakrul FahmyFahmy Bin Bin TaufiakTaufiak

Facilitator : Mr. Chang Chun Facilitator : Mr. Chang Chun KiatKiat

Flow & Sediment Characteristic of Flow & Sediment Characteristic of SungaiSungai KulimKulim

Scope of WorkScope of WorkData Collection : Cross Section, Bed Material, Flow Discharge, bData Collection : Cross Section, Bed Material, Flow Discharge, bed Loaded Load

Data Analysis : Cross Section Changes, Bed Load rating Curve, Data Analysis : Cross Section Changes, Bed Load rating Curve, Flow Rating CurveFlow Rating Curve

ReferencesReferences

2. Lee Chee Beng : Lee, C.B., (2001). Application of River Modeling (Fluvial-12): Case Study of Kulim River and Melaka River. Final Year Project Thesis, Universiti Sains

Malaysia, Penang, Malaysia.

1. Nasehir Khan : Yahaya, N.E.M., (1999). Development of Sediment Rating Curves for Rivers in Malaysia: Case Studies of Pari, Kerayong and Kulim Rivers, MSc. Thesis,

Universiti Sains Malaysia, Penang, Malaysia.

3. Koey Boon Chin : Koay, B.C., (2004). River Equilibrium : Case Study of Kulim River, Final Year Project Thesis, Universiti Sains Malaysia, Penang, Malaysia.

4

Ch 11800

Ch 3000

Ch 5980

Ch 1000

Ara Kuda

Ch 8200

On-Site River Survey13th May 2004 @ Ara Kuda

Flow & Sediment Characteristic of Flow & Sediment Characteristic of SungaiSungai KilimKilim

5

Student : Student : MahadiMahadi Bin Bin BaharudinBaharudin

Facilitator : Mr. Facilitator : Mr. ShahrulShahrul AiedeyAiedey bin Mohammedbin Mohammed

Flow Characteristic of An Ecological SwaleFlow Characteristic of An Ecological Swale

Scope of WorkScope of WorkData Collection : Flow DischargeData Collection : Flow Discharge

Data Analysis : ManningData Analysis : Manning’’s ns n

ReferenceReference1. Wong Yin Meng :

Wong, Y.M., (2004). Hydraulic Characteristic of Ecological Swale, Final Year Project Thesis, Universiti Sains Malaysia, Penang, Malaysia.

Upstream

Downstream

Flow Characteristic of An Ecological SwaleFlow Characteristic of An Ecological Swale

6

Student : Student : MohamadMohamad AnsarAnsar Bin Bin DeraniDerani

Facilitator : Mr. Facilitator : Mr. ShahrulShahrul AiedeyAiedey bin Mohammedbin Mohammed

Flow Characteristic of A Flow Characteristic of A WetpondWetpond

Scope of WorkScope of WorkData Collection : Flow Discharge at Inlet & OutletData Collection : Flow Discharge at Inlet & Outlet

Data Analysis : Peak Flow AttenuationData Analysis : Peak Flow Attenuation

OutletInlet

7

Bed Water Surface

Flow Measurement at Earth ChannelFlow Measurement at Earth Channel

Student : Student : TengkuTengku SaifulSaiful TengkuTengku ShariffShariff

Facilitator : Mr. Facilitator : Mr. ShahrulShahrul AiedeyAiedey bin Mohammedbin Mohammed

Peak Flow Attenuation Using Dry PondPeak Flow Attenuation Using Dry Pond

Scope of WorkScope of WorkData Collection : Infiltration, Water LevelData Collection : Infiltration, Water Level

Data Analysis : Infiltration Curve, Ponding TimeData Analysis : Infiltration Curve, Ponding Time

8

31 2

7

456

98

Infiltration TestInfiltration Test

(c) (b)

DP K

(a)

Dry Pond K

Ponding TimePonding Time

9

Dry Pond H(b) (c)

(a)

Ponding TimePonding Time

Dry Pond G

(a)

(c) (b)

PondingPonding TimeTime

10

Dry Pond E

(a)

(c) (b)

PondingPonding TimeTime

Dry Pond C (c) (b)

PondingPonding TimeTime

11

Student : Student : NasruddienNasruddien Bin Bin MohdMohd Nor Nor SaidiSaidiFacilitator : Mr. Facilitator : Mr. MohdMohd. . FazlyFazly YusofYusof

Infiltration Capacity @ ButterworthInfiltration Capacity @ Butterworth

Scope of WorkScope of WorkData Collection : InfiltrationData Collection : Infiltration

Data Analysis : Infiltration CurveData Analysis : Infiltration Curve

1. Izwan bin Johari :

Johari, I., (2004). Pembangunan Peta Penyusupan Bagi Zon 1/2, Butterworth, Final Year Project Thesis, University Science Malaysia,

Penang, Malaysia.

ReferenceReference

Infiltration Capacity @ ButterworthInfiltration Capacity @ Butterworth

12

Infiltration Capacity @ ButterworthInfiltration Capacity @ Butterworth

REDAC Technical StaffREDAC Technical Staff

MohamadMohamad FauziFauzi Ahmad ShahAhmad Shah

PakerPaker MohamadMohamad AbdAbd HamidHamid

RahimRahim GhazaliGhazali

ShahrulShahrul AiedeyAiedey bin Mohammedbin Mohammed

MohamadMohamad FirdausFirdaus bin bin TalibTalib

13

KemudahanKemudahan1.1. MakmalMakmal KomputerKomputer

(8.30am (8.30am ––12.00pm, 2.15pm 12.00pm, 2.15pm –– 4.30pm)4.30pm)

1.1. FotokopiFotokopi hitam/putihhitam/putih (RM 0.05 (RM 0.05 sekepingsekeping))

2.2. FotokopiFotokopi warnawarna (RM 1.00 (RM 1.00 sekepingsekeping))

3.3. PencetakPencetak hitam/putihhitam/putih (RM 0.05 (RM 0.05 sekepingsekeping))

4.4. PencetakPencetak warnawarna (RM 0.50 (RM 0.50 sekepingsekeping))

MaklumatMaklumat lanjutlanjut & & tempahantempahan ::

En. En. NasrulNasrul OsmanOsman

USM USM -- IAHR Student ChapterIAHR Student Chapter

1.1. PerlancaranPerlancaran –– RiversRivers’’04 : 2104 : 21stst Sept 2004Sept 2004

2.2. Membership Fee : F.O.C Membership Fee : F.O.C (Sponsor by REDAC)(Sponsor by REDAC)

3. 3. AktivitiAktiviti didi SungaiSungai RandukRanduk, , KolamKolam EkologiEkologi

Website : Website :

http://www1.eng.usm.my/redac/html/IAHRMSC.htmlhttp://www1.eng.usm.my/redac/html/IAHRMSC.html

14

SungaiSungai RandukRanduk