Deployment Of Intranet In Everest Industries Ltd. ITS IM, GREATER NOIDA SOUM YA DE PGDM - 2007 2009 Name: Soumya De Course: PGDM Year: 2007 2009

Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

  • Upload
    somyade

  • View
    1.823

  • Download
    1

Embed Size (px)

DESCRIPTION

This is a project on Deployment of intranet in Everest industries ltd.

Citation preview

Page 1: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

Name: Soumya De

Course: PGDM

Year: 2007 –2009

Page 2: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

S.NO

TOPICS

P.NO.

1 Preface i

2 Acknowledgement ii

3 Certificate iii

4 Executive Summary iv

5 Overview Of Everest Industries Ltd. 1

6 Overview Of The Project 2

7 A Detailed Over View Of The Organization 3

7.1 Profile 3

7.2 Vision 3

7.3 Mission 3

7.4 Background 3

7.5 Organizational Grade Structure 5

7.6 Board Members 5

7.7 Presence Of Everest In INDIA 6

7.8 Everest Growth Path 7

7.9 Zonal Offices & Production Units Map 8

710 Factories 9

7.11 Offices 9

7.12 Sales Depots 9

7.13 Production Facilities 11

8 Organization Chart For 3D Center 17

9 Product Range 18

Page 3: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

S.NO

TOPICS

P.NO.

10 About the Products 20

11 Financials 20

12 Increase In Capital 21

13 Recent Developments 21

13.1 Everest Solid Walls 21

13.2 Bhagwanpur Works, Uttarakhand 21

14 Management Discussion And Analysis Report 21

14.1 Highlights Of Performance/Events 21

14.2 Industry Structure And Development 22

14.3 Industry Outlook & Opportunities 22

14.4 Industry – Threats, Risks and Concerns 23

14.5 Costs and Profitability 24

14.6 Internal Control System & Adequacy 24

14.7 Human Resources 24

14.8 Cautionary Statement 24

14.9 Recreation For Employees 25

15

A Detailed Over View Of The Project 26

15.1 Introduction 26

15.2 Creator Of Intranet & Software used 26

15.3 Hosting & Maintenance of Intranet 27

15.4 Features Of Intranet Of Everest 27

15.5 Work Done By OLIVE GLOBAL 28

15.6 Hurdles faced & Methodologies followed to

overcome them

28

15.7 The First Presentation Of The Project 29

15.8 The changes done after getting feedback 29

15.9 The Second Presentation Of The Project 30

Page 4: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

S.NO

TOPICS

P.NO.

15.10 The Process Followed for Changes After the

Feedback of Second Presentation

31

15.11 The Methodology Followed During The Creation

Of Soft Copies

31

15.12 Creativity Used During The Project In Intranet 32

15.13 Final Official Launch 32

15.14 Presentation Done 32

15.15 Training Session 32

16 Limitations Of The System 33

17 Recommendation For Success Of The Project 34

18 Annexure 35

18.1 Annexure-1 35

18.2 Annexure-2 36

18.3 Annexure-3 37

18.4 Annexure-4 38

18.5 Annexure-5 39

18.6 Annexure-6 40

18.7 Annexure-7 ( Presentation Made ) 41

18.8 Annexure-8 (Animated Interactive Quiz Made) 73

19 Bibliography 89

Page 5: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

i

Preface

Management is the art & science of planning, directing, and controlling human efforts so that the

established objectives of an organization are accomplished in accordance with the accepted policies.

The course of PGDM enables us to go through a project work for eight weeks so as to take us closer to the practical aspects of all the theories we have been going through.

Practical training is considered to be an essential part of all professional courses and those who are aspiring for specialization in IT, practical training at the work place is essential for them.

I carried out the project work in EVEREST INDUSTRIES LIMITED for the „Deployment Of

Intranet‟. This is a web based application and database which can be accessed by all the employees at all the location just by using a login ID and password. This is a live project of Intranet. This is a very dynamic and user friendly & attractive system. Every care has been taken

so that no stone is unturned so as to make the system presentable in its first phase of launch. This report includes details of information about company profile, Intranet of Everest, process of

Intranet deployment and conclusion

Page 6: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

ii

Acknowledgement

“Life is nothing but a learning process”

“Whatever we do and achieve during the course of our limited lifetime is just not done by

our own effort but there is always some amount of hard effort contributed by other people associated with it directly or indirectly, knowingly or unknowingly.”

So I thank all those people who contributed to this project from the very beginning till its successful completion.

I thank to Mr. B. Ram Mohan VP (HR) of Everest Industries Limited for allowing me to

undertake the summer project that has certainly enriched my experience in the Head office of the

Everest Industries Limited

I also thank Mr. Sunil Kumar Sharma (Manager Administration) for his unstinted support and untiring guidance throughout the project.

In this chain I would be immensely thankful and convey my sincere gratitude to Mr. Somraj Dey (Asst. Manager, HR), Mr. U.Rastogi (V.P, I.T.), Mr.V.Hari (Manager, I.T.),

Mr.Abhishek (Server Administrator) for the enlightening guidance, constant inspiration and keen interest shown on me during the execution of the project. In addition I would also remain grateful to our esteemed teacher and guide Miss. Sunita Shukla to initiate this summer project

and give me a better scope to enhance my professional attitude and skills.

I also want to thank the employees of Finance department, Marketing department, IT and the HR department of the company for helping me in various ways, from the beginning till the completion of this project.

Page 7: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

iii

Certificate This is to certify that the entire project entitled „DEPLOYMENT OF INTRANET‟ has been

undertaken by Soumya De, under the guidance of Mr.B.R.Mohan (V.P., H.R.) Everest Industries Limited, New Delhi.

The project has been accomplished as a part of Summer Internship for the partial fulfillment of the degree of Post Graduate Diploma In Management.

Mr.B.R.Mohan Vice President

Human Resource

Page 8: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

iv

Executive Summary

This project is an attempt to Deploy Intranet for the very first time in the organization of Everest

Industries Ltd.This is a live project of Everest Industries Ltd.

The project was undertaken with the objective to make the work environment of the company paper free and also to make the environment for the employees full of fun, energy and information. This project helped me to understand the skills of management and also to realize

the core importance and responsibilities of an administrator of such kind of live project. The one of the major objective was to keep in contact with those employees who are out for marketing. This will not only help the people of Head Office to get the latest news and update, circulars,

Notice etc., however this will be also utilized sensibly at other centers as well like zonal offices, sales depot, and factories.

During the period of project I was involved in the identification of the measurable attribute such as the data which can be updated as dynamic data and the data which required to be made as

static pages. During the complete duration of the project I was always helping the development and designing team of the Olive Global (Software Development Company). I was very vigilant

during the complete process of development so as reduce the errors at the user interface which would be shown as output on the screen. I was the System Administrator so I was responsible for all the dynamic updates of „Thought of the Day‟, News, Circulars, Picture Gallery, New Joinees

etc...

This project was not an easy task. However with the help and support of our honorable Mr.B Ram Mohan ( V.P. HR), Mr.Sunil Kumar Sharma ( Manager Administration) and all the employees of Finance department, Marketing department , IT and the HR department of the

company from the beginning till the end and hence the project was successfully completed.

Page 9: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 1 -

Overview Of Everest Industries Ltd.

Everest is having the biggest and fastest growing sector of the Indian economy

Housing and industrial sector

Rural sector

Everest today understands the bottom of Indian pyramid thorough a vast all India sales and

distribution network. Millions of Indian families are sheltered by Everest Roofing. Everest has transformed from a roofing products company into an organization which offers

range of solutions for all building construction needs.

Today India is in a hurry

To build rapidly

To grow faster

To become stronger and Everest caters to that commitment

Everest today has

Sales of 303 cr. ($75m)

5 major production facilities

1100 employees

Over 3000 retail points

Fast growing export market in Europe, Africa, Australia & Asia

Page 10: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 2 -

Overview Of The Project

This project is about Deployment of Intranet with the help of a web application so that it can be accessed from any anywhere by the Everest Employee using a password and a Login ID. This organization is almost a 80 years old organization. It has seen the all the good and bad times

during its growth till this stage. Now so as to compete well in his cut throat competition we need to make the work process and environment much more comfortable in terms of work process and

methodology. So it has been decided that the organization would go for deployment of intranet so as to make the work environment paper free. Maximum information and data that needs to be known by all the employees would be uploaded on the intranet. No one will even miss a single

announcement and circular even if at that point of time that employee is not available at the office. The current trend, latest news, events etc would be uploaded on the intranet and ca n be

shared among all the employees at all different locations and zonal offices. It has few interesting features like BLOGS where the employees can upload the feedbacks, there is a list of annual holidays for all the regions, the list of birthday of different employees is also displayed for

different locations etc.

This needs to be developed in such a manner so that this can be utilized by either new joiners or summer trainees at the time of understanding the organization and its processes.

The development of the framework for the Intranet has been given to a very reputed and well known software organization OLIVEGLOBAL. All the front end and back end has been

designed by them. The system was under testing for about one month before it was handed over to Everest for final usage.

In this project my core job was to handle the data and look after the proper installation of the system. The second most important function was to take care of the proper updation of the news,

circular, notice etc. Apart from all these I was also responsible to make the employees understand what is Intranet and why is it useful?

Page 11: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 3 -

A Detailed Over View Of The Organization

Profile

Everest Industries Limited, an IS/ISO 9001:2000 company has an established presence over 74

years with 5 manufacturing plants and wide dealers/distribution network all over India. Everest Industries Limited offers a versatile and wide range of products covering Fiber cemented

products to designing, manufacturing and erection of Pre-Engineered Steel Buildings. Everest has generated enormous confidence and goodwill amongst its customers both in India and abroad for the high quality standards of its products and solutions.

Vision Everest will be the deepest penetrated housing and building solution provider to deliver strength, speed and safety to its customers in all its target markets.

Mission Our mission is to achieve a sales turnover of Rs 1,000/- crores with a net profit of Rs 100 crores by 2010-11.

Everest has launched it self in new way as Everest Steel Building Solutions. It almost one year

old. The main aim of this is to provide Strength, Speed & Safety.

Background

Everest Industries Ltd., formerly known as Eternit Everest commenced business by taking over,

as a growing concern, the erstwhile Asbestos Cement (India) at Kymore, Madhya Pradesh. The company manufactures fibre based cement products,such as sheets for roofing and interiors as well as Non Asbestos flat sheets for varied applications including pre-fab housing. The

company was the first to manufacture asbestos cement roofing sheets in India at its first factory commissioned in May '34. Its manufacturing business was progressively expanded by

establishing a second sheeting factory at Mulund, Bombay, in 1937, a third one at Calcutta in Oct.'38 and a fourth at Podanur (near Coimbatore), Tamilnadu, in Nov.'53. In Sep.'57, a another sheeting plant was installed at the Kymore factory. Plants to manufacture pipes were added

between 1938 and 1963.

Page 12: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 4 -

Its "Everest" brand enjoys huge brand equity. Besides roofing, the company has introduced a range of new generation products called E-Board Classic for varied applications in interiors.

In 1988-89, Turner & Newall International, UK, sold its stake in the company to Eteroutremer, Belgium, the holding company of the Eternit group, Belgium. It obtained central government

approval to shift part of the production capacity of the Mulund works to Nasik and to shift the balance capacity within one year from the date of commissioning of the

factory at Nasik.

The company is venturing into non-asbestos-based roofing and paneling products. In addition to the fire-resistant boards being developed with the active assistance of the Etex group, the company has also initiated the introduction of passive fire protection systems with technical

support from an Etex group company. It has obtained ISO-9002 and ISO 14001 certification for its Podanur works.

The Etex Group, through its subsidiary Nefibouw BV of Netherlands acquired during 2000-2001, 0.54% of equity shares from the open market to take the Group's stake to 50%.

In Feb. 2002 Associated Cement Companies, has acquired 74,00,010 equity shares (constituting

50% of the total equity capital) by Inter se transfer between promoters. Total shareholding of voting rights after this acquisition comes to 1,12,50,030 equity shares (constituting 76.01 % of the total equity capital of the company). The company is Modernizing its Podanur, Kymore and

Kolkata works and the these projects have been completed. The company has expanded the increased capacity of Fiber Cement/Asbestos Cement products

during the financial year 2002-03 by 72000 MT and with this expansion; the total capacity has risen to 360000 MT.

ACC is holding 76.01% stake in Everest Industries as on 31.03.2004.

Adani Port Infrastructure Ltd and Accurate Finstock Pvt Ltd have announced an open offer to acquire 20% stake in Everest Industries during April 2004.The open offer follows the agreement

entered into by Swiss based Holcim which has signed a pact with Adani Ports to offload ACC's present stake of 76.01% in Everest Industries.

Page 13: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 5 -

Organizational Grade Structure

Top Management

TM-3 PRESIDENT

TM-2 SR.VICE PRESIDENT

TM-1 VICE PRESIDENT

Middle Management

E-5 GENERAL MANAGER

E-4 DY.GENERAL MANAGER

E-3 MANAGER

E-2 DY.MANAGER

E-1 ASST.MANAGER

General Grades

M-3 SR.OFFICER

M-2 OFFICER

M-1 JR.OFFICER

M ASST. OFFICER

Board Members

Particulars Designation Category Qualifications Functional areas

M. L. Gupta Managing

Director Executive B. Tech (Hons) Technical / General Management

Manish Sanghi Whole time

Director Executive Director

B.E. (Mech.), PGDM

(IIM) General Management

A. V. Somani Director Promoter Director M.Com, MBA Business Management

Sandeep

Junnarkar Director

Professional

Independent LLB, So licitor

Banking, Corporate, Exchange

Control & Securities Laws

Mohanlal

Bhandari Director

Professional

Independent B.Com, FCA Finance, Accounts & Taxation

Y.S.Rao Executive

Director Executive Director

B.Sc (Engg)

Mechanical

Manufacturing Operation General

Management

M.L.Narula Director Professional

Independent B.Sc (Elect) General Management

Page 14: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 6 -

Presence Of Everest In INDIA

Page 15: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 7 -

Everest Growth Path

Everest Industries has grown with a steady rate over the years. It has been earning profits as shown in the graph. Now it has much higher targets to achieve so as to grow in an enormous rate. Also to spread business in across the globe.

Turnover (US$ Million)

15.0

25.0

35.0

45.0

55.0

65.0

75.0

Turnover 30.3 37.3 44.3 50.5 56.6 67.8

2001-

2002

2002-

2003

2003-

2004

2004-

2005

2005-

2006

2006-

2007 (Est)

Page 16: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 8 -

Zonal Offices & Production Units

Page 17: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 9 -

Factories The major factories are located at Kolkata , Nasik , Bhagwanpur , Kymore , Podanur.

Offices The major offices are located at New Delhi ( Head office), Ahmadabad, Jabalpur, Kolkata,

Nasik, Mumbai, Bangalore, Chennai, Coimbatore, Cochin.

Sales Depots The major Sales Depots are located at Chandigarh, Delhi, Faridabad, Kanpur, Kota, Allahabad,

Patna, Guwahati, Indore, Ranchi, Burdwan, Jamshedpur, Kharajpur, Valsad, Raipur, Rourkela, Kolkata, Balasore, Cuttack, Hubli, Nellore, Mangalore, Bangalore, Chennai, Palakkad, Cochin

and Madurai. 1.Central Zone

Kymore Depot

Allahabad Depot

Allahabad Darwaza Depot

Kymore Depot

Indore Depot

Kanpur Depot

Kota Depot

Varanasi Depot

Bilaspur Depot

2.South Zone

Podanur Depot

Banglore Depot

Nellore Depot

Chennai Depot

Palghat Depot

Hubli Depot

Coinbatore Depot

Page 18: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 10 -

Madurai Depot

Manglore Depot

Cochin Depot

3.East Zone

Guahati Depot

Patna Depot

Ranchi Depot

Burdwan Depot

Balasore Depot

Rourkela Depot

Kharagpur Depot

Jamshedpur Depot

Barrackpore Depot

4. West Zone

Hariala Depot

Valsad Depot

Kolhapur Depot

Bhiwandi Depot

Lakhmapur depot

5.North Zone

Roorkee Depot

Merrut Depot

Chandigarh Depot

Rajpura Depot

Jaipur Depot

Faridabad Depot

Karnal Depot

Delhi Depot

All the above mentioned locations of Factories, Offices and Sales Depots are clearly

shown in the above map.

Page 19: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 11 -

Production Facilities The production facilities are present at five major location viz. Bhagwanpur, Kymore, Kolkata, Nasik and Podanur.

Bhagwanpur The Greenfield project started in June 2006 at Bhagwanpur Works, Roorkee is near its

completion. The BW will cater to market demand of Everest products in the North and Central India. The Flat boards line at BW started trial production in March’07 and the production is

being stabilized. The AC Roofing Line equipment trial runs are on and trial production is expected to start in the month of July,07 and stabilize fully by December,07.Trial production of Solid Wall Panels is expected to start at BW during the month of July, 2007. The first machine

for producing Light Grade structural Frames (LGSF) was put into operations in May’07. First lot of LGSF product from the machine is used for BW Canteen, Production Office, security office

and LGSF machine shed itself.

Products

Flat Boards

Chrysotile Asbestos Cement Corrugated (CBS) roofing sheets

Other Moulded Goods (Accessories)

Solid Wall Panels

Light Grade structural Frames (LGSF)

Initiatives

Development of Green Belt

Rain Water Harvesting

Effluent Treatment Plant for 100% recycling of process effluents

Energy Conservation

Welfare and social activities

Occupational Health centre

Canteen for employees/workmen

Everest Ladies Club, Roorkee

Community Development

Trained for self employment for under privileged women- Tailoring and

embroidering

provided tree guards

Page 20: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 12 -

Kymore Established in 1934, in Katni, Madhya Pradesh is the first plant in India that was setup to manufacture Fiber-Cement Roofing Sheets & Accessories.At Kymore Works great emphasis is

on Safety, Health & Environment to ensure high level of safety environment at workplace. KW has been honoured by State Level Award as the first and only unit in M.P. among similar

manufacturers to have been awarded by the Government of Madhya Pradesh for excellence in the fields of Safety, Health & Environment.

Over the years, despite of being of the oldest unit, continues to improve and flourish with highest levels of performance in its various operations.

Products

Asbestos Cement Corrugated (CBS) roofing sheets

Other Moulded Goods (Accessories)

Certification

QMS: IS/ISO-9001:2000 and EMS-IS/ISO 14001

Initiatives

Afforestation and development of Green Belt

Rain Water Harvesting

Treatment of Domestic Effluent in an oxidation pond.

Effluent Treatment Plant for 100% recycling of process effluents

Energy Conservation

Welfare and social activities

Integrated township for employees and workmen.

Occupational Health centre

Canteen for employees/workmen

Recreation/cultural club (Everest Club, Kymore)

Everest Middle School – open to public residing in the vicinity of Kymore

Computer Learning Centre – open for wards of employees and general public.

Everest Ladies Club, Kymore – actively works for the benefit of weaker sections,

ladies and general public staying in the vicinity of Kymore

Page 21: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 13 -

Kolkata Established in 1938, in Calcutta now known as Kolkata is the second plant of Everest that was setup to manufacture Fiber-Cement Roofing Sheets & Accessories. At Calcutta Works is spread

in 7 acres of land at Taratolla Road and during it existence for over 70 years great emphasis is on Safety, Health & Environment to ensure high level of safety environment at workplace. Over the

years, despite of being of the oldest unit, continues to improve and flourish with highest levels of performance in its various operations.

Products

Asbestos Cement Corrugated (CBS) roofing sheets

Other Moulded Goods (Accessories)

Certification

QMS: IS/ISO-9001:2000 and EMS-IS/ISO 14001

Initiatives

Developed of Green Belt

Rain Water Harvesting

Effluent Treatment Plant for 100% recycling of process effluents

Energy Conservation

Welfare and social activities

Integrated township for employees

Occupational Health centre

Canteen for employees/workmen

Recreation/cultural club (Everest Club, Kolkata)

Everest Ladies Club, Kolkata

Page 22: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 14 -

Nasik

Lakhmapur Works established in the year 1994-95, is about 35 kms. away from holy city of Nashik. LW has advanced manufacturing facility for manufacturing AC Corrugated roofing

sheets, Flat Boards, Compressed Boards, and Solid Wall Panels. LW was the first unit to manufacture Non-asbestos roofing sheet and Flat boards in India.

Products

Asbestos Cement Corrugated Roofing sheets

Other Moulded Goods (Accessories)

Non-Asbestos Flat Boards

Compressed Boards (Endura), Colour Compressed Boards

Solid Wall Panels

Certification

IS/ISO 9001:2000

Development of Green Belt

Rain Water Harvesting

Effluent Treatment Plant for 100% recycling of process effluents

Sewage Treatment Plant for treatment of Canteen wastes / Domestics waste

Energy Conservation

Vermiculture Plant

Initiatives

Development of Green Belt

Rain Water Harvesting

Effluent Treatment Plant for 100% recycling of process effluents

Sewage Treatment Plant for treatment of Canteen wastes / Domestics waste

Energy Conservation

Vermiculture Plant

Page 23: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 15 -

Welfare and social activities

Integrated township for employees

Club House

Occupational Health centre

Canteen for employees/workmen

Everest Ladies Club, Lakhmapur

Podanur

Podanur Works established in the year 1953 is about 10 kms. away from south Indian industrial town of Coimbatore and is well connected by road and rail. PW commenced production in 1953 with manual corrugation of AC sheets and Other Moulded Goods, and over the years, it

gradually transformed itself into a modernized plant, with vacuum corrugation. Today, PW had two lines for manufacturing AC Corrugated roofing sheets of CBS & CTS profiles, and Non-

Asbestos Roofing (Hi-tech) sheets and OMG Accessories. The Hi- tech Products are manufactured adapting the HIPP technology (High Impact Polypropylene) with its unique feature of inherent flexibility and ensures safety for the roofers.

Products

Asbestos Cement Roofing sheets – CBS and CTS profiles

Non-Asbestos Roofing (Hi-tech) sheets - Terracoata Red, Tropical Green & Ivory

White Shades.

Other Moulded Goods (Accessories)

Certification

IS/ISO 9001:2000

IS/ISO 14001:2004

Initiatives

Development of Green Belt

Rain Water Harvesting

Effluent Treatment Plant for 100% recycling of process effluents

Energy Conservation

Page 24: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 16 -

Welfare and social activities

Integrated township for employees & workmen

Recreation centre

Occupational Health centre

Canteen for employees/workmen

Everest Ladies Club, Podanur

Page 25: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 17 -

Page 26: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 18 -

Product Range

Everest has a very wide variety of product range.

Page 27: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 19 -

Everest follows a solution approach where various products and services are integrated to meet customer’s need. Everest offers a complete range of building solutions. These building solutions are:-

Everest Roofing Solution.

Everest Ceiling Solution.

Everest wall Solution.

Everest Floor Solution.

Everest Cladding Solution.

Everest Door. Now currently Everest is also entering in Pre-Engineering Steel Buildings & Smart-Steel

Building for industrial, commercial & residential sector.

Everest offers a very wide range of fiber cement products covering both roof as well as boards. Its product range has gained a wide acceptance in Asia, Africa, South Pacific & Europe.

Everest provides following building accessories:- Roof Curbs.

Adjustable/ Fixed Louvers.

Translucent Panels.

Gravity Ventilators.

Day Lighting Panels.

Turbo Ventilators.

Everest has two main solution providing business:-

Pre – Engineering Building Solution ( PEB )

It is the fastest system of industrial construction. There are several applications of Pre-Engineering Building (PEB). The main applications of PEB are:

Factory Buildings

Institutional Buildings

Recreational Facilities

Agricultural Storage

Commercial Spaces

Warehouses

Military Building & Aviation Hangers

Page 28: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 20 -

Smart Steel Building Solution.

It is 100% customized steel buildings. The main applications are:-

Commercial & Office Buildings.

Industrial Utility Buildings.

Site Offices & Residences.

Farm Houses

Restaurants

Automobile Showrooms

About the Products

Everest fiber cement corrugated roofing sheets and accessories are used for factories, power

plants, railway platforms, houses etc. The multipurpose cement boards are used as false ceilings, dry wall partitions and internal linings in residential, commercial and industrial sectors. Everest Hi-Tech is a non-asbestos, corrugated modern roofing system made in collaboration with Saint

Gobain. E-Board Classic is used as paneling, partitioning, false ceiling, cabinets, cupboards and doors. Acostyle provides better interiors in commercial establishments, and Rapicon provides

walling solutions for internal and external walls and prefabhousing. The compressed fiber cement board plant is imported from Dansk Eternit, Denmark under a

technology transfer agreement, and the company has an agreement with Dansk Eternit, Denmark for obtaining the hydrofobating technology required for surface treatment of compressed boards.

Everest Industries is entering into the business of design, manufacturing, supply and erection of pre-engineered steel buildings.

Financials

Everest Industries registered a steep drop of 27.42% in net profits of Rs 53.20 million for the quarter ended June 2007 from a profit of Rs 73.30 million for the quarter ended June 2006. Net Sales declined 0.19% to Rs 801.60 million for the quarter ended June 2007 from Rs 803.10

million for the quarter ended June 2006.Total income rose 0.41% to Rs 810.4 million for the quarter ended June 2007, from Rs 807.1 million for the quarter ended June 2006.The earnings

per share (EPS) of the company stood at Rs 3.59 in the quarter ended June 2007 .

Page 29: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 21 -

Increase In Capital

During the year under review, the Authorized Share Capital of the Company was increased to

Rs. 17,00,00,000/- (Rupees Seventeen Crores) from Rs.15, 00,00,000/- (Rupees Fifteen Crores) to provide for the future requirements of ESOS schemes and business funding, as and when necessary

Recent Developments

1.Everest Solid Walls:

The Company has already commissioned manufacturing facilities of Rapicon Panels at Lakhmapur Works with an initial capacity of 12,000 units per year. The product is mainly

applied as dry wall partitions in commercial establishments, mezzanine flooring and industrial sheds with cladding and pre-fabricated structures.

2.Bhagwanpur Works, Uttarakhand:

The Company has already completed in record time the erection of its new multi-manufacturing facility at Bhagwanpur (near Roorkee), to manufacture Roofing Sheets, Boards, Light Gauge Steel Frames and Rapicon Panels. The trial runs are being conducted. With this plant in

Northern India, the Company now has complete national coverage

Management Discussion And Analysis Report

1.Highlights Of Performance/Events

Sales volume up by 9 %.

Profit before tax & exceptional income at Rs. 3385.31 lakhs during the year ended 31st

March, 2006 as against Rs. 2895.33 lakhs during the previous financial year ended 31st March, 2005.

Fibre cement export turnover of Rs.499 lakhs as against Rs.203 lakhs of previous

financial year ended 31st March, 2005.

Successful commissioning of Compressed board plant under the Technology know-how

Agreement with M/s. Dansk Eternit, Denmark.

New line for manufacturing roofing sheets with Polypropylene fibres at Podanur Works.

Dividend of 70%( Interim 40%).

Page 30: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 22 -

2.Industry Structure And Development

Everest Industries Limited pioneered fibre Cement Roofing Industry in India by establishing its

first plant in the country in 1934 at Kymore, MP. During 2005-06, the industry reached a market size of 2.35 million MT with a CAGR of growth of 17.1% in the last 3 years. The industry

recorded a significant growth of 17.8% during 2005-06 in comparison with 16% growth it witnessed in the same period in the previous year. The market share of the Company stood at 15%. This high industry growth has resulted in many new players entering into the market. The

industry is witnessing an unprecedented capacity build up with very large capacities being set up in North and West India.

3.Industry Outlook & Opportunities

Roofing :-

The Fibre cement industry is an important constituent of economic development of the country and has unique place in construction and building material sector due to two reasons:

The fiber cement roof is commonly used in villages and small towns for houses and

cattle sheds, godowns, shops, workshops etc. Industrial houses for their industrial sheds & go-downs also extensively use it.

Fiber cement industry uses substantial amount of fly ash as raw material in its products

keeping the environment clean.

India is growing at a GDP of 8%. This high growth is reflected in all the sectors of the economy namely the manufacturing sector, service sector as well as the agriculture sector. The government is putting special focus on the rural economy and this is expected to give a boost to

the use of Fiber cement roofs.

The industrial sector is witnessing high growth with capacities getting increased through expansions/diversifications and up new Greenfield units. The growth of fiber cement roofing industry depends on prosperity of rural/industrial sector. Both these sectors have seen healthy

growth in last 2 years. This is reflected in fiber cement roofing industry, as it saw a significant growth of around 17.8 % in year 2005-06 in comparison with previous year.

Page 31: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 23 -

The growth was particularly high in states like Uttar Pradesh, Gujarat, Maharashtra, West Bengal, Tamil Nadu. Good monsoon continues to remain crucial factor for agriculture as well as for Industry, as it brings higher agriculture productivity and thus the rural masses having higher

disposable income can graduate to fiber cement roofs from thatch roofs. Steel will continue to remain its major competitor and any upward revision in steel prices will bring increased demand

to this Industry. Boards :-

Fiber cement boards are typically used for false ceilings, partitions, paneling and prefabricated

structures. There is a major growth in each of these applications with the growth of the economy. The users are increasingly finding that the fiber cement boards are far better substitutes in terms of resistance to moisture, fire and termites. There is also an increasing need for faster and cleaner

construction, which can be done using the fiber cement boards.

4.Industry – Threats, Risks and Concerns The growth in the industry has resulted in many new players entering in this already competitive

market. Any new additions in the capacity either by existing players or through new entrants will always remain prime concern.

Increase in input costs like the cost of cement, asbestos fiber, fuel etc is a major concern for the industry.

The malafide campaign against asbestos from certain sectors has given totally erroneous information to the general public and decision makers. This has so far not affected the sales of the industry. The industry association Asbestos Cement Products Manufacturers Association

(ACPMA) continues with its initiative to counter the malafide anti asbestos campaign and successfully managed to make the general public and key decision makers aware that there was

no risks associated with the use of asbestos to manufacture of fiber cement products, when all necessary precautions are taken.

Risk Management :-

In accordance with the Clause 49 of the Listing Agreements with Stock Exchanges, the Company has already appointed Risk consultant to assist the Company to lay down procedures/system for speedier assessment of risk, information to Board of Directors and steps to

mitigate/ minimize the risk.

Page 32: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 24 -

5.Costs and Profitability The Company is always committed to reduce its costs through better negotiation with its raw

material suppliers, transporters and increase its profitability by de-bottlenecking, efficient use of plant and machinery resulting in better yield, scrapping unwanted depots, concentration on

markets with low freight, increased productivity and reduction on overheads.

6.Internal Control System & Adequacy

The Company's internal control system has always been adequate to ensure that all its assets are safeguarded and protected against loss from unauthorized use and disposition. It has evolved financial reporting on monthly basis for all its 4 factories as independent profit centres. These

systems and measures are constantly checked by the Internal Auditors of the Company, on the basis of an approved Audit plan of the Audit Committee. The Audit Reports are placed before

the Audit Committee, on quarterly basis, who after reviewing the same ensures that Audit findings are complied with by the management. The management at the subsequent meetings by

way of an Action Taken Reports tables the compliances. All observations made by the Audit Committee are duly considered and acted upon by the management of the Company.

7.Human Resources

Industrial Relations at all manufacturing units of the Company have been normal and peaceful. The Company as on 31st March 2006 had 874 permanent employees.

8.Cautionary Statement

Statements in the Management Discussion and Analysis Report describing the current industry

structure, outlook & opportunities reflect the Company's assessment and perception of the situation. It may differ materially depending on the environmental regulations stipulated globally

and also the changes in government regulations, policies and other related factors.

Page 33: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 25 -

9.Recreation For Employees

Everest takes care of their employee recreation from time to time by taking them out for movies, picnic, arranging matches like cricket, arranging events like Kavi Sammelan etc.

Few of the recent events and programs are like The cricket match was held on 15th Nivember’2007, Picnic was held on 3rd February’2008 and Kavi Sammelan was held on 13th

April’2008.

Page 34: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 26 -

A Detailed Over View Of The Project

Introduction This project is all about making a web based application so as to reduce the paper work or else

we can say that this project was implemented to make a paper free environment to work. The motive was to create transparency between different departments and employees. A lot of data is

such which each and every Everest employee should know and also has the right to know. This application was made web based so that the data can be accessed by all the employees not only from the head office but also from the other location of Zonal Offices, Factories and Sales

Depots. The idea was to support those employees as well who can not visit or get in touch with the head office frequently. Apart from all these we wanted to use the same for interacting with all

the employees, also allowing them to share data and feedback on line. After this idea was frozen, we contacted a software development organization OLIVE GLOBAL

for developing our INTRANET.A meeting was organized in which all the people who were involved in this project were present. The project members from Everest were mainly our

honorable Mr. B.Ram.Mohan (V.P. Human Resource), Mr. Sunil Kumar Sharma (Manager Administration) and myself. The point of contact from Olive was Mr.Chetan Sharma (Account Manager).After the meeting this project was handed over to me so that I can co-ordinate with

Mr.Chetan and do the needful so as to successfully deploy the Intranet.

Before actually starting the project I made a presentation on Intranet to the higher management of Everest so as to facilitate to make the employee understand the difference between Internet and Intranet. For this I visited few different organizations for getting the details of their intranet.

The organization where I visited were CSC at Noida, GE MONEY at Gurgaon, ALSTOM at Gurgaon.From all the organization I got an overview of Intranet so that I can apply the relevant

details in my project of deployment of Intranet and to make it success.

Creator Of Intranet & Software used The creator of Intranet is the Olive people who have put in all the effort for designing the front

end using ASP and the database for storing the online data has been created using SQL.The server is also a SQL based server. The static pages has been created using ASP and also the front end the screen which would be used by the users has been designed using ASP.

Page 35: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 27 -

Hosting & Maintenance of Intranet The hosting of intranet has been done in the server of Olive since there was no web base SQL

server available with Everest. On top of all procurement of new web based server was too expensive. So it was decided that we will be hosting our intranet on the server of Olive and allow

them to do the maintenance at a nominal annual fee for both the services of hosting and maintenance.

Features Of Intranet Of Everest

The most attractive feature of our Intranet is that it can be accessed from any where, any time just by logging in to the system via internet using a Login ID & Password. Each and every employee of Everest would be provided with a unique Login ID and Password. There are many

sections in Intranet as below:-

About Us which would contain a lot many sub menu viz. Company Profile , Production Facilities, Board Of Directors, Network, Contact

Human Resource which would contain a lot many sub menu viz. Code Of Conduct, Organizational Grade Structure, HR Value Addition, HRD, Policy, Benifites, Loan Rules, Leave

Rules, General Information Marketing which would contain a lot many sub menu viz. Ceiling Solution, Wall Boards,

Designer Wall Boards, Heavy Duty Wall Boards, Roofing System, Roof Light, Exports, Additional Informations, Solid Wall Panels, Hi- tech Leaflet – Advantage Everest Hi-tech, Hi-tech Leaflet – The Ultimate Choice, Final Filter

Financial which would contain a lot many sub menu viz. Balance Sheet, Profit Loss, Report

Ended 31.3.2008, Corporate Governance Report Educational which would contain a sub menu viz.Time Management

Event which would contain a lot many sub menu viz. Media Coverage & Current Events

Quick Links which would contain a lot many sub menu viz.Team Members, Extension List, Office Circulars, Holiday Calendar, Picture Gallery, Birth Days & Anniversaries, New Team

Members, Current Openings, Notice Board, Newsletter, Feedback & Suggestion, Helpdesk

Helpdesk would contain a sub menu viz. Helpdesk;

Page 36: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 28 -

Work Done By OLIVE GLOBAL

OLIVE people was to create a basic structure of Intranet that was decided and given during their

proposal and do some of the modification that may be asked by Everest after the system would be handed over to us.

Now the main work of mine comes in to play. Here I was the concerned person from Everest who was supposed to check the basic structure and also to provide the data of Everest in the form

of soft copy so that they can upload all the data on to the server. The soft copy was provided so that their static pages for intranet can be created from them for Intranet. Also the soft copy of

complete database has been given so that it can be uploaded once in to the database for the first time.

The role of Olive would become much clearer as and when I would be explaining the flow of my work in the following sections. The proper co-ordination between us and the support we

provided to each other that made this project a success would become clear. In the following sections I would be explaining the hurdles and difficulties that I had faced

during the creation of database in soft copy and other soft copy for making static pages. The methodologies that I had followed so as to overcome these hurdles and to attain success.

Hurdles faced & Methodologies followed to overcome them

During the creation of soft copies of the complete database of the employees for the database of the Intranet I met and coordinated with all the employees of different departments so as to collect

valid and authenticated data. During this process I got data all in excel sheet and in different formats and in different units. Now my biggest challenge was to set all the data in a similar format and in the same unit so that it can be used to create proper and authenticated database.

Now the database do not only mean the names and address however it comprises of a lot many

data which has to be 100% correct like the name and designation, department and many more. In the beginning the biggest challenge was to consolidate all the data in one excel sheet from different excel sheets that were provide to me by different concerned persons. There were major

concerns like many names were written in different formats in different excel sheets. An example to the problem faced the name Sunil Kumar Sharma can be written as Sunil Kumar

Sharma, Sunil Kr. Sharma and Sunil K. Sharma. Now if I need to collect data from three different sheets having the name in three different styles as mentioned above then it becomes difficult for me to understand that what is the corresponding data for each name. Now if for

example the data is scattered over three different excel file for Date Of Joining, Birth Days,

Page 37: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 29 -

department then the chances of misinterpreting the data becomes very high, inspite of that I

worked on the files and have harmonized the data of individuals in to a single file.

The other major issue was that all the data of all the employees were not available like the Date of Anniversaries. This was creating trouble for uploading the data in intranet since many people were resisting for giving the data. Inspite of this resistance I tried my best and collected as many

data as possible for updating.

The lists of holidays were all region specific. So I was only able to update and view the list of holidays for Delhi Head Office. For this issue I approached the Olive development team and asked them to do a modification so that list of holidays can be seen region wise.

There is a facility of updating pictures in the Picture Gallery. However this feature could not be

fully utilized because of the limitation of space. In the beginning this issue was understood to be the outcome of uploading the picture in a wrong manner. However this was discovered at a later stage that the space provided was too less. So as to resolve this issue I got in touch with the Olive

people and made them increase the space.

The First Presentation Of The Project

After all the soft copies of the data base were made as per the different modules, the time came

when these data were supposed to be uploaded in to the system. This was the day when I sat with the Olive people till 11.30 at night in the office and worked with them so as to help them for the

uploading of the data in the system. This was the day when the system was made fully functional also presentable to the Directors. The next day the system was presented in front of the Directors and there was a mixed reaction and feedback. The feedbacks were regarding the suggested

changes in the outlook of the intranet.

The changes done after getting feedback

After the presentation of the Intranet in front of the higher management I made a strategy and

started working accordingly. Now my work on the recreation of the structure of intranet as per the feedback and guidance of

the Board Directors, started with the help of Olive Development and Design team. Few of the major changes that were suggested by them were the first screen was supposed to be made more

colorful. The ‘Thought of the Day’ was not to be shown in all the screens. The Login Screen was to be made much more colorful. The display of Anniversaries was needed to be removed from the display. Even there was an observation that the lists of holidays were displayed in an

inappropriate manner and the same was to be changed. The dynamic facilities are not being

Page 38: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 30 -

utilized currently so I was asked to help the Olive to make few static pages so that the information can at least be put on the Intranet as static pages. I noted all the points discussed and planned for the implementation of the suggested changes and put the system in to function as

soon as possible.

This was a phase when I was supposed to handle the process and do the required updates and make the system as per the suggestion of the higher authority. During this period I updated all the dynamic data in to the system like the pictures in the gallery, circulars, notice board, News,

New Joinees, names and other information in the data base etc.

Few of the changes which were possible from my end they were done. These changes mainly include all the data of dynamic nature. However the changes in the data and the structure were supposed to be done by the Olive development team. For this job I drafted an official letter

signed by Mr. B.Ram.Mohan and approached Mr.Chatan Sharma for the changes. I got a commitment from him that the job would be done as soon as possible. The developer and the

designer started working on this project. In the beginning they did not require any help from my side so I only visited Olive to see the process of development of the project. After some time I decided to help them out so as to complete the project before the given dead line. I used to create

all the soft copies for the creation of static pages to help them. I also helped them in designing the flow of the navigation for different tabs on the home page.

The Second Presentation Of The Project

After the changes were made the same was shown to Mr.B.Ram.Mohan. With few of the changes made he was happy however a lot many changes were yet expected to be done. The

major changes which were expected to be done - the ‘Thought of the Day’ was to be brought at the home page. The second screen was to contain all the links and the click on the link should take the screen to the login screen so as to pursue the user to login in to the system. After

logining in to the system there were information displayed in the form of boxes, the size of the boxes were to be reduced since it was necessary to scroll for some time to view the complete

screen which apparently was an unpleasant experience for the users and hence it was felt that the user may lose interest in the usage of the system. There was a display of ‘Thought Of The Day’ on all the screens which was not required so it was to be removed from all the screens. This also

lead to wasting a lot of space and necessitated avoidable scrolling of the screen and because of this the user may lose interest.

These necessary changes were few of the new challenges for me to bring the system to the expectation of the users.

Page 39: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 31 -

The Process Followed for Changes After the Feedback of Second Presentation

After getting the feed backs in the second presentation I was expected to get the work done from

the Olive since the changes were to be made by the developer and the designing team. This process required a lot of coding and use of web designing tool. So I contacted Mr.Chetan Sharma

for these updates. After talking to him we fixed up the time for a meeting so that I could explain to him what all were still required and what all still needed to be done so as to complete the first phase of the project. During this meeting I obtained a commitment from Mr.Chetan that all the

changes would be made and I would be able to show the system to the higher authority for complete deployment up to their complete satisfaction latest by last week of June.

The Methodology Followed During The Creation Of Soft Copies

Till now I have been discussing, what has been done during the complete flow of the project. However now I would like to explain the unexpected troubles faced by me. I would be

supporting the same with annexure attached at the end.

Before actually making the system live it was necessary to feed the basic data in to the system

which was provided to me in the form of excel sheets. In the database there were many fields which were made compulsory to create an ‘Employee’ in the database. For this I collected the

data from different departments. For example I got the Joining Dates from one department, Employee code and date of birth from HR., all the mailing ID’s from IT and so on and so forth. It was not easy to get all the data just by making one visit to the concerned person. It took me

days to collect data from all different sources. It was possible to complete this process in a relatively short period of time because of unstinted support from Mr.B.Ram.Mohan & Mr. Sunil Kumar Sharma.

Even after getting all the data in soft and in different excel sheets it was not an easy task to

collate all the data in one excel sheet. The demo of all the excel sheets are given as annexures (annexure -1, annexure-2, annexure-3, annexure-4, annexure-5, annexure-6) at the end. Not only that, many data was given in the form of PDF files and presentations, using that I created soft

copies for making static pages on Intranet. Even many data was in the form of scanned copy for example the address of zonal offices and factories. After getting all the data in various forms I

worked on all the various forms of data and tried converting them in to a single form on Excel or in MS Word. These conversions of data in these formats helped me and the Olive development team to make proper static pages for intranet. Even the same data has been used for updating the

dynamic fields in the intranet for example the area of ‘Adding Employees’ has been filled using these data collected by me, new openings in Everest , list of new joinees etc.

Page 40: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 32 -

Creativity Used During The Project In Intranet I have tried using my creativity in the project so as to make it look more attractive and beautiful.

I got scope of showing my creativity in the area of entering the dynamic data like display of ‘Thought Of The Day’, News Items, Events, New Joinees, Picture Gallery etc…

One of the most interesting and attractive option that I was able to provide the users was an online quiz for competition based on which we can do lucky draw and give prize to the winner.

This quiz has been designed and made by me using software known as Question Writer-3. The best feature of this exercise was that all the reports were automatically mailed to my Mailing I.D.

so that those reports can be used to judge the winner of the Quiz. This can be made a regular feature. By doing this I was able to attract people and make the use intranet. By doing this I was also able to make it popular among our employees. To support this I am adding annexure-8 at the

end.

In these areas I can use my own imagination for color combination and display so as to make the system look more attractive. Since I had the administrative rights of the Intranet I was responsible for the data and its regular updation.

Final Official Launch After all the workings the system was finally launched and was opened completely for the

employees to use and give feedback.

Presentation Done

After the launch of Intranet a presentation has been done so as to make the employees understand

the difference between Internet and Intranet. Also the motive of the presentation was to increase the interest of the employees in the usage of Intranet. The presentation that has been presented has been attached as an annexure.

Training Session I being the administrator and one of the core team member during the development of the system it was also my responsibility to train the people about the usage of the system. For this I was

advised to make a schedule and take training sessions at all the zonal offices including the head office.

Page 41: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 33 -

Limitations Of The System The Intranet Deployed has a lot of limitation till date and it can be upgraded slowly as and when

required. This would be a never ending process. The project what has been done is only its first phase. After the first phase the system needs to be used for a considerable period of time so that

we can get proper feedbacks and more data to be uploaded from different employees & department.

All the feedbacks and data can be utilized for updating the system in the second phase of the project. Even during this period of time the employees would become used to the system and

would enjoy using the same.

Page 42: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 34 -

Recommendation For Success Of The Project All the employees should use the system and know its advantages. There should be proper

schedule for training and presentations so as to propagate the idea and to increase its usage. The success of the project depends on the usage of the system, adding value and updates by the

employees, given good inputs in the system by the employees, etc. Above all there should be a dedicated administrator for the system so as to maintain the flow of

data and updation of all the dynamic record of the Intranet.

Page 43: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 35 -

Annexture-1

Emp Code Joining Date Cities 37331 24/08/1994 KOLKATA

90198 11/7/2007 KOLKATA

37344 17/4/2006 KOLKATA

90239 19/12/2007 KOLKATA

90182 24/9/2007 KOLKATA

90127 30/08/2004 KOLKATA

90215 15/11/2007 BHAGWANPUR

51097 18/4/2006 BHAGWANPUR

90272 25/6/2007 BHAGWANPUR

419 9/1/2006 BHAGWANPUR

90218 26/11/2007 BHAGWANPUR

90221 26/11/2007 BHAGWANPUR

90268 17/1/2008 BHAGWANPUR

19148 26/2/1991 KYMORE

19101 6/2/1976 KYMORE

19113 29/11/1976 KYMORE

10788 15/06/2004 KYMORE

19112 2/1/1972 KYMORE

19130 9/6/2006 KYMORE

51101 6/8/2006 LAKHMAPUR

51115 1/10/2007 LAKHMAPUR

51105 17/7/2006 LAKHMAPUR

56091 12/11/1977 LAKHMAPUR

90180 17/9/2007 LAKHMAPUR

51111 7/1/2006 LAKHMAPUR

30 28/6/2006 LAKHMAPUR

51091 1/2/2006 LAKHMAPUR

51095 3/1/2006 MUMBAI

51094 14/2/2006 MUMBAI

51110 15/11/2006 MUMBAI

90196 1/11/2007 MUMBAI

425 16/3/2006 NEW DELHI

417 4/9/2006 NEW DELHI

415 4/6/1997 NEW DELHI

411 10/12/2005 NEW DELHI

409 19/7/2006 NEW DELHI

418 4/9/2006 NEW DELHI

11011 2/5/2007 PODANUR

10766 15/4/2002 PODANUR

Page 44: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 36 -

Annexture-2

Name E-mail Address

Business

State Job Title

SACHIN CHATURVEDI [email protected] Agra Officer (Marketing)

D. FERNANDES [email protected] Ahmedabad Manager (marketing)

TUSHAR MOHAN [email protected] Ahmedabad Asst Manger (Mktg)

VINOBHA MEHRCHANDANI [email protected] Ahmedabad Dy Manager (Mktg)

AVISHEK DHARA [email protected] Bagwanpur Sr. Officer Stores

B SESHA RAO [email protected] Bagwanpur

Vice President -

Bagwanpur

BADRI PRASHAD VERMA [email protected] Bagwanpur

Dy. Manager (Mainetenance)

DEEPPAK GUPTA [email protected] Bagwanpur Sr. Engineer(Maintenance)

BHANWAR SINGH

KHIRIYA [email protected] Bareilly Officer (Marketing)

RAJESH KHANNA [email protected] Bhopal DGM (Marketing)

RANBIR BASUTHAKUR [email protected] Calcutta

DY. MANAGER

(MARKET.)

S D SENGUPTA [email protected] Calcutta Dy. Manager Saftey

GAMBHIR SINGH

BALIYAN [email protected]

HEAD

OFFICE Head (Projects-BSB)

MANOJ BISWAS [email protected] HEAD OFFICE Sr.Officer(Tech.Services)

SHARAD GUPTA [email protected] Kymore Manager Finance

TUSHAR VYAHARE [email protected] Kymore Manager HR

V L TAMBOLI [email protected] Lakmapur Sr Officer R & D

V S DEVARAJAN [email protected] Lakmapur D.G.M (R & D)

RAHUL CHOPRA [email protected] Mumbai V.P (Mktg)

Page 45: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 37 -

Annexture-3

unit_nm emp_code emp_name dt_birth DOJ DOB

BW 90215 SHAILESH VERMA 10/4/1980 15/11/2007 4/10/80

BW 51097 Sharad Kumar Verma 2/21/1972 18/4/06 21/2/72

BW 90272 DIBYA RANJAN PARIDA 1/1/1900 25/6./2007 2/7/84

BW 419 GYANENDRA SINGH CHAUHAN

1/1/1900 1/9/2006 13/2/1974

BW 443 Kirtendra Singh 1/1/1900 7/5/2007 20/10/73

BW 442 Ramesh Singh Kushwaha 1/1/1900 10/5/2007 12/7/65

BW 90218 P.ANANDA RAO 1/1/1900 26/11/2007 1/4/75

BW 90221 PRITAM SINGH 1/1/1900 26/11/2007 5/6/80

BW 90201 SUSANTA KUMAR PANIGRAHI

1/1/1900 30/10/2007 17/11/1980

BW 90148 Anuj Kumar Singh 1/1/1900 12/6/2007 10/4/76

BW 90255 K.SATHRUKKAN 1/1/1900 19/12/2007 11/5/1954

BW 90192 OM SHANKAR GUPTA 8/21/1968 24/9/2007 21/8/1968

BW 425 SURESH BABU 1/15/1963 16/3/2006 15/1/1963

BW 90268 SANDEEP JOSHI 1/1/1900 17/1/2008 27/4/84

BW 417 DEEPAK GUPTA 1/1/1900 4/9/2006 20/8/70

BW 415 MANOJ DIXIT 9/25/1972 4/6/97 25/9/72

BW 411 SUNIL TIWARI 1/1/1900 10/12/05 2/6/80

BW 19131 Sandeep Kalia 1/1/1900 7/9/2006 15/10/80

BW 409 BADRI PRASAD VERMA 1/1/1900 19/7/2006 4/8/1962

BW 418 HITESH KUMAR SHARMA 1/1/1900 4/9/2006 21/4/1980

BW 90256 PIYUSH PARASHAR 1/1/1900 24/12/2007 15/7/1970

BW 430 ASHOK KUMAR VERMA 9/9/1965 18/12/2006 9/7/1965

BW 441 RAJEEV KUMAR 1/1/1900 17/4/2007 7/7/76

BW 90157 SANJAY KUMAR SHARMA 1/1/1900 1/8/2007 15/12/1972

HO 307 Y Srinivas 7/30/1972 1/5/96 30/7/72

HO 90125 RANBIR BASU THAKUR 8/3/1970 4/12/2000 3/8/70

HO 6 ANOOP MISHRA 5/9/1973 6/3/2006 9/5/1973

HO 12 SHEEL SHARMA 6/10/1970 23/3/2007 10/6/70

HO 212 A Ramanath 5/29/1962 22/10/96 29/5/62

Page 46: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 38 -

Annexture-4

Marketing

Mr. Sanjay Dhingra 40512349 #2349

Mr. Manish Sanghi 40512336 #2336

Mr. Subrata Dutta 40512339 #2339

Mr. Rahul Chopra 40512386 #2386

Mr. Y Srinivas 40512356 #2356

Mr. Jasmeet Singh 40512376 #2376

Mr. Amit Oberoi 40512369 #2369

Mr. Ranjan Bhat 4052370 #2370

Mr. Neeraj Agarwal 40512337 #2337

Mr. Siddharth Patnaik 40512379 #2379

Mr. Gurucharan 40512324 #2324

Mr. Manu Srivastava 40512398 #2398

Ms. Beena Aggarwal 40512372 #2372

Mr. Prabhakar Rao 40512341 #2341

Mr. Deepak Karna 40512337 #2337

Mr. Ranabir Basu Thakur 40512398 #2398

Mr. B. Purshotam 40512387 #2387

Mr. S.P.S.Gill 40512371 #2371

Mr. Sushovan Bemel 40512378 #2378

Mr. Sheel Sharma 40512324 #2324

Mr. Anoop Mishra 40512398 #2398

Internal Audit

Mr. Atul Jain 40512375 #2375

Mr. Rajeev Tomar 40512375 #2375

Page 47: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

- 39 -

Annexture-5

Page 48: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

40

Annexture-6

Employee Code* Location* Department* Employee Designation*

Reporting To* Official Email ID* Login ID* Password*

Confirm Password* Status

Employee Type Title First Name* Last Name Sex

Date of Birth Father's Name*

37331 CW Production Jr. officer V.P. [email protected] dpal password password Active Employee Mr. DEBABRATA PAL M 25/08/1965 Mr.PAL

90198 CW Production ENGINEER(PROD.)M V.P. [email protected] goutamnaha password password Active Employee Mr. GOUTAM NAHA M 11/8/1978 Mr.NAHA

37344 CW Purchase OFFICER V.P. [email protected] rajnishsrivastva password password Active Employee Mr. RAJNISH SRIVASTAVA M 7/5/1973 Mr.SRIVASTAVA

90239 CW Production Manager V.P. [email protected] rajatroy password password Active Employee Mr. RAJAT ROY M 23/4/1962 Mr.ROY

90182 CW HR ASST.MANAGER V.P. [email protected] deepakshaw password password Active Employee Mr. DEEPAK SHAW M 2/10/1971 Mr.SHAW

90127 CW HR DY. GEN. MGR V.P. [email protected] manashsengupta password password Active Employee Mr. MANASH KUMAR SENGUPTA M 19/01/1953 Mr.SENGUPTA

90216 CW Confidential Secretary V.P. [email protected] rrganguly password password Active Employee Mr. RADHARAMAN GANGULY M 15/9/1966 Mr.GANGULY

37346 CW Finance Deputy Manager V.P. [email protected] sbanerjee password password Active Employee Mr. SANJAY BANERJEE M 23/7/1965 Mr.BANERJEE

9425 EZ Marketing Officer Mkgt V.P. [email protected] amitdas password password Active Employee Mr. Amit Das M 19/10/1975 Mr.Das

9409 EZ Marketing OFFICER V.P. [email protected] amitghosal password password Active Employee Mr. AMIT GHOSAL M 5/11/1980 Mr.GHOSAL

9447 EZ Marketing DY.MGR V.P. [email protected] goutomghosh password password Active Employee Mr. GOUTOM GHOSH M 1/1/1963 Mr.GHOSH

21 EZ Marketing Sales Officer V.P. [email protected] ranaroy password password Active Employee Mr. RANA ROY M 18/8/1980 Mr.ROY

9445 EZ Marketing Deputy Manager V.P. [email protected] sudipdutta password password Active Employee Mr. Sudip Dutta M 17/1/1968 Mr.Dutta

9414 EZ Marketing DM V.P. [email protected] smukhopadhyay password password Active Employee Mr. SUJAY MUKHOPADHYAY M 3/8/1968 Mr.MUKHOPADHYAY

90261 EZ Marketing OFFICER V.P. [email protected] suvankar.basu password password Active Employee Mr. SUVANKAR BASU M 4/9/1977 Mr.BASU

90306 EZ Marketing OFFICER V.P. [email protected] vikas.sarna password password Active Employee Mr. VIKAS SARNA M 20/6/1979 Mr.SARNA

9416 EZ CONFIDENTIAL SE V.P. [email protected] sanjay password password Active Employee Mr. SANJAY BHATTACHARYA M 22/2/1966 Mr.BHATTACHARYA

9412 EZ Commertial ASST MNGR V.P. [email protected] amitbanerjee password password Active Employee Mr. AMIT BANERJEE M 10/8/1969 Mr.BANERJEE

9411 EZ Commertial DY. MGR. V.P. [email protected] sujoymukherjee password password Active Employee Mr. SUJOY MUKHERJEE M 20/7/1968 Mr.MUKHERJEE

Page 49: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

41

Annexture-7

Presented By :-

Soumya De

PGDM

ITS IM,GREATER NOIDA

MOB - 9990275852

Before understanding what is INTRANET?

It is necessary that to understand the

difference between the INTERNET and

INTRANET.

2

Page 50: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

42

INTERNET INTRANET

Generally known as “NET”.

If permitted can get

information from any other

computer on network.

Users can share information

through telephone wires and

satellite links.

It works in internal, secured business environment.

Easy and quick access to information.

Facilitates interdepartmental cooperation.

Operates on a LAN (local area network).

It provides similar internet like facilities.

Its structure is Organizational Need Based.

Facilitates interdepartmental cooperation.

Saves time and resources.

INTERNET INTRANET Sharing research and

business data among colleagues and like-minded individuals.

Communicating with others and transmitting files via E-mail.

Requesting and providing assistance with problems and questions.

Marketing and publicizing products and services.

Gathering valuable feedback and suggestions from customers and business partners.

All agency’s information is kept in a single location.

Faster sharing of data.

Creates transparency between different departments.

Gives space ( blog ) to employees to give view on line.

Has different sections for Family updates, IT, HR, Finance, Marketing, etc.

Saves Time & Resources.

Can easily be accessed or updated.

It is very flexible and easy to use.

Page 51: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

43

HUMAN RESOURCES SALES DEPARTMENT Company newsletter.

Employee newsgroups.

Employee training materials.

Employee hand book.

Quick easy access to job applications, employee directory etc.

Chat boards with in the organization.

Sales reports.

Forecasts and goals of

the organization.

Marketing strategies.

Geographic saturation.

Profiles of potential new

markets or clients.

Information on potential

competing markets

ACCOUNTING DEPARTMENT INFORMATION SYSTEMS

Requisition requests will save

time, resources and money.

Pages can be password

protected to limit employee

access, or administratively

controlled.

Payroll, receivables/payables.

Budget reports.

Access to Data warehousing.

Departmental software

development applications.

Network support.

FAQ’s to support intranet.

Interactive tutorials for

department and employees to

teach themselves intranet.

Minimizes training investment.

Security information.

Technical resources.

Page 52: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

44

Before I discuss about the intranet of EVEREST,

I would like to discuss about the intranet of few

other MNC.. Viz…. ALSTOM , CSC , GE …. So as

to give you an idea about already deployed

intranet..

Page 53: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

45

On the top of the web page they have provided few major links viz.

News… Click

About Alstom… Click

People… Click

Finance… Click

Legal... Click

International Network… Click

Communications { Also In Quick Links }… Click

EHS ( Environment, Health and Safety )… Click

Travel { Also In Quick Links }… Click

E-Book { Also In Quick Links }… Click

Useful Tools… Click

FEW IMPORTANT LINKS ON HOME PAGE ( ALSTOM )

Glossary of acronyms.

Video Conferencing.

Gifts Catalogue.

Time Zones ( WEB ).

Currency Convertor ( WEB ).

Translation help ( WEB ).

Maps & Directions

( WEB).For Further Details See : - Click… (http://alstom.co.in/)

Page 54: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

46

On the top of the web page they have provided few major links viz.

About CSC

Financial Press Releases.

Legal.

Travel { Also Present In Quick Links }.

Corporate Governance.

Investor Relations.

Newsroom.

Locations.

Cycling Sponsorship.

Blogs, Podcasts, Videos & RSS.

CSC Portal.

Research Coverage.

Stock Information.

For Further Details See : - Click… (http://www.csc.com/)

INTRANET OF GE

On the top of the web page they have provided few major links viz.

Innovation… Click

Products & Services… Click

Our Company… Click

Industry News… Click

Investor Relations… Click

Careers… Click

World Wide Locations… Click

Travel… Click

Legal… Click

Page 55: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

47

Proposed Format Of EVEREST Web Page…Main Topics At The Top Of Web Page :-

About Us : This would contain most of the current facts &

figures about the company… Click

Vision : This covers the vision of the organization… Click

Mission : This shows the future goals of the organization…

Click

Code of Conduct : This will contain the complete code of

conduct… Click

Quality Policy: This is a section all the policy of the

organization for quality would be mentioned… Click

Safety,Health & Environment policy: This section deals with

the safety,health and environment issues.. Click

IT security policy: Under this section all the IT related issues are

handled…

Corporate Communication Policy : This section deals with the issues

which states that how data can be transmitted or shared between

different departments or employees.

Human Resources: This is a section which contains all the human

Resources policies… Click

Marketing : This is a section which deals with the marketing strategies

and policies which are used by the marketing people…

Click

Finance: This is a section which deals with financial working and

decisions of the organization… Click

Technical : This is a section which deals with the technical support

and technical knowledge…

Page 56: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

48

Strategic Planning: This is a section which would give information

regarding strategic planning… Click

Events & Happenings: This section will act as a blog where all the

latest happenings and events would be updates…

Industry News: This section will contain all the industry news like

the business relations with other sister concerns and franchise…

Message Board: This is a common section or blog where any one

can put their views…. Click

E-Magazine: This is a section of e-books where any book related to

organization can be put in a soft copy . Not only this many other

documents like presentation etc can be stored…

HR Initiatives: This section would be of utmost interest of

employees since it shows the works done by the HR for their

employees… Click

Help Desk: This section would be used to provide online help to

the employees…Click

Legal : This Section would cover the legal rules and guide lines…

Click

Travel: This section would help the employees to arrange for taxi

and cabs for official traveling… Click

Corporate Governence: This would include information about the

board of directors & other committee… Click

Page 57: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

49

CONCLUSION

This will make life of all the Employee’s very easy and

simple.

This will save lot of working time and also resources.

Increase the productivity of the employee.

Improve the performance of the employee.

The link of our Intranet :- http://intranet.everestind.com

The Link of Admin Pannel :- http://intranet.everestind.com/admin/

Thank You…..

Please Feel Free To Contact

Soumya For Further

Clarification……..

MOB – 9990275852Email- [email protected]

END

Page 58: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

50

Links of slides for Intranet Of ALSTOM in sequence

NEWS

Press Releases.

International News.

Alstom 360’(Video Magazne).

Announcements.

Did you know ( Additional Knowledge like update new phone

number , update anti virus etc ).

END

ABOUT ALSTOM

Alstom Organization.

Brand & Values.

Corporate responsibility.

Innovation.

General Financial Information.

Corporate Governance.

Alstom History.

Central Functions.

Share Price.END

Page 59: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

51

PEOPLE

Organization.

It’s all about people.

Welcome to ALSTOM.

Performance Management.

Developing Talent.

Learning & Networking.

Total Compensation.

Career & Internal Mobility.

Jobs Online.

Roles & Responsibility.

HR News.END

FINANCE

Organization.

People.

Applications.

Publications.

Reference Documents.END

Page 60: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

52

LEGAL

Organization & Instructions.

Business Transactions.

Finance & Company Law.

Group Insurance.

Litigation & Claims.

END

INTERNATIONAL NETWORK

Organization.

Missions of geographical areas.

Projects & Export Finance.

Network News.

Network Appointments.

Country security warning.END

Page 61: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

53

COMMUNICATION

Organization.

Brand.

Graphic Chart.

Internet & Intranet.

Presentations Available.

Publications Issued.

Commutation Tools.END

EHS

Environment , Health & Safety.

Commitments & Organization.

EHS Integrated Management Systems.

Implementation.

Results.

END

Page 62: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

54

TRAVEL

Contacts.

Travel News.

Cab & Taxi Bookings.

Booking of Luxury Car.

END

E - BOOKS

E-Book Summary.

Corporate Instructions.

Code of Ethics.

ALSTOM Organization.

Management Responsibility.

Financial.

Legal.

Human Resource.

Sourcing & Operations.

Technology.

Communication.

International Network.

Strategy of business.END

Page 63: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

55

USEFUL TOOLS

Intranet Site.

Internet Site.

ALSTOM Profile.

ALSTOM Presentation.

ALSTOM Annual Report.

Security Instructions.

Calendar of Public Holidays.END

Page 64: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

56

Links of slides for Intranet Of GE in sequence

INNOVATION

Innovation = Imagination. The Science Behind Security (GE’s Entry Scan).

GE Innovation Timeline (Explore 130 years of GE Innovation).

Photovoltaic Technology (See how Sun is growing a business).

Health Care Re-imagined (Focusing on early diagnosis and prevention).

Cleaner Power Generation ( Helping Milan Breathe A Little Easier).

Nanotechnology at GE (Straight from nature to GE’s Global Research Center).

GE and the Olympic Games (Countdown to Beijing).

GE in the Middle East (From sand to sky scrapers).

Aviation : Incredible Views (Made possible by the team at GE).

GE’s Greenhouse Gas Reduction ( Small Changes = Big Results).

Ecomagination (Part of our vision for a better tomorrow).

Global Research Center (3000 researchers working toward next innovation).

END

Products & Services

Appliances

Aviation

Consumer Electronics

Electrical Distribution

Energy

Finance – Business

Finance – Consumer

Healthcare

Lighting

Media & Entertainment

Oil & Gas

Rail

Security

Water

A – Z Index END

Page 65: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

57

OUR COMPANY

Citizenship

Worldwide Activities

Our Businesses

Leadership

Governance

Our Culture

Our History

AdvertisingEND

INDUSTRY NEWS

Press Releases

GE in the News

Audio & Video

Olympic Games

News feeds

Press Contacts

END

Page 66: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

58

INVERSTOR RELATIONS

Stock Information

Financial Reporting

Events & Presentations

Shareholder Services

Personal Investing

Institutional Investing

Investor Contacts

END

TRAVEL

Contacts.

Travel News.

Cab & Taxi Bookings.

Booking of Luxury Car.

END

Page 67: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

59

LEGAL

Organization & Instructions.

Business Transactions.

Finance & Company Law.

Group Insurance.

Litigation & Claims.

END

Page 68: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

60

Links Of slides for Intranet Of Everest Industries Limited in sequence

EVEREST INDUSTRIES LTD

Everest Industries Limited, an IS/ISO 9001:2000 company has an established presence over 74 years with 5 manufacturing plants and wide dealers/distribution network all over India. Everest Industries Limited offers a versatile and wide range of products covering Fiber cemented products to designing, manufacturing and erection of Pre-Engineered Steel Buildings. Everest has generated enormous confidence and goodwill amongst its customers both in India and abroad for the high quality standards of its products and solutions.

END

VISION

Everest will be the deepest penetrated housing

and building solution provider to deliver

strength, speed and safety to its customers in

all its target markets.

END

Page 69: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

61

MISSION

Our mission is to achieve a sales turnover of Rs

1,000/- crores with a net profit of Rs 100

crores by 2010-11

END

Code Of Conduct Slides ( Slide 1)

CODE OF CONDUCT

Code of ConductCode of Conduct for all Board Members and Senior Management ofEverest Industries Limited.PrefaceThe Board of Directors (hereinafter referred to as the “Board”) of Everest Industries Limited (EIL) (hereinafter referred to as the “Company”) has adopted the following Code of Business Conduct and Ethics (hereinafter referred to as the “Code”) for the Board and Senior Management.

A model code of conduct has been designed to put values into practice. This Code of Conduct isn’t merely a set of rules for specific circumstances but an intentionally expansive statement of principles meant to inform all the actions of the Board of Directors and Senior Management. The Board and Senior Management should make an effort to study and understand these principles and do their best to apply them to any and all circumstances which may arise.

Page 70: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

62

( Slide 2)

All senior management employees should sign the acknowledgement form

at the end of this Code and return the form to the HR Department that they

have received, read and understood, and agreed to comply with the Code.

The signed acknowledgement form shall be filed in each Officer’s personal

file.

The Code shall be posted/displayed on the website of the Company.

Applicability of the Code

This Code applies to:

(a) All the Directors of the Company.

(b) All the Senior Management Employees of the Company, which would

comprise all members of Management one level below the Executive

Director, including all Functional, Works and Zonal heads.

( Slide 3)

In terms of the Listing Agreement all the Board Members and the Senior

Management employees should affirm compliance with the code on an

annual basis. The Annual Report of the Company shall contain a declaration

to this effect and signed by the Managing Director.

The Code

1. Conflict of Interest or Duty

1.1 The Board and Senior Management must be aware of potential conflict between (directly or indirectly):

(a) On the one hand:

The interest of the Company

Their duties to the Company

(b) On the other hand:

Their personal or external business interests

Their duties to any third party

Page 71: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

63

( Slide 4)

1.2 The Board and Senior Management must avoid placing themselves in a position that may lead to:

(a) An actual or a potential conflict of interest or duty.

(b) A reasonable perception of an actual or potential conflict of interest or duty.

1.3 The Board and Senior Management must:

(a) Fully and frankly inform the company of any personal or external business interest that may lead to:

An actual or potential conflict of interest or duty.

A reasonable perception of an actual or potential conflict of interest or duty.

(b) Obtain and follow independent legal advice to avoid and resolve any actual, potential or perceived conflict of interest of duty.

1.4 Each Director must:

(a) Not participate when the Board considers any matter in which the Director has or may have a conflict of interest or duty: and

(b) Comply with the Companies Act, 1956 and Listing Agreement provisions in relation to the disclosing material personal interests and restrictions on voting by Directors.

( Slide 5)

1.5 each Director must inform the Board:

(a) Any existing Directorship or other office held by Director in another entity

(b) Any proposed appointment as a Director or Senior Executive of another

entity before accepting the appointment.1.6 The Board and Senior

Management must not exploit for their own personal gain the opportunities

that are discovered through the use of corporate property, information or

position unless the opportunity is disclosed fully in writing to the

Company.2. Compliance with laws, regulations, policies and procedures.

The Board and Senior Management must:

(a) comply with the letter and spirit of any applicable law, rule or regulation.

(b) comply with the Insider Trading Regulations as laid down by SEBI and

the Company.

(c) comply with policies and procedures of the Company.

(d) encourage other officers and employees to do the same.

Page 72: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

64

( Slide 6)

3. Confidentiality

3.1 Any information acquired by the Board and Senior Management while

performing their duties is confidential information of the Company and must

be kept confidential. The Board and Senior Management must not disclose

the information to a third party except where that disclosure is:

(a) Authorized by the Board.

(b) Required by law or regulatory body (including a relevant stock exchange.

3.2 The existence and details of any Board and Management information,

discussions and decisions that are not publicly known and have not been

approved by the Board for public release are confidential information of the

Company and subject to paragraph 3.1.

( Slide 7)

4. Protection and Proper use of Company Assets

4.1 The Company expects each Director and Senior Management to use all

reasonable endeavors to protect any Company Asset and to ensure its

eff icient use.

4.2 A Director or Senior Management may only use a Company Asset for

legitimate business purposes approved by the Board.

4.3 Each Director and Senior Management must immediately report any

suspected fraud or theft of a Company asset for investigation.

4.4 The Board, Senior Management and all employees must pay particular

attention to information technology aspects such as data protection and

data security.

5. Fair Dealing

5.1 The Company expects the Board and Senior Management to:

(a) Deal fairly with employees, investors, customers, suppliers, competitors,

auditors, lawyers, creditors or other advisors of the Company.

(b) Encourage other employees and officers to do the same.

Page 73: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

65

( Slide 8)

5.2 The Board and Senior Management must not take unfair advantage of

any employee, customer, supplier, competitor, auditor, lawyer or other

advisor of the Company, creditor through illegal conduct, manipulation,

undue influence, concealment, abuse of confidential information,

misrepresentation of material facts or any other unfair dealing practice.

5.3 The Board and Senior Management must promote a respectful work

place, culture that is free of harassment, bias and discrimination of any

k ind.6. Compensation from non-Company sources and Gifts6.1 The Board

and Senior Management should not accept compensation (in any form) for

services performed for the Company from any source other than the

Company.6.2 The Board and Senior Management may not offer, give or

receive gifts from persons or entities who deal with the Company or its

Holding Company, where any such gift is being made in order to influence

the actions or where acceptance of the gifts could create the appearance of

a conflict of interest.7. Reporting of Illegal and unethical Behavior7.1 The

Board and Senior Management should promote ethical behavior and take

steps to ensure that the Company:

( Slide 9)

(a) Encourages employees to talk to supervisors, managers and other

appropriate personnel when in doubt about the best course of action in a

particular situation.

(b) Encourages employees to report violations of laws, regulations or the

Company’s Code of Conduct to appropriate personnel.

(c) Informs employees that the Company will not allow retaliation for reports

made in good faith.

8. Violation and Compliance of the Code

8.1 The Board and Senior Management is required to help enforce this code

as part of his/her job and also of his/her ethical responsibil ity.

8.2 Directors should communicate any suspected violations of this Code

promptly to the Chairman of the Audit Committee. Senior Management

should communicate any suspected violation of this Code to the Managing

Director who in turn shall communicate it to the Chairman of the Audit

Committee.

Page 74: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

66

( Slide 10)

8.3 Violations will be investigated by the Board or by persons designated by

the Board, and appropriate action will be taken in the event of any violations

of the Code.

9. Waiver and Amendment of the Code

9.1 This Code is subject to modification at any time since the Company is

committed to continuously reviewing and updating its policies and

procedures in terms of extant guidelines and procedures laid down by

different statutory authorities.

9.2 Any amendment/inclusion or waiver of any provision of this Code shall

be approved by the Company’s Board of Directors and must be promptly

disclosed on the Company’s website.

END

QUALITY POLICY

We at Everest Industries Ltd., manufacturer of fibre cement products are strongly committed to:

Manufacture and sell quality proven products. Provide the most efficient service to our customers

Continually improve effectiveness of quality management system by:

Regular monitoring and measurement of processes and products to achieve the set quality objectives.

Providing required resources and developing competencies of the people in the organisation.

Periodic review of the system for sustainable development.

Comply with all relevant Regulatory, Statutory and other requirements. The above policy is well implemented, maintained and communicated to all employees,

customers & others interested partiesOUR MOTTO

Continuous customer delight is our reward.

M.L.GUPTAMANAGING DIRECTOR

END

Page 75: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

67

SAFETY, HEALTH & ENVIRONMENT POLICY

We at Everest Industries Ltd., manufacturer of fibre cement products are strongly committed to:

Manufacture, market and sell products that are safe for use. Promote Programmes and measures to ensure Health & Safety at Workplace.

Ensure environmental excellence through responsible care, i.e.

Comply with all relevant legislative/regulatory and other requirements

Prevention of pollution by conservation of natural resources and by sound environmental management system.

Continual improvement in our activities, products and services towards achieving sustainable developments by periodic review of environmental objectives and targets.

The above policy is well implemented, maintained and communicated to all employees, customers & others interested parties

S.P.BOLAR

VICE PRESIDENT-DEVELOPMENT

END

HUMAN RESOURCES

HR Policies Leave (Annual,Casual,Sick, Materinity Leave, Half day Leave, Leave Encasment)

Safety, Health & Hygiene Policy

Communication Policy

Promotion/Upgradation Policy

Transfer Policy

Vocational/Summer Training

Welfare Measures; Group Mediclaim , Accidental Insurance, Loans ( Car/Housing), Management Staff Superannuation Scheme

Reimbursement of Medical expenses for self and dependents

LTA Claim

Perquisites

Conveyance claims on local and project

END

Page 76: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

68

MARKETING

Manual /Catalogues

Product Range/Specifications

New business developments

Album

Compains

Achievements

List of sales office, depots and dealers

END

FINANCIALS

Financial Highlights

Financial results

Products . Everest Roofing

. Everest Boards

. Everest Building Solutions

. Pre Engineered Buildings

Achievements

END

Page 77: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

69

STRATEGIC PLANNING

Certification

IS/ISO

New projects/Ventures

END

MESSAGE BOARD

Thought of the day

Birthday / Anniversary Celebrations

Well done

Photographs ..

Our Heros.

END

Page 78: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

70

HR INITIATIVES

Recruitments: Everest on hiring spree

New Mediclaim Policy

Superannuation Scheme

Hero of the week

Knowledge Bank

New Joinees

Soft Skills trainings

Stress management tips

END

HELP DESK

IT Related Help

Administrative Help

Monetary Help

Informative Help

FAQ

END

Page 79: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

71

LEGAL

Organization & Instructions.

Business Transactions.

Finance & Company Law.

Group Insurance.

Litigation & Claims.

END

TRAVEL

Contacts.

Travel News.

Cab & Taxi Bookings.

Booking of Luxury Car.

END

Page 80: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

72

CORPORATE GOVERNANCE

Board of Directors.

Audit Committee.

Executive Committee.

END

Page 81: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

73

Annexture-8

Page 82: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

74

Page 83: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

75

Page 84: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

76

Page 85: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

77

Page 86: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

78

Page 87: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

79

Page 88: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

80

Page 89: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

81

Page 90: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

82

Page 91: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

83

Page 92: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

84

Page 93: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

85

Page 94: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

86

Page 95: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

87

Page 96: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

88

Page 97: Final Summer Training Report -> Deployment Of Intranet In Everest Industries Ltd

Deployment Of Intranet In Everest Industries Ltd.

ITS IM, GREATER NOIDA

SOUMYA DE

PGDM - 2007 – 2009

89

Bibliography