Page 1: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

FINAL REPORT Scalable Deployment of Advanced Building

Energy Management Systems

ESTCP Project EW-201015

MAY 2013

Veronica Adetola Sunil Ahuja Trevor Bailey Bing Dong Taimoor Khawaja Dong Luo Zheng O’Neill Madhusudana Shashanka United Technologies Research Center

Page 2: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE MAY 2013 2. REPORT TYPE

3. DATES COVERED 00-00-2013 to 00-00-2013

4. TITLE AND SUBTITLE Scalable Deployment of Advanced Building Energy Management Systems

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) United Technologies Research Center,411 Silver Lane ,East Hartford,CT,06108

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited

13. SUPPLEMENTARY NOTES

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as

Report (SAR)

18. NUMBEROF PAGES

185

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 ii May 2013

ContentsList of Figures ................................................................................................................................ iii 

List of Tables ............................................................................................................................... viii 

Acronyms ........................................................................................................................................ x 

ACKNOWLEDGEMENTS ......................................................................................................... xiv 

EXECUTIVE SUMMARY .......................................................................................................... 15 

1.0  INTRODUCTION ................................................................................................................ 6 

1.1  BACKGROUND ......................................................................................................................................... 6 1.2  OBJECTIVE OF THE DEMONSTRATION .............................................................................................. 7 1.3  REGULATORY DRIVERS ......................................................................................................................... 9 

2.0  TECHNOLOGY DESCRIPTION ...................................................................................... 10 

2.1  TECHNOLOGY OVERVIEW .................................................................................................................. 10 2.2  ADVANTAGES AND LIMITATIONS OF THE TECHNOLOGY ......................................................... 17 

3.0  SITE/ FACILITY DESCRIPTION ..................................................................................... 20 

3.1  SITE/FACILITY LOCATION AND OPERATIONS, AND CONDITIONS ............................................ 20 3.2  SITE/FACILITY IMPLEMENTATION CRITERIA ................................................................................ 22 3.3  SITE-RELATED PERMITS AND REGULATIONS ................................................................................ 23 

4.0  TEST DESIGN AND ISSUE RESOLUTION ................................................................... 24 

4.1  CONCEPTUAL TEST DESIGN ............................................................................................................... 24 4.2  BASELINE CHARACTERIZATION ....................................................................................................... 24 4.3  DESIGN AND LAYOUT OF TECHNOLOGY COMPONENTS ............................................................ 25 4.4  OPERATIONAL TESTING ...................................................................................................................... 31 4.5  SAMPLING PROTOCOL ......................................................................................................................... 34 4.6  EQUIPMENT CALIBRATION AND DATA QUALITY ISSUES .......................................................... 35 4.7  SAMPLING RESULTS ............................................................................................................................. 36 

5.0  PERFORMANCE RESULTS ............................................................................................. 40 

5.1   SUMMARY OF PERFORMANCE OBJECTIVES AND OUTCOMES .................................................. 40 5.2   PERFORMANCE RESULTS DISCUSSION ............................................................................................ 43 

6.0  COST ASSESSMENT ........................................................................................................ 53 

6.1  COST DRIVERS ....................................................................................................................................... 53 6.2  COST ANALYSIS AND COMPARISON ................................................................................................ 55 

7.0  IMPLEMENTATION ISSUES .......................................................................................... 58 

8.0  TECHNOLOGY TRANSFER ............................................................................................ 62 

APPENDICES .............................................................................................................................. 65 

APPENDIX A: PERFORMANCE ASSESSMENT METHODOLOGIES ................................. 66 

A.1  HVAC EQUIPMENT REDUCED-ORDER MODEL PERFORMANCE ASSESSMENT ...................... 66 A.2  INTEGRATED SYSTEM MODEL PERFORMANCE ASSESSMENT .................................................. 71 A.3  HVAC OPERATION SENSITIVITY STUDY ASSESSMENT ............................................................... 86 A.4  FAULT DETECTION AND DIAGNOSTICS PERFORMANCE ASSESSMENT .................................. 88 A.5  ENERGY SAVINGS OPPORTUNITIES ASSESSMENT ....................................................................... 96 

Page 4: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 ii May 2013

A.6  TECHNOLOGY SCALABILITY ASSESSMENT ................................................................................... 98 APPENDIX B: BUILDING LIFE CYCLE COST MODEL RESULTS ................................... 100 

APPENDIX C: MANAGEMENT AND STAFFING ................................................................ 102 

APPENDIX D: REFERENCE .................................................................................................... 103 

APPENDIX E: REDUCED-ORDER BUILDING ENVELOPE MODEL ................................ 105 

APPENDIX F: LOAD ESTIMATION ....................................................................................... 113 

APPENDIX G: HVAC EQUIPMENT MODELS ...................................................................... 116 

APPENDIX H: BUILDING VISUALIZATIONS AND FDD ................................................... 131 

APPENDIX I: DATA ACQUISITION SYSTEM ...................................................................... 143 

APPENDIX J: BIM TO BEM TOOLKIT .................................................................................. 148 

APPENDIX K: RESPONSE TO ESTCP IPR ACTION ITEMS ............................................... 156 

APPENDIX L: RESPONSE TO ESTCP TEST BED 10 ........................................................... 166 

Page 5: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 iii May 2013

List of Figures

Figure1.1 Block Diagram of the Advanced Building Energy Management System ...................... 8 

Figure 2.1 Schematics of the Real Time Load Estimator ............................................................. 10 

Figure 2.2 Overall Schema of Integrated System Model .............................................................. 13 

Figure 2.3 Diagnostic Models for Building 7230 ......................................................................... 14 

Figure 2.4 Overview of the Energy Visualization Interface ......................................................... 15 

Figure 2.5 A Screenshot of FDD Interface ................................................................................... 15 

Figure 2.6 A Screenshot of Fault Energy Impacts Interface ......................................................... 16 

Figure 3.1 Location of Buildings 7230, 7113 and 7114 ............................................................... 20 

Figure 4.1 Approximated Locations for BTU Meters at AHU1 and AHU2 in Building 7230 .... 26 

Figure 4.2 Approximated locations for BTU meters at AHU4 in Building 7230......................... 26 

Figure 4.3 a) Approximated Locations of Additional Power Meters/CTs (Lighting Loads): Sub-

meters for Lighting Loads in (Building 7114) .............................................................................. 29 

Figure 4.3 b) Approximated Locations of Additional Power Meters/CTs (Lighting Loads): Sub-

meters for Lighting Loads (Building 7113) .................................................................................. 29 

Figure 4.3 c) Approximated Locations of Additional Power Meters/CTs (Lighting Loads): Sub-

meters for Emergency Lighting Loads (Building 7113/7114) ...................................................... 30 

Figure 4.4 Approximated Locations of Additional Power Meters/CTs (Plug Loads): ................ 30 

Figure 4.5 Approximated Locations for Chilled Water BTU meters ........................................... 30 

Figure 4.6 Approximated Locations for Hot Water BTU Meters ................................................. 31 

Figure 4.7 Approximated Locations for Absorption Chiller Steam Condensate Meters .............. 31 

Figure 4.8 Overview of Offline Demonstration Integration Structure ......................................... 32 

Figure 4.9 Advanced Building Energy Management System (aBEMS) Schematic Diagram ...... 33 

Figure 4.10 Demonstration System in Building 7113/7114 ......................................................... 34 

Figure 4.11 Building 7113/7114 Outside Air Temperature .......................................................... 37 

Figure 4.12 Building 7114 AHU1 Mixed Air Temperature vs. Outside Air Temperature .......... 37 

Figure 4.13 Building 7114 Chiller 2 Chilled Water Flow Rate .................................................... 38 

Figure 4.14 Building 7114 Chiller 2 Supply Water Temperature vs. Return Water Temperature 38 

Figure 4.15 Building 7114 AHU1 Discharge air Temperature vs. Setpoint ................................. 39 

Figure 5.1 Measured Chilled Water Consumption Comparisons (with Faults vs. Faults corrected)

....................................................................................................................................................... 44 

Page 6: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 iv May 2013

Figure 5.2 Electric Energy Deviation Errors for HVAC Components Models in Building

7113/7114 ..................................................................................................................................... 48 

Figure 5.3 Comparisons of Hot Water Energy Consumption between Predictions from a ROM

and Measurements in January, 2011 for Building 7230 ............................................................... 48 

Figure 5.4 Cooling Season Integrated Model Validation from 07/06/2011 to 07/10/2011 for

Building 7114................................................................................................................................ 49 

Figure 5.5 Model Error Distribution for Cooling Season Integrated Model Validation from

7/06/2011 to 07/10/2011 for Building 7114 ................................................................................. 49 

Figure 6.1 Pie chart of capital cost structure for Building 7113/7114 .......................................... 56 

Figure 8.1 Training session in Great Lakes on May 16, 2012 ...................................................... 63 

Figure A.1 Error of Model Prediction of Electric Energy for Chiller 1 in Building 7230 .......... 67 

Figure A.2 Monthly Distribution of Electric Energy Consumption of Chiller 1 in Building 7230

....................................................................................................................................................... 67 

Figure A.3 Scatter Plot of Model Prediction Error of Electric Energy for Chiller 1 in Building

7230............................................................................................................................................... 67 

Figure A.4 Heat Input Factor (Heat Input Divided by Design Value) vs. Supply Chilled Water

Temperature of Chiller 2 in Building 7114................................................................................... 68 

Figure A.5 Average Errors of the Cooling Coil Model Prediction of AHUs in Building7230 .... 69 

Figure A.6 Errors of Air and Water Temperatures Leaving Cooling Coil in Building 7230 ...... 69 

Figure A.7 Error of Model Prediction of Electric Energy of VFD Fans in Building 7230 .......... 70 

Figure A.8 Distribution of Electric Energy Consumption of VFD Fans in the Drill Hall ............ 70 

Figure A.9 Error of Model Prediction of Air Temperature Leaving VAV1 of Building 7230 in

Heating Mode................................................................................................................................ 71 

Figure A.10 Error of Model Prediction of Air Flow Rate of VAV1 of Building 7230 in Cooling

Mode ............................................................................................................................................. 71 

Figure A.11 Scatter Plot for Load Prediction Errors by Thermal Network Model (Compared with

EnergyPlus) ................................................................................................................................... 73 

Figure A.12 Load Comparisons Between Data and Thermal Network Model. ............................ 74 

Figure A.13 Scatter Plot for Load Prediction Errors by Thermal Network Model (Compared with

Data) .............................................................................................................................................. 74 

Page 7: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 v May 2013

Figure A.14 Scatter Plot for Load Comparisons (Zones Served by AHU 1/ 2 in Building 7114).

....................................................................................................................................................... 75 

Figure A.15 Load Comparisons Results for Classroom Zones Served by AHU3 ........................ 75 

Figure A.16 Comparisons Between ROM and EnergyPlus Total Building Load for Cooling

Season ........................................................................................................................................... 76 

Figure A.17 Comparisons Between ROM and EnergyPlus Total Building Load for Heating

Season ........................................................................................................................................... 77 

Figure A.18 Comparisons of Hot Water Energy Consumption Between ROM and Measurements

in January, 2011 ............................................................................................................................ 77 

Figure A.19 Annual Energy Simulation Results for Building 7114 in 2011 ................................ 78 

Figure A.20 Building 7114 Cooling Season Integrated Model Validation from 07/06/2011 to

07/10/2011 .................................................................................................................................... 79 

Figure A.21 Building 7114 Heating Season Integrated Model Validation from 12/08/2011 to

12/10/2011 .................................................................................................................................... 79 

Figure A.22 Building 7113 Cooling Season Integrated Model Validation from 07/07/2011 to

07/10/2011 .................................................................................................................................... 80 

Figure A.23 Building 7113 Heating Season Integrated Model Validation from 12/08/2011 to

12/10/2011 .................................................................................................................................... 81 

Figure A.24 Campus Cooling Season Integrated Model Validation from 07/06/2011 to

07/11/2011 .................................................................................................................................... 82 

Figure A. 25 Campus Heating Season Integrated Model Validation from 12/08/2011 to

12/10/2011 .................................................................................................................................... 82 

Figure A. 26 Comparisons between Measured and Estimated Lighting Loads in Building 7114

from 08/06/2011 to 08/09/2011 .................................................................................................... 83 

Figure A. 27 Comparisons between Measured and Estimated Lighting loads of Compartments

and Classroom Areas in Building 7114 from June to December, 2011........................................ 84 

Figure A. 28 Comparisons between Measured and Estimated Plug Loads in Building 7114 from

07/09/2011 to 07/18/2011 ............................................................................................................. 85 

Figure A. 29 Comparisons between Measured and Estimated Plug Loads in Building 7114 from

June to December, 2011. ............................................................................................................... 85 

Page 8: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 vi May 2013

Figure A.30 Comparison of Measured Total Lighting Energy Consumption between Building

7113 and 7114. .............................................................................................................................. 88 

Figure A.31 Lighting Faults in Building 7230. ............................................................................ 89 

Figure A.32 AHU Economizer Fault in Building 7113/7114 ...................................................... 90 

Figure A.33 AHU1 Faulty Operational data in July 2011 ............................................................ 90 

Figure A.34 Probabilistic Graphical Network for AHU1 Economizer ......................................... 91 

Figure A.35 Measured Chilled Water Consumption Comparisons .............................................. 91 

Figure A.36 Chiller 2 Faulty Operational Data in July 2011 ........................................................ 92 

Figure A.37 VAV Box Fault Detection ........................................................................................ 93 

Figure A.38 Building 7114 AHU1 FDD Accuracy Analysis ....................................................... 95 

Figure A.39 Building 7113/7114 Steam End Use in 2011 ........................................................... 97 

Figure A.40 Building 7113/7114 Electricity End Use in July 2011 ............................................. 97 

Figure A.41 Building 7113/7114 Electricity End Use in December 2011 ................................... 98 

Figure C.1 Organization Chart .................................................................................................... 102 

Figure E.1 Energy Flow in Buildings for ROM ......................................................................... 105 

Figure E.2 Thermal Network Model of One External Wall ...................................................... 107 

Figure E.3 Sun Position in An Earth-Sun System ...................................................................... 108 

Figure E.4 Solar Angle for Vertical and Horizontal Surfaces [1] ............................................... 109 

Figure E.5 Results for the ASHRAE BESTEST ........................................................................ 112 

Figure F.1 Validation of Load Estimator .................................................................................... 114 

Figure F.2 Constrained Load Estimator Applied to EnergyPlus Data. ....................................... 115 

Figure H.1 Schematics for FDD Module and Visualization Module ......................................... 131 

Figure H.2 Graphical Network Example .................................................................................... 133 

Figure H.3 Graphical Network for Building 7230 ...................................................................... 134 

Figure H.4 Overview of the Energy Visualization ..................................................................... 135 

Figure H.5 Building Hierarchy Interface .................................................................................... 136 

Figure H.6 Time-Series Energy Flows Interface ........................................................................ 136 

Figure H.7 Energy Statistics Pie Chart Interface ........................................................................ 137 

Figure H.8 Data Range Selection Interface ................................................................................ 137 

Figure H.9 Chilled Water Energy Consumption Interface ......................................................... 138 

Figure H.10 APAR Rules Tool Interface. ................................................................................... 139 

Page 9: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 vii May 2013

Figure H.11 Overview of the AHU APAR Rules Tool .............................................................. 139 

Figure H.12 Energy Impact Module Interface ............................................................................ 140 

Figure H.13 Overview of the APAR Rules Tool. ....................................................................... 140 

Figure H.14 HVAC Operation Sensitivity Analysis Tool Interface ........................................... 141 

Figure H.15 Heating Sensitivity Analysis Tool. ......................................................................... 141 

Figure H.16 Cooling Sensitivity Analysis Tool. ......................................................................... 142 

Figure I.1 BACnet Configuration File 1 .................................................................................... 144 

Figure I.2 BACnet Configuration File 2 ..................................................................................... 144 

Figure I.3 BACnet Configuration File 3 .................................................................................... 144 

Figure I.4 BACnet Reader Example ........................................................................................... 145 

Figure I.5 Store BACnet Data to Database ................................................................................. 147 

Figure J.1 Building and Zone ...................................................................................................... 148 

Figure J.2 Relationship between Zone and Room, Wall, Window and Material ....................... 149 

Figure J.3 Equipment .................................................................................................................. 150 

Figure J.4 Primary, Secondary and Terminal System ................................................................. 150 

Figure J.5 Sensor Schema ........................................................................................................... 151 

Figure J.6 Temperature Sensor Schema ...................................................................................... 151 

Figure J.7 Simulation Data ......................................................................................................... 152 

Figure J.8 FDD Discrete Data .................................................................................................... 152 

Figure J.9 FDD Dynamic Discrete Data ..................................................................................... 153 

Figure J.10 MVD for Architecture .............................................................................................. 154 

Figure J.11 MVD for HVAC Systems ........................................................................................ 154 

Figure J.12 BIM to BEM Flow Chart ......................................................................................... 155 

Figure K.1 A Schematic Diagram of Low Cost and Scalable Building Energy Monitoring System

..................................................................................................................................................... 158 

Figure K.2 Middleware Schematic Diagram .............................................................................. 158 

Figure K.3 A Schema for an Automated Convertor from a Revit-based BIM to a BEM ......... 161 

Page 10: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 viii May 2013

List of Tables

Table 1.1 Performance Objectives Results ..................................................................................... 3 

Table 2.1 Individual Modules in the Building Envelope Reduced-order Model .......................... 11 

Table 2.2 List of HVAC System Reduced-Order Models for Building 7230 .............................. 11 

Table 2.3 List of HVAC System Reduced-Order Models for Building 7113/7114 ..................... 12 

Table 3.1 Major Equipment Used in Building 7230 ..................................................................... 21 

Table 3.2 Major Equipment Used in Building 7113 ..................................................................... 21 

Table 3.3 Major Equipment Used in Building 7114 ..................................................................... 22 

Table 4.1 Additional System Tool Components for Building 7113/7114 .................................... 27 

Table 4.2 Performance Monitoring Points List for Building 7113/7114 ...................................... 27 

Table 4.3 Building Data Facts ...................................................................................................... 36 

Table 5.1 Performance Objectives ................................................................................................ 40 

Table 5.2 Results of Sensitivity Study for Cooling Season in Building 7230 .............................. 44 

Table 5.3 Summary of Selected Savings Opportunities for Building 7113/7114 ......................... 45 

Table 5.4 Annual and Peak Loads Comparisons between the EnergyPlus and the ROM for

Building 7230................................................................................................................................ 47 

Table 5.5 Confusion Matrix for Fault Classification Accuracy .................................................... 50 

Table 6.1 Cost Model aBEMS ...................................................................................................... 53 

Table 6.2 Materials Cost for Building 7113/7114 Instrumentation .............................................. 54 

Table 6.3 Labor Cost for Building 7113/7114 Instrumentation ................................................... 54 

Table 6.4 Comparisons of two options for weather station .......................................................... 55 

Table 6.5 Capital Cost Scenarios for Building 7113/7114 ........................................................... 57 

Table 6.6 Cost Analysis Results for Building 7113/7714 Demonstration .................................... 57 

Table A.1 Annual and Peak Load Comparison Between EnergyPlus and Thermal Network

Models for Drill Hall .................................................................................................................... 73 

Table A.2 Annual and Peak Load Comparisons between Data and Thermal Network Models for

the Building 7230 .......................................................................................................................... 74 

Table A.3 Comparisons of Building 7114 Cooling Load at the AHU Level between Data and

Thermal Network Models for July and August 2011 ................................................................... 75 

Table A.4 Results of Sensitivity Study for Cooling Season in Building 7230 ............................. 86 

Page 11: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 ix May 2013

Table A.5 Results of Sensitivity Study for Heating Season with Pre-Heating Option Only ........ 86 

Table A.6 List of Parameters for Sensitivity Study of Buildings 7113/7114 ............................... 87 

Table A.7 Results of Sensitivity Study of Buildings 7113/7114 .................................................. 87 

Table A.8 Annual Chilled Water Consumption Extrapolation. .................................................... 92 

Table A.9 Confusion matrix ......................................................................................................... 95 

Table A.10 Building 7113/7114 Steam Utility Bill in 2011 ......................................................... 96 

Table A.11 Building 7113/7114 Electricity Utility Bill in 2011 .................................................. 96 

Table A.12 Building 7113/7114 Energy Savings ......................................................................... 98 

Table C.1 Point of Contact.......................................................................................................... 102 

Table E.1 Envelope Component Infiltration Rates ..................................................................... 111 

Table E.2 Infiltration Coeffcients ............................................................................................... 111 

Table G.1 Applicable Ranges of the Electric Chiller Model ...................................................... 116 

Table G.2 Inputs, Outputs and Parameters of the Electric Chiller Model .................................. 117 

Table G.3 Applicable Ranges of the Absorption Chiller Model ................................................ 118 

Table G. 4 Inputs, Outputs and Parameters of the Absorption Chiller Model ............................ 119 

Table G. 5 Applicable Ranges of the Cooling Tower Model ..................................................... 121 

Table G. 6 Inputs, Outputs and Parameters of the Cooling Tower Model ................................. 122 

Table G. 7 Applicable Ranges of the Air-Water Cooling Coil Model ....................................... 123 

Table G. 8 Inputs, Outputs and Parameters of the Air-Water Cooling Coil Model ................... 124 

Table G. 9 Inputs, Outputs and Parameters of the Air-Water Heating Coil Model .................... 125 

Table G. 10 Applicable Ranges of the Variable Speed Fan/Pump Model .................................. 126 

Table G.11 Inputs, Outputs and Parameters of the Variable Speed Fan/Pump Model ............... 127 

Table G. 12 Inputs, Outputs and Parameters of the Economizer Model .................................... 128 

Table G. 13 Applicable Ranges of the VAV Model ................................................................... 129 

Table G. 14 Inputs, Outputs and Parameters of the VAV Model ............................................... 130 

Page 12: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 x May 2013

Acronyms

aBEMS: Advanced Building Energy Management System

AC: Alternating Current

AEC: Architectural, Engineering, Construction

AHU: Air Handling Unit

API: Application Programming Interface

ANSI: American National Standards Institute

ASHRAE: American Society of Heating, Refrigerating, and Air-Conditioning Engineers

BACnet: Building Automation and Control Networks

BDAS: Building Data Acquisition System

BEM: Building Energy Modeling

BIM: Building Information Modeling

BIMTB: Building Information Model Test Bed

BLCC: Building Life-Cycle Cost

BMS: Building Management System

C: Capacity

CBECS: Commercial Buildings Energy Consumption Survey

CCV: Cooling Coil Valve

CFM: Cubic Feet per Minute

CFR: Code of Federal Regulations

CHW: Chilled Water

CO2: Carbon Dioxide

COV: Change of Value

COTs: Commercial Off-the-shelf

CT: Current Transducer

DAQ: Data Acquisition

DB: Database

DC: Direct Current

DEM: Digital Energy Monitor

DDC: Direct Digital Control

Page 13: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 xi May 2013

DFSS: Duct Free Split System

DoD: Department of Defense

eHMI: Energy Human Machine Interface

EIS: Energy Information Systems

EKF: Extended Kalman Filter

ESTCP: Environmental Security Technology Certification Program

FDD: Fault Detection and Diagnosis

FEMP: Federal Energy Management Program

GB: Gigabyte

GHz: Gigahertz

GPM: Gallon per Minute

HVAC: Heating, Ventilation and Air Conditioning

HW: Hot Water

iBED Viz: Integrated Buildings Energy and Diagnostics Visualization

IFC: Industry Foundation Classes

IPMVP: International Performance and Measurement Verification Protocol

ISO: International Standards Organization

KF: Kalman Filter

MVD: Model View Definition

NIST: National Institute of Standards and Technology

NAVFAC: Naval Facilities Engineering Command

NOAA: National Oceanic and Atmospheric Administration

OSD: Office of the Secretary of Defense

OAT: Outside Air Temperature

PACRAT: Performance and Continuous Re-Commissioning Analysis Tool

PC: Personal Computer

PI: Principal Investigator

PLC: Programmable Logic Controllers

POC: Point of Contact

R: Resistance

RH: Relative Humidity

Page 14: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 xii May 2013

ROM: Reduced-Order Model

SCADA: Supervisory Control and Data Acquisition

SERDP: Strategic Environmental Research and Development Program

SIR: Savings to Investment Ratio

SQL: Structured Query Language

TMY: Typical Meteorological Year

UPS: Uninterruptible Power Supply

U.S.: United States

UTRC: United Technologies Research Center

V: Volts

VAV: Variable Air Volume

VFD: Variable Frequency Drive

Page 15: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 xiii May 2013

Page 16: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 xiv May 2013

ACKNOWLEDGEMENTS

This work was performed under the project EW10-15 administered by ESTCP (Environmental Security Technology Certification Program) technology program of the Department of Defense. We would also like to thank ESTCP Director, Dr. Jeffery Marqusee and the Program Manager, Dr. James Galvin and the Energy Manager at Naval Station Great Lakes, Mr. Peter Behrens, for their support.

Page 17: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 xv May 2013

EXECUTIVE SUMMARY

OBJECTIVES OF THE DEMONSTRATION The United Technologies Research Center (UTRC)1, with the sponsorship from DoD ESTCP program, has performed a demonstration of an advanced Building Energy Management System (aBEMS) that employs advanced methods of whole-building performance monitoring combined with statistical learning methods and data analysis to enable identification of both gradual and discrete performance erosion and faults. The specific technical objectives of the demonstration project were: 1) to demonstrate 10% building energy savings by providing the facility engineers with actionable energy fault information to identify and correct poor system performance, and 2) to demonstrate an additional 10% energy savings by identifying alternative energy system operation strategies that improve building energy performance. The demonstrated technology is targeted at commercial buildings that use building energy management systems. The demonstration was conducted in a drill hall/office building (Building 7230) and a large barracks facility (Building 7113/7114) at Naval Station Great Lakes. At Great Lakes, greater than 20% savings were demonstrated for building energy consumption by improving facility manager decision support to diagnose energy faults and prioritize alternative, energy efficient operation strategies. TECHNOLOGY DESCRIPTION The advanced building energy management system assimilated data from multiple sources including blueprints, reduced-order models (ROM) and measurements, and employed probabilistic graphical models and other advanced statistical learning algorithms to identify patterns of anomalies. The results were presented graphically in a manner understandable to a facilities manager. The system incorporated learning algorithms and simplified reduced-order simulation models to circumvent the need to manually construct and maintain a detailed building energy simulation model. This detailed building model is required for the existing technology (demonstrated in ESTCP project SI-0929) and represents a practical barrier to a broad scalable application. The facility Building Management System (BMS) was extended to incorporate the energy diagnostics and analysis algorithms, producing systematic identification of alternative, energy efficient HVAC operation strategies. The scalability of the solution has also been demonstrated by applying 1) load estimation techniques and reduced-order models for the building and HVAC systems, reducing the need for constructing specific, detailed models for each building, and 2) probabilistic graphic models for energy diagnostics, as the graphic structure does not have to be learned for similar equipment and systems every time.

DEMONSTRATION RESULTS The performance objectives were met during the demonstration as shown in Table 1.1. The overall performance evaluation for the aBEMS is summarized as follows: Greater than 20% savings was demonstrated for building energy consumption by improving

facility manager decision support to diagnose energy faults and prioritize alternative, energy efficient operation strategies

1 www.utrc.utc.com

Page 18: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 2 May 2013

A ROM library for building envelope and HVAC equipment has been developed, validated and tested by using demonstration buildings at Naval Station Great Lakes.

A prototype toolkit to seamlessly and automatically transfer a Building Information Model (BIM) to a Building Energy Model (BEM) has been developed and tested. This dramatically reduced the time to create a BEM (50% time reduction).

A tool chain for a scalable probabilistic graphical model based energy diagnostics has been established, tested and demonstrated. Greater than 15% energy savings was achieved by correcting AHU economizer faults. Greater than 95% of faults identified were classified correctly.

A ROM based HVAC operation sensitivity study has been implemented and greater than 20% energy savings was identified by pre-cooling/preheating the building, resetting chilled water supply temperature setpoints, resetting zone temperature setpoints, and optimizing outside air flow rate in the demonstration buildings.

A visualization dashboard for building performance energy monitoring, HVAC operation strategies prioritization and energy diagnostics has been developed and deployed in demonstration buildings at Naval Station Great Lakes. This dashboard provides an effective way for building facility managers to perform building performance decision-making.

Faults and issues identified by the advanced building energy management system were valued by the facility team because the tool provided additional visibility into the building operation that was not provided by the existing traditional building management system. This additional information allowed the facility team to identify previously unknown operational issues and prioritize their maintenance actions.

IMPLEMENTATION ISSUES The primary concern for the future implementation of the technology is the instrumentation cost. The largest components are the equipment and installation costs related to sub-metering and the on-site weather station. It is possible and reasonable to eliminate the on-site weather station by using weather data from the internet or an existing weather station on the base. There is a need for additional research efforts to establish cost-effective sub-metering. During the demonstration, the UTC stage-gated technology and product development processes have been applied to begin transitioning the technology into a commercial product. The advanced building energy management system will be a part of a new BMS product or will be applied as an overlay on an existing BMS.

Page 19: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 3 May 2013

Table 1.1 Performance Objectives Results

Performance Objective

Metric Data

Requirements Success Criteria2

Results

Quantitative Performance Objectives Reduce Building Energy Consumption (Energy) & Greenhouse Gas Emissions (CO2)

Building total electric consumption (kWh/ft2-yr) and peak demand (kW) Building total steam consumption (therm/ ft2-yr) and peak demand Building total equivalent CO2

emissions (kg)

Metering data for building electric and steam usage Building simulation data for equivalent CO2 emissions

>20% reduction in building total energy consumption (over baseline) >15% reduction in building peak demand energy (over baseline) >20% reduction in building total equivalent CO2 emissions (over baseline)

>20% reduction in building total energy consumption (over baseline) 7~15% reduction in building peak demand energy (over baseline) >20% reduction in building total equivalent CO2 emissions (over baseline)

Reduce HVAC Equipment Specific Energy Consumption (Energy)

Chiller (kW/ton) Cooling Tower (gpm/ton, kW/ton) AHU (kW/ton) Fan (kW/CFM) Pump (kW/gpm)

Sub-metering data for HVAC equipment

>10% reduction in HVAC equipment energy consumption (over baseline)

5~15% reduction in HVAC equipment energy consumption for AHU, Fan (over baseline)

Reduce Building Loads (Energy)

Lighting loads (kWh) Plug loads (kWh)

Sub-metering data for lighting and plug loads

>10% reduction in lighting or plug loads (over baseline)

>20% reduction in lighting load (Drill Hall) with occupancy control

Building & HVAC System Reduced-order Model (ROM) Validation

Building load (kWh) Building overall energy consumption (kWh/ft2-yr) HVAC equipment energy consumption (kWh)

Simulation data from detailed building model (i.e., EnergyPlus) Metering data for building electric and steam usage Sub-metering data for lighting and plugs loads Building measured data

Predicted building loads difference (absolute error) between detailed model and ROM within +/- 10% Overall building energy consumption accuracy within +/-15% (ROM vs. measurement) HVAC equipment energy consumption accuracy within +/-10% at the rated conditions (ROM vs. measurement)

Predicted building loads difference (absolute error) between detailed model and ROM within +/- 10% Overall building energy consumption accuracy within +/-15% (ROM vs. measurement) HVAC equipment energy consumption accuracy within +/-10% at the rated conditions (ROM vs. measurement)

Advanced Building Energy Management System Robustness

Percentage of faults classified correctly

Building energy fault identified/classified by advanced building energy management system

85% of faults identified are classified correctly (during 3-month demonstration period)

>95% of faults identified are classified correctly

2 Success criteria related to building and HVAC equipment energy consumption were assessed using both model-based simulations and actual energy measurements.

Page 20: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 4 May 2013

Advanced Building Energy Management System Payback3

Simple payback time SIR (Savings-to-Investment Ratio)

Cost to install and implement advanced building energy management system Savings from using advanced building energy management system

Simple payback time is less than 5 years4 SIR is greater than 1.25.

Simple payback time is less than 3 years SIR is greater than 2.5.

Qualitative Performance Objectives Ease of Use Ability of an energy

manager and/or facility team skilled in the area of building energy modeling and control to use the technology

Feedback from the energy manager and/or facility team on usability of the technology and time required to learn and use

With some training, An energy manager and/or facility team skilled in HVAC able to use the Advanced Building Energy Management System to identify and correct poor HVAC system performance

The user interface was refined based on feedback from facility team. The refined interface was well received.

Interactive and Visual Interface

Ability of an energy manager and/or facility team to effectively make building operation decision by using front-end user interface

Feedback from the energy manager and/or facility team on the interface

An energy manager and/or facility team able to more effectively exploit available building data to improve building operation decision-make

The user interface was refined based on feedback from facility team. The refined interface was well received. 

Energy Fault Identification, Classification and Prioritization

Ability to detect, classify and prioritize (based on energy impact) building faults

Building measured data Building simulation data

Energy manager and/or facility team able to detect , classify and prioritize (based on energy impact) building faults by comparing simulated building performance (design intent or optimal) against measured building performance

The system flags faulty behavior via anomaly scores. This information enables facility team to prioritize faults based on energy impacts from simulation models.

Energy Fault Corrective Action Prioritization

Ability to prioritize energy fault corrective actions based on energy impact

Building measured data Building simulation data

Energy manager and/or facility team able to prioritize energy fault corrective actions by comparing the simulated building

By comparing the simulated building energy impact benefits, the system enables facility team to prioritize the fault corrective action.

3 This payback success criterion is only applied to the case when the only retrofits considered are those that do not involve major equipment retrofits 4 DoD Energy Managers Handbook http://www.wbdg.org/ccb/DOD/DOD4/dodemhb.pdf

Page 21: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 5 May 2013

energy impact benefits for each fault corrective action alternative against the simulated or measured baseline building energy performance

HVAC System Operation Strategies Prioritization

Ability to prioritize the alternative energy efficient HVAC system operation strategies

Building measured data Building simulation data

Energy manager and/or facility team able to prioritize energy efficient HVAC system operating strategies by comparing the simulated building energy impact benefits for each HVAC operation strategy against the simulated or measured baseline building energy performance

Energy manager and/or facility team able to prioritize energy efficient HVAC system operating strategies by comparing the simulated building energy impact benefits for each HVAC operation strategy against the simulated or measured baseline building energy performance

Scalability Ability of advanced building energy management system to be scaled to different types and sizes of buildings Time to implement the system for a new building

Feedback from the energy manager and/or facility team on scalability; Implementation time for Drill Hall; Implementation time for Building 7113/7114

Type of building: successful demonstrations for office and barracks buildings; Size of building: scale from Drill Hall with smaller floor area to building 7113/7114 with bigger floor area; Implementation time is about 30% less for building 7113/7114 compared with Drill Hall

The aBEMS was successful implemented in Buildings with different type and different size (Building 7230: drill hall and office building with 70,000 sf2 vs. Building 7113/7114: barracks building with 300,000 sf2).

Page 22: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 6 May 2013

1.0 INTRODUCTION

1.1 BACKGROUND

The DoD (Department of Defense) is the largest single user of energy in the United States, representing 0.8% of the total US energy consumed and 78% of the energy consumed by the Federal government [1]. Approximately 25% of the DoD energy use is consumed by its buildings and facilities. The DoD currently has 316,238 buildings across 5429 sites and in 2006 its facility energy bill was over $3.5B [2]. The Office of the Secretary of Defense (OSD) published an energy policy to ‘ensure that the DoD infrastructure is secure, safe, reliable and efficient’ [3], and subsequent energy policy is being guided by the Energy Policy Act of 2005, Executive Order 13423, and the Energy Independence and Security Act of 2007 to ensure a 30% energy reduction by 2015. Due to the large energy footprint of DoD facilities, increasing building energy efficiency offers the largest opportunity for reducing DoD energy consumption. Building HVAC systems consume greater than 30% of a building’s energy consumption5 and ensuring sustained, operational efficiencies of building HVAC systems is the focus of this demonstration project. Studies show that building HVAC systems can consume greater than 20% more electrical energy than the design intent largely because of equipment performance degradation (e.g. filter or heat exchanger fouling), equipment failures, or detrimental interactions among subsystems such as cooling and then reheating of conditioned air [4]. Identifying the root causes of efficiency losses is challenging because gradual erosion of performance can be difficult to detect. Available technologies such as ENFORMA Building Diagnostics6 exist but focus on detecting equipment level faults and must be programmed using rules. A key barrier is the lack of information at sufficient detail to isolate abnormal changes in load conditions or anomalous equipment operations. While there has been considerable effort to develop and demonstrate advanced methods for building energy diagnostics and HVAC controls [5, 6, 7], the scalable realization of these methods has not been achieved. To address these challenges in a scalable manner, the United Technologies Research Center (UTRC)7 performed a demonstration of a building energy management system that employs advanced methods of whole-building performance monitoring combined with statistical methods learning and data analysis to enable identification of both gradual and discrete performance erosion and faults. The system assimilated data collected from multiple sources including blueprints, reduced-order models and measurements, and employed probabilistic graphical models and other advanced statistical learning algorithms to identify patterns of anomalies. The reduced-order model is a simplified model from the simplification of a high-dimensional physical model. The results were presented graphically in a manner understandable to a facilities manager. Importantly, the system incorporated learning algorithms and reduced-order simulation models to circumvent the need to manually construct and maintain a detailed building simulation model. This detailed building model is required for the existing technology (e.g., model-based

5Energy savings are based on 3.8 billion kWh per year of electricity consumed by DOD facilities in 2006 [1]. 6 www.archenergy.com 7 www.utrc.utc.com

Page 23: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 7 May 2013

real-time whole building energy performance monitoring and diagnostics demonstrated in ESTCP project SI-0929) and represents a practical barrier to a broad scalable application. The demonstration was conducted in three different buildings at the Naval Station Great Lakes. The facility building management systems were extended to incorporate the energy diagnostics and analysis algorithms, producing systematic identification of alternative, energy efficient HVAC operation strategies. More than 20% energy savings for building energy consumption was demonstrated via the implementation of advanced building energy management systems.

Expected Benefits: It is expected that the broad deployment of scalable building energy management systems that apply advanced energy diagnostics and alternative, energy efficient HVAC operation strategies will deliver 20% savings for HVAC energy consumption at DoD facilities. With an annual DoD facility energy spend of $3.5B, 20% energy savings would offer >$200M savings potential across all DoD facilities. Achievable annual energy savings amount to 0.8 billion kWh, which offer a reduction of 528,000 metric ton of CO2 per year8. Once the technology is commercialized, it is projected that the $200M DoD energy savings per year can be applied to the entire US building stock and will result in approximately $5.3B energy savings per year.

1.2 OBJECTIVE OF THE DEMONSTRATION

The objective of this project is to demonstrate an advanced building energy management system that enables facility managers to visualize building energy performance, diagnose building energy faults, and assess alternative, energy efficient HVAC operation strategies. The demonstration was carried out at Naval Station Great Lakes in Illinois. This project demonstrated the scalability of the advanced building energy management system to different types and sizes of buildings. This project delivered an advanced building energy management system that enables facility managers to visualize building energy performance, diagnose building energy faults, and assess alternative HVAC operation strategies (Figure 1.1). The advanced building energy management system was implemented as a software extension to the current existing Building Energy Management and Control System. For the Naval Station Great Lakes demonstration, this system interfaced directly with the Siemens Building Management System and resided on an independent computer. Prior to the demonstration, there was not any HVAC equipment shakedown/testing.

8 CO2 emission reduction based on US average of 1329 lb of CO2/MWh of electricity generated (0.60 metric ton CO2/MWh). http://www.epa.gov/cleanenergy/energy-resources/refs.html.

Page 24: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 8 May 2013

ReferencePerformance Metrics

BMSMeasurements

Alternative HVAC Operation

Strategies

Loads Diagnostics&

Visualization(3)

weather

Energy Fault Tree

Local controllerAutomatic or Human-gated

implementationReal-time Load Estimator (1)

HVAC Operation Sensitivity

Analysis (2)

Benchmarks (3)

HVAC/Power System &

Control Model

HVAC/Power System &

Control Model

HVAC/Power Monitoring

System (BMS)

HVAC/Power Monitoring

System (BMS)

OptimizedPerformance Metrics

RecommendationsActions

Benchmark Nominal Optimized Actual

0 4 8 12 16 20 24

Time of the day (hrs)

HVAC Set-Points

Energy Consumption/CostEnvironmental Impact

System Status

Figure1.1 Block Diagram of the Advanced Building Energy Management System

Page 25: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 9 May 2013

This project demonstrated the scalability of the advanced building energy management system to different types and sizes of buildings. Specifically, the scalability of tools and methods for load estimation, reduced-order models for the building and HVAC systems, building and HVAC system energy diagnostics, building and HVAC system energy visualization, and HVAC operation sensitivity analysis was demonstrated. The demonstrated technology is targeted at commercial buildings that use building energy management systems. The scalability of the solution was also demonstrated by applying 1) load estimation techniques and reduced-order models for the building and HVAC systems, reducing the need for constructing specific, detailed models for each building, and 2) probabilistic graphical models for energy diagnostics, where the graphical structure does not have to be learned for similar equipment and systems every time. The specific technical objectives of the demonstration project were 1) to demonstrate 10% building energy savings by providing the facility engineers with actionable energy fault information to identify and correct poor system performance, and 2) to demonstrate an additional 10% energy savings by identifying alternative energy system operation strategies that improve building energy performance.

1.3 REGULATORY DRIVERS

Executive Order 13423 [8], 13514 [9] and the Energy Independence and Security Act of 2007 (Title IV Subtitle C) require that U.S. federal agencies improve energy efficiency and reduce greenhouse gas emissions by 30% by 2015 relative to a 2003 baseline.

Page 26: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 10 May 2013

2.0 TECHNOLOGY DESCRIPTION

2.1 TECHNOLOGY OVERVIEW

The demonstrated technology focused on the scalability of the advanced building energy management system to different types and sizes of buildings. Specifically, the scalability of tools and methods for load estimation, reduced-order models for the building and HVAC systems, building and HVAC system energy diagnostics, building and HVAC system energy visualization, and HVAC operation sensitivity analysis were demonstrated. The project advanced and applied the following key technologies. 1) Load Estimation. A model-based estimation approach was used to provide information

about unmeasured data relative to building energy performance (e.g., internal loads, infiltration, etc.). Estimation was performed using extended Kalman Filters [25], and was based on building reduced-order models. Figure 2.1 shows the schematics of the real time load estimator. Details for the load estimation can be found in Appendix F.

Dynamic Reduced Order Building Model

Real time BMS data

Tosur Tisur Tamb Tzone

C

1/hiA 1/hoA R Qsurfi Qsurfo

C

Qstructure

Rwin

Extended KalmanFilter Based Estimator

Time update

Measurement update

Internal loads (Plug load, lighting load etc.)

0 200 400 600 800 1000 1200 14000

200

400

600

800

Qin

t (W

)

t (min)

Qint (W)

Figure 2.1 Schematics of the Real Time Load Estimator

2) Building Envelope and HVAC System Reduced-Order Models. Building Envelope and HVAC system reduced-order models were used to predict system energy performance in buildings. Dynamic models are important to explicitly capture the nonlinear and dynamic energy performance in actual buildings (e.g., building envelope thermal mass for the storage). The dynamic coupling that exists between HVAC subsystems also requires models that consider dynamics (e.g., the slow dynamics from the building envelope vs. the fast dynamics from the HVAC equipment; chiller etc.). The building envelope and HVAC system reduced-order models, based on thermodynamics, thermo-fluid laws, and heat transfer analysis, were used for the following: a) as a reference model to represent the ‘as-designed’ building operation; b) to estimate unmeasured variables and energy performance metrics; c) to perform HVAC operation sensitivity analysis to evaluate the impact of various HVAC operation strategies on the building energy performance; and d) to generate the ground truth data (i.e., the baseline) for data driven energy diagnostics.

Page 27: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 11 May 2013

Table 2.1 shows the developed modules in the building envelope reduced-order model. All modules were validated with measured data from the demonstration site, except for the infiltration model due to lack of data. However, the infiltration module was validated in the literature [24]. The detailed physics of each module are presented in Appendix E. Validation for the building envelope model is included in Appendix A.2.

Table 2.1 Individual Modules in the Building Envelope Reduced-order Model

System Component Model Validation/Verification

Envelope Solar Radiation √ √

Infiltration √ N/A

Window Heat Transfer √ √

Wall Heat Transfer √ √

Air Heat Balance √ √

Internal Load Generator √ √

Automatically generated ODE √ √

BIM generated model √ √ N/A: No data available for validation/verification

Models have been created for the HVAC equipment in the demonstration buildings as listed in Tables 2.2 and 2.3. Models created in Building 7230 were reused in Building 7112/7114 for similar equipment. These models are lumped steady-state reduced-order models (ROM’s). The models can be used for energy monitoring and trend analysis. They are not intended for distributed thermo-fluid or detailed control study. Models have been calibrated and validated when appropriate measured data was available. For equipment without measured data or with low-quality data, models have been examined with trends and ranges based on fundamental physics. Details for the model validation procedure and methodology are included in Appendix A.1.

Table 2.2 List of HVAC System Reduced-Order Models for Building 7230 System Equipment Quantity Model Validation/Verification

Primary Chiller 2 √ √ Secondary Cooling coil 4 √ √

(AHU) Heating coil 4 √ N/A Fan 8 √ √

Economizer 4 √ * Pump 2 √ √

Terminal

VAV with reheat 7 √ * Duct Free Split System (DFSS)

2 √ N/A

Unit heater 10 √ N/A

Utility Psychrometrics 13 √ √

Iteration solver 1 √ √

Page 28: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 12 May 2013

Table 2.3 List of HVAC System Reduced-Order Models for Building 7113/7114 System Equipment Quantity Model Validation/Verification

Primary Absorption chiller 2 √ **

Cooling tower 1 √ Verification Condenser pump 3 √ √

Secondary Cooling coil 10 √ N/A (AHU) Heating coil 8 √ N/A

Heat recovery coil 4 √ N/A Supply fan 10 √ √ Return fan 10 √ √

CHW pump 3 √ √ HW pump 4 √ √

Heat recovery

pump 4 √ N/A

Economizer 10 √ * Terminal VAV 238 √ N/A

Other

Unit heater (water) 5 √ N/A Unit heater (electric)

6 √ N/A

Exhaust fans 39 √ VFD fans

Utility Psychrometrics 15 √ √ Iteration solver 1 √ √

* Inconsistent controls for some units. (e.g., minimal damper positions specified by the control design document were not in the actual operation) ** Measured data of the condensate flow rate for heat inputs need to be improved N/A: No data available for the validation/verification

The reduced-order models do not require detailed descriptions of the equipment such as geometry and structure; therefore they can be readily reused or scaled for reuse. The HVAC system reduced-order models have been used for various model based studies including performance monitoring, controls and diagnostics. Although model formats can be kept the same, model parameters should be calibrated with the test data for a given system. Detailed descriptions of HVAC equipment models are included in Appendix G. Validation results of HVAC equipment models can be found in Appendix A.1.

The integrated building system model was developed based on previous implemented building envelope and HVAC system reduced-order models. The integrated model has four parts: 1) model initialization; 2) HVAC control logic; 3) coupling of the building envelope model with HVAC system models; and 4) interface with the building database and BMS. The overall schema of the integrated system model is illustrated in Figure 2.2. The integrated system model runs in the MATLAB [10] simulation environment. The coupling between the building envelope and the HVAC system models uses a “ping-pong” approach. At each time-step, the building envelope model passes the loads of all zones into the HVAC system model. The HVAC system model then calculates the required airflow and supply air temperature for each zone, which become inputs for the

Page 29: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 13 May 2013

next time step. The Extended Kalman Filter [25] has been implemented to estimate the uncertain parameters and/or inputs in the integrated model such as thermal capacitances and resistances of walls, internal mass of zones, and internal loads. The estimation module is scheduled to run every two weeks or can be invoked on demand.

Integrated BuildingModel

SimulationInitialization(Time step)

Envelope ROMInitialization

HVAC ROMInitialization

Initialization

BMS Data

BACnetDatabase

Envelope ROMModeling

HVAC ROMModeling

Modeling Results

Every two weeksor on demand

HVAC Control Logic

Zone Set-points

Ventilation

saT

sam

oaTsolQ

raT

loadQ

ii CR ,Heat/Cool Mode

ParameterEstimation

Figure 2.2 Overall Schema of Integrated System Model

3) Building and HVAC System Energy Diagnostics. Building and HVAC system data represents a hierarchical structure of power usage and the delivered heating/cooling throughout the building. Identifying at which level in this hierarchy a fault-cause occurs is crucial to effectively provide facility management decision support. Building and HVAC system energy anomalies were detected and decision support methods were used to direct the facility manager to the likely root causes that were prioritized by the magnitude of the energy impact. To perform energy diagnostics, data mining and model-based estimation approaches were used to provide energy anomaly detection. A number of complementary modeling methods were used to implement energy diagnostic decision support. These include probabilistic graphical models [11, 12] and expert rule-based threshold methods [26]. For example, the system level diagnostic model and one of its component diagnostic models for Building 7230 are shown in Figure 2.3.

.

Page 30: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 14 May 2013

System level graphical network Component level heat exchanger graphical network

Figure 2.3 Diagnostic Models for Building 7230

The graphical structure is learned from operational data by discovering the relationships between measured variables. The goal of this step is to learn the nominal behavior of the system. After this step the learned graphical structure is validated against domain knowledge and physics based understanding of the system. At this point the graphical network model for Fault Detection and Diagnostics (FDD) is used to analyze new data to generate an anomaly score quantifying the difference between a variable’s predicted state and its measured value. Based on the anomaly scores and a suitably chosen threshold, faults are detected & diagnosed by identifying anomalous variables. Details about the probabilistic graphical model based FDD can be found in Appendix H.

4) Energy Performance Visualization Tool. The current state-of-the-art building management systems (BMS) provide facility managers with a rich set of building data. This building data includes system and equipment performance (temperature, pressure, energy consumption of building systems, etc.), controller status, and equipment fault status. However, the interconnected complexity and large volume of this building data often complicate facility manager decision-making. Today, facility managers rely on their personal intuition and experience to perform building operation decision-making. This project developed an interactive, visual interface for facility managers to more effectively exploit available building data to improve building operation decision-making. The energy performance visualization tool enables: a) visualization of energy-related metrics at different building and HVAC systems levels; b) decision support to enable the identification and prioritization of alternative, energy efficient HVAC system operating strategies for facilities engineers; c) energy fault diagnostics and root cause analysis; and d) identifying persistent trends in energy usage. The energy performance visualization tool provided an interactive user interface for facility manager to access building energy operational data. The Integrated Buildings Energy and Diagnostics Visualization (iBED Viz) tool, developed in this project, provides an intuitive interface to view energy utilization at the building level and for major components, i.e., lighting, plug loads, heating, cooling, fans and pumps.

DEM DEMAND: Demand from electric meter (DEM: Digital Electric Monitor)

Page 31: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 15 May 2013

Advanced visualization features for easy navigation and drill-down analysis have also been implemented. The diagnostics interface takes a top-down approach which allows the operator to see building level health performance as well as component level health performance using a hierarchical building interface that lists key system components such as the chiller, heat exchanger and air handling units (AHU). Key features of the iBED Viz visualization system (highlighted in Figures 2.4, 2.5 and 2.6) are discussed in Appendix H.

Building Hierarchy Interface

Time-Series Energy Flows Interface

Energy Statistics Pie Chart Interface

Figure 2.4 Overview of the Energy Visualization Interface

Fault AlarmAnomaly score

Diagnostics Flag

Figure 2.5 A Screenshot of FDD Interface

Page 32: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 16 May 2013

Fault Impacts

Energy Impacts

Diagnostics Flag

Figure 2.6 A Screenshot of Fault Energy Impacts Interface

5) HVAC Operation Sensitivity Analysis. The current state-of-the-art building management systems do not readily provide facility managers with the capability to identify or prioritize alternative HVAC operation strategies that could deliver energy savings. Often, HVAC system energy improvement measures are down-selected for implementation without a rigorous assessment of the impact on the target building or HVAC system operation. The integration of the ROM for the building and HVAC systems with energy performance visualization offer an opportunity to rigorously assess energy impact of alternative HVAC operation strategies before and after implementation. HVAC operation sensitivity analysis methods were implemented within the energy performance visualization framework to allow the facility manager to identify and prioritize energy efficient HVAC operation alternatives for implementation. Both single and simultaneous multivariable sensitivity analysis methods were implemented. As an example, single variable sensitivity analysis will allow the facility manager to assess if an increase or decrease in chiller supply water temperature setpoints will cause higher or lower system level energy consumption. A multivariable sensitivity analysis will allow the facility manager to identify more complex operation strategies that will lead to overall lower energy consumption. For example, what direction and by how much should the chiller water supply temperature set-point and fan speeds be modified when load conditions vary. An HVAC operation sensitivity study based on the integrated ROM offers a great opportunity to rigorously assess energy impact of alternative HVAC operation strategies before and after implementation. Both single and simultaneous multivariable sensitivity analysis methods were implemented for Building 7230 and Building 7113/7114 based on the integrated building system model. Details about the operation sensitivity study can be found in Appendix A.3. The unique feature of the HVAC operation sensitivity study within the advanced building energy management system is that it compares the energy savings from different operation scenarios and provides actionable recommendations to the facility team. (Please refer to Figures H.15 and H.16 in Appendix H for examples).

Page 33: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 17 May 2013

6) Building Data Acquisition System. A Building Data Acquisition System (BDAS) was developed to acquire data from the BMS. The current version is able to acquire data from any BACnet protocol compatible system. In the future this software may be expanded to cover other protocols. The current version is based on the Building Control Virtual Test Bed (BCVTB) environment [13]. The following functions are supported by the BDAS system:

Get data from systems that support BACnet protocol Store data in a database

Details about the BDAS can be found in Appendix I. 7) Building Information Model (BIM) to Building Energy Model (BEM) Tool Kit. A

desirable building life cycle delivery process should include design, construction, commissioning and post-occupancy evaluation. It involves tremendous information storage and exchange. Although there are BIM based design tools such as Revit to represent building data for design and there are currently no tools available to systematically translate building design data into building operational BEM. This results in a time consuming and error prone building energy modeling, and also impacts the results of model-based FDD. To address this issue, a BIM to BEM toolkit was developed. This toolkit includes a BIM-based database and automatically simulation code generation. Details for this toolkit can be found in Appendix J.

2.2 ADVANTAGES AND LIMITATIONS OF THE TECHNOLOGY

The broad, scalable application of building energy management systems that apply advanced methods for HVAC operational controls and energy diagnostics to DoD’s facilities is a key for achieving the DoD’s energy reduction targets. Ensuring that the energy management decisions made by DoD facility managers is based on a building monitoring system that raises the visibility of energy performance is key for delivering building energy savings. The tangible DoD energy benefits are 20% savings for building energy consumption at DoD facilities where 10% is achieved through improved visibility of building energy diagnostics that provide facility engineers actionable data to identify and correct poor system performance and an additional 10% reduction achievable by providing HVAC set-points that would optimize system performance. With an annual DoD facility energy spend of $3.5B and a 20% building energy reduction achieved through the application, the aBEMS would offer >$200M savings potential across all DoD facilities. Achievable annual energy savings amount to 0.8 billion kWh9, which offers a reduction of 528,000 metric ton of CO2 per year10. The intangible DoD benefits are to provide consistent energy management practices utilized by its facility managers through increased visibility into equipment performance, better informed decisions on maintenance and operational issues, improved forecasting of equipment life and equipment replacement and upgrade programs, and a reduction in emergency equipment failures. Ultimately energy benchmarking and best-practice sharing across DoD facilities can also be achieved.

9 Energy savings are based on 3.8 billion kWh per year of electricity consumed by DOD facilities in 2006 [1]. 10 CO2 emission reduction based on US average of 1329 lb of CO2/MWh of electricity generated (0.60 metric ton CO2/MWh). http://www.epa.gov/cleanenergy/energy-resources/refs.html.

Page 34: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 18 May 2013

The advanced building energy management system differs from existing Energy Information Systems (EIS) in the following ways:

This system augments an existing BMS with additional sensors/meters and uses a reduced-order model and diagnostic software to make performance deviations visible.

Existing systems neither provide a viable means to quantify the value of a proposed HVAC operation strategy, nor a methodology to quantify the value of different strategies. This system employs a physics-based ROM sensitivity study that is useful to estimate the economic value of different HVAC operation strategies. This actionable information will facilitate the facility manager’s decision-making process.

Compared to purely rule-based technologies such as PACRAT [14], this system uses a scalable physics-based ROM together with data mining techniques such as probabilistic graphical network models for rigorous energy diagnosis.

Existing systems do not provide a means to calculate and visualize the energy impact due to faults.

The technical risks and the corresponding mitigations are summarized as follows:

1) The model accuracy is crucial for model based HVAC operation sensitivity studies. A load estimator was used to provide more realistic internal load input profiles to the model. Model calibration is very important and can be handled well by using auto-tuning tools [15].

2) The effectiveness and reliability of the data mining methods are directly related to the quality of the data collected (data gaps, inconsistent sensors, lack of full system information). Risk mitigation includes 1) supplementing the data with inputs derived by physics-based models, statistics and domain knowledge, and 2) sensor diagnostics.

3) The corrective actions to correct faulty operation or other deficiencies identified by the tool may require modifications to building systems that are outside the scope of this contract or substantial capital expenditures that are beyond the means of this contract. Mitigation efforts were focusing on modifications to the control system that are realizable with minimal effort, and also on relatively simple fixes to the HVAC or lighting systems that fall within the expertise of the team and local facility staff.

4) The relatively high implementation cost is a major limitation. The largest components are the equipment and installation costs related to sub-metering and the on-site weather station. It is possible and reasonable to eliminate the on-site weather station by using weather data from the internet or an existing weather station on the base. A detailed cost analysis is provided in Section 6. To address this challenge, a low cost and scalable building energy monitoring system should be the focus of one of the future research efforts (see Appendix K for the details). This system should include:

o A comprehensive design guideline to determine the minimum set of sensors for deploying energy monitoring systems in DoD buildings;

o Virtual sensors derived from physical based models; o Low cost, scalable building electrical and thermal energy sub-metering;

Page 35: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 19 May 2013

o Middleware that provides seamless data acquisition and automated point mapping into the advanced building energy management systems;

o Automated sensor health monitoring that combines heuristic rules, physics based models and data mining algorithms.

5) A deployment concern for this technology is the skill level required to install and maintain the system. A user manual and training for end users such as facility managers and building operators is necessary.

Page 36: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 20 May 2013

3.0 SITE/ FACILITY DESCRIPTION

3.1 SITE/FACILITY LOCATION AND OPERATIONS, AND CONDITIONS

The first demonstration site was Building 7230, the Naval Atlantic Drill Hall, at Naval Training Center, Great Lakes, IL. Building 7230 is a two-story facility with a drill deck, office, and administrative rooms. The gross area of this building is approximately 69,218 ft2. The second demonstration sites were Buildings 7113 and 7114 at Naval Training Center, Great lakes, IL. Building 7113 is a 149,875 ft2 recruit barracks and is a long rectangular building, consisting of a large block of berthing compartments, heads (bathrooms), laundry rooms, classrooms, a quarterdeck with a two-story atrium and office spaces, and a large cafeteria/galley. Buildings 7113 and 7114 are functionally similar (i.e., include barracks, classroom, and cafeteria etc.) and share a common central chilled water plant. Figure 3.1 shows the location of Building 7230 (Drill Hall), Building 7113 and 7114

Figure 3.1 Location of Buildings 7230, 7113 and 7114

Building 7230 The Drill Hall (Building 7230) HVAC system consists of four airside systems and two separate waterside systems. The drill deck is supplied by two variable-air volume (VAV) air handling units with heating and cooling capability. Operation of these units depends on the occupancy of the drill deck space. Double-walled sheet metal ductwork with a perforated liner and drum louvers distribute the air throughout the space. The office and administrative area is served by one VAV air handling unit with VAV terminal units (with hot water reheat). The classroom is served by one VAV air handling unit. The chilled water system consists of two 100-ton air-cooled rotary-screw type chillers with fixed-speed primary pumping and variable-speed secondary pumping. Heating is supplied from the existing base-wide steam system through a steam-to-water heat exchanger. The hot water serves unit heaters, VAV box reheating coils, and air handling unit heating coils. There is an instantaneous stream-to-domestic hot water generator

7230

7113

7114

Page 37: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 21 May 2013

for domestic hot water service. The server room and communication service room are served by dedicated split systems. Table 3.1 lists major HVAC equipment used in building 7230.

Table 3.1 Major Equipment Used in Building 7230 Equipment Number Manufacturer

Duct free split system 2 Carrier Air cooled screw chiller 2 Carrier Variable volume AHU 4 Carrier Suspended unit heater 7 Vulcan Cabinet unit heater 3 Vulcan VAV box with hot water reheat coil 8 TITUS Pumps 7 Bell & Gossett

Building 7113/7114 When Building 7113/7114 was occupied by recruits, the building was occupied 24 hours a day for seven days a week. Recruits spent about 85% of their time in the barracks. Recruits left the barracks for drills and marches and during personal time on Sunday and holidays. The HVAC equipment in Building 7113 is located in five (5) mechanical rooms and an attic space. Building 7114 shares the absorption chillers, cooling tower, heating hot water heat exchangers, chilled water pumping system, heating hot water pumping system, and the condenser water pumping system with building 7113. The following equipment is used in Building 7113.

Table 3.2 Major Equipment Used in Building 7113 Equipment Number Manufacturer

Air Cooled Condensing Unit 1 -- Variable volume AHU 5 Trane Exhaust fan (in mechanical room) 12 -- Roof Exhaust Fans For Dining/Galley 7 -- Hot water unit heater 3 Vulcan Electric unit heater 3 Vulcan Drying Room Cabinet Unit Heaters 18 Vulcan VAV box with hot water reheat coil 81 TITUS VAV box without hot water reheat coil 48 TITUS Pumps 1 Bell & Gossett Coil run around heat recovery systems 2 --

The HVAC equipment in Building 7114 is located in six (6) mechanical rooms and attic space. The following equipment is used in Building 7114.

Page 38: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 22 May 2013

Table 3.3 Major Equipment Used in Building 7114 Equipment Number Manufacturer

Air Cooled Condensing Unit 1 -- Steam to hot water heat exchanger 2 -- Absorption chiller 2 Trane Variable volume AHU 5 Trane Exhaust fan(in mechanical room) 12 -- Roof Exhaust Fans For Dining/Galley 7 -- Hot water unit heater 3 Vulcan Electric unit heater 3 Vulcan Drying Room Cabinet Unit Heaters 18 Vulcan VAV box with hot water reheat coil 162 TITUS VAV box with hot water reheat coil 81 TITUS VAV box without hot water reheat coil 48 TITUS Pumps 12 Bell & Gossett Coil run around heat recovery systems 2 -- Cooling Tower 1 BAC

A distributed Direct Digital Control (DDC) system, APOGEETM Insight by Siemens Building Technologies is installed in Buildings 7230, 7113 and 7114. This system monitors all major lighting and environmental systems. Building electric meters are also read by the DDC system. Operator workstations provide graphics with real-time status for all DDC input and output connections. The energy manager and facility team at Naval Station Great Lakes were willing to endorse and support the demonstration from the beginning of the demonstration. The demonstrated advanced building energy management system was implemented as an overlay on the existing BMS and had no directly interfaces with the HVAC equipment and system operation in the demonstration buildings. The advanced building energy management system provided actionable information about building operation such as HVAC system/equipment health status and fault priority list based on energy impacts etc. Currently, the communication between the existing BMS and the advanced building energy management system is one-way, and building operators have the authority to take final actions based on the information provided by advanced building energy management system.

3.2 SITE/FACILITY IMPLEMENTATION CRITERIA

The implementation of the aBEMS depends on the existing building control system communication capability. In general, the aBEMS can be applied to any commercial buildings with a BMS. It is desirable that the existing BMS in the building supports an open communication protocol such as BACnet, LonWorks, or Modbus. For the buildings that are not compatible with these open communication protocols, the BMS vendor can provide data drivers to make the building operational data available. Another criterion for site selection is whether the building is undergoing a major renovation or has the renovation plan in the near future. The aBEMS is intended to apply to buildings that are operating in a relatively stable state.

Page 39: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 23 May 2013

Based on building stock information extracted from the DoD’s real property asset database (RPAD11) and from CBECS12 database, there are 31,461 buildings across the DoD with an area greater than 10,000 ft2. It is likely that a BMS exists in these buildings and the demonstrated advanced building energy management system will be applicable. To reduce the initial cost associated with the advanced building energy management system, DoD should begin to mandate that DoD facilities to install energy meters at the intermediate level recommended by the ASHRAE performance measurement protocols13. This will support an enhanced level of understanding of building performance and to identify possible areas of performance improvement through the use of the advanced building energy management system. Energy meters include:

HVAC total electric HVAC fan electric Chiller plant electric Nonelectric heating (other fuel) Electric heating, when significant electrical that is present Indoor lighting total electric Miscellaneous electric (Plug loads) Thermal BTU meters for chilled water loop and hot water loop Thermal BTU meters for hot water loop

3.3 SITE-RELATED PERMITS AND REGULATIONS

Regulation: None Environmental Permit: None Agreements: None

11 The RPAD database contains a total of 216985 buildings. 12 Commercial Building Energy Consumption Survey (CBECS) http://www.eia.gov/consumption/commercial/ 13 ASHRAE. 2010. Performance Measurement Protocols for Commercial Buildings

Page 40: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 24 May 2013

4.0 TEST DESIGN AND ISSUE RESOLUTION

4.1 CONCEPTUAL TEST DESIGN

The technology was demonstrated in two phases at Naval Station Great Lakes. Phase 1 targeted a single building (Great Lakes Building 7230). Building 7230 is a Navy drill hall and represents buildings with large interior spaces. Integrated reduced-order models (building envelope and HVAC systems) were constructed and calibrated based on as-built drawings and other reference material. Building instrumentation was deployed and data was collected. Tasks included energy diagnostics and decision support methods, energy visualization tool, and HVAC operation sensitivity analysis methods. They were implemented to improve building performance at Great Lakes. Phase 2 demonstrated the scalability of the proposed approach, and expanded the capabilities developed for a single building to a building campus at Naval Station Great Lakes (Buildings 7113, 7114, 7230). The scalability issues addressed in Phase 2 considered demonstration across buildings of different and similar types. Building 7113 represents a multi-function building that includes barracks, classroom, and cafeteria that is functionally different from Building 7230. Buildings 7113 and 7114 are functionally similar (i.e., include barracks, classroom, and cafeteria) and share common central chilled water plant and were also used to demonstrate the scalability to buildings of different size. The objective for Phase 2 was to demonstrate the scalability of the advanced energy management systems to a campus level at Naval Station Great Lakes. Scalability addressed how reduced-order models and estimation methods for building and HVAC systems, and the energy diagnostics, visualization, and HVAC operation sensitivity analysis can be reused. Additional metering is required to calibrate models and accurately measure energy consumption to validate results. For Building 7230, the existing instrumentation system from ESTCP project SI-0929 [16] was utilized with additional measurements (i.e., chilled water BTU meters at the AHU local level). For Buildings 7113 and 7114, sub-meters (DEM) were installed to measure lighting and plug loads at building level. BTU meters were installed for both hot water and chiller water loops. The steam consumption for absorption chillers was monitored through condensate meters. Details about the additional instrumentation for Building 7113/7114 can be found in Section 4.3. These sensors/meters were integrated into the existing Siemens BMS, and a prototype middleware interface was installed to enable information flow to a Personal Computer (PC) located within the building. This PC also hosted the aBEMS.

4.2 BASELINE CHARACTERIZATION

An existing operation baseline model was used in this project. The existing operation baseline model is a reduced-order model (both building envelope and HVAC systems) that represents the current building operational practice. The model inputs include a description of the building (e.g., location, orientation, geometry, shading, envelope material and construction), weather, lighting and plug load profiles, occupancy and the HVAC system sequence of operation. The model computes the building energy consumption for the HVAC system, lighting and plug loads at a 5-minute interval.

Page 41: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 25 May 2013

The building description was obtained from the design documentation and as-built drawings. In the case where some of the information was not available, either an on-site investigation or an empirical estimate was used to determine these parameters. The HVAC system sequence of operation was obtained by combining the information from the control design documents, the existing BMS programs, and interviews with the building operators. The weather data was collected from the augmented instrumentation (i.e., on site weather station). The lighting and plug load profiles were estimated from the additional building level sub metering. The real occupancy profiles for classrooms and compartment areas were derived from the motion sensor data. If the motion count exceeded 5 within 5 minutes, the space was considered to be occupied. Load profiles were also assessed using a load estimator. A model-based estimation approach was used to provide estimates of internal loads within the building. The estimation is built using a building reduced-order model from the building thermal network and measured data (e.g., temperatures, airflow rates) from the BMS, with considerations for sensor noise and model uncertainties. Appendix F provides the details for the load estimator. After the initial model is built, a calibration process was applied to match the simulation results with the measured data by tuning the model input data. An uncertainty analysis was also performed to quantify model accuracy. The building envelope and HVAC system reduced-order models are based on thermodynamics, thermo-fluid laws, and heat transfer analysis. These models were used in the following ways: a) as a reference model to represent the ‘as-operated’ building operation; b) to estimate unmeasured variables and energy performance metrics; c) to perform HVAC operation sensitivity analysis to evaluate the impact of various HVAC operation strategies on the building energy performance; and d) to generate the ground truth data for probabilistic graphical model based energy diagnostics.

4.3 DESIGN AND LAYOUT OF TECHNOLOGY COMPONENTS

Instrumentation and Monitoring The required measurement points and measurement accuracy have been taken from the Specifications Guide for Performance Monitoring Systems (http://cbs.lbl.gov/performance-monitoring/specifications/). 1) Building 7230 The existing instrumentation system from ESTCP project SI-0929 [16] was used. This includes an on-site weather station, electric sub-meters for chillers, lighting and plug loads, and thermal BTU meters for hot water loop and chilled water loop. Additional BTU meters (including a matched pair of supply and return chilled water temperature sensors and water flow measurements) at the AHU level were installed as shown in Figures 4.1 and 4.2.

Page 42: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 26 May 2013

Figure 4.1 Approximated Locations for BTU Meters at AHU1 and AHU2 in Building 7230

 

Figure 4.2 Approximated locations for BTU meters at AHU4 in Building 7230

2) Building 7113/7114 The additional hardware and software necessary to implement the advanced building energy management system in Building 7113/7114 are listed in Table 4.1. All of the building performance monitoring points that were required for the demonstrated system are listed in Table 4.2. Approximately 2773 points were mapped from Siemens BMS system to the demonstrated system. The cost estimates for these monitoring points are provided in Section 6. The installation details and exact locations were determined on site with the subcontractor that installed and

Page 43: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 27 May 2013

calibrated the equipment. Approximated locations for the additional instrumentation are shown in Figure 4.3 to 4.7.

Table 4.1 Additional System Tool Components for Building 7113/7114

Component Quantity Note

PC 1 Window XP, 2.5GHz processor speed, 1 GB memory, 250 GB hard drive, UPS is recommended.

Siemens BACnet Server

1 Establish the communication capability between the Siemens APOGEETM system and the demonstrated system (data acquisition).

Table 4.2 Performance Monitoring Points List for Building 7113/7114

Point needed Status

Note New Existing

Outside air temp X Aspirated weather station is required.

Outside air wet bulb X

Pyranometer X

Wind speed/direction X

Building pressure X

Main power meter X

Lighting load power X

The approximated locations are shown in Figure 4.3. (the actual location may be slightly different due to differences between as-built drawing and actual layouts)

Plug load power X The approximated locations are shown in Figure 4.4.

Absorption chiller steam condensate meter

X The approximated locations are shown in Figure 4.7.

CHW secondary pump power

X Utilize the VFD power measurement.

CHW supply temp X Matched pair sensors are recommended and the approximated locations are shown in Figure 4.5.

CHW return temp X Matched pair sensors are recommended and the approximated locations are shown in Figure 4.5.

CHW flow meter X The approximated locations are shown in Figure 4.5.

HW pump power Utilize the VFD power measurement.

HW supply temp X Matched pair sensors are recommended and the approximated locations are shown in Figure 4.6.

HW return temp X Matched pair sensors are recommended and the approximated locations are shown in Figure 4.6.

Page 44: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 28 May 2013

HW flow meter X The approximated locations are shown in Figure 4.6.

Condenser fan power Utilize the VFD power measurement.

AHU supply fan power

X Utilize the VFD power measurement.

AHU return fan power

X Utilize the VFD power measurement

Zone temperatures X

Zone relative humidity (RH)

X

VAV box damper position

X

VAV box flow X

VAV box reheat coil valve

X

AHU supply air Temperature

X

AHU mixed air temperature

X Average sensors are recommended.

AHU return air temperature

X

AHU static pressure X

AHU air flow X

AHU heating coil X

AHU cooling coil X AHU economizer damper position

X

Page 45: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 29 May 2013

 

Figure 4.3 a) Approximated Locations of Additional Power Meters/CTs (Lighting Loads):

Sub-meters for Lighting Loads in (Building 7114)

 

Figure 4.3 b) Approximated Locations of Additional Power Meters/CTs (Lighting Loads): Sub-meters for Lighting Loads (Building 7113)

Page 46: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 30 May 2013

  Figure 4.3 c) Approximated Locations of Additional Power Meters/CTs (Lighting Loads):

Sub-meters for Emergency Lighting Loads (Building 7113/7114)

Figure 4.4 Approximated Locations of Additional Power Meters/CTs (Plug Loads):

Figure 4.5 Approximated Locations for Chilled Water BTU meters

Page 47: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 31 May 2013

 

Figure 4.6 Approximated Locations for Hot Water BTU Meters

  Figure 4.7 Approximated Locations for Absorption Chiller Steam Condensate Meters

4.4 OPERATIONAL TESTING

There were two demonstration phases. Phase 1 targeted a single building (Great Lakes Building 7230). Phase 2 demonstrated the scalability of the proposed approach, and expanded the capabilities developed for a single building to a building campus at Naval Station Great Lakes (Buildings 7113/7114).

Page 48: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 32 May 2013

Phase 1: Building 7230 Off-Line Demonstration The off-line demonstration for Building 7230 was conducted from 07/01/2010 to 03/31/2011. This phase began right after the additional building instrumentation had been installed and calibrated. There were four activities in this phase: The building ROM was assessed through a direct comparison between the ROM building

modeling approach and the detailed building model approach (i.e., the EnergyPlus model used in ESTCP project SI-0929). The building ROM model was also tested against the ASHRAE 140 standard - Method of Test for The Evaluation of Building Energy Analysis Computer Programs [17]. The test results are included in Appendix E. The outcome from this assessment was a “Go” decision for the ROM building modeling method to be applied in phase 2.

The project team calibrated the ROM using the building measurement data. During this phase, the required data was acquired from the existing Siemens BMS and stored in a database to make it available for the off-line demonstration. Data was used to: 1) calibrate the reference ROM and 2) identify potential system energy faults and to identify opportunities for corrective actions.

A manual process was used to analyze the building performance by comparing the measured data and the reference ROM outputs. This analysis quantified the performance deviation in terms of energy impact and identified root causes for potential faults. The ROM was also used to conduct the preliminary HVAC operation sensitivity study for different HVAC operation strategies in Building 7230 (See Table A.4 in Appendix A).

The offline demonstration of the advanced building energy management system for Building 7230 was setup on a PC at the UTRC’s Integrated Building Energy and Control Laboratory. There were four main components: integrated building model module, database module, FDD module and visualization module. The measured data from Building 7230 was stored in the database for the period of May 2010 to December, 2010. A building information model (BIM) data base was designed to have a relational database schema to facilitate the storage of building operational data and FDD analysis data. The integrated model reads data from the database every five-minute, runs the simulation and stores the results back into the database. The FDD model runs every one hour. Visualization was triggered when requested by the user. Figure 4.8 shows the overview of offline demo integration structure.

Figure 4.8 Overview of Offline Demonstration Integration Structure

Page 49: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 33 May 2013

Phase 2: Building 7113/7114 On-Site Demonstration This onsite demonstration in Building 7113/7114 was conducted from 04/01/2011 to 04/30/2012. This phase began right after the off-line demonstration in phase one. The schematic diagram for an online implementation of the advanced building energy management system is shown in Figure 4.9. The computer server running the aBEMS is located in the same building location as the PC running the Siemens BMS. The required building performance data was collected through the existing BMS and made accessible to the advanced building energy management system through a data acquisition module.

PC running BMS

Siemens EMCS

Siemens BACNet Interface

PC running advanced Building Energy Management System (aBEMS)

EthernetData

Acquisition Data Base

Energy Diagnostics

Visualization Reduced Order Models

Sensitivity Analysis

BCVTB

Figure 4.9 Advanced Building Energy Management System (aBEMS) Schematic Diagram

Within the advanced building management system there are several modules necessary to achieve the system functional requirements for an on-site demonstration. The Data Acquisition module, developed from the open source Building Control Virtual Testbed (BCVTB), is used to acquire the relevant measured building performance data from the Siemens BACnet interface through an Ethernet connection. The Data Acquisition module also transfers the data to the Data Base module which is storing data into the database. The sampling interval for this demonstration is 5 minutes. The calibrated ROM module that represents the design/optimal building performance is receiving data (e.g., weather data, estimated loads) used by the simulation and executing the reference ROM at each 5 minute interval. The ROM simulated results then are passed back to the Database module where the results are stored in the database. The Sensitivity Analysis Module uses the ROM to prioritize different HVAC operation strategies and results are stored in the database. The Energy Diagnostic module is used to execute the diagnostic tool at every four hours. The Energy Diagnostic tool communicates directly with the Database to retrieve historical data (building measurements and building reference model predictions). The Energy Diagnostic tool applies data mining and anomaly detection methods to identify building faults. The database stores all the relevant building performance data and ROM simulation results every 5 minutes and stores the Energy Diagnostic tool results (faults and recommendations) every four hours. The database used in this demonstration is PostgreSQL. Any Structured Query Language (SQL) database (e.g., MySQL) can be integrated to the aBEMS. The visualization is the user front-end interface to demonstrate the results as well as to display the measured building performance data. Visualization is trigged whenever requested by the user.

Page 50: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 34 May 2013

The aBEMS was running as an application on a computer at Building 7113/7114 to automatically and/or semi-automatically invoke the different functional modules (Data Acquisition, Database, ROM, Energy Diagnostics, and Sensitivity Analysis). A visual user interface application was available on the PC desktop. This user interface application allowed the facility team to plot a comparison of building energy consumption data, the ROM output and sensitivity analysis results. The user interface application also allowed the facility team to automatically identify what building performance metrics are anomalous and where corrective actions should be prioritized. Figure 4.10 shows the demonstration system in Building 7113/7114, which is located in the Building 7114 penthouse. At the end of the demonstration, the advanced building energy management system was left in place and turned over to the site facility management team.

Figure 4.10 Demonstration System in Building 7113/7114

4.5 SAMPLING PROTOCOL

The existing Siemens APOGEETM BMS collects all the building performance data, including the additional measurement data proposed by this project. The data communication within APOGEETM is done with a Siemens proprietary protocol. In order to acquire the relevant data for this demonstration project, an APOGEETM BACnet interface was installed. This BACnet interface allows the existing Siemens BMS to exchange data with an external data acquisition system through the BACnet protocol. A sampling frequency of 5 minutes was selected to ensure the collection of sufficient data to represent the real-world building operating conditions. BACnet is a communications protocol for building automation and control networks. It is an ASHRAE, ANSI, and ISO standard protocol. BACnet was designed to allow communication of building automation and control systems for applications such as heating, ventilating, and air-conditioning control, lighting control, access control, and fire detection systems and their associated equipment. The BACnet protocol provides mechanisms for computerized building automation devices to exchange information, regardless of the particular building service they perform. The data acquisition module in the demonstrated system acquires building performance data from the Siemens BACnet interface. The communication was established through an Ethernet

Siemens BMS

Advanced Building Energy Management System (aBEMS)

Page 51: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 35 May 2013

connection. Data quality control information is provided in Section 4.6 and relevant building performance sampling points are presented in Tables 4.1 and 4.2 in Section 4.3.

4.6 EQUIPMENT CALIBRATION AND DATA QUALITY ISSUES

Calibration of Equipment All the equipment specified in Section 4.3 was calibrated when installation was complete. The calibration procedures strictly followed manufacturer guidelines14. During the building performance monitoring period, the team assessed sensor drift for the data points collected from the BMS. The team applied a data statistical analysis protocol that computes various statistics to ensure computed values are within acceptable ranges. Specifically, data for each measured point was used to compute the minimum value, maximum value, mean (average) and standard deviation. If the computed values were outside of the reference range, the data was flagged and further analyzed to identify the root cause. The majority of measurement points were directly from the existing BMS, where the controller vendor (e.g., Siemens at Great Lakes) closely monitored these points based on control industry standards and protocols to make sure that all the measurements were within the acceptable accuracy band. Quality Assurance Sampling Data quality is very important for the performance of the aBEMS. The sampling frequency has an effect on the type of faults that the system can detect. In general, a faster sampling frequency is better. Since the goal was to detect the energy related faults, a five-minute sample frequency was used. Scripts were used to automatically remove the duplicated data and spiked samples from raw data, synchronize data, and output clean, conditioned data for an analysis within the system. Missing data is possible even though the instrumentation and monitor systems are designed and commissioned to be reliable. Statistical methods such as extrapolation, interpolation and trend analysis, augmented by domain expertise, were applied to fill in the missing data. For quality assurance sampling, the team took the following approaches: Duplicates – Two measurements for some important points were deployed in the building

system. For example, there were duplicated temperature measurements for both hot water and chilled water. The current BMS already has water temperature sensors. Additional paired water temperature sensors (supply and return) were installed at the appropriate location. This improved reliability and quality of the data collected.

Spiked samples – Spiked samples are defined as measurements that are taken for certain points and then compared against expected values obtained in “laboratory setting”. Spiked samples are used to measure accuracy. For the sensors used in building systems such as temperature sensors and flow sensors, it is difficult to have spiked sample testing after these sensors are in

14 BTU meters; http://www.onicon.com/System10.shtml Outside air temperature http://www.vaisala.com/en/products/humidity/Pages/HMT330.aspx Electric meter (DEM): http://cn.siemens.com/cms/cn/English/SBT/downloading/Building_Automation_Product_Home/Direct_Digital_Controller/Documents/DEM/DEMElectricalSeries10002000Datasheet_EN_1173020.pdf

Page 52: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 36 May 2013

place. However, these sensors have been tested and calibrated before the installation. For example, temperatures sensors are usually calibrated in the lab for certain points such as 0°C (ice-water mixture) and 100°C (water boiling point).

Blanks samples - Blank samples are clean samples, produced in the field, used to detect analytical problems during the whole measurement process. In the automated continuous commissioning system, blanks samples were created when the building was in normal operation in order to establish and calibrate a baseline model.

Data Analysis Quality of the data acquired from the BMS is crucial for the success of this project and a data quality review is an integral aspect of the implemented approach. Robust data quality evaluation includes testing for precision, accuracy, representativeness (including sampling rate and latency issues) and completeness of the data. Data precision [18] is how close agreement exists between sensor values obtained by replicating measurements on the same or similar objects under specified conditions. Precision is used to define measurement repeatability and measurement reproducibility. Repeatability is the variability of a measurement when keeping all controllable and uncontrollable factors constant. It is typically measured by taking data very close together in time, under similar conditions in a laboratory setting. Reproducibility is the variability due to specific controllable or uncontrollable factors by observing measurements at various system configurations. Typical statistical techniques used to accomplish this are analysis of variance and analysis of covariance methods. The team used the specification sheets provided by sensor manufacturers as a guideline but in cases where sensors didn’t perform as expected; further analysis and in-house testing were performed. In addition to the above steps, the data collected from the BMS is subjected to a protocol that computes various statistics on the data to ensure computed values are within acceptable ranges. These values were computed periodically for various lengths of time and the values were compared with reference values obtained from the accuracy analysis (using spiked values or duplicates when appropriate). If the computed values were outside of the reference range, then the data was flagged and further analyzed to identify and (and possibly discard) any spurious data points. This process served as a final sanity-check before the data was used for diagnostics.

4.7 SAMPLING RESULTS

Table 4.3 lists summary information regarding the data collected in this project. All the data is stored in the PostgreSQL database residing on the host PC in Great Lakes.

Table 4.3 Building Data Facts

Building Data points Sampling frequency

Duration Measurement variables

BLDG7230 688 5 minutes 04/12/2010 to present

Temperatures, water flow rates, air flow rates, damper/valve positions, duct pressure, setpoints, control outputs (command)

BLDG7113/7114 2733 5 minutes 03/03/2011 to present

Page 53: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 37 May 2013

Figures 4.11 to 4.15 show example data plots for data taken from Building 7114 from August 5th, 2011 to August 25th, 2011.

08/05 08/10 08/15 08/20 08/2550

55

60

65

70

75

80

85

90

95

Times

Out

side

Air

Tem

pera

ture

(F

)

Figure 4.11 Building 7113/7114 Outside Air Temperature

60 65 70 75 80 85 90 9560

65

70

75

80

85

90

95

AHU1 Outside Air Temperature (F)

AH

U1

Mix

ed A

ir T

empe

ratu

re

Figure 4.12 Building 7114 AHU1 Mixed Air Temperature vs. Outside Air Temperature

Page 54: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 38 May 2013

08/05 08/10 08/15 08/20 08/25

200

400

600

800

1000

1200

1400

Times

Chi

ller

2 B

TU

Met

er F

low

Rat

e (G

PM

)

Figure 4.13 Building 7114 Chiller 2 Chilled Water Flow Rate

30 40 50 60 70 80 9030

40

50

60

70

80

90

100

Chiller 2 Supply Water Temperature (F)

Chi

ller

2 R

etur

n W

ater

Tem

pera

ture

(F

)

Figure 4.14 Building 7114 Chiller 2 Supply Water Temperature vs. Return Water Temperature

Page 55: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 39 May 2013

08/05 08/10 08/15 08/20 08/2540

45

50

55

60

65

70

75

80

85

90p

times

AH

U1

Tem

pera

ture

s (F

)

DAT Setpoint

DAT

Figure 4.15 Building 7114 AHU1 Discharge air Temperature vs. Setpoint

Page 56: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 40 May 2013

5.0 PERFORMANCE RESULTS

5.1 SUMMARY OF PERFORMANCE OBJECTIVES AND OUTCOMES

Table 5.1 below provides the summary for evaluating the performance of the aBEMS demonstrated at Great Lakes.

Table 5.1 Performance Objectives

Performance Objective

Metric Data

Requirements Success Criteria15

Results

Quantitative Performance Objectives Reduce Building Energy Consumption (Energy) & Greenhouse Gas Emissions (CO2)

Building total electric consumption (kWh/ft2-yr) and peak demand (kW) Building total steam consumption (therm/ ft2-yr) and peak demand Building total equivalent CO2 emissions (kg)

Metering data for building electric and steam usage Building simulation data for equivalent CO2 emissions

>20% reduction in building total energy consumption (over baseline) >15% reduction in building peak demand energy (over baseline) >20% reduction in building total equivalent CO2 emissions (over baseline)

>20% reduction in building total energy consumption (over baseline) 7~15% reduction in building peak demand energy (over baseline) >20% reduction in building total equivalent CO2 emissions (over baseline)

Reduce HVAC Equipment Specific Energy Consumption (Energy)

Chiller (kW/ton) Cooling Tower (gpm/ton, kW/ton) AHU (kW/ton) Fan (kW/CFM) Pump (kW/gpm)

Sub-metering data for HVAC equipment

>10% reduction in HVAC equipment energy consumption (over baseline)

5~15% reduction in HVAC equipment energy consumption for AHU, Fan (over baseline)

Reduce Building Loads (Energy)

Lighting loads (kWh) Plug loads (kWh)

Sub-metering data for lighting and plug loads

>10% reduction in lighting or plug loads (over baseline)

>20% reduction in lighting load (Drill Hall) with occupancy control

Building & HVAC System Reduced-order Model (ROM) Validation

Building load (kWh) Building overall energy consumption (kWh/ft2-yr) HVAC equipment energy consumption (kWh)

Simulation data from detailed building model (i.e., EnergyPlus) Metering data for building electric and steam usage Sub-metering data for lighting and plugs loads Building measured data

Predicted building loads difference (absolute error) between detailed model and ROM within +/- 10% Overall building energy consumption accuracy within +/-15% (ROM vs. measurement) HVAC equipment energy consumption accuracy within +/-10% at the rated

Predicted building loads difference (absolute error) between detailed model and ROM within +/- 10% Overall building energy consumption accuracy within +/-15% (ROM vs. measurement) HVAC equipment energy consumption accuracy within +/-10% at the rated

15 Success criteria related to building and HVAC equipment energy consumption were assessed using both model-based simulations and actual energy measurements.

Page 57: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 41 May 2013

conditions (ROM vs. measurement)

conditions (ROM vs. measurement)

Advanced Building Energy Management System Robustness

Percentage of faults classified correctly

Building energy fault identified/classified by advanced building energy management system

85% of faults identified are classified correctly (during 3-month demonstration period)

>95% of faults identified are classified correctly

Advanced Building Energy Management System Payback16

Simple payback time SIR (Savings-to-Investment Ratio)

Cost to install and implement advanced building energy management system Savings from using advanced building energy management system

Simple payback time is less than 5 years17 SIR is greater than 1.25.

Simple payback time is less than 3 years SIR is greater than 2.5.

Qualitative Performance Objectives Ease of Use Ability of an energy

manager and/or facility team skilled in the area of building energy modeling and control to use the technology

Feedback from the energy manager and/or facility team on usability of the technology and time required to learn and use

With some training, An energy manager and/or facility team skilled in HVAC able to use the Advanced Building Energy Management System to identify and correct poor HVAC system performance

The user interface was refined based on feedback from facility team. The refined interface was well received.

Interactive and Visual Interface

Ability of an energy manager and/or facility team to effectively make building operation decision by using front-end user interface

Feedback from the energy manager and/or facility team on the interface

An energy manager and/or facility team able to more effectively exploit available building data to improve building operation decision-make

The user interface was refined based on feedback from facility team. The refined interface was well received. 

Energy Fault Identification, Classification and Prioritization

Ability to detect, classify and prioritize (based on energy impact) building faults

Building measured data Building simulation data

Energy manager and/or facility team able to detect , classify and prioritize (based on energy impact) building faults by comparing simulated building performance (design intent or optimal) against measured

The system flags faulty behavior via anomaly scores. This information enables facility team to prioritize faults based on energy impacts from simulation models.

16 This payback success criterion is only applied to the case when the only retrofits considered are those that do not involve major equipment retrofits 17 DoD Energy Managers Handbook http://www.wbdg.org/ccb/DOD/DOD4/dodemhb.pdf

Page 58: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 42 May 2013

building performance

Energy Fault Corrective Action Prioritization

Ability to prioritize energy fault corrective actions based on energy impact

Building measured data Building simulation data

Energy manager and/or facility team able to prioritize energy fault corrective actions by comparing the simulated building energy impact benefits for each fault corrective action alternative against the simulated or measured baseline building energy performance

By comparing the simulated building energy impact benefits, the system enables facility team to prioritize the fault corrective action.

HVAC System Operation Strategies Prioritization

Ability to prioritize the alternative energy efficient HVAC system operation strategies

Building measured data Building simulation data

Energy manager and/or facility team able to prioritize energy efficient HVAC system operating strategies by comparing the simulated building energy impact benefits for each HVAC operation strategy against the simulated or measured baseline building energy performance

Energy manager and/or facility team able to prioritize energy efficient HVAC system operating strategies by comparing the simulated building energy impact benefits for each HVAC operation strategy against the simulated or measured baseline building energy performance

Scalability Ability of advanced building energy management system to be scaled to different types and sizes of buildings Time to implement the system for a new building

Feedback from the energy manager and/or facility team on scalability; Implementation time for Drill Hall; Implementation time for Building 7113/7114

Type of building: successful demonstrations for office and barracks buildings; Size of building: scale from Drill Hall with smaller floor area to building 7113/7114 with bigger floor area; Implementation time is about 30% less for building 7113/7114 compared with Drill Hall

The aBEMS was successful implemented in Buildings with different type and different size (Building 7230: drill hall and office building with 70,000 ft2 vs. Building 7113/7114: barracks building with 300,000 ft2).

Page 59: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 43 May 2013

5.2 PERFORMANCE RESULTS DISCUSSION

Each performance objective presented in Table 5.1 is described in the following paragraphs. Additional details about the performance assessment can be found in Appendix A. Quantitative Performance Objectives 1. Reduce Building Energy Consumption (Energy) & Greenhouse Gas Emissions (CO2).

Purpose: The ultimate goal of the aBEMS is to reduce energy consumption, peak electric demand, and greenhouse gas emissions in DoD facilities by providing actionable information to facility managers and building operators. This objective is to reduce building total energy consumption including HVAC, lighting and equipment (i.e., plug loads). For example, turning off lights when the space is unoccupied will reduce total building electricity consumption significantly. To achieve 20% energy savings at the building level, 10% savings is achieved by visualizing energy diagnostics and an additional 10% energy savings is achieved through alternative energy system operation strategies. Metrics and Success Criteria: The metrics used to assess this objective and the success criteria are listed as following:

Total electric consumption (kWh/(ft2-year)): 20% reduction over the baseline (10% energy savings by visualizing energy diagnostics and an additional 10% energy savings through alternative energy operation strategies)

Peak electric demand (kW): 15% reduction over the baseline Total steam consumptions (therm/(ft2-year)): 20% reduction over the baseline Peak steam demand : 15% reduction over the baseline Total equivalent carbon dioxide (CO2) emissions (kg): 20% reduction over the

baseline Data: The above metrics were assessed with model based simulations and actual building energy consumption measurement. The baseline building is the current as-built building without any energy fault corrective actions. The data required to calculate these energy-related metrics are either simulation data or metering data for building electric, hot water, chilled water and steam usage. The simulation data was used for calculation of equivalent CO2 emissions. Analytical Methodology: Quantitative comparisons were performed: 1) between measured data from current as-built building and the building with faults corrected and/or 2) between predictions from different operation strategies based on a calibrated building ROM. Results: The following faults were detected and diagnosed at the demonstrated sites: Building 7230 (Drill Hall) and Building 7113/7114.

Economizer faults: Approximately 2,000 CFM more outside air intake during non-economizer modes (Building 7230)

Lighting faults: lights on during unoccupied hours (Building 7230) Economizer faults: The control sequence of operation was incorrect due to errors in

the enthalpy calculations. This caused significantly more outside air intake during hot summer days (e.g., 100% vs. minimal outside air intake) (Building 7113/7114).

Economizer faults: Outside air fraction was not minimal in the heating mode (Building 7113/7114).

Absorption chiller issues: Chiller 1 was turned off due to operational issues during the whole demonstration period. Chiller 2 had issues related to a leaky steam pipe and,

Page 60: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 44 May 2013

steam valve oscillation. Chilled water temperature setpoints could not be maintained during hot summer days, consequently, the AHU supply temperature setpoints and room temperature setpoints could not be maintained (Building 7113/7114)

As an example, Figure 5.1 below shows the measured chilled water consumption vs. outside air temperatures for July (with faults) and August (faults corrected) in Building 7114. The chilled water BTU meter measurement confirmed 18% chilled water consumption reduction due to the corrected economizer faults. Details for the energy faults diagnostics and savings calculations can be found in Appendices A.4 and A.5

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

B7114 CHW Average

 BTU

/hr

OAT BINS (F)

With Faults

Faults Corrected

Figure 5.1 Measured Chilled Water Consumption Comparisons (with Faults vs. Faults

corrected)

The following HVAC operation strategies were evaluated using the integrated ROM:

Pre-cooling and pre-heating (Building 7230) Chilled water supply temperature (CHWT) setpoint reset (Building 7230) Zone temperature setpoint reset (Building 7113/7114) Out air fraction optimal control(Building 7113/7114)

Table 5.2 below shows the operation sensitivity results for Building 7230. More details about the HVAC operation sensitivity study assessment can be found in Appendix A.3.

Table 5.2 Results of Sensitivity Study for Cooling Season in Building 7230

Energy Savings in July 2010  Pre-cooling Savings

Pre-cooling and CHWT Setpoint Reset Savings 

Chiller Electricity  15.4%  18.1% 

Whole Building Level Electricity  7.2%  8.2% 

Peak Demand  12.5%  14.7% 

The summary of the identified savings and related payback for Building 7113/7114 is provided in Table 5.3. Details for the performance assessment in terms of savings calculations can be found from Appendix A.5.

Page 61: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 45 May 2013

It is assumed that the equivalent carbon dioxide (CO2) emissions reduction is proportional to energy consumption reduction.

Table 5.3 Summary of Selected Savings Opportunities for Building 7113/7114

Selected energy savings strategies

Energy Savings (%) compared with current operation

Annual savings in $ a

Simple payback b

Economizer faults (enthalpy calculation )

18% (chilled water consumption c)

$12,950 No capital cost

Zone temperature daytime setpoint reset (from 70°F to 74°F) in the cooling season

16% (B7113)

18% (B7114)

$52,734d No capital cost

Zone temperature daytime setpoint reset (from 72°F to 68°F) in the heating season

11% (B7113)

15% (B7114)

Zone temperature daytime setpoint reset together with outside air control in the cooling season

24% (B7113)

12% (B7114)

Zone temperature daytime setpoint reset together with outside air control in the heating season

23% (B7113)

39% (B7114)

a) Assume 1) $0.069 per kWh for the electricity; 2) $8.7 per MMBTU for the steam; 3) Use 2011 utility bill for the baseline energy consumption.

b) Only consider the capital cost required to implement these energy savings strategies. c) Measured savings based on BTU meter data from July 2011 to August 2011. d) Assume 20% HVAC related energy savings (electricity and steam) at the campus level (the rationale

is provided in Appendix A.5.

2. Reduce HVAC Equipment Specific Energy Consumption. Purpose: Energy consumption reduction was also evaluated at the HVAC equipment level. Metrics and Success Criteria: The following metrics and criteria were selected for the evaluation of individual equipment performance:

Chiller (kW/ton): 10% reduction over the baseline Air handling unit – AHU (kW/ton): 10% reduction over the baseline Fan (kW/CFM): 10% reduction over the baseline Pump (kW/GPM): 10% reduction over the baseline Cooling tower (GPM/ton, kW/ton): 10% reduction over the baseline

Data: These metrics were assessed with HVAC equipment power sub-metering data and measurement of HVAC equipment airflow rates (fans) and water flow rates (pumps).

Page 62: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 46 May 2013

Analytical Methodology: Quantitative comparisons were performed: 1) between measured data from current as-built building and the building with faults corrected and/or 2) between predictions from different operation strategies based on a calibrated building ROM. Results: The HVAC operation sensitivity study shows that the air-cooled chiller performance was improved by 5-10% in the terms of kW/ton. Fan electricity consumption was reduced by 10 ~ 11%. Due to issues with the chiller plant in Building 7113/7114 (See Appendix A.1 for details), the Building 7113/7114 absorption chiller performance optimization was not included in the demonstration.

3. Reduce Building Loads (Energy). Purpose: Reducing building loads (e.g. lighting, plug) is an effective way to reduce building demand energy. It is quite common to find lighting and other equipment operating when it is unnecessary (e.g., lights on during unoccupied hours). The aBEMS was able to automatically detect this type of fault. Metrics and Success Criteria: The following metric and criteria were used to assess this performance objective:

Lighting or plug loads (kWh): 10% reduction over the baseline Data: Sub-metering data for lighting and plug loads (electric equipment such as computers and printers) was used to assess the reduction in energy use (kWh) Analytical Methodology: Quantitative comparisons were performed between predictions from different operation strategies based on a calibrated building ROM. Results: Lights in Building 7230 were on during unoccupied hours. Based on a calibrated building model, the electricity consumption at the building level could be reduced by 23% if occupancy based light control was implemented in Building 7230.

4. Building & HVAC System Reduced-order Model (ROM) Validation. Purpose: One featured innovation from the aBEMS is that it employs an integrated, reduced-order model for a whole building. This model provides hourly calculations of building energy consumption, HVAC, and lighting systems performance, taking into account the dynamic interactions among the building envelope, airflow, weather, internal loads, building usage, equipment, and controls. The performance generated by this physics-based reference model, which represents “design intent” or ideal performance, is compared with measured data from the building. The performance deviation will indicate sub-optimal operation or faults. The ROM was also used for the HVAC operation sensitivity analysis. The data generated from the ROM was used as the baseline for the FDD module. Metrics and Success Criteria: The following metrics and criteria were used to evaluate building model accuracy:

Building load (kWh): Predicted building load difference (absolute error) between a detailed model (i.e., EnergyPlus model) and a ROM within ±10%.

Building overall energy consumption (kWh/(ft2-yr)): Accuracy within ±15% compared with real data.

HVAC equipment energy consumption (kWh): Accuracy within ±10% compared with real data at rated conditions.

Data: Measured data was used to validate the building reference model. The measured data include metering data for building electric and steam usage, and sub-metering data for HVAC equipment. Historical utility bills were also used for model validation. The outputs from EnergyPlus such as building thermal loads at different levels (e.g., zonal and building levels) were used to validate the building reference ROM.

Page 63: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 47 May 2013

Analytical Methodology: Quantitative comparisons were performed: 1) between predictions from a detailed model (i.e., EnergyPlus model) and a ROM, and 2) between measurements and predictions from a ROM. The building reference ROM performance predictions differed from the actual building performance measurements. However, given that this ROM contains a representation of the actual physics in the building, it can be used to assess the relative differences in building performance due to incremental building changes (e.g., control set-points, equipment faults). Therefore, while the overall absolute performance accuracy of the model may be ±15%, the model can be used to assess the performance impact of incremental changes relative to a baseline, calibrated model configuration. Essentially, the relative model uncertainty for these building incremental changes is significantly lower than the absolute model accuracy. This allows the impact on the project performance objectives to be assessed using the building reference models. Results: Extensive validation has been performed for the reduced-order models in terms of load predictions from the building envelope ROM and energy performance predictions from the HVAC equipment ROM and the integrated system ROM. Appendices A.1 to A.2 provide detailed information about the validation results. Table 5.4 shows the comparisons between annual and peak loads predictions from the detailed building performance model (EnergyPlus) and the ROM.

Table 5.4 Annual and Peak Loads Comparisons between the EnergyPlus and the ROM for Building 7230

Loads (building level) EnergyPlus ROM error*

Annual cooling (MW-hr) 169.3 174.7 3.18 %

Peak cooling (kW) 140.6 144.4 2.72 %

Annual heating (MW-hr) 96.1 106.7 10.98 %

Peak heating (kW) 174.2 162.6 6.67 %

* The error is computed relative the predictions of the EnergyPlus model

Figure 5.2 shows HVAC equipment model validation results for Building 7113/7114. Figures 5.3 and 5.4 illustrate the validation results with measurements for an integrated system ROM of Building 7230 and Building 7114. It is observed that the model accuracy is worse when low load conditions existed. In addition, measurements with low load conditions (e.g., middle of the night) had some spikes due to transient behaviors of building thermal loads. However, the energy impacts at low load conditions most time are negligible. For example, considering a typical summer day in Building 7114, the HVAC electricity consumption from 12:00am to 4:00am is less than 5% of total daily electricity consumption. And the chilled water consumption from 12:00am to 4:00am is less than 10% of total daily chilled water consumption.

Page 64: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 48 May 2013

Total PumpsCooling 

Tower Fans

AHU 

Supply Fans

AHU 

Return Fans

Exhaust 

Fans

Dev ‐5% ‐4% ‐13% ‐4% ‐3% ‐12%

‐25%

‐20%

‐15%

‐10%

‐5%

0%

Electric Energy Deviation 

Target ±10% at rated conditions

Figure 5.2 Electric Energy Deviation Errors for HVAC Components Models in Building

7113/7114

01/02 01/07 01/12 01/17 01/22 01/27

0

500

1000

HW

Co

nsu

mp

tion

(kB

TU

)

MeasuredSimulated

01/02 01/07 01/12 01/17 01/22 01/27-20

-10

0

10

20

Diff

ere

nce

(%

)

Figure 5.3 Comparisons of Hot Water Energy Consumption between Predictions from a

ROM and Measurements in January, 2011 for Building 7230

Target +/-15%

Page 65: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 49 May 2013

07/06 07/07 07/08 07/090

200

400

600

800B

LDG

7114

Coo

ling

Load

(kW

)

SimulatedMeasured

07/06 07/07 07/08 07/09

-15

0

15

Diff

eren

ces

(%)

Figure 5.4 Cooling Season Integrated Model Validation from 07/06/2011 to 07/10/2011 for

Building 7114

In summary, the total building load comparisons show that the differences between measurements and predictions for the integrated ROM are within the ±15% target for the majority of time (as shown in Figure 5.5). The model prediction errors are outside the ±15% error band when there are low load conditions. This is as expected because the HVAC ROM performance is degrading at non-rated conditions.

-60 -40 -20 0 20 40 600

5

10

15

20

Per

cent

age

of O

ccur

renc

e (%

)

Relative Error Bins (%)

More than 85% time, the error is less within ±15%

Figure 5.5 Model Error Distribution for Cooling Season Integrated Model Validation from

7/06/2011 to 07/10/2011 for Building 7114

5. Advanced Building Energy Management System Robustness. Purpose: It is critical for the success of this project that the aBEMS should be able to identify and classify building faults correctly.

Target +/-15%

Page 66: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 50 May 2013

Metrics and Success Criteria: During the demonstration period, it is expected that 85% of the faults identified by the aBEMS system will be classified in line with the building facility manager and/or the team assessment of fault causes. Data: Building energy faults identified/classified by the advanced building energy management system and the assessments from the building experts (e.g., building facility manager) Analytical Methodology: To quantify the accuracy of the diagnostics algorithm, a dataset with known faults (a priori) is needed. The algorithms can be then applied to the dataset to quantify how many of the known faults were detected correctly. Results: The data from the AHU1 economizer in Building 7114 during March 1 -31, 2012 was chosen. It was assumed (confirmed with the faculty team) that the outside air damper should operate at the minimal opening position whenever the AHU is in the heating mode (i.e., heating valve is open and hot water pump is ON). If the damper is not at the minimal position, then a fault is occurring and should be detected. The confusion matrix (e.g., matrix of fault classification accuracy) in Table 5.5 shows the numbers of accurate classifications, missed detections and false alarms for this fault. This matrix contains information about actual and predicted classifications done by the FDD method. True anomalies were detected correctly 2740 times out of 2843 actual anomalies corresponding to an accuracy of 96.38%. No fault condition was detected correctly 612 times out of 781 times (78.36%). The false alarm rate was 21.64% and missed detection rate was 3.62%.

Table 5.5 Confusion Matrix for Fault Classification Accuracy yTRUE FALSE Total

TRUE 2740 103 2843FALSE 169 612 781

Total 2909 715 3624

Details about this confusion matrix can be found in Appendix A.4. 6. Advanced Building Energy Management System Payback Time.

Purpose: Simple Payback (SPB) and SIR (savings-to-investment ratio) were used as metrics to assess the economic viability of the aBEMS. Metrics and Success Criteria: The following criteria were used to evaluate the advanced building energy management system SPB: less than 5 years. DoD Energy Mangers Handbook [19] recommends that all

projects with 10 year or less simple payback that fit within financial constraints shall be implemented.

SIR: greater than 1.25. An investment is cost effective if its SIR is greater than 1.0. Under DoD funding programs, SIR is typically required to be 1.25 or higher [19].

Data: Cost to install and implement the advanced building energy management system. Savings from using advanced building energy management system for the demonstration sites. Analytical Methodology: The MILCON ECIP template in the NIST BLCC program [20] was used to calculate the SPB (Simple Payback) and SIR (Savings to Investment Ratio) for the aBEMS deployed at the demonstration sites. A practical SIR formula for building related projects, recommended by NIST [20], was used in this project:

Page 67: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 51 May 2013

(1)

Where: : Ratio of operational savings to investment-related additional costs, computed

for the alternative relative to the base case; : Savings in energy costs attributable to the alternative;

: Savings in water costs attributable to the alternative; : Difference in OM&R costs;

: Additional initial investment cost required for the alternative relative to the base case;

: Difference in capital replacement costs; : Difference in residual value.

All amounts in Equation (1) are in present values.

If , ΔWt ΔOM&Rt are assumed to be the same in every year (i.e., there is no price escalation and quantities of energy and water saved each year are the same) and there are no additional non-annually recurring OM&R or replacement costs, the following simplified formula can be used to compute simple payback time (SPB)[20]:

(2)

Where: : Additional initial investment cost; : Annual savings in energy cost; : Annual savings in water cost;

: Annual difference in OM&R costs. Results: Tables 6.5 and Table 6.6 in Section 6.2 summarize the cost analysis results for the Building 7113/7114 demonstration. Details about this cost analysis can be found in Section 6.2 and Appendix B. In summary, with current initial costs of $150,129 and HVAC related energy savings of 20%, the SPB for the advanced building energy management system in Building 7113/7114 is 2.85 years and the SIR is 2.78.

Qualitative Performance Objectives 1. Ease of Use.

Purpose and Metrics: The aBEMS should be an easy of use tool with an interactive interface for building facility managers and operators. The potential users of this aBEMS tool include the building energy manager and/or facility team who are skilled in the area of building HVAC systems (e.g., building energy modeling and controls). With some training, they should able to use the aBEMS to identify and correct poor HVAC system performance Results: The feedback from Great Lakes facility team on the usability of the technology and time required to learn and use the aBEMS system was used to help the project team to develop, evaluate, and refine the aBEMS. The refined interface was well received.

2. Interactive and Visual Interface. Purpose and Metrics: The aBEMS should provide an interactive and visual interface for facility managers and building operators to facilitate them to effectively make building operation decision.

Page 68: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 52 May 2013

Results: The feedback from these users on the interface was used to help the project team to develop, evaluate, and refine the interface. The user interface was refined based on feedback from Great Lakes facility team and the refined interface was well received.

3. Energy Fault Identification, Classification and Prioritization. Purpose and Metrics: The aBEMS should be able to detect, classify and prioritize building faults based on energy impact. Results: The aBEMS enabled the energy manager and/or facility team to detect, classify, and prioritize building energy system faults based on energy impact by comparing simulated building performance (design intent or optimal) against measured building performance. The aBEMS automatically identified whole building performance deviations from the reference reduced-order model by using probabilistic graphical network models, cluster analysis and domain expertise. This enabled root cause analysis of these deviations, not only identification of a pre-defined, rule-based, set of equipment faults. It also provided a means to prioritize the faults based on energy impact. The data required to evaluate this metric was obtained from measurement and simulation.

4. Energy Fault Corrective Action Prioritization. Purpose and Metrics: The aBEMS should be able to prioritize energy fault corrective actions based on energy impact. Results: The aBEMS enabled the energy manager and/or facility team to prioritize energy fault corrective actions by comparing the simulated building energy impact benefits for each fault corrective action against the simulated or measured baseline building energy performance. The physics-based, calibrated reduced-order models were used to evaluate the energy and economic value of alternative correction actions. The data required to evaluate this metric was obtained from measurements and simulation.

5. HVAC System Operation Strategies Prioritization. Purpose and Metrics: The aBEM should be able to prioritize the alternative energy efficient HVAC system operation strategies. Results: The aBEMS enabled the energy manager and/or facility team to prioritize energy efficient HVAC system operating strategies by comparing the simulated building energy impact benefits for each HVAC operation strategy against the simulated or measured baseline building energy performance. The data required to evaluate this metric was obtained from measurements and simulation.

Page 69: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 53 May 2013

6.0 COST ASSESSMENT

A cost model for the Advanced Building Energy Management System ( aBEMS) is provided in Table 6.1. A detailed discussion is given in the following subsections.

6.1 COST DRIVERS

Hardware Capital Cost The hardware capital costs are mainly attributed to the additional instrumentation, which is required to provide run-time model inputs, calibrate models and do energy performance diagnostics. A BMS with BACnet gateway is a requirement for implementing the technology. In cases where the BACnet gateway is absent and needs to be provided, additional cost is incurred. The measurements related to run-time weather inputs are outdoor dry bulb temperature, outdoor relative humidity, direct normal solar radiation, diffuse solar radiation, wind speed and direction. The additional measurements required to track key performance metrics are electrical power sub-metering and thermal energy consumption for cooling and heating. The sub-metering of the electrical power should be able to measure the whole building electrical power and separate the lighting electrical power, plug load electrical power, key HVAC equipment (e.g., chiller) and total HVAC equipment electrical power. The detailed breakdown costs for materials used for the demonstration are listed in Table 6.2 for Building 7113/7114. Existing instrumentation from ESTCP EW-0929 [16] was used for Building 7230 with additional chilled water BTU meters at the AHU level.

Table 6.1 Cost Model aBEMS

Cost Element Data Tracked During the

Demonstration Estimated Costs ($)

Hardware capital costs Estimates made based on component costs for demonstration

$70,919

Installation costs Labor and material required to install $79,210

Consumables Estimates based on rate of consumable use during the field demonstration

N/A

Facility operational costs Reduction in energy required vs. baseline data

N/A

Maintenance Frequency of required maintenance Labor and material per maintenance

action

One day per year ($1,000)

Hardware lifetime Estimate based on components degradation during demonstration

0

Operator training Estimate of training costs One day ($1,000)

1 Detailed list of materials and analytical costs provided in Sections 6.1 and 6.2

Page 70: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 54 May 2013

Table 6.2 Materials Cost for Building 7113/7114 Instrumentation Items Cost Percentage

8 BTU meters $39,144 55% 10 DEMs (Digital Energy Monitor) $12,738 18% 2 steam condensate meters $2,455 3% BACnet server $5,500 8% Wireless solution for weather station $6,500 9% PC $4,582 6% Total $70,919

Table 6.3 Labor Cost for Building 7113/7114 Instrumentation

Items Cost Percentage 8 BTU meters $34,250 43% 10 DEMs (Digital Energy Monitor) $19,175 24% 2 steam condensate meters $6,895 9% BACnet server $9,510 12% Wireless solution for weather station $9,380 12% PC NATotal $79,210

Table 6.3 lists the labor cost breakdowns for instrumentation. The labor cost covers sensor/meter installation and points mapping within Siemens BMS.

Weather Station and Real Time Weather Data Real time weather data from an on-site weather station, including solar radiation data, are essential to reduce model prediction error. Statistical TMY3 weather data can cause the model predictions to significantly deviate from measured data. For the July 2010, the average difference between measured outside air temperature and TMY3 data is about 5.4°F (3°C), and maximum difference is about 23°F (12.75°C). When deploying the technology, there are a few options that can be considered for cost reduction:

1) If internet access is available, the data from the NOAA website (National Oceanic and Atmospheric Administration) could be used directly without installing the weather station. If internet access is not available, as is the case at Naval Station Great Lakes, then a weather station has to be installed to access real time weather data.

2) Multiple buildings on one campus are able to share one weather station with the necessary network setup to reduce the cost per building. It is possible that this kind of network setup (e.g., a centralized BMS) is not available for some campuses.

Building 7113/7114 is only about 100 feet away from Building 7230 which has an on-site weather station installed (ESTP EW-0929). Unfortunately, the BMS networks from these two buildings cannot communicate with each other due to a Navy IT security policy. To reduce the cost, a wireless sub-network was created to acquire and transfer the weather information directly from the existing weather station in Building 7230 to the BMS network in Building 7113/7114. Table 6.4 compares the cost for two options. The total cost was reduced by more than 50% with a wireless solution.

Page 71: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 55 May 2013

Table 6.4 Comparisons of two options for weather station Materials Labor Total

Wireless Solution $6,500 $9,380 $15,880

New Weather Station $21,990 $10,695 $32,685 Additional Sub-metering The cost associated with the sub-metering is site-specific and presents the highest variable cost. The number of electric power meters needed to disaggregate depends on the layout of electrical circuits. The end-uses can be as few as four or greater than ten. The number of electric power meters needs to be determined by reviewing the electrical as-built drawings and through an on-site audit. The instrumentation for thermal energy measurement needs to be determined on a site-by-site basis, e.g., electromagnetic vs. turbine flow meter, hot water measurement vs. steam measurement. If long straight pipe sections are available, a more cost effective turbine flow meter will be sufficient. Otherwise, a magnetic flow meter is required. If district heating or cooling is present, the need for chiller electric power measurement and boiler fuel measurement can be eliminated if the focus is at the building level. Other Costs A dedicated computer to host the software needed by the aBEMS is required. Most commercial available computers are adequate. A BACnet gateway is required only if the existing BMS is not BACnet compatible.

Several site-specific characteristics that will significantly impact cost are highlighted here:

Networking capability for campus applications. If networking is available to allow multi-building sharing of a weather station, then only one weather station is needed.

Electrical system layout. A good electrical system design requires significantly fewer electric power meters to disaggregate the end-uses.

Cooling and heating distribution system. If long straight main pipe segments are not available, then multiple BTU meters will need to be installed on the piping branches to obtain the total thermal energy consumption.

6.2 COST ANALYSIS AND COMPARISON

The MILCON ECIP template in the NIST BLCC program [20] is used to calculate the SPB (Simple Payback) and SIR (Savings to Investment Ratio) for the aBEMS in Building 7113/7114. Section 5 and Appendices A.3, A.4 and A.5 provide details of savings opportunities from the demonstration buildings. It is shown that annual energy savings of $52,734 could be achieved for electricity and steam for Building 7113 and 7114. It is assumed that there will be ~$1,000 savings per year per building for operation and maintenance costs due to the fact that the system down-time could be reduced and the facility team could better prioritize their work orders. The following assumptions are used:

$0.069/kWh for electricity and $8.7 /MMBTU for steam

Page 72: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 56 May 2013

No demand charge Real discount rate of 3% Inflation rate of 1.2% Length of study period is 10 years

A few different capital cost scenarios (Table 6.5 for Building 7113/7114) were proposed after the analysis of the current capital cost structure. Figure 6.1 illustrates the capital cost structure for Building 7113/7114. The materials (i.e., sensors and meters) and installation costs are highly dependent on the specific site and buildings (e.g., system configuration and roof access requirement etc.). Therefore, it is reasonable to assume different capital cost scenarios.

8 BTU meters49%

10 DEMs21%

2 steam condensate meters

6%

BACnet server10%

Wireless solution for 

weather station

11%

PC3%

Figure 6.1 Pie chart of capital cost structure for Building 7113/7114

The following assumptions are used for different capital cost scenarios:

If the building has a native BACnet BMS, then BACnet server will not be needed. If there is a personal computer (PC) available, then a PC will not be needed. If the weather information can be accessed from the internet or an existing weather

station on the base via the BMS network, then the cost related to weather station (e.g., wireless solution for Building 7113/7114) will be eliminated.

The installation cost reduction is linearly related to the material cost reduction. To effectively use the advanced building energy management system, sub-metering is

necessary. The lighting faults (Building 7230) could not have been identified without the sub-meters installed in this project. New emerging technology for electrical sub-meters (about $250 per point including materials and installation) could be leveraged.

The SPB and SIR in different capital cost scenarios for the advanced building energy management system demonstrated in the Great Lakes buildings are summarized in Table 6.6 below.

Page 73: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 57 May 2013

Table 6.5 Capital Cost Scenarios for Building 7113/7114

Scenario 1 Full capital cost

($ 150,129)

Scenario 2 87% of capital cost

($ 130,537)

Scenario 3 76% of capital cost

($ 114,657)

Scenario 4 57% of capital cost

($ 85,244)

BACnet server 10 DEM 8 BTU meters 2 steam condensate meter PC Weather station (wireless solution)

10 DEM 8 BTU meters 2 steam condensate meter Weather station (wireless solution) Remove BACnet server and PC

10 DEM 8 BTU meters 2 steam condensate meter Remove BACnet server, PC and weather station

10 low cost electrical sub-meters 8 BTU meters 2 steam condensate meter Remove BACnet server, PC and weather station Replace DEMs with new emerging sensors

Table 6.6 Cost Analysis Results for Building 7113/7714 Demonstration

Scenario 1

Capital cost Scenario 2

87% of capital cost Scenario 3

76% of capital cost Scenario 4

57% of capital cost First year savings18:

$52,734 $52,734 $52,734 $52,734

Simple Payback Period (in years): SPB

2.85 2.48 2.17

1.62

Savings to Investment Ratio: SIR

2.78 3.20 3.64

4.9

Performance objectives were for less than 5 years for SPB and greater than 1.25 for SIR. As shown in Table 6.6, both objectives were achieved for the advanced building energy management system deployed in Building 7113/7114 including Scenario 1 (i.e., full capital cost as spent in this demonstration). The return on investment analysis depends on the baseline energy consumption for a given building. The Energy Usage Index (EUI) for Building 7113/7114 was 176.75 KBTU/sf2-year in 2009. Currently, some of the faults identified in Building7113/7714 are related to thermal comfort rather than energy consumption. For example, due to control/chiller problems, there were times when the chiller was actually switched off when it was commanded on, so the building consumed less energy than expected but the room temperatures were not maintained. The economic impact from occupant productivity due to lower thermal comfort is not quantified here as it is beyond the scope of this project. Based on an ASHRAE study [21] on the life cycle of a building, initial construction cost is about 2% and operational and energy cost is about 6%, while occupancy cost accounts for about 92%. The aBEMS is able to identify issues related to thermal comfort to help address productivity problems.

18 Section 5 and Appendices A.3, A.4 and A.5 provide details of savings opportunities from the demonstration buildings.

Page 74: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 58 May 2013

7.0 IMPLEMENTATION ISSUES

This section includes a discussion of the implementation issues in the areas of instrumentation, modeling, BMS integration, network communication, user interfaces and required skills issues. Instrumentation All instrumentation used in this demonstration is standard Commercial Off-the-shelf (COTs) products. The recommended measurement accuracies for the power meters and thermal meters are given in A Specifications Guide for Performance Monitoring Systems [22]. If the BMS is not a ‘native’ BACnet system, a BACnet gateway will be required to implement the technology. Care is needed when setting up the BACnet gateway. The change of value (COV) for updating the measurement for the weather station, power meters and thermal meters should be as small as possible while not overloading the data communication network. Currently, the instrumentation cost is relatively high. The largest components are the equipment and installation costs related to sub-metering and the on-site weather station. It is possible to eliminate the on-site weather station by using weather data from the internet or an existing weather station on the base. The cost drivers for the building energy monitoring system include: material and installation costs for thermal and electrical energy meters, commissioning costs associated with mapping hardware points into the building energy management systems, and commissioning costs related to the quality of energy monitoring data. A low cost and scalable building energy monitoring system should be on the DoD demonstration agenda. This system should aim to reduce costs related to the energy monitoring system necessary to enable advanced Building Energy Management Systems that integrate performance monitoring, energy diagnostics and control technologies capable of delivering and maintaining 30% energy saving opportunities and reducing facility maintenance labor costs and improve occupant productivity. The following key technologies need to be addressed:

A comprehensive design guideline to determine the minimum set of sensors for deploying energy monitoring systems in DoD buildings;

Virtual sensors derived from physical based models; Low cost, scalable building electrical and thermal energy sub-metering; Middleware that provides seamless data acquisition and automated point mapping into

the advanced building energy management systems; Automated sensor health monitoring that combines heuristic rules, physical based

models and data mining algorithms. Modeling Matlab was used in this project as the platform for simulation and visualization. For a technology demonstration project, the use of Matlab is appropriate. For broader deployment, existing Matlab code can be compiled and distributed as an executable program. In other words, the aBEMS can be deployed on computers without Matlab. The Matlab-based visualization is available only on the local machine. The next generation system would utilize a web-based visualization tool. For some equipment models, including absorption chiller and cooling coil, lack of good quality data created some issues for model calibration and validation. Currently, considerable time is

Page 75: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 59 May 2013

spent dealing with issues related to sensor data quality (e.g., sensor bias and drifting) for modeling and diagnostics. Real-time sensor health monitoring provides a means to dramatically reduce the cost related to the commissioning of energy monitoring systems to ensure data quality. An automated sensor health monitoring system should be considered. This system combines physics-based models, heuristic rules and machine learning algorithms. Also, information related to building current control sequences was not totally open due to a proprietary BMS on site. There is a need for a robust, scalable and standardized way to collect and store both static and dynamic operation data throughout a building lifecycle. BMS Integration In this demonstration project, real time building operational data was collected through a BACnet gateway by using the open source software BCVTB19. A Building Information Model (BIM) supported database was prototyped and used to store both building static data (e.g. model parameters, HVAC configuration, etc) and building dynamic operational data (e.g., temperature, energy). All the mapping was done manually which increased the implementation cost. The following gaps are identified:

Lack of a universal data collection system where data can be extracted and retrieved through other industry standard communication protocols (e.g., Lonworks, Modbus, etc).

Lack of a secure, scalable and industry standard oriented storage mechanism for both static and real time dynamic building operational data.

Lack of a standard Application Programming Interface (APIs) that enable applications to programmatically extract data from the system, perform calculations outside of the middleware and finally write data back to the middleware. Examples of such applications are building performance simulation programs, FDD tools, visualization, controls and optimization tools.

Lack of common computational services such as on-line parameter estimation and on-line model calibration that can be deployed as part of the middleware.

To address these gaps, it is recommended that the following activities should occur after this project:

Extend a BACnet compatible data acquisition system to cover the other industry standard communication protocols.

Develop a database structure that enables rapid mapping and use of both static building information and real time dynamic operational data during the design and operational phases of a building lifecycle. This structure should be tested in a variety of buildings with different types and sizes.

Develop a services-based architecture to support the data exchange APIs and computational services.

Network Communication Significant challenges were encountered in the development and testing of the advanced building energy management system tool because of remote access problems. Network security constraints prevented the team from having remote access to the computers at Great Lakes. This

19 Building Control Virtual Test Bed http://simulationresearch.lbl.gov/bcvtb/

Page 76: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 60 May 2013

presented a significant challenge for coding and debugging. Team members could do efficient debugging only while visiting the site. This made it harder for the team to troubleshoot and fix complex and unforeseen issues with the code. It is recommended that remote access be granted for developers implementing similar systems at other sites. This access should be in compliance with DoD IT policy including Navy Public Service Network. Also, a secured and integrated DoD network should be established for building applications. Performance Visualization User Interface The visualization interface has been refined and adapted based on feedback received from the facility team at the Great Lakes site. The UTRC team visited the Great Lakes site in September, 2011, February and May, 2011. The visualization frontend was demonstrated to the facility team. The facility team was satisfied with the functionality of the tool but had several suggestions regarding aspects of visualization. Most of the suggestions were refinements that would improve usability of the tool. New visualizations that allow a user to compare building energy performance between two time periods and across various outside air temperature ranges have been implemented. New features that implement carpet plots have also been included into the existing user interfaces. A user friendly and modular user interface (UI) was developed to facilitate navigation through a large database. Gaps are listed as follows:

Lack of a UI that allows users to rapidly build their own visualization screens containing charts and 3D graphics.

Lack of functionality for generating comprehensive reports that can be sent in real time to the facility team.

Lack of a standard and common building operation interface that can be integrated with the BMS in all DoD buildings

To address these gaps, it is recommended that the following activities should occur after this project:

Develop a flexible and extensible Energy Human Machine Interface (eHMI) that enables rapid development by common DoD facility users.

Develop a standard mobile application for the aBEMS. This will make the recommendations provided by the aBEMS immediately visible and actionable.

Required Skills Using this advanced building energy management system currently requires the installer to have the following skills:

Create a ROM. A library for building envelope and HVAC system reduced-order models was created. The Appendices E and G provide detailed descriptions of ROM for demonstration buildings used in the project. The BIM to BEM toolkit developed in this project help users to automatically generate ROM building envelope model.

Set up the data acquisition system. A Building Data Acquisition System (BDAS) was created using an open source software environment. A detailed description of the steps required to use the BDAS is provided in Appendix I.

Set up FDD models. Detailed instructions for setting up the necessary files and providing data for training the diagnostic models are described in the Training Documentation. The user will need to run a MATLAB script after validated data corresponding to nominal behavior is selected.

Page 77: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 61 May 2013

In summary, during the demonstration process at Naval Station Great Lakes, the maturity of the different technology elements have been assessed with gaps identified that will impact the successful deployment of a building energy performance monitoring and diagnostics system. After the completion of the Naval Station Great Lakes demonstration, it is recommended that the following list of activities should occur to ensure widespread technology deployment at the DoD.

1) Develop low cost and scalable building energy monitoring systems. 2) Implement a robust and scalable middleware for DoD buildings. 3) Deploy a secured DoD network for energy efficient buildings. 4) Integrate Energy Human Machine Interface (eHMI) applications for DoD building

facility operations. The rationale and details for these recommendations are provided in Appendix K: “Response to the ESTCP IPR action items”.

Page 78: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 62 May 2013

8.0 TECHNOLOGY TRANSFER

8.1 COMMERCIALIZATION AND IMPLEMENTATION During the demonstration, the UTC stage-gated technology and product development processes have been applied to begin transitioning the technology into a commercial product. The Advanced Building Energy Management System (aBEMS) can be a part of a new BMS product or can be applied as an overlay on an existing BMS. To support a large-scale DoD deployment, UTRC has been engaging expertise from UTC businesses:

Automated Logic Corporation (ALC) – The demonstrated technology elements including BMS integration (middleware), energy diagnostics, and HVAC operation sensitivity analysis can be integrated into the ALC WebCTRL BMS.

NORESCO provides energy services to DoD facilities worldwide. 8.2 TRAINING REQUIREMENTS AND RESOURCES Technical/Educational Sessions: The results of the technology demonstrated in this project have been or will be presented in the following events.

Journal and Conference Papers 1) Dong, B., Z. O'Neill, D. Luo and T. Bailey. 2013. Development and Calibration of a

Reduced-order Energy Performance Model for a Mixed-use Building, Accepted. The 13th International Building Performance Simulation Association Conference and Exhibition.

2) O’Neill, Z. and T. Bailey, B. Dong, D. Lou and M. Shashanka. 2012. Advanced Building Energy Management Systems. Invited paper, submitted to Annals of the New York Academy of Sciences.

3) Li, Z., B. Dong, Z. O’Neill and G. Augenbroe. 2012. A Streamlined Workflow Process and Related Infrastructure for Building Fault Detection and Diagnostics. Submitted to Automation in Construction.

4) Dong, B., Z. O'Neill, D. Luo, S. Ahuja and T. Bailey. 2012. An Integrated Infrastructure for Real-Time Building Energy Modeling and FDD. The Fifth National Conference of IBPSA-USA: SimBuild2012. Madison, Wisconsin. August 1–3, 2012.

5) Li, Z, B. Dong and Z. O’Neill. 2011. Database Supported BACNet Data Acquisition System for Building Energy Diagnostics. The 11th International Conference for Enhanced Building Operations. New York City, NY. October 18–20, 2011.

Presentations

6) Scalable Advanced Building Energy Management Systems. SERDP/ESTCP Symposium. Washington, D.C. November 29 –December 1. 2011.

7) Advanced Building Energy Management Systems Demonstration. EPA Green Building Research Symposium. Philadelphia, PA, July 17, 2012.

8) A Reduced-order Energy Performance Modeling Approach for Buildings. Invited presentation. SIAM CS&E 2013. Boston, MA, February 25 to March 1, 2013.

Page 79: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 63 May 2013

End User Training: The team has provided user training to the facility team at Great Lakes. Three on-site demonstration and training sessions with Great Lakes facility team were held in the demonstration building on September 12, 2011, January 12, 2012 and May 16, 2012. Figure 8.1 shows the training session on May 16th, 2012.

Figure 8.1 Training session in Great Lakes on May 16, 2012

A training documentation was completed and will be available upon request from ESTCP program office. The demonstrated advanced building energy management system was introduced in the EPA Green Building Research Symposium on July 17th, 2012 in Philadelphia, PA. The seminar was well received and the team was invited to submit a Journal paper to a special issue of Annals of the New York Academy of Sciences that discusses the implications of a data-driven built environment.

In the future, the team will attend specific conferences such as SERDP/ESTCP Symposium and webinars such as FEMP’s First Thursday’s program to reach a broad government audience.

8.3 DESIGN COMMUNITY IMPACTS

This project has identified a key remaining barrier for broader DoD deployment which is the initial cost related to energy monitoring systems necessary to enable advanced building energy management system. Currently, the DoD does not have a design guideline to determine the minimum set of sensors needed by energy monitoring systems (including electrical and thermal) for both new building design and existing building retrofit scenarios. A DoD Building Energy Monitoring Design Guideline to determine the minimum set of sensors is needed. Existing reports [23] for building sub-metering systems should be incorporated and adapted. This design guideline should include a check list of sensors and decision flow charts that will help facilitate the deployment of advanced building energy management system across DoD facilities. Recommendations that emerged from this demonstration that relate to building energy monitoring system, middleware, and a secured DoD network for energy efficient buildings should be integrated within DoD Energy Manager’s Handbook.

Page 80: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 64 May 2013

The DoD should begin to publish guidelines and standards in the following areas to facilitate the deployment of advanced building energy management systems across DoD buildings and facilities:

A design guideline to determine the minimum set of sensors/meters required to deploy a comprehensive energy monitoring system for both new construction and retrofit of existing buildings. This guideline should include a check list of sensors/meters and decision flow charts for different HVAC systems.

A guideline to establish a secured and integrated DoD network for building applications. A standard to share building energy usage data via a secured network using native

communication protocols such as BACnet and Lonworks etc. A standardized process to automatically collect building information from available

references and transfer them to building energy applications such as building energy models.

Page 81: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 65 May 2013

APPENDICES

Page 82: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 66 May 2013

APPENDIX A: PERFORMANCE ASSESSMENT METHODOLOGIES

The performance of the Advanced Building Energy Management System (aBEMS) has been assessed against the performance objectives listed in Table 5.1 in Section 5.0. Details about how these objectives were assessed are presented in the following subsections.

A.1 HVAC EQUIPMENT REDUCED-ORDER MODEL PERFORMANCE ASSESSMENT

Details about HVAC equipment reduced-order model (e.g., equations, inputs and output etc.) are included in Appendix E. Models have been calibrated and validated except for the equipment without quality measured data (e.g., heat coils and absorption chiller) or with inconsistent operation patterns (e.g., economizers). Model parameters were first calibrated with one set of data that covered an appropriate range of operation (e.g., data of fan speed and power from May) and then applied to other sets of data (e.g., data from June/July).Deviation of energy consumption for each of the chillers, fans and pumps was within +/-10% based on the data used for validation. The absorption chiller model for Buildings 7113/7114 could be improved if more reliable measured data was available for heat input in normal operation. At the time when the test data was collected, one of the two absorption chillers stopped working while the other one that was working has inappropriate operating status and was under repair. Air Cooled Electric Chiller For the air-cooled electric chillers in Building 7230 values of model parameters were determined from catalog and some measured data. The parameters were then used to tune the model with data in July 2010 and validated with data in May, June and August 2010, as shown in Figures A.1 and A.2. Difference between measured data and model prediction of electric energy consumption of chillers in Building 7230 was within 1%. Magnitude of errors was mainly affected by the load level, with larger errors under low load conditions, e.g., 24.7% with mild ambient weather in May in this case, and smaller errors under higher load conditions, e.g., 6.9% in June and around 3.5% in July and August. Electric energy consumption under low load conditions was much smaller than that at higher load conditions, impact of the deviation from measured data under low load conditions became negligible compared to the total energy consumption. For example, in this study, electric energy consumption of the chillers in May accounted for only 2.3% of the total during May-August. In the scatter plot shown in Figure A.3, the size of each circle represents monthly load as a percentage of the total, while the color represents the model prediction error in percentage.

Page 83: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 67 May 2013

24.7%

6.9%

‐3.5% ‐3.4%‐0.8%

‐10%

0%

10%

20%

30%

Deviation

May

June

July

August

Total

Figure A.1 Error of Model Prediction of Electric Energy for Chiller 1 in Building 7230

2.3%

19.5%

50.2%

28.0%May

June

July

August

Figure A.2 Monthly Distribution of Electric Energy Consumption of Chiller 1 in Building 7230

Figure A.3 Scatter Plot of Model Prediction Error of Electric Energy for Chiller 1 in Building

7230

Page 84: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 68 May 2013

Absorption Chiller For the steam driven absorption chillers in Building 7113/7114, values of model parameters were determined from a chiller product catalog and some measured data. The parameters were then used to tune and validate the model with data in June through August 2011. Difference between measured data and model prediction of steam consumption of chiller in Building 7113/7114 was within 10%. Larger deviations occurred under low load conditions. Although deviation of predicted accumulated energy consumption from measurement was reduced to within 10%, the error of heat input rate data was relatively large at a given time point. Data quality was not appropriate due to the abnormal operating status of the chillers as reported later by the facility staff during the period when data was collected. Chiller 1 was not working and chiller 2 was not able to maintain the chilled water setpoint. With data collected during the cooling season during June 1 – August 4, 2011, data trends did not reflect the physics in a consistent manner for reliable prediction of heat input, as shown in Figure A.4. Given the quality of data used for the current model, it is recommended that the model coefficients should be recreated when data with high quality is available.  

0.0

0.5

1.0

1.5

2.0

4 5 6 7 8 9 10 11 12 13

Heat Input Factor 

Supply Chilled Water Temperature (oC)

Figure A.4 Heat Input Factor (Heat Input Divided by Design Value) vs. Supply Chilled

Water Temperature of Chiller 2 in Building 7114

Cooling Coil For the cooling coils in the air handling units 1 and 2 in Building7230, UA values were first calculated with data from the design schedule. With the design UA values as a reference, test data in June-July 2011 were used to calibrate the UA values to achieve minimum deviations of leaving air and water temperatures between model and data. The calibrated UA values were then used to validate the model with data in August-September 2011. As shown in Figure A.5, difference in capacity on water side and sensible capacity on air side between model and data was less than 10%. The average difference in air and water leaving temperatures was less than 0.5oC. However, large temperature deviations occurred at low water flow rates, as shown in Figure A.6.

Page 85: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 69 May 2013

2%

‐8%

3%

‐5%

‐10%

‐8%

‐6%

‐4%

‐2%

0%

2%

4%

Sensible Total

Error AHU1

AHU2

0.28

0.50

0.25

0.37

0.0

0.1

0.2

0.3

0.4

0.5

0.6

Air Water

Error (

oC) AHU1

AHU2

Capacity Error Leaving Air and Water Temperature Error

Figure A.5 Average Errors of the Cooling Coil Model Prediction of AHUs in Building7230

‐3

‐2

‐1

0

1

2

3

4 5 6 7 8 9 10 11Error (oC)

Water Flow Rate (kg/s)

Err_Tao

Err_Two

‐4

‐3

‐2

‐1

0

1

2

3

4

3 4 5 6 7 8 9 10 11Error (

oC)

Water Flow Rate (kg/s)

Err_Tao

Err_Two

AHU1 AHU2

Figure A.6 Errors of Air and Water Temperatures Leaving Cooling Coil in Building 7230

Fan Models have been created for the VFD fans and pumps in Building 7230 and Building 7113/7114. For Building 7230, data of one month from May-August 2010 were used to generate the coefficients and data in the other two months were used for validation. For Building 7113/7114, data from June-July were used to generate coefficients and data from August-September were used for validation. As shown in Figure A.7, for Building 7230, fan power input was calculated as a function of air flow rate. Error of accumulated electric energy consumption of fan/pump was less than 10% (power as a function of air flow rate) except for return fan 1 (RF1), which account for 9% of the total as shown in Figure A.8. Total electric energy consumption was negligible. For Building 7113/7114, fan power input was calculated as a function of fan speed control signal. Error of accumulated energy consumption was less than 1% and error of the predicted total electric energy consumption is negligible.

Page 86: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 70 May 2013

4.0%

‐10.6%

‐0.2% ‐0.6%

‐2.8%

0.0% 0.0%

‐12%

‐10%

‐8%

‐6%

‐4%

‐2%

0%

2%

4%

6%

SF1 RF1 SF2 RF2 SF4 RF4 Total

Error

Figure A.7 Error of Model Prediction of Electric Energy of VFD Fans in Building 7230

33%

9%34%

15%

6%3%

SF1

RF1

SF2

RF2

SF4

RF4

Figure A.8 Distribution of Electric Energy Consumption of VFD Fans in the Drill Hall

VAV For Building 7230, UA values of the reheat coil were derived from the design schedule. The minimum air flow fraction was refined with actual field data. However, the minimum air flow control was not maintained in heating mode in some of the VAVs as they were designed. For the ones that were maintained at a relatively constant minimum air flow rate, deviations of leaving air temperature after reheat were less than 1oC, with an average of 0.14 oC, as shown in Figure A.9. In cooling mode, the relative errors of air flow rate were within 10%, with an average of 3%, as shown in Figure A.10.

Page 87: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 71 May 2013

‐0.8

‐0.6

‐0.4

‐0.2

0.0

0.2

0.4

0.6

0.8

1.0

1/21 1/22 1/23 1/24 1/25 1/26 1/27 1/28 1/29Error (oC)

Date

Figure A.9 Error of Model Prediction of Air Temperature Leaving VAV1 of Building 7230

in Heating Mode

‐15%

‐10%

‐5%

0%

5%

10%

15%

20%

25%

6/27 7/1 7/5 7/9 7/13 7/17 7/21 7/25 7/29 8/2

Error

Date

Figure A.10 Error of Model Prediction of Air Flow Rate of VAV1 of Building 7230 in

Cooling Mode

For Building 7113/7114, data was not sufficient for model validation and therefore models have been only reviewed in trends. Wide bands in data of air flow rate vs. damper position were observed in all the selected VAV units.

A.2 INTEGRATED SYSTEM MODEL PERFORMANCE ASSESSMENT

The system model performance validation consists of four parts: Comparison of the building load predictions from building envelope ROM with the

EnergyPlus model. In this case, a comparison of the ROM with a calibrated EnergyPlus model was conducted for Building 7230. The results showed the differences were less than 3% for the cooling season and 11% for the heating season.

Page 88: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 72 May 2013

Comparison of the building load predictions from the building envelope ROM with measured data. In this case, the loads predicted from the ROM and those calculated from measured data for Building 7230 and Building 7114 were compared. For Building 7230, the load predictions were within the ± 5% error band for the cooling season and the ±17% for the heating season. For Building 7114, the model predictions were within the ±11% error band for all the AHUs during the cooling season.

Comparison of the building load predictions from the integrated ROM including the HVAC ROM with measured data. In this case, a comparison between the integrated ROM and measurements was conducted. For Building 7230, a comparison of the simulated and measured monthly hot water consumption showed the difference was less than 5% for January, 2011. For Building 7113/7114, 75% to 85% of the data was within ±15% error band in each time step (i.e., 5 minutes) during both cooling and heating typical days.

Comparison of lighting and plug loads between the model predictions and measurements. In this case, a comparison of monthly total predictions from June to December, 2011 for both lighting and plugs with measured data was conducted. The result showed differences were from -0.22% to 2.91% for monthly total lighting and plug loads.

Overall, the performance objective for the ROM was achieved where the prediction accuracy was within ±15% for the overall building load predictions. Comparison of Results from EnergyPlus A comparison of load predictions between the ROM and the EnergyPlus model was conducted for Building 7230 where there was a calibrated EnergyPlus model [16]. As a first step, the predictions of the thermal network model were compared to that of a higher-fidelity EnergyPlus model of the building that was developed in a companion project. Thus, the uncertainties could be minimized, since the thermal parameters (resistance R, Capacitance C) and the internal heat gains used were exactly the same as that in EnergyPlus. Further, the same weather data was used in both the models; in particular, TMY3 data for Waukegan, IL was used, which is the nearest airport to this building. The supply air conditions were also obtained from EnergyPlus: Please note that the EnergyPlus model is a “steady-state” model that achieves required set-points at all times (within the constraints of the HVAC system). On the other hand, the thermal network model was an open-loop model, with no feedback to the controller. This results in a validation of just the building envelope model before integrating it with the HVAC system models. The results of the thermal network model were compared in Figure A.11. The figure compared the monthly integrated loads predicted by the two models; thus, for each zone, the total cooling or heating loads was computed for a given month, and a percentage error was computed, with respect to the EnergyPlus predictions. In the scatter plot shown in the figure, the size of each circle represents the load in the zone, while the color represents the percentage error. The months are along the y-axis, with January=1 and so on. The zones 1-12 represent the first floor (office area), 14-19 the second floor (class-room), while zones 24-35 represent the drill-deck. The zones with largest loads are the classroom and the drill-deck. The two models compare very well, to within 5% accuracy for the summer months (May-September). But the main source of

Page 89: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 73 May 2013

inaccuracy is in the winter months. The reasons for such difference is that supply air temperature (24°C) was set very close to the zonal set-points (21°C) during the winter months in the EnergyPlus model. Depending on the disturbances (e.g., outside conditions and building usage etc. ), the load often fluctuated between cooling and heating; due to that, the two models often predicted opposite signs of loads, thus resulting in large percentage errors. The results were expected to be closer if the difference in the supply air temperature and zonal set-points are sufficiently large. The actual supply air temperatures in the building were much larger than those used in the EnergyPlus model, thus rendering it inaccurate for this operation. The annual and peak loads of the entire building are tabulated in Table A.1Table A.1; these show that the comparison is within 3% for the cooling operation and approximately 11% for the heating operation.

Figure A.11 Scatter Plot for Load Prediction Errors by Thermal Network Model (Compared

with EnergyPlus)

Table A.1 Annual and Peak Load Comparison Between EnergyPlus and Thermal Network Models for Drill Hall

Loads (building level) EnergyPlus RC Model Error*

Annual cooling (MW-hr) 169.3 174.7 3.2%

Peak cooling (kW) 140.6 144.4 2.7%

Annual heating (MW-hr) 96.1 106.7 10.9%

Peak heating (kW) 174.2 162.6 6.7%

* The error was computed relative to the predictions of the EnergyPlus model Building Load Comparison During this step, the loads predicted from the reduced-order model were compared with the ones calculated from measurements. Those tests were conducted for two buildings: Case 1: Building 7230(Drill Hall) The results of the calibrated model are shown in Figure A. 12, A.13, and Table A.2. Figure A.12 shows loads predicted by the thermal network model (black) with data (red) for two periods of one month each. The left Y axis in Figure A.13 shows the percentage errors, the X axis shows the number of zones. The size of the bubbles shows the amount of energy consumed, the bigger

Page 90: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 74 May 2013

the bubble, the larger the energy consumption. The comparisons are shown for the period of June to December 2011. The predictions were again within 5% of measurements for the cooling operation, but the error is higher for the heating operation. Note that, in the actual operation, the loads are dominant in the drill-deck, while the classroom has much smaller load. The discrepancies were justified in the winter operation as follows: the lumped well-mixed air model for the drill-deck, which is a large open space with a floor-to-ceiling height ranging from 8 meters to 14m, is inadequate.

The plot shows data for zones 17 (office area, left) and 24 (drill-deck, right) for two periods from May 4 –

June 5 (top) and Nov 25 – Dec 25 (bottom).

Figure A.12 Load Comparisons Between Data and Thermal Network Model.

Figure A.13 Scatter Plot for Load Prediction Errors by Thermal Network Model (Compared

with Data)

Table A.2 Annual and Peak Load Comparisons between Data and Thermal Network Models for the Building 7230

Loads (building level) Data RC Model Error

Annual cooling (MW-hr) 101.9 106.4 4.4%

Page 91: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 75 May 2013

Peak cooling (kW) 182.7 153.1 16.2 %

Annual heating (MW-hr) 92.1 75.6 17.9 %

Peak heating (kW) 235.0 180.9 23.0 % Case 2: Building 7114 The Building 7114 envelope model was calibrated and the results are illustrated in Figure A.14, which show scatter plots similar to the ones shown in the previous case study. The axes are similar to that in Figure A.13. The data was available for months of July and August only (cooling operation), as indicated by the month numbers on the y-axis. The first figure shows the compartment zones, and the largest circles (recall, the larger the diameter of the circle, the larger is the load) indeed represent the large sleeping areas. For most of the zones, the error ranges from 5-10% (indicated by the color); however, there are some zones with much larger error up to 30%. Figure A.15 shows a similar plot for the classroom zones served by AHU3 for July and August in 2011. The comparison at the AHU level is summarized in Table A.3, which shows that indeed, the model predictions are within 10-11% of the measurements for all the AHUs.

Figure A.14 Scatter Plot for Load Comparisons (Zones Served by AHU 1/ 2 in Building 7114).

Scatter Plot Load Distribution Plot

Figure A.15 Load Comparisons Results for Classroom Zones Served by AHU3

Table A.3 Comparisons of Building 7114 Cooling Load at the AHU Level between Data and Thermal Network Models for July and August 2011

AHU Loads, data Loads, model Error 1 112.1 104.6 11.1% 2 103.8 98.4 11.7% 3 54.4 51.8 9.7%

Page 92: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 76 May 2013

HVAC Load Comparison with Integrated Models Case 1: Building 7230 Similar to the previous case, a comparison between integrated model and EnergyPlus model was conducted as the first step for Building 7230. The results are shown in Figure A.16 and A.17. Figure A.16 shows the results from Aug. 1st to Aug. 5th, 2010, where 80% of the data is within ±20% error band. The large errors appear during the system start-up time period. This is due to the nature of steady-state HVAC model, which cannot simulate the dynamics. The similar pattern observed for heating season comparison which is from Nov. 27th to Dec. 1st, 2010. During this period, 75% of the data is within ±20% error band.

-6

-4

-2

0

Bui

ldin

g Lo

ad (

kW)

Integrated ModelE+

08/01 08/02 08/03 08/04 08/050

10

20

30

Per

cent

age

Err

or(%

)

Figure A.16 Comparisons Between ROM and EnergyPlus Total Building Load for Cooling

Season

Page 93: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 77 May 2013

0

20

40

60

Bu

ildin

g L

oa

d (

kW)

Integrated ModelE+

11/27 11/28 11/29 11/30 12/010

10

20

30

Pe

rce

nta

ge

Err

or(

%)

Figure A.17 Comparisons Between ROM and EnergyPlus Total Building Load for Heating

Season

Figure A.18 shows a comparison of hot water energy consumption between ROM and measured data in January 2011. The difference between total monthly hot water energy consumption predicted by ROM and the measurement is within ±5% error band. Again it is observed that there are some spikes due to the transient effects from the measured data where the low load conditions happened.

01/02 01/07 01/12 01/17 01/22 01/27

0

500

1000

HW

Co

nsu

mp

tion

(kB

TU

)

MeasuredSimulated

01/02 01/07 01/12 01/17 01/22 01/27-20

-10

0

10

20

Diff

ere

nce

(%

)

Figure A.18 Comparisons of Hot Water Energy Consumption Between ROM and

Measurements in January, 2011

Case 2: Building 7113/7114

Target error band +/- 15%

Page 94: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 78 May 2013

For Building 7113 and 7114, a whole year simulation was conducted and the results are shown in Figure A.19. The left axis shows the total thermal energy consumption and the right axis shows the percentage of simulation data points versus measured data points. Due to a BMS server issue and power outrage in Building 7113/7114, the measured data points were not collected continuously for the whole year. However, the weather data, used as thermal boundary conditions to drive the simulation, were collected independent from Building 7230 and are complete for the whole year. In Figure A.19, the right axis shows the percentage of available measured data points versus simulation data points. If the result is 100%, it means simulation result has the same number of data points of measured ones. Figure A.19 shows only a few months have the complete measured data points in 2011. In addition, the control logics for the simulation model are from the as-built control logic diagram provided by the BMS vendor. As shown in Figure A.19, there are some energy consumption differences for June and July, which are 44% and 66% respectively. This is due to faulty control logics in the building energy management system. Based on these facts, validating the model on a yearly or monthly basis becomes difficult. Hence, the model validations for Building 7113 /7114 were conducted for selected days with normal operation.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0

100000

200000

300000

400000

500000

600000

Percentage

 of D

ata Points Compared

Therm

al Energy Consumption (kWh)

Measured Simulated Percent Data Point

‐44%

‐66%

9%

18%

15%

Figure A.19 Annual Energy Simulation Results for Building 7114 in 2011

Based on the results from annual model simulation results, the integrated model validation was conducted based on the valid measured data. During the cooling season, the zone daily occupied set-point is 70 ºF and night set-back is 78 ºF. During the heating season, the zone daily occupied set-point is 72 ºF and night set-back is 65 ºF. Those set-points are derived from BMS measured data. There are six periods for model validations as follows: 1) Building 7114 cooling period The cooling model validation for Building 7114 was conducted from July 6th to July 9th, 2011 as shown in Figure A.20. About 85% of the data is within the ±15% error band in each time step (5 minutes). During the day time, the predicted loads from the model are very close to the ±10% error band. However, the model did not behave well during the middle of night due to the low load conditions.

Page 95: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 79 May 2013

2) Building 7114 heating period The heating model validation for Building 7114 was conducted from Dec 8th to Dec 10th, 2011 as shown in Figure A.21 below. About 75% of the data is within the ±15% error band in each time step (5 minutes). The main reason that the model prediction in the heating season is not as good as that in the cooling season is due to the fluctuation of water flow rate measurements.

07/06 07/07 07/08 07/090

200

400

600

800

BLD

G71

14 C

oolin

g Lo

ad (kW

)

SimulatedMeasured

07/06 07/07 07/08 07/09

-15

0

15

Diff

eren

ces

(%)

Figure A.20 Building 7114 Cooling Season Integrated Model Validation from 07/06/2011

to 07/10/2011

12/08 12/09 12/100

200

400

600

800

BLD

G71

14 H

eatin

g Lo

ad (kW

)

SimulatedMeasured

12/08 12/09 12/10

-15

0

15

Diff

eren

ces

(%)

Figure A.21 Building 7114 Heating Season Integrated Model Validation from 12/08/2011 to

Page 96: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 80 May 2013

12/10/2011

3) Building7113 cooling period The cooling model validation for Building 7113 was conducted from July 7th to July 11th, 2011 as shown in Figure A.22 below. 86% of the data is within the ±15% error band in each time step (5 minutes). The simulation result during the early morning has the same behavior as in Building 7114 where the actual measured data fluctuates more than the simulated results. This is due to the low load conditions at that time. Most of the results during the day time are within the ±10% error band. 4) Building 7113 heating period The heating model validation for Building 7113 was conducted from Dec 8th to Dec 10th, 2011 as shown in Figure A.23 below. 82% of the data is within ±15% the error band in each time step (5 minutes).

07/07 07/08 07/09 07/100

200

400

600

800

1000

BLD

G71

13 S

uppl

y Lo

ad (kW

)

SimulatedMeasured

07/07 07/08 07/09 07/10

-20

-10

0

10

20

Diff

eren

ces

(%)

Figure A.22 Building 7113 Cooling Season Integrated Model Validation from 07/07/2011 to

07/10/2011

Page 97: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 81 May 2013

00:00 06:00 12:00 18:00 00:00 06:00 12:00 18:00 00:00

200

400

600B

LDG

7113

Sup

ply

Load

(kW

)

SimulatedMeasured

00:00 06:00 12:00 18:00 00:00 06:00 12:00 18:00 00:00-15

0

15

Diff

eren

ces

(%)

Figure A.23 Building 7113 Heating Season Integrated Model Validation from 12/08/2011

to 12/10/2011

5) Campus building cooling period Since Building 7113 and Building 7114 share the same chiller plant and cooling towers, a campus model was developed to simulate the energy performance of both two buildings. The cooling model validation for the campus was conducted from July 6th to July 10th, 2011 as shown in Figure A.24 below. About 82% of the data is within the ±15% error band in each time step (5 minutes). 6) Campus building heating period The heating model validation for the campus was conducted from Dec 8th to Dec 10th, 2011 as shown in Figure A.25 below. About 80% of the data is within the ±15% error band in each time step (5 minutes). In summary, the total building load comparisons show that the differences between measurements and predicted building loads from the ROMs at each time step are within the ±15% error band. This result gives us confidences on the model performance for those validated days, which are used for the HAVC operation sensitivity analysis. In addition, when low load conditions appear, the differences between simulated and measured tend to increase.

Page 98: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 82 May 2013

07/06 07/07 07/08 07/09 07/100

500

1000

1500

2000B

LDG

7114

Sup

ply

Load

(kW

)

SimulatedMeasured

07/06 07/07 07/08 07/09 07/10-15

0

15

Diff

eren

ces

(%)

Figure A.24 Campus Cooling Season Integrated Model Validation from 07/06/2011 to

07/11/2011

00:00 06:00 12:00 18:00 00:00 06:00 12:00 18:00 00:000

200

400

600

BLD

G71

14 S

uppl

y Lo

ad (kW

)

SimulatedMeasured

00:00 06:00 12:00 18:00 00:00 06:00 12:00 18:00 00:00-20

-10

0

10

20

Diff

eren

ces

(%)

Figure A. 25 Campus Heating Season Integrated Model Validation from 12/08/2011 to

12/10/2011

Comparison of Lighting and Plug Loads Between Model and Measurements The comparison of lighting and plug loads between model predictions and measurements only occurs for Building 7114, as an example to show the model accuracy. Both loads were derived from measurement patterns and adjusted slightly for each month accordingly.

Page 99: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 83 May 2013

Lighting load For the lighting load, electric sub-meters were installed for emergence, compartments, classrooms and mechanical rooms. Since most of the occupant’s activities happen in the compartments and classrooms area, the comparison is conducted for those two areas. Figure A.24 shows an example of the usage pattern of the compartment lighting from Aug.6th to Aug. 9th. 2011. The red line shows the measured lighting load, while the blue line shows the estimated pattern. They are very close to each other, although with some fluctuations during the afternoon time. If such estimation was applied on all other months, Figure A.27 shows the totally monthly loads comparisons from June to December, 2011, with accuracies on the right vertical axis. The worst case is the December with a difference of 1.78%, while the best case is the July with a difference of -0.22%.

08/07 08/08 08/09

1

2

3

4

5

6

x 104

Com

part

men

t Bui

ldin

g Li

ghtin

g Lo

ads

MeasuredSimulated

Figure A. 26 Comparisons between Measured and Estimated Lighting Loads in Building

7114 from 08/06/2011 to 08/09/2011

Page 100: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 84 May 2013

‐0.49

‐0.22

‐1.63

‐0.48

0.77

‐1.78

‐2.00

‐1.50

‐1.00

‐0.50

0.00

0.50

1.00

0

500

1000

1500

2000

2500

3000

June July August Sept Nov Dec

Differences(%)

Lighting Loads (kW)

Measured Simulated Diff(%)

Figure A. 27 Comparisons between Measured and Estimated Lighting loads of

Compartments and Classroom Areas in Building 7114 from June to December, 2011.

Plug load There is only one total building sub-meter for the plug loads, which makes the estimation difficult. The estimation follows the three steps: 1) Plug loads after mid-night are mostly from computers in the two classrooms; 2) Before dinner time (around 5 pm), the plug loads are mainly from compartments and classrooms; 3) During dinner time, the plug loads are from compartments, classrooms and kitchen/dining areas. Based on these heuristic rules, the comparison is shown in Figures A.28 and A.29. Figure A.28 shows the measured plug loads have spikes in the late afternoon but not for all days. Figure A.29 shows the total building plug load comparison from June to December, 2011. The best case is the December with a difference of -0.1%, while the worst case is the July with a difference of 2.91%. This could be due to a lower building occupancy in December and a relatively higher building occupancy in July. With the high occupancy, there are more uncertainties in the plug load estimation.

Page 101: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 85 May 2013

07/10 07/11 07/12 07/13 07/14 07/15 07/16 07/17 07/18

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

2

x 105

Com

part

men

t Bui

ldin

g Li

ghtin

g Lo

ads

MeasuredSimulated

Figure A. 28 Comparisons between Measured and Estimated Plug Loads in Building 7114

from 07/09/2011 to 07/18/2011

0.12

2.91

0.87 0.91

2.56

‐0.10

‐0.50

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

0

500

1000

1500

2000

2500

3000

3500

June July August Sept Nov Dec

Differences(%)

Plug Loads (kW)

Measured Simulated Series3

Figure A. 29 Comparisons between Measured and Estimated Plug Loads in Building 7114

from June to December, 2011.

Page 102: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 86 May 2013

A.3 HVAC OPERATION SENSITIVITY STUDY ASSESSMENT

The HVAC operation sensitivity study was performed based on the integrated building envelope and HVAC equipment ROM. By comparing the existing operation baseline model with desired performance, the building energy consumption deviations were quantified. Case 1: Building 7230 As the first step, the operation sensitivity study was performed for both heating and cooling seasons based on integrated system model for Building 7230. Two practical operation strategies were selected for the cooling season is: 1) pre-cooling; 2) chilled water supply temperature setpoint reset, while only pre-heating was selected for the heating season. The results are shown in Table A.4 below.

Table A.4 Results of Sensitivity Study for Cooling Season in Building 7230 Energy Savings in July 2010   Option 1 Option 1 + 2 

Chiller Electricity  15.4%  18.1% 

Whole Building Level Electricity  7.2%  8.2% 

Peak Demand  12.5%  14.7% 

Table A.4 shows that by pre-cooling only for July, the energy savings was 15.4% for the chiller electricity energy consumption, while 18.1% if both options were applied. The same magnitude of savings could be achieved for August, 2010 as well. This is due to the fact that the pre-cooling schedule results in a lower zone temperature before the occupied time so that the cooling system will not use as much cooling energy as the regular cooling schedule to cool down the space to the set-point. The peak demands were reduced by 12.5% and 14.7%, respectively. Table A.5 shows the results of the sensitivity study for the heating season. The energy savings was 5.4% and 2% for November 2010 and January 2011, respectively. These savings were smaller compared with savings opportunities in the cooling season because of the cold weather during the winter season in Chicago which downgrades the effects of the pre-heating. The peak demand reduction for those two months was 10.7% and 7.2%, respectively.

Table A.5 Results of Sensitivity Study for Heating Season with Pre-Heating Option Only

Energy Savings   Nov 2010  Jan 2011 

Hot Water Energy Consumption  5.4%  2.0% 

Peak demand  10.7%  7.2% 

The sensitivity study also shows that the air-cooled chiller performance could be improved by 5-10% in terms of kW/ton. Case 2: Buildings 7113/7114 Sensitivity of building thermal load to key control parameters has been evaluated for Buildings 7113/7114. Parameters varied are listed in Table A.6. Parameters of the baseline models, as shown in Table A.6, were set up based on the system in actual operation when the model was

Page 103: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 87 May 2013

created. Outdoor air damper was fully open in the cooling mode and was modulated to maintain the mixed air temperature so that is was not below 50 oF in the heating mode.

Table A.6 List of Parameters for Sensitivity Study of Buildings 7113/7114

Parameters Baseline* Variation Cooling Option 1: Indoor Air Temperature Setpoint_Daytime (oF) 70 74

Option 2: Outdoor Air Fraction 100%

Economizer (Enthalpy

Differential) Heating Option 1: Indoor Air Temperature Setpoint_Daytime (oF) 72 68

Option 2: Minimum Outdoor Air Fraction Varied to maintain ≥50 oF of mixed air temperature

30%

*Taken from existing operational data

The study was performed with the integrated building system models calibrated with measured data of two typical cooling days, 7/7~7/8/2011, and two typical heating days, 12/8~12/9/2011. The impact on thermal loads is summarized in Table A.7 with adjustment of control setpoints as listed in Table A.6. Night setback control of indoor air temperature setpoint was also investigated. The result shown that night setback control did not have enough load reduction potentials for Building 7113/7114.

Table A.7 Results of Sensitivity Study of Buildings 7113/7114 Building 7113 Building 7114

Cooling Options 1 1 + 2 1 1 + 2

Load Reduction 16% 24% 18% 23%

Heating Options 1 1 + 2 1 1 + 2

Load Reduction 11% 12% 15% 39% For the two buildings in the cooling mode, load could be reduced by 16~18% with indoor air temperature setpoint increased by 2.2 oC (4 oF). Load was reduced by 23~24% when outdoor air fraction was corrected from the observed wide open outdoor air damper to economizer operation, while the fan electricity consumption was reduced by 10 ~ 11%. In the heating mode, thermal loads for both buildings were reduced with decreased indoor air temperature setpoint during the daytime and minimum outdoor air fraction. Load reduction of Building 7114 (39%) was more significant than Building 7113 (12%), which might have been caused by the distinct usage patterns between the two buildings during the heating season. As shown in Figure A.30, the lighting usage of Building 7113 was only half of Building 7114 during the heating season, which means some of the compartment zones were not used in Building 7113 during 2011 winter. This indicated during 2011 heating season the indoor air temperature setpoint (i.e., setpoint in unoccupied hours) in Building 7113 is lower than that (i.e., setpoint in

Page 104: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 88 May 2013

occupied hours) in Building 7114. Hence, Option 1 to change indoor air temperature setpoint had less effect on the thermal load reduction.

11/06 11/13 11/20 11/27 12/04 12/11 12/18 12/25 01/010

20

40

60

80

100

120T

otal

Bui

ldin

g Li

ghtin

g Lo

ads

(kW

h)

Lighting 7113Lighting 7114

Figure A.30 Comparison of Measured Total Lighting Energy Consumption between

Building 7113 and 7114.

The two-day evaluation results showed that building thermal load could be reduced by more than 10% with adjusted indoor air temperature setpoint and outdoor air fraction. Table A.7 shows that in average, building thermal load for Building 7113/7114 could be reduced by 23.5 to 25.5%. The primary energy usages (electricity and steam) are assumed to be reduced by at least 20% correspondingly. With the options down-selected from the two-day study, HVAC operation sensitivity analysis was further extended to the seasonal operation for the cooling during June-July 2011 and for the heating during November-December 2011. Total cooling load was reduced by 44.9% with daytime indoor air temperature setpoint raised from 70 oF to 74 oF and outdoor air fraction reduced to 30% of total supply air flow rate. Total heating load decreased by 44.6% with daytime indoor air temperature setpoint lowered from 72 oF to 68 oF and outdoor air fraction reduced to 30% of total supply air flow rate. This sensitivity study was intended to evaluate the variables with major impacts on building thermal loads. Savings might vary with practical limits of health, comfort or other operation constraints.

A.4 FAULT DETECTION AND DIAGNOSTICS PERFORMANCE ASSESSMENT

Below, representative FDD results were presented, and then followed by a brief analysis of the accuracy of the fault detection algorithms.

Page 105: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 89 May 2013

Case1: Building-level scheduling fault in Building 7230

Figure A.31 Lighting Faults in Building 7230.

The top plot shows the anomaly score, the middle plot shows the lighting load and the bottom plot shows the hour of day. Highlighted in red are times when the lights were left on at night and highlighted in green are times when the lights were turned off during daytime. Figure A.31 illustrates two kinds of anomalies detected in the lighting load of Building 7230 between 11/01/2011 and 11/15/2011. During this 15-day period, there were three instances detected when the lights were left on through the night (highlighted in red). There was also one instance detected when the lights were turned off during the day when the model expected them to be on (highlighted in green). The anomalies were based on a graphical network model that was trained on measured data from Building 7230.

Lights left ON at night

Lights remain OFF during day

Nov 01 Nov 15

0

24

Page 106: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 90 May 2013

Case 2: AHU 1 Economizer faults in Building 7114

Actual

Expected

07/17 07/24 07/31

0.4

0.6

0.8

1OA Damper Position

07/17 07/24 07/310

500

1000

Anomaly Score

Figure A.32 AHU Economizer Fault in Building 7113/7114

The top panel in Figure A.32 shows the expected position of the damper in green and the measured damper position in red. Bottom panel shows the anomaly score. Notice that anomalies persist for most of this selected time period.

Figure A.33 AHU1 Faulty Operational data in July 2011

Figure A.33 above illustrates that the AHU operation fails to maintain the discharge air temperature (DAT) setpoint. While outside air temperature (OAT) was in the range of 80 °F to 100°F, the outside air damper was 100% open due to economizer faults.

Figures A.32 and A.33 show economizer operation faults in AHU 1 in Building 7114 in July, 2011. In this case, the outside air damper was expected to modulate but was open at 100% for the entire period. Further analysis showed that the enthalpy calculation in the control sequence was erroneous. This fault was detected and diagnosed on August 3rd based on a graphical network model as shown in Figure A.34. Since the team suspected that the economizer operation was not nominal, measured data was not used for training the graphical network corresponding to

07/21 07/26 07/31

55

60

65

70

75

80

85

90

95

100

Times

Tem

pera

ture

(F

) /

Dam

per

Pos

ition

(%

)

MAT

OA Damper

DATDATS

OAT

Operation data

OA damper 100%

DAT setpoint cannot be maintained

Page 107: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 91 May 2013

nominal economizer operation. Instead, the results of the ROM were used for training the network. Once the network was trained, measured data was applied to generate anomaly scores. .

Figure A.34 Probabilistic Graphical Network for AHU1 Economizer

The diagnostics results were communicated and verified with the facility team. The faults were corrected on the same day. Figure A.35 shows the measured chilled water consumption vs. outside air temperatures for July and August in Building 7114. The chilled water BTU meter measurement confirmed 18% chilled water consumption reduction due to the corrected economizer faults. However, steam consumption reduction was not observed from the utility bill. This is probably due to the known issues for absorption chillers.

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

B7114 CHW Average

 BTU

/hr

OAT BINS (F)

With Faults

Faults Corrected

Figure A.35 Measured Chilled Water Consumption Comparisons

If this fault was not corrected on August 3rd, the annual chilled water consumption would be 18% more, as illustrated in Table A.8. The BIN method was used for the savings extrapolation with the assumption that the building will be in similar operation whenever outside air temperatures are similar.

Page 108: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 92 May 2013

Table A.8 Annual Chilled Water Consumption Extrapolation.

OAT BINS

Number of hrs*

Measured CHW consumption with

fault (BTU/hr)

Measured CHW consumption with

fault corrected (BTU/hr)

CHW consumption

with fault (BTU)

CHW consumption

with fault corrected

(BTU/) 72-74 239 1,893,578 1,800,146 452,565,044 430,234,96474-76 187 2,132,648 1,793,302 398,805,086 335,347,42976-78 154 2,061,607 1,666,539 317,487,485 256,647,00878-80 149 2,168,243 1,633,486 323,068,263 243,389,38180-82 122 2,300,915 1,926,514 280,711,639 235,034,69482-84 92 2,329,490 1,997,357 214,313,091 183,756,87484-86 49 2,364,257 1,828,973 115,848,602 89,619,66486-88 75 2,412,696 1,868,029 180,952,196 140,102,14288-90 29 2,327,037 1,806,220 67,484,062 52,380,379 Total 2,351,235,469 1,966,512,534

*Taken from TMY3 weather file for Wagkuan airport Case 3: Chiller faults in Building 7114

07/06 07/16

0

10

20

30

40

50

60

70

80

CH2 Steam Valve

CH2 Supply TempCH2 Supply Setpoint

Figure A.36 Chiller 2 Faulty Operational Data in July 2011

Figure A.36 plots the steam valve position, supply water temperature and supply water temperature setpoint for Chiller 2 in Building 7114. In the first two weeks of July, Chiller 2 in Building 7114 could not maintain the supply water temperature setpoint intermittently as shown. Further analysis revealed that the issue was related to a faulty steam valve operation.

Page 109: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 93 May 2013

Case 4: Damper faults in a VAV Box in Building 7114

Figure A.37 VAV Box Fault Detection

In Figure A.37, plots on the left column indicate a normally operating airflow damper in a VAV box and plots on the right column show a faulty VAV airflow damper from Building 7114. The top row shows the relationship between the airflow and damper position. For the faulty VAV, notice that there is no airflow until the damper is opened beyond 80% indicating a “sticky damper.” As a result, the zone temperature setpoint cannot be maintained as illustrated in the middle row panel in Figure A.37. Shown in the bottom is the anomaly score that shows that the operation is anomalous for the entire selected time period.

0 20 40 60 80 1000

0.2

0.4

0.6

0.8

1

Damper Position

No

rmal

ized

Air

flo

w

B7114.2EN.S.PERIM:

0 20 40 60 80 1000

0.2

0.4

0.6

0.8

1

Damper Position

No

rmal

ized

Air

flo

w

B7114.3EN.S.INTER:

Nominal VAV Box

Faulty VAV Box

07/18 07/19 07/20 07/21 07/22 07/23

70

72

74

76

78

80

Tem

per

atu

re

Zone Temperature

Zone Temperature Setpoint

07/18 07/19 07/20 07/21 07/22 07/23

70

72

74

76

78

80

Tem

per

atu

re

Zone TemperatureZone Temperature Setpoint

07/18 07/19 07/20 07/21 07/22 07/23

An

om

aly

Sco

re

Score ValueScore Threshold

07/18 07/19 07/20 07/21 07/22 07/23

An

om

aly

Sco

re

Score ValueScore Threshold

Page 110: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 94 May 2013

Figure A.37 illustrates the operation of two sample VAV boxes in Building 7114 over two weeks from July 2011. The VAV box “2EN.S.PERIM” operates normally while the VAV Box “3EN.S.INTER” is an example of faulty airflow damper operation. See the figure caption for more details about the fault.

Accuracy Analysis

To quantify the accuracy rate of the diagnostics algorithm, a dataset with known faults (a priori) is needed. Then, the algorithms can be applied to the dataset to quantify how many of the known faults were detected correctly.

The data from the AHU1 economizer in Building 7114 during March 1-31, 2012 was chosen. It was assumed that the outside air damper should operate at the minimal opening position whenever the AHU is in the heating mode (i.e., heating valve is open and hot water pump is ON). If the damper is not at the minimal position, then a fault is occurring and should be detected.

Since the team suspected that the economizer operation was not nominal, measured data was not used for training a graphical network corresponding to nominal economizer operation. The results of the integrated ROM for Building 7114 were used as training data for learning the network. Once the network was learned, measured data was applied to generate anomaly scores.

Page 111: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 95 May 2013

Figure A.38 Building 7114 AHU1 FDD Accuracy Analysis

The top panel in Figure A.38 displays the outside air damper position (OAD) for AHU1 in Building 7114. Notice that during the entire selected time period, the damper is never at the minimal position (30%). The bottom plot in Figure A.35 displays the anomaly status and the hot-water pump indicator.

The confusion matrix in Table A.9 shows the number of accurate classifications, missed detections and false alarms. This matrix contains information about actual and predicted classifications done by the proposed FDD method. True anomalies were detected correctly 2740 times out of 2843 actual anomalies corresponding to an accuracy of 96.38%. The no fault condition was detected correctly 612 times out of 781 times (78.36%). The false alarm rate was 21.64% and missed detection rate was 3.62%. During the selected time period, the outside air damper was never at the minimal position as shown in Figure A.34. Table A.9 shows the accuracy results.

Table A.9 Confusion matrix yTRUE FALSE Total

TRUE 2740 103 2843FALSE 169 612 781

Total 2909 715 3624 The false alarm rate at 21.64% was too high and further analysis was done to understand the drivers for this high false alarm rate. Regions when false alarms arise have been marked in the bottom panel of Figure A.38 as A, B and C. Notice that false alarms in Region A occur right after the HW pump was turned off. If we take into account potential residual flow right after the pump was turned off and ignore these alarms from Region A as false alarms, the false alarm rate

A B C

Page 112: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 96 May 2013

drops to 15.11%. From the perspective of finding entire fault periods, it can be noticed that false alarms in both Region A and Region B occur contiguous to true fault periods. Ignoring false alarms in both these regions, the false alarm rate further drops to 5.63%.

A.5 ENERGY SAVINGS OPPORTUNITIES ASSESSMENT

Savings calculations were based on: 1) identified percentage savings described in Appendices A.3 and A.4 and 2) building utility bill and metering data in 2011. Tables A.10 and A.11 show the steam and electricity bills for Building 7113/7114.

Table A.10 Building 7113/7114 Steam Utility Bill in 2011 2011 B7113 steam (MMBTU) B7114 steam (MMBTU)

Jan-11 729.7 3221.2Feb-11 612.0 3124.3Mar-11 743.2 2937.2Apr-11 841.8 2098.4

May-11 834.6 1802.4

Jun-11 718.0 1812.8

Jul-11 571.8 871.5Aug-11 571.3 2034.6Sep-11 691.6 2575.7Oct-11 533.0 1226.8

Nov-11 427.3 1358.2

Dec-11 541.1 1971.1

Table A.11 Building 7113/7114 Electricity Utility Bill in 2011

B7113 electricity

208V (KWh)

B7113/B7114 electricity 408V

(KWh)

B7114 electricity 208 V (KWh)

Jan-11 40080 284880 41280Feb-11 35760 273600 38400Mar-11 39840 273840 40320Apr-11 38400 241920 35040

May-11 37920 226560 37920

Jun-11 35760 231360 44640

Jul-11 34800 217920 30960Aug-11 37200 301680 40560Sep-11 50160 310560 50640Oct-11 39600 234480 43680

Nov-11 33600 171360 32160

Dec-11 30240 165360 32160 Both absorption chillers and steam-to-hot water heat exchangers are located in Building 7114, and the only steam end use in Building7113 is domestic hot water. The domestic hot water

Page 113: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 97 May 2013

usages are assumed to be the same for Buildings 7113 and 7114. Therefore, the total annual HVAC related steam consumption for Building 7113/7114 was assumed to be 17,218.8 MMBTU in 2011. Absorption chillers were only turned on from April to October and consumed 17% of the total steam. Heating related steam consumption was about 35% of the total. Figure A.39 illustrates steam end use in Building 7113/7114.

Cooling, 5,710, 17%

Heating, 11,509, 35%

DHW, 15,631, 48%

2011 Steam End Use (MMBTU)

Figure A.39 Building 7113/7114 Steam End Use in 2011

From the lighting and plug load sub-meters deployed in Building 7113/7114 by this demonstration project, together with the utility bill, HVAC related electricity end use can be calculated. Figures A.40 and A.41 show the electricity end use for Building 7113/7114 in July and December 2011, respectively. 43% of annual electricity consumption was assumed to be from HVAC equipment including pumps and fans for further energy savings analysis.

LTG, 86,081, 30%

Plug, 71,007, 25%

HVAC, 126,592, 45%

July 2011 Electricty End Use (KWH)

Figure A.40 Building 7113/7114 Electricity End Use in July 2011

LTG: Lighting

Page 114: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 98 May 2013

LTG, 76,116, 33%

Plug, 53,750, 24%

HVAC, 97,894, 43%

December 2011 Electricty End Use (KWH)

Figure A.41 Building 7113/7114 Electricity End Use in December 2011

For Building 7113/7114 savings calculations, the following assumptions are used: Based on 2011 utility bill 17% annual steam consumption is from the cooling 35% annual steam consumption is from the heating 43% annual electricity consumption is from the HVAC equipment and system 20% annual energy savings from the deployment of the aBEMS. Please refer to Table

A.7 in Appendix A.3 for savings number20. o Economizer faults correction o HVAC operation sensitivity study (setpoint reset and outside air flow rate control)

Table A.12 lists breakdown energy savings for Building 7113/7114.

Table A.12 Building 7113/7114 Energy Savings

2011 Total 20% Savings Cooling steam (MMBTU) 5,709.70 1,141.94 Heating steam (MMBTU) 11,509.10 2,301.82 HVAC Electricity (kWh) 1,657,495.20 331,499.04

A.6 TECHNOLOGY SCALABILITY ASSESSMENT

First, the scalability of demonstrated technology was assessed by the implementation time (i.e., labor hours) for the different technology elements:

20 The savings from correcting economizer faults was included in option 2 of HVAC operation sensitivity study. The existing operation baseline used in the sensitivity study reflected the faulty operation.

LTG: Lighting

Page 115: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 99 May 2013

Time to create ROM building envelope models was reduced by 50%-75% by using the toolkit to automatically convert from BIM to BEM compared with the traditional method to create detailed building models.

The time to create the HVAC equipment model using the ROM model library is varied (up to 50% reduction) depending on the data availability and quality for given equipment

For the HVAC equipment and system with the same configuration, the probabilistic graphical model based energy diagnostics requires 50% less labor time as diagnostic models can be directly re-used.

For similar HVAC equipment and systems, the probabilistic graphical model based energy diagnostics takes 10-20% less labor time as the graphical structure does not have to be learned from data and validated by experts. The networks have to be trained however to obtain appropriate parameters.

The toolkits, model developments and diagnostics algorithms testing occurred at the same time when the demonstrations in Building 7230 and Building 7113/7114 were conducted. Therefore, it is impossible to do a fair evaluation of the implementation time for the demonstrated technology in these buildings. However, if assuming all the toolkits and algorithms are in place, the implementation time of the aBEMS will be at least 30% less for Building 7113/7114 compared with Building 7230 mainly due to:

Reusable building envelope and HVAC equipment ROM library; A toolkit to automatically transfer a BIM to a BEM; Scalable probabilistic graphical model based energy diagnostics.

The aBEMS was successful implemented in buildings with different use types and different sizes (Building 7230: drill hall and office building with 70,000 ft2 vs. Building 7113/7114: barracks building with 300,000 ft2).

Page 116: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 100 May 2013

APPENDIX B: BUILDING LIFE CYCLE COST MODEL RESULTS

The MILCON ECIP template in the NIST BLCC program [20] is used to calculate the SPB (Simple Payback) and SIR (Savings to Investment Ratio) for the advanced building energy management system in Building 7113/7114. Section 5 and Appendix A provide details of savings opportunities from the demonstration buildings. It is assumed that there will be ~$1,000 savings per year per building for operation and maintenance costs due to the fact that the system down-time could be reduced and the facility team could better prioritize their work orders. The following assumptions are used:

$0.069/kWh for electricity and $8.7 /MMBTU for steam No demand charge Real discount rate of 3% Inflation rate of 1.2% Length of study period is 10 years

Below is the output of the BLCC model for the aBEMS demonstration in Building 7113/7114:

Page 117: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 101 May 2013

Page 118: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 102 May 2013

APPENDIX C: MANAGEMENT AND STAFFING

The Table C.1and Figure C.1 below show the organization chart for the project.

Table C.1 Point of Contact POINT OF CONTACT

Name

ORGANIZATION Name

Address

Phone Fax

E-mail Role in Project

Trevor Bailey United Technologies Research Center

411 Silver Lane, MS 129-78

East Hartford, CT, 06118

Ph. (860) 610-1554 Fax (860) 660-1014

Email: [email protected]

Project Leader

Zheng O’Neill United Technologies Research Center

411 Silver Lane, MS 129-85

East Hartford, CT, 06118

Ph. (860) 610-7331 Fax (860) 622-6228

Email: [email protected]

Co-PI

Peter Behrens Public Works Department, Great Lakes

2625 Ray Street

Great Lakes, IL 60088-3147

Ph. (847) 688-2121 x28 Fax: 847-688-2124

Email: [email protected]

Navy Great Lakes Energy Manager

United Technologies Research CenterTrevor Bailey

Project Leader

Dong LuoMechanical Engineer

Zheng O’Neill Mechanical Engineer

Public Works Department, Naval Station Great Lakes

Peter Behrens

Supervisory Role

Host site

Madhusudana Shashanka

Data mining

Sunil Ahuja Mechanical Engineer

Bing DongMechanical Engineer

Veronica Adetola

Control Engineer

Taimoor KhawajaData mining

Figure C.1 Organization Chart

Page 119: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 103 May 2013

APPENDIX D: REFERENCE

1. Office of the Under Secretary of Defense For Acquisition, Technology, and Logistics, Report of the Defense Science Board Task Force on DoD Energy Strategy, More Fight – Less Fuel, Feb 2008.

2. DoD Base Structure Report – Fiscal year 2008 3. DoD Facilities and Vehicles Energy Use, Strategies and Goals – Program Overview,

GovEnergy 2008, August 6, 2008. 4. TAMU. Potential of On-line Simulation for Fault Detection and Diagnosis in Large

Commercial Buildings with Built-up HVAC Systems, Energy Systems Laboratory, University of Nebraska and Energy Systems Laboratory, Texas A&M University, June 2002

5. G. P. Henze, Kalz, D. E., Liu, S., and Felsmann, C., Experimental Analysis of Model-Based Predictive Optimal Control, HVAC&R Research, Vol. 11, No. 2, 2005, pp. 189-213.

6. M. A. Piette, S. Kinney, and P. Haves. Analysis of an Information Monitoring and Diagnostic System to Improve Building Operations, Energy and Buildings 33 (8) (2001), 783-791.

7. TIAX LLC Energy Impact of Commercial Buildings Controls and Energy Diagnostics.. For DOE, May 2005. http://www.epa.gov/cleanenergy/energy-resources/refs.html

8. http://www.whitehouse.gov/news/releases/2007/01/20070124-2.html 9. http://www.fedcenter.gov/programs/eo13514/ 10. http://www.mathworks.com/products/matlab/ 11. D. Koller and N. Friedman. 2009. Probabilistic Graphical Models: Principles and

Techniques. Edited by . MIT Press. 12. K. Murphy. 2001. An Introduction to Graphical Models. Technical Report. 13. http://simulationresearch.lbl.gov/bcvtb/ 14. Friedman, H. and M.A. Piette, A Comparative Guide to Emerging Diagnostic Tools for

Large Commercial HVAC Systems, LBNL Report 48629, LBNL, Berkeley CA, May 2001. 15. New, J., Sanyal, J. Bhandari, M and Shrestha, S. 2012. Autotune E+ Building Energy

Models. SImBuild 2012. 16. T. Bailey and P. Haves. ESTCP SI-0929 Automated Continuous Commissioning of

Commercial Buildings Demonstration Plan. February 2010. 17. ANSI/ASHRAE Standard 140-2007. Standard Method of Test for the Evaluation of Building

Energy Analysis Computer Programs. American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Atlanta, GA. 2007.

18. Crispieri, G. 2008. Data Quality Evaluation Methods. International SEMATECH Manufacturing Initiative, Technology Transfer #08074943A-ENG. July 2008. Available at http://www.sematech.org/docubase/document/4943aeng.pdf]

19. DOD Energy Manager’s Handbook. http://www.wbdg.org/ccb/DOD/DOD4/dodemhb.pdf. August 25, 2005.

20. NIST Handbook 135 – Life Cycle Costing Manual for the Federal Energy Management Program. 1995.

21. ASHRAE existing building conference, presidential keynote presentation, New York City, NY, April 2010

22. http://cbs.lbl.gov/performance-monitoring/specifications/

Page 120: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 104 May 2013

23. National Science & Technology Council, Committee on Technology. Sub-metering of building energy and water usage - Analysis and recommendations of the subcommittee on buildings technology research and development. October. 2011.

24. Gowri, K., Winiarski, D. and Jarnagin, R. 2009. Infiltration Modeling Guidelines for Commercial Building Energy Analysis, PNNL-18898.

25. Welch, G. and Bishop, G. 2006. An Introduction to the Kalman Filter. http://www.cs.unc.edu/~welch/kalman

26. House, J. M., H. Vaezi-Nejad, and J. M. Whitcomb. 2001. An Expert Rule Set for Fault Detection in Air-Handling Units. ASHRAE Transactions 107 (1): 858–871.

Page 121: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 105 May 2013

APPENDIX E: REDUCED-ORDER BUILDING ENVELOPE MODEL

1. Overall Reduced-order Building Envelope Model The heat balance includes the solar radiation on the external surface of the structure, the transmitted solar radiation through the windows and subsequently absorbed by interior walls, floors and furniture, air leakage through doors, sensible air from HVAC, and sensible loads due to lighting, people and equipment. The mass balance includes refrigerator cases generated or removed humidity, water vapor brought by HVAC supply air and latent loads due to people and equipment. The thermal network model has been widely used to represent the above heat transfer and thermal dynamics process through building envelope and the subsequent effects on indoor air temperature. In this study this method was adopted. Two major assumptions were used for a given zone:

The zone air and humidity is well mixed Longwave radiation exchanges between surfaces are not considered.

ambTzoneT

Infiltration

zonew

Wall conduction

adjT

Air wall

Sensible Heat

Latent Heat

adjw

RTUs

Figure E.1 Energy Flow in Buildings for ROM

Figure E.1 shows a typical energy flow in buildings for ROM. The energy balance in one zone with one air node can be described as:

Page 122: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 106 May 2013

zonepvv

N

izonezoneizonei

N

iistructurezoneAMBzoneSUP

zone

zoneair

TCmHHm

QQHHmHHm

dt

dHm

adjzone

surface

1

_intinfsup

_

)(

(1)

pvzonepazonezone CCTH (2)

pvsapasaSUP CCTH (3)

pvAMBpaAMBAMB CCTH (4)

pvzoneipazoneizonei CCTH (5)

Where

zoneH , SUPH , AMBH and zoneiH are enthalpies of zone air, supply air, outdoor air and adjacent

zone air respectively

zoneairm _ air mass for the given zone [kg];

paC specific heat capacity of dry air [J/kg/ºC];

pvC specific heat capacity of water vapor [J/kg/ºC];

zoneT zone air temperature [ºC];

SUPT supply air temperature [ºC];

supm supply air mass flow rate [kg/s];

infm Infiltration mass flow rate [kg/s];

vm Internal water vapor generation rate [kg/s];

intQ convective internal loads[W];

surfaceN

iistructureQ _

sum of the convective heat transfer between the zone air and zone’s internal surface temperature [ºC];

adjzoneN

izonezonei HH

1

)( sum of the enthalpy exchange due to interzone air mixing;

zoneAMB HHm inf enthalpy exchange due to infiltration/leakage of outside air; The mass balance equation of water vapor in a zone is given by:

)(1

_ zonezonei

N

iivzonesaSUP

zonezoneair

adj

mmmdt

dm

(6)

Where

Page 123: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 107 May 2013

sa humidity ratio of supply air flow [kg/kg]

zone humidity ratio of the given zone [kg/kg]

zonei humidity ratio of adjacent zones [kg/kg]

Since there are open refrigerator cases and cooking area in this supermarket, the humidity and water vapor generation at the zone level cannot be neglected. The 3R2C thermal network model is used for estimating building structure load as shown in Figure E.2.

R

C

1/hiA1/hoA

R QsurfiQsurfo

C

Qstructure

Rwin

AMBT OSURT iSURT zoneT

Figure E.2 Thermal Network Model of One External Wall

The heat balance equation for outside surface is given by:

surfowall

osurfisurfosurfambo

osurf QR

TTTTAh

dt

dTC

(7)

The heat balance equation for inside surface is given by:

surfiwall

isurfosurfisurfzonei

isurf QR

TTTTAh

dt

dTC

(8)

The heat balance equation for the zone air node is given by:

win

zoneambzoneisufistructure R

TTTTAhQ

)()(

(9)

The solar radiation on external and internal surfaces is defined as:

solsurfo QQ (10)

intQQQ solsurfi (11)

The thermal resistance and capacity are defined as:

Page 124: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 108 May 2013

kA

lR ,

2

lACC p

(12)

Where,

isurfT inside surface temperature [ºC]

osurfT outside surface temperature [ºC]

surfoQ outside surface absorbed solar radiation [W]

surfiQ inside surface absorbed solar radiation [W]

oh outside surface heat transfer coefficient [W/m2,ºC]

ih Inside surface heat transfer coefficient [W/m2,ºC]

A wall or window surface area [m2] k thermal conductivity of surface [W/m, ºC] density of the surface material [kg/m3] 2. Solar Radiation Model The solar radiation model is based on Chapter 14, ASHARE Fundamentals. For the total amount of solar radiation on a receiving surface, there are three steps. Step 1: Calculate the sun position

Figure E.3 Sun Position in An Earth-Sun System

Solar altitude and solar azimuth are used to describe the position of the Sun relative to the earth. Solar altitude and azimuth angles , in turn, depend on the local latitude (°N, negative in the southern hemisphere); the solar declination , which is a function of the date; and the hour angle , defined as the angular displacement of the sun east or west of the local meridian due to the rotation of the earth, and expressed in degrees as:

)12(15 ASTH (13) where AST is the apparent solar time. Now the relationship of solar altitude is defined as:

Page 125: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 109 May 2013

)sin()sin()cos()cos()cos()sin( LHLh (14) The azimuth angle is uniquely defined by its sine and cosine given below:

)cos(/)cos()sin()sin( HA (15))cos(/))cos()sin()sin()cos()(cos()cos( LLHA (16)

Step 2: Geometry information of receiving surface The orientation of a receiving surface is best characterized by its tilt angle and its azimuth. The tilt angle (also called slope) is the angle between the surface and the horizontal plane. Its value lies between 0 and 180°. Most often, slopes are between 0° (horizontal) and 90° (vertical). Values above 90° correspond to surfaces facing the ground. The surface azimuth is defined as the displacement from south of the projection, on the horizontal plane, of the normal to the surface.

Figure E.4 Solar Angle for Vertical and Horizontal Surfaces [1]

The surface-solar azimuth angle is defined as the angular difference between the solar azimuth A and the surface azimuth

A (17) Finally, the angle between the line normal to the irradiated surface and the earth-sun line is called the angle of incidence . It is important in fenestration, load calculations, and solar technology because it affects the intensity of the direct component of solar radiation striking the

Page 126: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 110 May 2013

surface and the surface’s ability to absorb, transmit, or reflect the sun’s rays. Its value is given by:

)cos()sin()sin()cos()cos()cos( hh (18) Step 3: Calculate solar radiation on the receiving surface Total sky irradiance reaching the receiving surface is the sum of three components: the beam component originating from the solar disc; the diffuse component originating from the sky dome; and the ground-reflected component originating from the ground in front of the receiving surface. Thus,

diffbeamg SSS (19)

Normally, the and are from measurements. 3. Infiltration Model Air infiltration through the building envelope has a significant impact on the space heating energy use in buildings. Although there are very detailed and complex approaches available to model air infiltration using air flow networks (AFN) and computation fluid dynamics (CFD), typically building energy simulation tools use a simplified approach to estimate air change rate based on building air tightness measured by pressurization tests. Several field surveys and test methods have been developed to specify building level air infiltration rates for a known standard pressure difference across the envelope. In an effort to specify air-barrier requirements, the ASHRAE 90.1 Envelope Subcommittee has developed a list of component infiltration rates that can be used to calculate the overall building air infiltration rate. During the development of air barrier requirement changes to 90.1-2004, ASHRAE SSPC 90.1 Envelope Subcommittee developed recommendations of baseline and advanced infiltration levels for building components, as shown in Table E.1 [2]. These recommendations were provided for each opaque element of the envelope such as walls, windows, roof, etc. The total infiltration for a building can be calculated by aggregating the component infiltration rates. During the HVAC design, there is a design criterion for indoor-outdoor air pressure difference, for example 75 pa. Based on this assumption, there is a method to convert this into wind-driven infiltration model, which is called design flow rate model. (20) Where coefficients A,B,C and D are different for different models as shown in Table E.2 [2] below.

)]()(*[ 2WindSpeedDWindSpeedCTTBAIonInfiltrati ambientzonedesign

Page 127: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 111 May 2013

Table E.1 Envelope Component Infiltration Rates

Table E.2 Infiltration Coeffcients

The designed infiltration is defined as:

nHspabldgdesign

UCII )

75

5.0()1(

2

75

(21)

Page 128: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 112 May 2013

Where bldg is the atmospheric boundary layer component. For a typical urban terrain

environment, bldg is 0.22. sC is the local wind pressure coefficient at the point of impingement.

HU is the wind speed at building height and defined as:

bldgmet

bldg

bldg

met

met

met

HH

HU

U

)()( (22)

Where metU is the wind speed at measurement point. metH is the height of measurement point.

is the atmospheric boundary layer thickness. This method is implemented in the building envelope model. 4. Test with ASHRAE 140 (BESTEST) ANSI/ASHRAE Standard 140 [3] Method of Test for the Evaluation of Building Energy Analysis Computer Programs, sets forth procedures for testing building energy simulation software. ASHRAE Standard 90.1 [4], Energy Standard for Buildings Except Low-Rise Residential Buildings, requires that “simulation program shall be tested according to ANSI/ASHRAE Standard 140, and the results shall be furnished by the software provider.”

Figure E.5 Results for the ASHRAE BESTEST

Figure E.5 shows the annual load predictions of the ROM thermal network model for various ASHRAE BESTEST cases (numbers are shown on the x-axis), with the bars showing the loads predicted in different cases. For each test case, the ASHRAE Standard provides a range of results produced by reference programs. If test results fall within or close to this range, the subject software is considered to yield acceptable accuracy. Cases 600,620.640, 900, 920 and 940 for ROM building envelope model were tested. All predicted loads were in the range of example results from the Standard. References [1] ASHRAE. 2009. ASHRAE Fundamentals . ASHRAE. [2] Gowri, K., Winiarski, D. and Jarnagin, R. 2009. Infiltration Modeling Guidelines for Commercial Building Energy Analysis, PNNL-18898. [3] ASHRAE. 2004. ANSI/ASHRAE Standard 140-2004. Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs. [4] ASHRAE. 2007. ANSI/ASHRAE/IESNA Standard 90.1-2007. Energy Standard for Buildings Except Low-Rise Residential Buildings.

Page 129: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 113 May 2013

APPENDIX F: LOAD ESTIMATION

Load Estimation: The load estimation algorithm [1] was adapted for the purpose of estimating the unknown building lumped internal load from the available model and measurements. The internal load herein comprises of plug, occupancy and lighting loads. The system model was augmented with states defining the internal load and driven with white noise (Equation 1). The extended Kalman filter is then employed to estimate the load. Please refer to [1] for more details on the filter.

vxCY

w

wQxfuxf

Q

xX

T

Q

x

)1(

),(),( int

int

Additional Capabilities/ Flexibilities provided in this project are: 1. Constraint Handling: The EKF implementation was extended to handle time-varying lower

and upper bound constraints on the internal load. The algorithm requires the user to specify these bounds a-priori, otherwise a default value of zero lower bound is used to reflect the fact that internal loads (physically) can only be non-negative. The bound specification is required to be a Ndata by Nzones matrix, where Ndata is number of data points and Nzones is the number of zones for which load estimates is required. Any available information on the internal load can easily be incorporated in to the constraints. For example, if the lighting load is known, the lower bound will be set to a minimum value equal to the lighting load for each zone. Otherwise, the model can be modified to include the known component of the load while the estimator only computes the unknown component. The constrained load estimation is handled with an algorithm that projects the unconstraint estimate unto the user defined constraint surface. Specifically, the projection algorithm presented in ([1], page 13) is implemented for this purpose.

2. Consolidation of Output Model: The original KF code requires one function file per output, resulting in unnecessary many function files for large buildings with many zones. Since the output measurements in the buildings is usually the zone temperature. The KF is revised to accept one single function file for all the specified outputs.

3. Automatic calculation of Jacobian: EKF requires the calculation of the partial derivative

matrices or Jacobian (eqn 2) at the current state estimate.

)2(ˆ,ˆ uxx

fA

Since the functional form of the model is not available for analytical computation of the Jacobian, it is computed numerically by finite difference. The advantage of this is that

Page 130: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 114 May 2013

the user only need to provide the building model and the Jacobian is calculated as part of the estimation routine.

 Implementation: The estimation algorithm is embedded in to an existing model simulation code. The user is expected to interact only with the main file and the input file. The user provides information on the data and system’s model in the main file and provides the constraints and the covariance matrices required by the load estimator in the input_file. Simulation Example: Drill Hall - Conference room on the 2nd floor The load estimator was validated using data generated from a 3R2C model. Figure F.1 shows the load estimation result, confirming the effectiveness of the estimation tool. Next the estimator was applied to data generated from Energy plus. While the estimator captures the basic behavior of the actual load (Figure F.2), it is obvious that it also accounts for other uncertainties in the model in an attempt to minimize the error between E+ and ROM outputs.

May-29 May-30 May-30 May-31

0

1

2

Load

, K

W

Actual Estimate

May-29 May-30 May-30 May-3121

22

23

24

tem

p, d

eg C

Actual Validation

Figure F.1 Validation of Load Estimator

Page 131: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 115 May 2013

May-29 May-30 May-30 May-31

0

1

2Lo

ad,

KW

E+ Est

May-29 May-30 May-30 May-3121

22

23

24

tem

p, d

eg C

E+ ROM valid

Figure F.2 Constrained Load Estimator Applied to EnergyPlus Data.

Day time maximum load = 2KW; Night time maximum load =20W. Minimum load for all time = 0W.

References: [1] O’Neill, D., S. Narayanan, and R. Brahme. 2010. Model-based thermal load estimation in buildings, the Fourth National Conference of IBPSA-USA

Page 132: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 116 May 2013

APPENDIX G: HVAC EQUIPMENT MODELS

This Appendix describes the HVAC equipment models in details. The current library includes models for the following HVAC equipment:

Electric chiller Absorption chiller Cooling tower Cooling coil Heating coil Fan/pump Air side economizer VAV box

Electric Chiller

Overview This is for a description of the lumped steady-state model for air- or water-cooled electric chillers based on the EnergyPlus [1] formulation. The model uses performance information at design conditions along with three curve fits for cooling capacity and efficiency to determine chiller operation at off-design conditions. The correlation based model calculates the thermal performance and the power consumption of the chiller. This model does not simulate the performance of individual components inside the chiller system. It does not simulate thermal performance or power consumption of associated pumps or cooling towers. Models for such auxiliary equipment are created in separate files. Applicability Equipment: electric chiller. Type of model: lumped, steady-state. Applicable ranges: the applicable range of the correlation-based model is mainly defined by the range of the data used to create the model. As an example, model limits for the Carrier 100-ton air cooled chiller in the Navy Drill Hall are listed in the following table. Note: range of parameters should not exceed manufacturer’s operating envelope.

Table G.1 Applicable Ranges of the Electric Chiller Model Variable Unit Min Max

Temperature of Air Entering Condenser ºC 14 35 Temperature of Chilled Water Leaving Chiller ºC 5 12 Part Load Ratio -- 0.1 1.2

Model Description

Page 133: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 117 May 2013

Chiller performance curves can be generated by fitting manufacturer’s catalog data or measured data. The three curves are defined as follows:

where, PLR: part load ratio; Teo, Tci: fluid temperatures at outlet of evaporator and inlet of condenser, °C; CAPFT: cooling capacity factor as function temperatures; EIRFT, EIRPLR: efficiency factor as functions of temperatures and part load ratio; a~f: coefficients. Refer to the EnergyPlus Engineering Reference [1] for more details. Inputs/Outputs/Parameters

Table G.2 Inputs, Outputs and Parameters of the Electric Chiller Model Inputs (real-time values from system or related components) Tcwe Temperature of water entering chiller from secondary loop (or building) ,

ºC; Tcwl Temperature of water leaving chiller from secondary loop (or building) ,

ºC; Qloadevap Cooling load on chiller from secondary loop (or building), W; Tconde Temperature of fluid entering condenser from weather, ºC; Mdotwevap Mass flow rate of chilled water from secondary loop (or building), kg/s; Outputs Pchiller Chiller power consumption, W; Pcondfan Chiller condenser fan power consumption, W; ChillerCOP Chiller COP rating Parameters Design parameters Qref Chiller rating capacity, W; COPref Reference Chiller COP rating; Mdotwevapref Mass flow rate of chilled water, kg/s; 224.7 GPM; Tcwlspt Setpoint of chilled water temperature leaving chiller, ºC; PLR_minunloadratio Minimum unload ratio of chiller; Pcondfanratio Chiller condenser fan power ratio, W/W; eff_compmotor Compressor motor efficiency; Parameters generated from data Chiller capacity function of temperature, ChillerCapFTemp

cqt(1) Coefficient1 Constant cqt(2) Coefficient2 Tcwl

Page 134: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 118 May 2013

cqt(3) Coefficient3 Tcwl2 cqt(4) Coefficient4 Tconde cqt(5) Coefficient5 Tconde2 cqt(6) Coefficient6 Tcwl*Tconde Energy input to cooling output ratio function of temperature, ChillerEIRFTemp cet(1) Coefficient1 Constant cet(2) Coefficient2 Tcwl cet(3) Coefficient3 Tcwl2 cet(4) Coefficient4 Tconde cet(5) Coefficient5 Tconde2 cet(5) Coefficient6 Tcwl*Tconde Energy input to cooling output ratio function of part load ratio, ChillerEIRFPLR cep(1) Coefficient1 Constant cep(2) Coefficient2 PLR cep(3) Coefficient3 PLR2

Absorption Chiller

Overview This is for a description of the lumped steady-state model for steam driven absorption chiller. The model uses performance information at design condition along with two curve fits for cooling capacity and heat input to determine chiller operation at off design conditions. This model does not simulate the performance of individual components inside the chiller system. It does not simulate thermal performance or power consumption of associated pumps or cooling towers. Applicability Equipment: steam driven absorption chiller Type of model: lumped, steady-state Applicable ranges: the applicable range of the correlation-based model is mainly defined by the range of the data used to create the model. As an example, model limits for the Trane ABTF NTON-500 chiller in the Navy Buildings 7113/7114 are listed Table G.3. Note: range of parameters should not exceed manufacturer’s operating envelope.

Table G.3 Applicable Ranges of the Absorption Chiller Model Variable Unit Min Max

Temperature of Air Entering Condenser °C 25 31 Temperature of Chilled Water Leaving Chiller °C 5 12

Model Description Chiller performance curves can be generated by fitting manufacturer’s catalog data or measured data. The two curves are defined as follows: ChillerCapFTemp = cqt(1) + cqt(2)*Twel + cqt(3)*Twel*Twel + cqt(4)*Twce + cqt(5)*Twce*Twce + cqt(6)*Twel*Twce;

Page 135: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 119 May 2013

GenHIRFTemp = cgt(1) + cgt(2)*Twel + cgt(3)*Twel*Twel + cgt(4)*Twce + cgt(5)*Twce*Twce + cgt(6)*Twel*Twce; where, Twce: temperature of water entering condenser, °C; Twel: temperature of water leaving evaportor, °C; ChillerCapFTemp: cooling capacity ratio (relative to design capacity) as function of Twce and

Twel, nd; GenHIRFTemp: generator heat input ratio (relative to design heat input) as function of Twce and

Twel, nd; cqt, cgt: correlation coefficients generated from data. The model format was adopted originally from EnergyPlus and was modified later due to issues of data availability and quality from the test building. However, I/O structure is still maintained so that the model can be modified if data available for other formats, e.g., the EnergyPlus model with part load ratio curves. Inputs/Outputs/Parameters

Table G. 4 Inputs, Outputs and Parameters of the Absorption Chiller Model Inputs

Twee* Temperature of water entering chiller evaporator from secondary loop (or building) , ºC;

Twel Temperature of water leaving chiller evaporator to secondary loop (or building) , ºC;

Twce Temperature of water entering chiller condenser from weather, ºC;

Mdotwe Mass flow rate of chilled water from secondary loop (or building), kg/s; Mdotwc Mass flow rate of cooling water from cooling tower, kg/s; Outputs Qgen Heat load of generator, W; Ppump Pump power input, W; Qcond Condenser heat load, W; Twcl Temperature of water leaving condenser, ºC; ChillerCOP COP of chiller; Mdotwg Mass flow rate of steam/condensate; Parameters Design Values

Heatsource Type of driving force, 1: steam; 2: hot water. (hot water calculation not tested);

Qref Chiller rating capacity, W; 493 tons for the ABTF500 unit; Twel_stpt Setpoint of chilled water temperature leaving chiller, ºC

Page 136: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 120 May 2013

COPref Rating COP; Mdotweref Mass flow rate of chilled water, kg/s; Ppumpref Total electric power of pumps in chiller, W; hfg Latent heat of vapor, J/kg; dTsc Subcooling in generator, default 1 in EnergyPlus max 20, ºC; dTsc_loop subcooling in loop due to heat loss in EnergyPlus , default 0 in EnergyPlus; Parameters derived from data ChillerCapFTemp Chiller capacity function of temperature cqt(1) Coefficient1 Constant cqt(2) Coefficient2 Twel cqt(3) Coefficient3 Twel2 cqt(4) Coefficient4 Twce cqt(5) Coefficient5 Twce2 cqt(6) Coefficient6 Twel*Twce cqt(7) * Coefficient7 Twge cqt(8) * Coefficient8 Twge2 cqt(9) * Coefficient9 Twel*Twce*Twge GenHIRFTemp Generator heat input ratio function of temperature cgt(1) Coefficient1 Constant cgt(2) Coefficient2 Twel cgt(3) Coefficient3 Twel2 cgt(4) Coefficient4 Twge cgt(5) Coefficient5 Twge2 cgt(6) Coefficient6 Twel*Twge GenHIRFPLR * Generator heat input ratio function of part load ratio cgp(1) Coefficient1 Constant cgp(2) Coefficient2 PLR cgp(3) Coefficient3 PLR2 PumpEIRFPLR * Solution pump power ratio function of part load ratio cpp(1) Coefficient1 Constant cpp(2) Coefficient2 PLR cpp(3) Coefficient3 PLR2 Property Data Cpw Specific heat of water, J/kg. ºC * Not used in current model due to lack of data.

Page 137: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 121 May 2013

Cooling Tower Overview This is a description of the lumped steady-state model of cooling tower with variable speed fans. It is based on empirical curve fits of manufacturer’s performance data or field measurements. User specifies tower performance at design conditions, and empirical curves are used to determine the approach temperature and fan power at off-design conditions. This model does not calculate the detailed heat and mass transfer process of the cooling tower. Applicability Equipment: cooling tower with variable speed fans Type of model: lumped, steady-state Applicable ranges: this model is based on the YorkCalc correlation which is applicable to a wider range compared to the CoolTool formula. Applicable ranges of the model are listed in Table G.5. Note: ranges of parameters should not exceed manufacturer’s operating envelope.

Table G. 5 Applicable Ranges of the Cooling Tower Model Variables Limits

minimum inlet air wet-bulb temperature (°C) -34.4 maximum inlet air wet-bulb temperature (°C) 26.7 minimum tower range temperature (°C) 1.1 maximum tower range temperature (°C) 22.2 minimum tower approach temperature (°C) 1.1 maximum tower approach temperature (°C) 40 minimum water flow rate ratio 0.75 maximum water flow rate ratio 1.25 maximum liquid-to-gas ratio 8

Model Description The variable speed tower model utilizes user-defined tower performance at design conditions along with empirical curves to determine tower heat rejection and fan power at off-design conditions. Makeup water usage is also modeled based on user inputs, tower entering air conditions, and tower operation. The following section describes the main equation for approach temperature calculation. Heat rejection is modeled based on the YorkCalc correlation, which calculates the tower approach temperature using a polynomial curve fit with 27 terms and four independent variables. dTapp = capp(1) + capp(2)*Tawbe + capp(3)*Tawbe^2 + capp(4)*dTw + capp(5)*Tawbe*dTw + capp(6)*Tawbe^2*dTw + capp(7)*dTw^2 + capp(8)*Tawbe*dTw^2 + capp(9)*Tawbe^2*dTw^2 + capp(10)*ffwa +

Page 138: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 122 May 2013

capp(11)*Tawbe*ffwa + capp(12)*Tawbe^2*ffwa + capp(13)*dTw*ffwa + capp(14)*Tawbe*dTw*ffwa + capp(15)*Tawbe^2*dTw*ffwa +

capp(16)*dTw^2*ffwa + capp(17)*Tawbe*dTw^2*ffwa + capp(18)*Tawbe^2*dTw^2*ffwa + capp(19)*ffwa^2 + capp(20)*Tawbe*ffwa^2 + capp(21)* Tawbe^2*ffwa^2 + capp(22)*dTw*ffwa^2 + capp(23)*Tawbe*dTw*ffwa^2 + capp(24)*Tawbe^2*dTw*ffwa^2 + capp(25)*dTw^2*ffwa^2 + capp(26)*Tawbe*dTw^2*ffwa^2 + capp(27)*Tawbe^2*dTw^2*ffwa^2; where: dTapp: approach temperature (ºC) = outlet water temperature - inlet air wet-bulb temperature; dTw: range temperature (ºC) = inlet water temperature - outlet water temperature; Tawbe: inlet air wet-bulb temperature (ºC); Ffwa: liquid-to-gas ratio = ratio of water flow rate ratio (FRwater) to air flow rate ratio (FRair); Capp(i): correlation coefficients; FRair = air flow rate ratio (actual air flow rate divided by design air flow rate); FRwater = water flow rate ratio (actual water flow rate divided by design water flow rate). For more details, refer to the EnergyPlus Engineering Reference [1]. Inputs/Outputs/Parameters

Table G. 6 Inputs, Outputs and Parameters of the Cooling Tower Model Inputs Tadbe Entering air dry bulb temperature, ºC; RHae Entering air relative humidity, 0-1; Twe Entering water temperature, ºC; Vdotw Water volume flow rate, m3/s. Outputs Twl Leaving water temperature, ºC; Pow_ct Cooling tower power input, W; Vdotw_makeup Makeup water volume flow rate, m3/s; Vdota Air flow rate, m3/s; Parameters ncell Number of cells; Twl_stpt Setpoint of leaving water temperature, ºC; Vdota_des Design value of air volume flow rate, m3/s; Vdotw_ref Reference value of water volume flow rate, m3/s; fcfc Fraction of cooling tower capacity in free convection at zero

fan speed vs. max fan speed, nd; capp Coefficients for approach temperature (Tapp) calculation, nd; cpf Coefficients for fan power vs. air volume flow rate; Tawbe_min Minimum inlet air wet-bulb temperature, °C; Tawbe_max Maximum inlet air wet-bulb temperature, °C;

Page 139: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 123 May 2013

dTw_min Minimum tower range temperature, °C; dTw_max Maximum tower range temperature, °C; dTapp_min Maximum tower approach temperature, °C; dTapp_max Maximum tower approach temperature, °C; fw_min Maximum water flow rate ratio, nd; fw_max Maximum water flow rate ratio, nd; ffwa_min Maximum liquid-to-gas ratio, nd; fa_min Maximum air flow rate ratio, nd; fa_max Maximum air flow rate ratio, nd; makeup_evap Option of calculation of makeup water due to evaporation. 1:

assume saturated leaving air, 2. use loss factor fw_evap, nd; fw_evap Loss factor of water due to evaporation, percent of condenser

water flow rate per degree change of water temperature, 0.15-0.27, percent/K;

fw_drift Loss factor of water due to drift, percent of design water flow rate lost to drift at the tower design air flow rate, percent;

fscon Ratio of solids in the blowdown water to solids in the makeup water, 3-5, nd;

itmax Maximum number of iterations; Cpw Specific heat of water entering chiller, J/kg.ºC; Patm Atmospheric pressure, Pa.

Cooling Coil Overview This is a description of the lumped steady-state model for air-water cooling coil. The model calculates leaving air and water conditions based on the UA value derived from design schedule and calibrated with measured data available. This model does not calculate the detailed heat transfer process due to the constraint of data availability in practice. Applicability Equipment: air-water cooling coil Type of model: lumped, steady-state Applicable ranges: the ranges depend on the bounds of data available for the validated UA. As an example, applicable ranges of the Navy Drill Hall building are listed in the following table. Note: range of parameters should not exceed manufacturer’s operating envelope.

Table G. 7 Applicable Ranges of the Air-Water Cooling Coil Model Variable Unit Min Max

Temperature of Air Entering Coil ºC 18 30 Relative Humidity of Air Entering Coil % 20 100 Mass Flow Rate of Air kg/s 8.3 9.1

Page 140: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 124 May 2013

Temperature of Water Entering Coil ºC 5.1 12.2 Mass Flow Rate of Water kg/s 2.3 9.5

Model Description Adopted from the EnergyPlus format, the cooling coil model is based on approach to the saturation line in the heat and mass transfer process. As an equivalent psychrometric calculation, UA values are derived from the bypass factor and effectiveness-NTU method using temperature for dry coil and enthalpy for wet coil conditions. UAt = e_NTU(mdota, ha_i, mdotw*cpw/cpsat, ha_Twi) UAo = -log(BPh) * mdota * cpa; UAi = cpsat / (1/UAh – cpa/UAo) where, UAt, UAo, UAi: UA values for total, external and internal heat transfer rate, W/K; Mdota, Modtw: air and water mass flow rate, kg/s; cpa, cpw, cpsat: specific heat of air, water and air at equivalent saturation condition, J/(kg.K); BPh: bypass factor, nd. For the cooling coil model, eight functions for coil and 15 psychrometric functions have been created in Matlab. For more details, refer to the EnergyPlus Engineering Reference [1]. Inputs/Outputs/Parameters

Table G. 8 Inputs, Outputs and Parameters of the Air-Water Cooling Coil Model Inputs InletWaterMassFlowRate Mass flow rate of water, kg/s

InletWaterTemp Temperature of water entering coil, ºC

InletAirMassFlowRate Mass flow rate of air, kg/s

InletAirTemp Temperature of air entering coil, ºC

InletAirHumRat Humidity ratio of air entering coil, ºC

Outputs

OutletWaterTemp Temperature of water leaving coil, ºC

OutletAirTemp Temperature of air leaving coil, ºC

OutletAirHumRat Humidity ratio of air leaving coil, ºC

Parameters UACoilTotal Total heat tranfer rate, W/K UACoilInternal Internal heat tranfer rate, W/K UACoilExternal External heat tranfer rate, W/K

Page 141: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 125 May 2013

Heating Coil Overview This is a description of the model of air-water heating coil. The model calculates leaving air and water temperatures based on the UA value derived from design schedule and calibrated if measured data is available. This model does not calculate the detailed heat transfer process due to the constraint of data availability in practice. Applicability Equipment: air-water heating coil Type of model: lumped, steady-state Applicable ranges: the ranges depend on the bounds of data used for validation of the model (not available in this study).

Model Description The air-water heating coil model uses performance information at design conditions to calculate the design UA value. If measured data is available, UA value should be calibrated and coil performance should be validated especially for off-design conditions. The heating coil model is based on the effectiveness-NTU method for cross flow with the derived UA as well as temperature and flow rate of entering air and water, which is similar to the dry-coil condition of the cooling coil model. For more details, refer to the EnergyPlus Engineering Reference [1]. Inputs/Outputs/Parameters

Table G. 9 Inputs, Outputs and Parameters of the Air-Water Heating Coil Model Inputs AirMassFlow Air mass flow rate, kg/s WaterMassFlowRate Water mass flow rate, kg/s TempAirIn Entering air temperature, ºC TempWaterIn Entering water temperature, ºC Outputs TempAirOut , C Leaving air temperature, ºC TempWaterOut Leaving water temperature, ºC Parameters UA Heat transfer rate, W/C Cpw Specific heat of water, J/(kg. ºC)

Page 142: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 126 May 2013

Fan/Pump Overview This is a description of the model of variable speed fans and pumps. The model uses measured data of air/water flow rate or fan/pump speed to calculate power input of the fan or pump. Coefficients for the correlation are derived from test data under normal operating conditions. The fan/pump power model can be used in energy prediction and monitoring of fan/pump status. This model is not based on fan curves from manufacturers to avoid inaccuracy in power prediction due to the variations in field application from lab test conditions of manufacturers. Applicability Equipment: variable speed fan/pump Type of model: lumped, steady-state Applicable ranges: the ranges are defined by the data used to generate the correlation coefficients. As an example, applicable ranges of models for VFD fans/pumps in buildings 7113/7114 are listed in following table.

Table G. 10 Applicable Ranges of the Variable Speed Fan/Pump Model Unit Min. speed (%) Max. speed (%)

b7113_ah1raf 55 65 b7113_ah1saf 55 100 b7113_ah2raf 55 92 b7113_ah2saf 55 100 b7113_ah3raf 50 100 b7113_ah3saf 37 45 b7113_ah4raf 999 999 b7113_ah4saf 55 88 b7113_te1 44 92 b7113_te2 37 90 b7113_te4 100 100 b7114_ah1raf 60 94 b7114_ah1saf 57 98 b7114_ah2raf 57 100 b7114_ah2saf 40 100 b7114_ah3raf 50 100 b7114_ah3saf 91 100 b7114_ah4raf 65 100 b7114_ah4saf 65 88 b7114_chsp4 49 100 b7114_chsp5 53 97 b7114_chsp6 49 100 b7114_ctr1 40 60

Page 143: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 127 May 2013

b7114_ctr2 17 40 b7114_ctr3 18 40 b7114_hxp8 48 66 b7114_hxp9 45 70 b7114_hxp10 54 100 b7114_te1 41 59 b7114_te2 36 41 b7114_te4 100 100

Model Description The fan/pump power model can be created as a function of either volumetric flow rate of air/water or fan/pump speed signal, depending on availability of data. Fan power = c0 + c1*x + c2*x2 (Watts) where, c0-c2: coefficients created from data; x: air/water flow rate (m3/s) or fan/pump speed signal (%).

Inputs/Outputs/Parameters

Table G.11 Inputs, Outputs and Parameters of the Variable Speed Fan/Pump Model Inputs csf Fan speed control signal, 0-100 tai Air temperature at inlet, ºC vdota Volumetric flow rate of air, m3/s Outputs pow Power input, W tao Air temperature at outlet, ºC Parameters cpa Air specific heat, w/kg-ºC cpow Coefficients of fan power input (W) vs fan speed signal fh2a Fraction of fan heat into air roua Air density, kg/m3 x_min Minimum speed control signal, 0-100 x_max Maximum speed control signal, 0-100

Economizer Overview This is a description of the model of temperature or enthalpy differential based economizer control in air handling unit. The air flow rate modulates in cooling mode and stays at minimum in heating mode.

Page 144: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 128 May 2013

This model does not include dynamic control of damper position in the economizer. The output of this model in cooling mode is fraction of air flow rate relative to the total supply air flow rate, not the damper position. Applicability Equipment: air-side economizer Type of model: lumped, steady-state Applicable ranges: the ranges depend on the bounds of data defined in field application.

Model Description The model calculates fraction of outdoor air flow rate relative to the total supply air flow rate based on the differential enthalpy or temperature values among outdoor air, return air and supply air setpoint. Outdoor air fraction = (outdoor air temperature/enthalpy – supply air temperature/enthalpy) / (return air temperature/enthalpy – supply air temperature/enthalpy) Inputs/Outputs/Parameters

Table G. 12 Inputs, Outputs and Parameters of the Economizer Model Inputs T_o Outdoor air temperature, ºC RH_o Outdoor air relative humidity, nd, 0-1 T_r Return air temperature, ºC RH_r Return air relative humidity, nd, 0-1 daytype Wekday(wd) or weekend (we) timeofday Current hour of the day, hr Outputs f_Mdot_o Fraction of outside air, nd Parameters T_s_stpt_c Supply air temperature setpoint in cooling, ºC T_s_stpt_h Supply air temperature setpoint in heating, ºC RH_s_stpt_c Supply air relative humidity setpoint in cooling, nd, 0-1 Vdot_o_min Minimum fluid volume flow rate, m3/s Vdot_o_max Maximum fluid volume flow rate, m3/s T_o_min Minimum outdoor air temperature for economizer operation, ºC T_o_max Maximum outdoor air temperature for economizer operation, ºC f_sch_wd_eco Schedule factor of economizer during weekdays, nd f_sch_wd_eco Schedule factor of economizer during weekends of holidays, nd

Page 145: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 129 May 2013

VAV Overview This is a description of the model of variable air volume box with reheat. It calculates air flow rate as a fraction of the design value in cooling mode and leaving air temperature with minimum air flow rate in heating mode. This model does not include dynamic control of damper position in the VAV box. The output of this model in cooling mode is fraction of air flow rate relative to design value, not the damper position. Applicability Equipment: VAV box with reheat Type of model: lumped, steady-state Applicable ranges: the ranges depend on the bounds of data defined in field application. As an example, applicable ranges of the Navy Drill Hall building are listed in Table G. 13. Note: Values listed here are from the design schedule. These values should be modified based on field implementation. In some of the VAV boxes in the Navy Drill Hall, the lower limit varied especially in heating mode.

Table G. 13 Applicable Ranges of the VAV Model Min. Air Flow Rate (m3/s) Max. Air Flow Rate (m3/s)

VAV1 0.153 0.519 VAV2 0.153 0.576 VAV3 0.109 0.441 VAV4 0.212 0.857 VAV5 0.038 0.175 VAV6 0.212 0.897 VAV7 0.153 0.656 VAV8 0.021 0.047

Model Description The type of air flow management is based on the logics implemented in the Navy Drill Hall and buildings 7113/7114. In cooling mode, the model calculates the air flow rate as a fraction the design value to maintain the zone temperature. In heating mode, the model calculates water flow rate and leaving air and water temperatures. UA value is derived from design condition and can be tuned if data available.

Page 146: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 130 May 2013

Inputs/Outputs/Parameters

Table G. 14 Inputs, Outputs and Parameters of the VAV Model Inputs Ta_i Air temperature at inlet of VAV box, ºC Ta_z Zone air temperature, ºC Tw_i Temperature of water at inlet of reheater, ºC Q_z Zone thermal load, W daytype Type of day, weekday (1) or weekend/holiday (0) timeofday Current hour of the day, 1-24 mode Zone demand mode, cooling (-1), heating (1) or none (0) Outputs Ta_o Air temperature at outlet of VAV box, ºC Mdota Mass flow rate of supply air, kg/s Tw_o Water temperature at outlet of reheat, ºC Mdotw Mass flow rate of water for reheat, kg/s Q Heating demand on reheat, W f_Mdot Parameters Design Parameters Mdota_max Design air mass flow rate, kg/s

f_Mdota_min Minimum air mass flow rate as fraction of design air mass flow rate, nd

UA_des Design UA of reheat in VAV box, J/ºC Other Parameters f_sch_wd_eco Schedule factor of economizer during weekdays, nd f_sch_wd_eco Schedule factor of economizer during weekends of holidays, nd

References [1]. EnergyPlus Engineering Reference. October 2, 2009. http://apps1.eere.energy.gov/buildings/energyplus/

Page 147: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 131 May 2013

APPENDIX H: BUILDING VISUALIZATIONS AND FDD

In this Appendix, the visualization and FDD modules, which have been implemented and demonstrated at Naval Station Great Lakes, are described. Architecture and Data Management

Fault Detection/Diagnosis (FDD) and Visualization were implemented as two separate modules. The Fault Detection/Diagnosis module runs in an automated fashion once every four hours for Building 7113/7114. In each instance, it reads the BMS data for the past four hours from the database, performs computations (based on trained diagnostic models), and archives the results back in the database.

The visualization module was implemented as a stand-alone module and was initiated by the user. The user selects the time period that he/she wishes to explore after which the module reads corresponding data from the database and displays them to the user. The FDD/visualization modules have been implemented in MATLAB [1] and interact with the database using MATLAB’s database toolbox. Schematics of both the modules are shown in Figure H.1 below.

FDD Module

Computations

BMS Data

Database

Diagnostic Models

(trained on validated  nominal data & ROM data)

Every 4 Hours

Database

Visualization Module

User Initiation Display

BMS Data Results & Anomaly Scores

Figure H.1 Schematics for FDD Module and Visualization Module

Page 148: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 132 May 2013

Setup and Commissioning in a New Building The following are the steps involved in commissioning the Fault Detection/Diagnosis and Visualization modules.

1) Begin archiving BMS data.

2) Identify a period of data at least two weeks long and validate for nominal operation. If such data is unavailable or difficult to obtain, utilize the validated reduced-order models to train the diagnostic models (Bayesian Networks).

3) Run the initialization code for FDD computations after at least 30 days of data has been accumulated. This sets up all the necessary files for continuous running of the FDD module.

4) Use the FDD visualization module after the initialization is complete

5) Run the FDD computations module periodically, updating results every four hours, based on new incoming data.

Fault Detection and Diagnostics Approach

The FDD module utilizes data from the BMS as well as simulation outputs from reduced-order models for training. The module primarily uses algorithms from the statistical machine learning literature to characterize the joint probability distributions of data for the purpose of fault detection and fault identification. The statistical machine learning methods used rely on the assumption that the characteristics of the data variations are relatively unchanged unless a fault occurs in the system. This implies that statistical properties like the mean and variance, at a particular operating point are repeatable, even though the individual values may show significant fluctuations. This repeatability allows thresholds for certain measures that indicate anomalous operation to be determined automatically. This is the essence of the underlying principle used in the FDD module. A class of techniques commonly known as “Probabilistic Graphical Models” was used to characterize the probability distributions of data and we briefly summarize it below. Probabilistic Graphical Models Overview Probabilistic graphical models are a class of models that can represent the joint multivariate probability distribution of a set of random variables. Modeling the joint probability distribution allows one to assign probability values to measured data points and this can be used to detect anomalous events. Any data-point with a low probability assignment can be interpreted as an anomaly. Probabilistic graphical models provide a compact representation of the joint probability distribution by representing the random variables and the relationships between them as a graphical network. Random variables are represented as nodes in the graph and arcs between nodes represent statistical relationships. In this project, directed arcs were used to represent the relationships. Representing the joint probability distribution as a directed graphical network simplifies the computation of the joint distribution by expressing it as a product of the

Page 149: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 133 May 2013

conditional probability distributions at every node. The parameters of such models are the conditional distributions at every node. The advantages of using models as described above can be illustrated using a synthetic example. Considering a scenario where the problem is to model the dependency between the weather (cloudy conditions and rain) and condition of the lawn (sprinkler system and whether the lawn has been watered). Figure H.2 below shows a graphical network corresponding to this problem along with the probability distributions at every node. In the probability tables, T and F represent “True” and “False” respectively. The nodes “Cloudy,” “Sprinkler,” “Rain” and “WetGrass” are represented by their initial letters.

Figure H.2 Graphical Network Example

Given a graphical network like the one shown in Figure H.3, along with the associated conditional probability parameters, one can revise the values of probabilities in light of actual observations. This process is usually referred to as “inference.” For example, one can engage in “bottom-up” or “diagnostic” reasoning where the problem is to infer the most likely cause given some evidence (i.e. observed data). In the case of the weather and lawn example, if the grass was observed to be wet, one can compute the probabilities that the cause was rain or sprinkler to be 0.708 and 0.43 respectively. The computations result from an application of Bayes’ rule. In this case, it is more likely that the grass was wet due to rain. One can also try to understand how causes generate effects via “top-down” or “causal” reasoning. One could answer questions such as specifying the probability that the grass will be wet if it is cloudy. One can also “explain away” observations by updating probabilities when additional “evidence” or observations become available. For example, if the grass was wet and in

Page 150: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 134 May 2013

addition it was observed that it was raining, one can update the probability that the sprinkler was on and find it to be very low given the new evidence. In the above toy example, the graphical network was given to us along with the parameters. In real-life problems, this is not available and there are algorithms that help “learn” the structure of the network and the parameters from raw data. One can also use the knowledge of experts in developing the structure of the network or guiding the algorithm to find the right structure. Given the properties described above and the flexibility of the methods, probabilistic graphical models were used to characterize the data from buildings to detect anomalies. Since buildings consist of many integrated systems, a whole building graphical network model maybe too complex for tractability. A hierarchical approach is proposed and FDD is done in a top-down manner. At the building level, a system level network models and tracks various systems and interactions between them. Each node in this top-level network leads down to component level FDD modules. In this manner, the size and the complexity of the network, that needs to be dealt with at any point in time, can be kept to a manageable size. For example, the system level graphical network and one of its component networks for Building 7230 are shown in Figure H.3. .

System level graphical network Component level heat exchanger graphical network Figure H.3 Graphical Network for Building 7230

The graphical structure is learned in a completely data-driven manner to discover the relationships between variables inherent in the data. . The goal of this step is to learn the nominal behavior of the system. If available, measured data was used for training after it has been validated that there were no faults present during the selected time-period. When such data is not available, data from reduced-order models were used to learn the relationships corresponding to nominal behavior. After this step the learned graphical structure is validated against domain knowledge and physics based understanding of the system. At this step several spurious

Page 151: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 135 May 2013

connections may be removed and some critical ones enforced, the graphical structure is also pruned to keep only necessary variables for dimensionality reduction. At this point the graphical network model for FDD is used to analyze new data to generate an anomaly score quantifying the extent of departure from the nominal performance of variable, given the measurement of other related variables. Based on the anomaly scores and a suitably chosen threshold, faults are detected & diagnosed by identifying anomalous variables in the given set of nodes in the network.

User Interface and Visualizations

A platform-independent, MATLAB [1] based visualization tool for monitoring building energy consumption, overall building health and integrated building diagnostics has been developed for Building 7114. The Integrated Buildings Energy and Diagnostics (iBED Viz) tool provides an intuitive interface to view energy utilization at the building level and for major components, i.e., lighting, plug loads, heating, cooling, fans and pumps. Advanced visualization features for easy navigation and drill-down analysis have also been implemented. The diagnostics interface takes a top-down approach which allows the operator to see building level health performance as well as component level health performance using a hierarchical building interface that lists key system components such as the chiller, heat exchanger and air handling units (AHU). Key features of the iBED Viz visualization system (highlighted in Figure H.4) are discussed below.

Figure H.4 Overview of the Energy Visualization

Building Hierarchy

Page 152: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 136 May 2013

The visualization interface is customizable in that it can load any building hierarchy and customize the display for that building structure. This hierarchical structure allows the user to navigate to different levels of detail while analyzing faults and their origin. Figure H.5 shows the building structure for Building 7114 which is used to navigate through the system. It includes four AHUs a heat exchanger and a chiller. Also, the AHU labels in the system hierarchy are expandable to show components within the AHU – the economizer (ECON), cooling coil valve (CCV) and the heating coil valve (HCV). See Figure H.5 below for an illustration.

Figure H.5 Building Hierarchy Interface

Time-Series Energy Flows The visualization gives the operator a snap-shot of the system level energy consumption as well as its breakdown into multiple components such as lights and plugs etc. as continuously-updated time series data. The user can thus infer information about how the building is spending energy at different levels of detail by selectively checking the energy modes (fans, pumps, plugs, lights) he/she wishes to visualize, as illustrated in Figure H.6.

Figure H.6 Time-Series Energy Flows Interface

Page 153: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 137 May 2013

Vital Energy Statistics In addition to the spatial information, cumulative statistics of the energy consumption are calculated and displayed as pie charts as shown in Figure H.7. Currently, these pie charts display cumulative energy consumption, peak energy consumption and instantaneous energy consumption relative to the time-window of display. The instantaneous consumption is calculated based on the first time-sample in the field of view or is based on an operator-selected point in the time-series plot.

Figure H.7 Energy Statistics Pie Chart Interface

Panning and Zooming options The visualization interface gives the operator scrolling and zooming capabilities for better navigating the energy time-series plots.

Date Range Selection

Figure H.8 Data Range Selection Interface

Page 154: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 138 May 2013

The interface gives the user an option to choose a date range of his/her choice as shown in Figure H.8.

Thermal Energy Consumption In addition to the electrical energies, the user also has the ability to visualize chilled water or hot water energy consumption by accessing the “visualization” tab from the toolbar. Figure H.9 below is a screenshot of chilled water energy consumption visualization.

Figure H.9 Chilled Water Energy Consumption Interface

NIST APAR Rules for AHUs The tool also implements NIST AHU Performance Assessment Rules (APAR) for AHU diagnostics [2]. APAR diagnostics has been implemented as a separate tool and can be accessed by clicking APAR under the AHU of interest in the building hierarchy. Figure H.10 illustrates the building hierarchical pane from the main iBED Viz tool window where user can access APAR rules tool.

Page 155: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 139 May 2013

Figure H.10 APAR Rules Tool Interface.

The tool opens in a new window as shown in Figure H.11.

Figure H.11 Overview of the AHU APAR Rules Tool

The top panel in Figure H.11 shows an anomaly score which indicates the number of rules that were fired. The bottom panel shows particular rules that were fired. Each of the 28 rows corresponds to a particular APAR rule. When a particular time is chosen, the rules that fired at the time are displayed in the system status panel on the right. The tool also calculates the energy

Page 156: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 140 May 2013

impact of the individual rules. The energy impacts can be accessed from the “Tools” menu as shown below in Figure H.12.

Figure H.12 Energy Impact Module Interface

The energy impacts are shown in the top panel in the form of a bar graph, as shown in Figure H.13. White bars indicate heating energy impact whereas bars in black indicate cooling energy impacts. The values are also displayed on the system status panel as shown in the figure below.

Figure H.13 Overview of the APAR Rules Tool.

Sensitivity Analysis The tool also allows the user to visualize results of HVAC operation sensitivity analyses and they can be accessed from the “Tools” menu. Figure H.14 shows how a user can access sensitivity analysis tools and model validation results from the iBED Viz main tool window.

Page 157: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 141 May 2013

Figure H.14 HVAC Operation Sensitivity Analysis Tool Interface

Heating and cooling sensitivity analyses are implemented as separate tools that open in new windows as shown in Figure H.15 and Figure H.16

Figure H.15 Heating Sensitivity Analysis Tool.

Page 158: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 142 May 2013

Figure H.16 Cooling Sensitivity Analysis Tool.

The sensitivity analysis tools allow the user to select an option and see energy impacts from the selected option compares to the baseline. Additional features of the tool including diagnostics are described in details in the training documentation. References: 1. http://www.mathworks.com/products/matlab/ 2. House, J. M., Vaezi-Nejad, H. and Whitcomb, J. M. 2001. An Expert Rule Set for Fault

Detection in Air-handling Units. ASHRAE Transactions. 107(1).

Page 159: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 143 May 2013

APPENDIX I: DATA ACQUISITION SYSTEM

Background A Building Data Acquisition System (BDAS) was developed to acquire data in Building Automation Control (BAC) systems. The current version is able to acquire data from BACnet protocol compatible systems. In the future this software may be expanded to cover other protocols. The current version is based on the Building Control Virtual Test Bed (BCVTB) environment [1]. The content in this manual for BACnet Reader and BACnet Writer is from the manual of BCVTB [1]. Function Supported Up to the current stage, following functions are supported by the BDAS system: Get data from systems that support BACnet protocol Store data in a database

Get Software To get the software, user needs to download following items: BCVTB: It can be downloaded from https://gaia.lbl.gov/bcvtb/Download DataToSQLConverter: UTRC will provide this software. PostgreSQL: It can be downloaded at http://www.postgresql.org/download/ JDBC Postgresql Driver: It can be downloaded from

http://jdbc.postgresql.org/download/postgresql-9.0-801.jdbc4.jar

Install Software To install PostgreSQL on Windows, please follow the installation wizard. It is important to keep the password you set in a location because it will be used many times after the installation. To install BCVTB, DataToSQLConverter and JDBC Driver, please follow these steps: Follow the BCVTB installation wizard to install BCVTB If the root directory of BCVTB is ’root’, put the JDBC Driver in this directory

’root/lib/ptII/ptolemy/actor/lib/database/’, note that this path works for BCVTB version 0.7.0, for other version this may slightly change.

Open the file ’systemVariables-SYSTEM.properties’ in ’root/bin’, find the line starting with ’entry key=CLASSPATH’, add the following to it (please modify the JDBC driver name if your version is different) %PTII%nPtolemynactornlibndatabasenpostgresql-9.0-801.jdbc4.jar

Unzip DataToSQLConverter, copy both ’GetTime.class’ and ’StoreBACnetDataToDB.class’ to this path ’root/lib/ptII/myActors’.

Open file ’myActor.xml’ in ’root/lib/ptII/myActors’, add the following two items in the group entry <entity name=“SendStorageTime” class=“myActors.GetTime”= > <entity name=“StoreBACnetDataToDatabase” class=“myActors.StoreBACnetDataToDB”= >

Then you are ready to go

Page 160: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 144 May 2013

How to Use the software Use of BACnet Reader in BCVTB The BACnetReader actor reads an xml configuration file to determine what data it needs to read from BACnet devices. This configuration file species the BACnet object types and their child elements, which can be other BACnet object types or BACnet property Identifier. The xml configuration file has the following syntax: It starts and ends with the following element.

Figure I.1 BACnet Configuration File 1

BACnet requires at least one child element of the form i.e., the element name is Object, the attribute Type needs to be

Figure I.2 BACnet Configuration File 2

Device and the attribute Instance needs to be set to its instance number, which is a unique number that is assigned at the discretion of the control provider. Any Object element can contain other Object elements and other Property Identifier elements. Thus, for example, the following can be set as a configuration file to read the ’Present Value’ property of an ’analog output’ object.

Figure I.3 BACnet Configuration File 3

Three types of objects need to be specified in the xml configuration file: BACnet. It is the root of the xml configuration file, every file has to start from <BACnet>

and end at <BACnet>. Only contents specified between these will be recognized by BACnetreader.

Page 161: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 145 May 2013

ObjectType. It is used to specify BACnet objects, including device objects and non-device objects. None device objects are attached to a device object, therefore, none device objects are specified at the child level of device objects, although they use the same name “ObjectType”. For device object, the name attribute should be “DeviceObjectType”, the instance attribute should be the device instance number. For non-device object, the name attribute should be the name of the object, for example, “AnalogInputObjectType”, the instance attribute should be the object instance number.

PropertyIdentifier. It is used to specify the BACnet properties user want to query from BACnet server/device. They can be properties of both device object and non-device object. They should be at the child level of corresponding objects. The name attribute should be the name of the property.

An example for BACnet Reader is shown in Figure I.4. It shows a Ptolemy II system model that uses the BACnetReader actor. It has four output ports. errorSignal

If there were no errors in the previous data exchange, then this port outputs zero. Otherwise, the output is a non-zero integer. errorMessage

If there was an error in the previous data exchange, then this port outputs the error message that was generated by the BACnetReader actor. (The error messages that were generated by the BACnet stack are output of the consoleOutput port.

Figure I.4 BACnet Reader Example

consoleOutput

Page 162: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 146 May 2013

This port outputs the standard output stream and the standard error stream of the executable that communicates with BACnet. propertyValueArray

This port outputs the values obtained at the last successful communication with the BACnet devices. If there was an error in the last communication, then the values from the previous time step will be output of this port. The output data type is an array whose elements are string representations of the BACnet properties that are read according to the configuration file. Elements can be extracted from this array using actors from Ptolemy IIs Actors-Array library. To configure the BACnetReader, double-click on its icon and add the name of its configuration file. There is also a check-box called continueWhenError. If activated and an error occurs, then Ptolemy II will continue the simulation and the actor will output at its ports the last known value and the error message, unless the error occurs in the first step, in which case the simulation stops. If deactivated and an error occurs, then the simulation will stop, the error message will be displayed on the screen and the user is required to confirm the error message by clicking on its OK button. Thus, the user should select this box if the BCVTB should continue its operation when a run-time error, such as a network timeout, occurs. Use of Database Storage Function To store the data retrieved from Building Automation Control (BAC) system to database, four actors have to be used. SendStorageTime

Found in MyActors->SendStorageTime StoreBACnetDataToDatabase

Found in MyActors->StoreBACnetDataToDatabase SQLStatement

Found in Actors->DatabaseActors->SQLStatement DatabaseManager

Found in Actors->DatabaseActors->DatabaseManager

Page 163: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 147 May 2013

Figure I.5 Store BACnet Data to Database

SendStorageTime has two input ports: time and basetime. ’time’ port receives the current simulation time from its start. Since the unit of synchronized time is seconds, it has to times by 1000 (to convert to milliseconds) before sent to the port. ’basetime’ port receives the base from which the simulation starts. It is in ’YYYY-MM-DD HH:MM:SS’ format. The output of SendStorageTime Actor is the current timestamp, in the same format as basetime. StoreBACnetDataToDatabase actor has two input ports:input, time, and two parameters: tbname, colname. Input port receives data coming from BACnetReader actor, time port receives data coming from SendStorageTime actor. Tbname parameter specifies the table to which the data will be stored and colname parameter specifies the column names of the table. It is important to note that the column names are separated by comma, and the first column type has to be timestamp, because it is used to store time. The output of this actor is a SQL script. SQLStatement actor has two input ports: trigger and query. If the direct is SDF director, trigger port does not need to be connected. Query port receives the SQL script. The output is the response from database, it could be ’OK’ or ’failed’. It could be displayed if the output port is connected to a ’Display’ actor. Database manager actor is a necessary component for all database use model. It has two parameters; database and userName. ’Database’ specifies the name of the database, if it is a PostgreSQL database, it should be like ’jdbc:postgresql://localhost:5432/dbname’, userName is the owner of that database. During the execution, a user also needs to type in the password for that particular database and username. Reference [1] http://simulationresearch.lbl.gov/bcvtb/

Page 164: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 148 May 2013

APPENDIX J: BIM TO BEM TOOLKIT

1. BIM-based Database The BIM-based database is a repository for building properties. This includes: a) static information directly from a building Industry Foundation Classes (IFC) file which is generated by a Revit model and b) dynamic information from building operational data. The purpose of this database is to perform information exchange among multiple function modules, which includes a simulation module, a visualization module, a FDD module and a real time data acquisition module. This BIM-based database is a core entity for this integrated infrastructure. The development of this database scheme is composed four elements: a) Building Static Information Building static information includes building envelope information related to thermal performance, building occupancy information and building system information. Building system include lighting system, power system such as plug load etc., and HVAC system. Since thermal modeling is the purpose of storing building envelope information, the schema entities follow the traditional building energy modeling naming conventions. The physical elements are categorized at three levels: building, zone (shown in Figure J.1) and room (shown in Figure J.2). At the building level, location and weather information are stored. At both zone and room levels, wall, window and material property information can be stored.

Figure J.1 Building and Zone

Page 165: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 149 May 2013

To conduct a full building energy simulation, property information about HVAC system and power system is also necessary. The schema generalizes all equipment with an equipment entity, and differentiates the usage with a function attribute. Then based on where the equipment is located, the system level equipment is categorized into one of three categories: primary system, secondary system and terminal system. Component level equipment is categorized into “component”. The equipment entity is shown in Figure J.3. Primary system, secondary system, terminal system and equipment are shown in Figures J.3 and J.4, respectively.

Figure J.2 Relationship between Zone and Room, Wall, Window and Material

Page 166: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 150 May 2013

Figure J.3 Equipment

Figure J.4 Primary, Secondary and Terminal System

b) Operational Information The building operational information refers to the information coming from building BMS system including all sensor data, command signals and control set points. This is also how operational data is categorized. In each category (sensor, set point, and control signal), entities are further separated based on the physical definition (temperature, velocity, volume flow rate, etc.). The sensor schema developed based on this categorization is shown in Figure J.5. To store the dynamic value of a sensor, timestamp is used as attribute at the smallest category level. As an example, Figure J.6 shows the schema for temperature sensor.

Page 167: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 151 May 2013

Figure J.5 Sensor Schema

Figure J.6 Temperature Sensor Schema

c) Simulation Information To store the output from real time energy simulation, the following entities are used: simulationdata, temperaturesim, flowsim, humiditysim, loadsim, pressuresim, factorsim and efficiencysim. The schema for Simulationdata is shown in Figure J.7.

Page 168: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 152 May 2013

Figure J.7 Simulation Data

Figure J.8 FDD Discrete Data

Page 169: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 153 May 2013

Figure J.9 FDD Dynamic Discrete Data

d) FDD Information A static table that stores the FDD data points and a dynamic table that stores the FDD outputs are the minimal configuration requirements for FDD information. In the current schema, the ‘discretedata’ entity is used for storing the FDD static information, the ‘dynamicDiscreteData’ entity is used to store the FDD dynamic information, which are shown in Figures J.8 and J.9, respectively. 2). Automatic Simulation Code Generation Once the BIM database is set-up, the static information is collected through Building Information Modeling Test Bed (BIMTB), a middleware which reads building information from a neutral format file (IFC/gbXML), and stores that data in the centralized BIM database. An IFC View Definition, or Model View Definition (MVD), defines a subset of the IFC schema, which is needed to satisfy one or many exchange requirements of the architectural, engineering and construction (AEC) industry. This is also one of the requirements for successful information exchanges. The MVD for architecture and HVAC relevant information is shown in Figures J.10 and J.11, respectively.

Page 170: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 154 May 2013

Figure J.10 MVD for Architecture

Figure J.11 MVD for HVAC Systems

Page 171: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 155 May 2013

Automatic data extract

IFC, gbXML

BIM Database

Automatic data extract

ROM Inputfiles

Building 7114 Architectural Model

Tosur TisurTamb Tzone

C

1/hiA 1/hoA R Qsurfi Qsurfo

C

Qstructure

Rwin

BEM (Thermal Network Model)

Building 7114 Mechanical Model

Figure J.12 BIM to BEM Flow Chart

Figure J.12 shows the flow chart from BIM to Building Energy Modeling (BEM) process. The information from both Revit architecture and mechanical drawings were exported to IFC and gbXML files. The unique difficulties of Autodesk Revit are: (1) Revit does not support the translation of a HVAC zone to a IFC zone;(2) mapping between a zone and an envelope surface does not exist in the IFC file; (3), mapping between a zone and a HVAC equipment does not exist in IFC file; and (4) Native translation of Revit model to IFC file does not contain the connection between flow terminals and equipment. To address the above problems, following approaches are proposed: Architectural information is read from a gbXML file, which can also be exported given a

Revit model HVAC information is read from a refined Revit HVAC model through GraphiSoft plugin [1]

for Revit MEP 2011. The link between the architectural information and HVAC information is established through

the geometry attribute, where the coordinates of each flow terminal are mapped to its corresponding zones.

Beside the issues with HVAC zones, the thermal properties for each material layer can be only entered manually as a single thermal resistance value after calculated outside the software. Input files for both building envelope and HVAC models are automatically generated from the data extracted from IFC/gbXML files. References: [1] Graphisoft, http://www.graphisoft.com/

Page 172: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 156 May 2013

APPENDIX K: RESPONSE TO ESTCP IPR ACTION ITEMS

Action Item: A White Paper was requested at the October 2011 IPR to address the maturity of building energy management systems and what follow on activities should occur after this project as the next step towards widespread deployment of the technology across DoD. Recommend additional types of demonstrations needed to advance the technology and its adoption by DoD. Please submit the White Paper by Dec 15, 2011. Project Summary The United Technologies Research Center is demonstrating a building energy management system that employs advanced methods for whole-building performance monitoring combined with statistical methods of learning and data analysis to enable identification of both gradual and discrete performance degradation and faults. The system assimilates data collected from multiple sources including drawings, reduced-order models (ROM) and measurements, and employ advanced statistical learning algorithms to identify patterns of anomalies. The results are presented graphically in a manner understandable by a facilities manager. The demonstrated technology is targeted at commercial buildings that use building energy management systems. We expect to be able to demonstrate 20% savings for building energy consumption by improving facility manager decision support to diagnose energy faults and prioritize alternative, energy efficient operation strategies. We also expect to demonstrate scalability of the solution by applying load estimation techniques and reduced-order models for the building and HVAC systems, reducing the need for developing specific, detailed models for each building. The specific technical objectives of the project are 1) to demonstrate 10% building energy savings by providing the facility engineers with actionable energy fault information to identify and correct poor system performance, and 2) to demonstrate an additional 10% energy savings by identifying alternative energy system operation strategies that improve building energy performance. The demonstration is being conducted in buildings at the Naval Station Great Lakes. The facility building management systems are being extended to incorporate the energy diagnostics and analysis algorithms, producing systematic identification of alternative, energy efficient HVAC operation strategies. Response: Scalable deployment of Advanced Building Energy Management Systems During the demonstration process at Naval Station Great Lakes, the maturity of the different technology elements have been assessed with gaps identified that will impact the successful deployment of a building energy performance monitoring and diagnostics system. After the completion of the Naval Station Great Lakes demonstration, it is recommended that the following list of activities should occur to ensure widespread technology deployment at the DoD.

1) Develop low cost and scalable building energy monitoring systems. 2) Implement a robust and scalable middleware for DoD buildings. 3) Deploy a secured DoD network for energy efficient buildings. 4) Integrate Energy Human Machine Interface (eHMI) applications for DoD building

facility operations. 5) Implement a scalable process for DoD building data collection.

The following paragraphs provide the rationale and details for these recommendations.

Page 173: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 157 May 2013

Low cost and scalable building energy monitoring systems The instrumentation required to support the advanced building energy management system has a cost that will challenge broader deployment of the aBEMS in other DoD buildings. The instrumentation costs include:

material costs (i.e., sensors, thermal and electrical meters) installation costs system commissioning costs building management system points mapping costs

The advanced building energy management system uses sensor information from existing building management systems wherever possible. Additional instrumentation is added to provide run-time model inputs, calibrate models and to do energy performance monitoring and diagnosis. A BMS with BACnet (A Data Communication Protocol for Building Automation and Control Networks) gateway is a required to implement the technology. The additional measurements required to track key building energy performance metrics are electrical power sub-metering and thermal energy consumption for cooling and heating. After the sensors/meters have been installed, there is currently considerable time required to handle issues related to data quality, system commissioning and mapping points into the BMS. This is due to the fact that current BMS in existing buildings are not designed for building performance monitoring and energy diagnostics. It is desirable that the sub-metering system and associated points should be considered and included in the BMS at the design stage. A low cost and scalable building energy monitoring system is important for building commissioning that will span the entire building life cycle. It will reduce the commissioning cost and increase the fidelity of energy waste identified during the commissioning process. The payback time of the building commissioning process will be significantly decreased due to the proposed low cost monitoring system. High instrumentation costs that have occurred in the current ESTCP demonstration projects need to be addressed to enable broad DoD deployment of the aBEMS. Specific gaps are identified as follows:

Lack of a guideline for energy monitoring systems (including electric and thermal) for both new building design and retrofit of existing buildings.

Lack of low cost, scalable building electrical and thermal energy sub-metering Lack of systematic and robust tools and methods to design a building energy sensor

network that includes both physical and virtual sensors. Lack of scalable method for automated sensor diagnostics. Lack of a robust and universal data management system for DoD buildings.

To address these gaps, the following key technologies need to be developed and tested:

Develop a comprehensive guideline for the deployment of energy monitoring systems in DoD buildings.

Demonstrate low cost, scalable building electrical and thermal energy sub-metering Automated sensor diagnostics that combine heuristic rules, physical based models and

data mining algorithms Virtual sensors derived from physical based models and nonintrusive load monitoring in

commercial buildings. Universal data management systems that include data acquisition and automated point

mapping into the BMS.

Page 174: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 158 May 2013

Figure K.1 illustrates the concepts of low cost and scalable building energy monitoring system.

Figure K.1 A Schematic Diagram of Low Cost and Scalable Building Energy Monitoring System

Robust and scalable middleware for buildings Existing data management systems included with a building BMS are fragile and control-vendor specific. A universal middleware is necessary to deploy the key elements in the aBEMS in DoD buildings. This middleware will significantly reduce the deployment time required for data acquisition, data storage, visualization and service application integration. In addition, the use of middleware to enable distributed computing and storage at a sensor or central node level has the potential to provide faster response times and fault tolerance. Figure K.2 shows a schematic diagram for a robust and scalable middleware.

Collection

Computation

Visualization

API

Storage

Thermal metersElectrical metersData acquisition systemSecured networkBuilding automation systemBuilding system and equipment

Fault detection and diagnosticsPerformance monitoringControlsModels

Parameter estimationOn line model calibration

Static dataDynamic dataBIM database

Middleware

Figure K.2 Middleware Schematic Diagram

In the Naval Station Great Lakes demonstration project, real time building operational data is collected through a BACnet gateway by using the open source software BCVTB21. A Building Information Model (BIM) supported database was prototyped and used to store both building

21 Building Control Virtual Test Bed http://simulationresearch.lbl.gov/bcvtb/

Page 175: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 159 May 2013

static data (e.g., model parameters, HVAC configuration, etc.) and building dynamic operational data (e.g. temperature, energy). The following gaps are identified:

Lack of a universal data collection system where data can be extracted and retrieved through other industry standard communication protocols (e.g., LonWorks, Modbus, etc.).

Lack of a secure, scalable and industry standard oriented storage mechanism for both static and real time dynamic building operational data.

Lack of a standard Application Programming Interface (APIs) that enable applications to programmatically extract data from the system, perform calculations outside of the middleware and finally write data back to the middleware. Examples of such applications are building performance simulation programs, Fault Detection and Diagnostics (FDD) tools, visualization, controls and optimization tools.

Lack of common computational services such as on-line parameter estimation and on-line model calibration that can be deployed as part of the middleware.

To address these gaps, it is recommended that the following activities should occur after this project:

Extend a BACnet compatible data acquisition system to cover the other industry standard communication protocols.

Develop a database structure that enables rapid mapping and use of both static building information and real time dynamic operational data during the design and operational phases of a building lifecycle. This structure should be tested in a variety of buildings with different types and sizes.

Develop a services-based architecture to support the data exchange APIs and computational services.

Deployment of a secured DOD network for energy efficient buildings The IT infrastructure and security requirements at Naval Station Great Lakes presented a significant challenge for the project. Limited remote access to the demonstration buildings increased both the time and cost of development and testing the aBEMS. Network security constraints at the demonstration site prevented the team from having broadband access to the PCs at Naval Station Great Lakes. An ISDN line was set up to access the computer at Building 7230. However, the ISDN connection speed is prohibitively slow for the massive data transfer (e.g. >1 GB of operational data for one month) required by this project. In the case of Building 7113/7114, there was no possibility for remote access. This presented a significant challenge for coding, debugging and testing. Another issue is related to a centralized BMS. Currently, Great Lakes does not have a centralized BMS. Ideally, to deploy the aBEMS for all the buildings at Great Lakes, only one additional PC should be required to monitor the performance for all the buildings. A secured DoD network is necessary to improve energy efficiency in buildings across the DoD. A secured and integrated network will facilitate the deployment of energy efficient technologies such as the advanced building energy management system prototyped in this project, automated demand response, and smart meters etc. In addition, this secured network will make the building information visible across the DoD so that building performance benchmarking will be possible. Building performance benchmarking data is extremely useful for facility managers to understand

Page 176: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 160 May 2013

their building behaviors in the comparative context of peer buildings. At the same time, Real-time energy meter data can be provided to the building tenants to visibly show how their facilities are performing and give them an incentive to reduce energy consumption. Recently, the team has been made aware of a project executed through Naval District Washington to develop a secured DoD network that will make real time building meter data visible. Currently this effort is focused only on total building energy consumption and would need to be expanded to include building energy sub-metering necessary to support the advanced building energy management system. The following gaps are identified:

Lack of a specification to define a secured DoD network for energy efficient buildings Lack of a secured and integrated network that links all the BMS in individual buildings to

a centralized BMS. Lack of a systematic way to collect and publish building energy usage data, including

total building energy usage (i.e., EUI), subsystems and components level metering data, from all DoD commercial buildings via a secured network.

To address these gaps, it is recommended that the following activities should occur after this project:

Establish a secured and integrated DoD network for building applications. Collect and share building energy usage data via a secured network.

Energy Human Machine Interface (eHMI) applications for DoD building facility operations The eHMI provides a graphics-based visualization of building performance monitoring and energy diagnostics. The approach to make the building information visible and actionable for the facility team is critical to better operate the building and reduce energy consumption in buildings. This visible and actionable information helps to decrease the time needed for building system maintenance and upgrades. The aBEMS provides real time performance monitoring and energy diagnostic functionality. A user friendly and modular user interface (UI) is being developed to facilitate navigation through a potentially large database. Gaps are listed as follows:

Lack of a UI such that users can rapidly build their own visualization screens containing charts and 3D graphics.

Lack of functionality for generating comprehensive reports that can be sent in real time to the facility team.

Lack of a standard and common building operation interface that can be integrated with the BMS in all DoD buildings

To address these gaps, it is recommended that the following activities should occur after this project:

Develop a flexible and extensible UI that enables rapid development by common DoD facility users.

Develop a standard mobile application for the aBEMS. This will make the recommendations provided by the aBEMS immediately visible and actionable.

A scalable process for building data collection Collecting building data for building performance monitoring, energy diagnostic and controls is time-consuming and inefficient in current building industry practice. This project started to

Page 177: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 161 May 2013

address this issue by using a BIM supported approach. The issues are related to the generation of a BIM from available building reference data and then the seamless transition to secondary applications such as a Building Energy Model (BEM). A prototype that automatically converted a Revit-based BIM to a BEM was developed as part of this project (Figure K.3). However, due to some natural deficiencies of BIM (e.g. control sequences cannot be captured in BIM); there is still a need to spend substantial time and resources to collect the building data. Gaps are listed as follows:

Lack of a systematic process to automatically extract building reference data from industry standard data files (e.g., IFC and gbXML).

Lack of a robust, scalable and standardized way to collect and store both static and operation dynamic data throughout a building lifecycle.

Lack of a robust and scalable way to automatically transfer building information from legacy drawings to building energy applications.

To address these gaps, it is recommended that the following activities should occur after this project:

Develop a standardized process to automatically collect building information from available references and transfer them to building energy applications such as BEM.

Automated data extract

IFC, gbXML

BIM Database

Automated data extract BEM

Inputfiles

BIM (Building 7114 Revit Model )

Tosur TisurTamb Tzone

C

1/hiA 1/hoA R

Qsurfi Qsurfo C

Qstructure

Rwin

BEM Reduced order model  

Figure K.3 A Schema for an Automated Convertor from a Revit-based BIM to a BEM

Conclusions To ensure widespread deployment of the Advanced Building Energy Management System at the DoD, it is recommended that the following list of activities should occur after the completion of this demonstration project.

1) Develop low cost and scalable building energy monitoring systems. 2) Implement a robust and scalable middleware for DoD buildings. 3) Deploy a secured DoD network for energy efficient buildings. 4) Integrate Energy Human Machine Interface (eHMI) applications for DoD building

facility operations. 5) Implement a scalable process for DoD building data collection.

These activities will help to achieve DoD energy goals and meet federal mandates to reduce energy costs, operations and maintenance costs.

Page 178: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 162 May 2013

Action Item: Provide recommendations for DoD to consider when integrating building energy management systems with emerging microgrid technologies and practices such as demand management. The same approaches that are currently used for building energy management systems at the demand side can be applied for supply and storage side. These approaches include but are not limited to fault detection and diagnostics, optimal control with receding horizon, stochastic consideration of loads and weather forecasts. Demand, supply and storage integration (i.e., a holistic consideration to energy management in buildings) could be a straightforward extension to existing approaches and existing building energy management systems (BMS). The integration could bring additional savings and security of supply to critical loads. For example, if the utility increases prices or sends a request for peak shaving, the integrated energy management system can decide whether to produce more, use stored energy, or temporary cut demand. It will depend on customer preferences and requirements, economic incentives, forecasts (e.g. solar or wind, and loads), and the security of supply side. Another way to control the microgrid is a SCADA (Supervisory Control and Data Acquisition)/PLC (Programmable Logic Controllers) system. This is an industry standard for controls of distributed power generation. One of the advantages of using a SCADA system is that utility and grid networks also use SCADA for sub-station control and utility power generators use SCADA for power station control and wind farm control etc. The grid operators communicate with the power generation SCADA for monitoring and control purposes. It is well known that utility providers tend to be very conservative and adoption of new standards, particularly those which are not directly related to safety, tends to take a long time. In the near term, using SCADA is possible the better way to integrate the demand side with the smart grid. In terms of best practice, if there is a microgrid with a PLC/SCADA system, it would be better to use the SCADA rather than the BMS to control electrical loads. Particularly if there is a ramp down or a control sequence required because currently there is a lot more flexibility in programming of SCADA than there is in BMS systems. However, if it is just an on/off control, a contactor in the BMS panel, linked to some simple logics in the BMS programming would do the job. Action Item: Describe the general approach to energy management system calibration using performance data over time to learn and adjust. The reference model used in the building energy management system can be automatically calibrated using the approach presented in O’Neill (2012)22. The brief summary is as follows: The model calibration process relies heavily on characterizing parametric influences on the outputs of the model. This analysis was performed by sampling all parameters of the model around their nominal value to create a database of output data which was used to calculate the

22 O’Neill, Z. D., B. Eisenhower, V. Fonoberov and T. Bailey. 2012. Calibration of a Building Energy Model Considering Parametric Uncertainty. ASHRAE Transactions, 118(2). ASHRAE Annual Meeting. San Antonio, TX. Jun 23–27, 2012.

Page 179: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 163 May 2013

sensitivity of these outputs to parameter variation as well as to derive an analytic meta-model based on this model data Once the most influential parameters (on the order of 10 to 20) of the model are identified, an optimization can be performed (using the meta-model) in order to identify parameter combinations that produce the best fit to measured data. Only 10-20 of the most influential input parameters instead of thousands were optimized during the optimization/calibration process to avoid the issue of over fitting the model. Action Item: Describe specifications DoD should publish in appropriate standards documents addressing topics such as building size, numbers/types of meters, instrumentation, communications protocols, integration of native systems, etc. DoD should start to publish the guidelines and standards in the following areas to facilitate the deployment of advanced building energy management systems across DoD buildings and facilities.

A design guideline to determine the minimum set of sensors/meters needed to deploy a comprehensive energy monitoring system for both new construction and retrofit of existing buildings. This guideline should include a check list of sensors/meters and decision flow charts for different HVAC systems.

A guideline to establish a secured and integrated DoD network for building applications. A standard to share building energy usage data via a secured network using native

communication protocols such as BACnet and LonWorks etc. A standardized process to automatically collect building information from available

references and transfer them to building energy applications such as building energy models.

Action Item: Discuss issues and insights regarding the implementation of energy management systems within the DoD information technology infrastructure. The IT infrastructure and security requirements at Naval Station Great Lakes presented a significant challenge for the project. Limited remote access to the demonstration buildings increased both the time and cost of development and testing the aBEMS. Network security constraints at the demonstration site prevented the team from having broadband access to the PCs at Naval Station Great Lakes. An ISDN line was set up to access the computer at Building 7230. However, the ISDN connection speed is prohibitively slow for the massive data transfer (e.g. >1 GB of operational data for one month) required by this project. In the case of Building 7113/7114, there was no possibility for remote access. This presented a significant challenge for coding, debugging and testing. Another issue is related to a centralized BMS. Currently, Great Lakes does not have a centralized BMS. Ideally, to deploy the aBEMS for all the buildings at Great Lakes, only one additional PC should be required to monitor the performance for all the buildings. A secured DoD network is necessary to improve energy efficiency in buildings across the DoD. A secured and integrated network will facilitate the deployment of energy efficient technologies such as the advanced building energy management system prototyped in this project, automated demand response, and smart meters etc. In addition, this secured network will make the building information visible across the DoD so that building performance benchmarking will be possible. Building performance benchmarking data is extremely useful for facility managers to understand their building behaviors in the comparative context of peer buildings. At the same time, Real-

Page 180: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 164 May 2013

time energy meter data can be provided to the building tenants to visibly show how their facilities are performing and give them an incentive to reduce energy consumption. Recently, the team has been made aware of a project executed through Naval District Washington to develop a secured DoD network that will make real time building meter data visible. Currently this effort is focused only on total building energy consumption and would need to be expanded to include building energy sub-metering necessary to support the advanced building energy management system. Action Item: In your Final and Cost & Performance Reports, recommend guidelines for how the demonstrated technology could apply to new construction and how it could apply in retrofit applications, particularly in terms of system controls and enabling sensors to collect data for diagnostics. A design guideline to determine the minimum set of sensors/meters needed to deploy a comprehensive energy monitoring system for both new construction and retrofit of existing buildings is recommended. This guideline should include a check list of sensors/meters and decision flow charts for different HVAC systems. This guideline also should follow the following industry guidelines:

Specifications Guide for Performance Monitoring Systems (http://cbs.lbl.gov/performance-monitoring/specifications/)

ASHRAE: Performance Measurement Protocols for Commercial Buildings. National Science & Technology Council, Committee on Technology. Sub-metering of

building energy and water usage - Analysis and recommendations of the subcommittee on buildings technology research and development.

For the new construction buildings, it is recommended that the owners and designers should pay attention to the following items:

Electrical circuits design to make sure the sub-metering is possible at the subsystem and component level.

BMS design to select a native communication protocol such as BACnet to ensure the data communication and acquisition via a secured network across different subsystems in buildings.

In retrofit applications, it is possible that the existing BMS is not compatible with native communication protocols. Data acquisition will have to be tunneled through a middleware that is capable of extracting data via a specific server such as a BACnet server and an OPC server. Action Item: In your Final and Cost & Performance Reports, include a discussion about the quantification and management of increased risks to building operations caused by increasing complexity of the building system by metering and sub-metering a building. In the advanced building energy management system, all the meters (thermal and electrical) are mapped and integrated with the existing BMS system. The mapped information can be graphically displayed through the existing BMS’s interface (e.g., Siemens’ Insight). Meter locations and real time meter data are visible to the facility manager and building operator. Energy diagnostics module in the advanced building energy management system also detects, diagnoses and flags faults from the metering sub-system.

Page 181: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 165 May 2013

Action Item: In your Final and Cost & Performance Reports, discuss what types of policies DoD should implement to ensure building metering and sensors are adequate to use advanced management systems. It is recommended that DoD should develop a design guideline to determine the minimum set of sensors/meters required to deploy a comprehensive energy monitoring system for both new construction and retrofit of existing buildings. DoD should begin to mandate that DoD facilities to install energy meters at the intermediate level recommended by the ASHRAE performance measurement protocols23. This will support an enhanced level of understanding of the building performance and to identify possible areas of performance improvement through the use of advanced building energy management system. Energy meters should include:

HVAC total electric HVAC fan electric Chiller plant electric Nonelectric heating (other fuel) Electric heating, when significant electrical that is present Indoor lighting total electric Miscellaneous electric (Plug loads) Thermal BTU meters for chilled water loop and hot water loop Thermal BTU meters for hot water loop

23 ASHRAE. 2010. Performance Measurement Protocols for Commercial Buildings

Page 182: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 166 May 2013

APPENDIX L: RESPONSE TO ESTCP TEST BED 10

1. What is the baseline/standard in most DoD buildings/installations for the demonstrated technology? (nationally?)

The baseline/standard in most DoD buildings/installations for the demonstrated Advanced Building Energy Management System (aBEMS) is described in five different areas in terms of gaps as follows:

Building Energy Monitoring System: Lack of a guideline for energy monitoring systems (including electric and thermal)

for both new building design and retrofit of existing buildings. Lack of low cost, scalable building electrical and thermal energy sub-metering Lack of systematic and robust tools and methods to design a building energy sensor

network that includes both physical and virtual sensors. Lack of scalable method for automated sensor diagnostics. Lack of a robust and universal data management system for DoD buildings.

Middleware for Buildings: Lack of a universal data collection system where data can be extracted and retrieved

through other industry standard communication protocols (e.g., Lonworks, Modbus, etc).

Lack of a secure, scalable and industry standard oriented storage mechanism for both static and real time dynamic building operational data.

Lack of a standard Application Programming Interface (APIs) that enable applications to programmatically extract data from the system, perform calculations outside of the middleware and finally write data back to the middleware. Examples of such applications are building performance simulation programs, Fault Detection and Diagnostics (FDD) tools, visualization, controls and optimization tools.

Lack of common computational services such as on-line parameter estimation and on-line model calibration that can be deployed as part of the middleware.

Secured DOD Network for Energy Efficient Buildings Lack of a specification to define a secured DoD network for energy efficient

buildings. Lack of a secured and integrated network that links all the BMS in individual

buildings to a centralized BMS. Lack of a systematic way to collect and publish building energy usage data, including

total building energy usage (i.e., EUI), subsystems and components level metering data, from all DoD commercial buildings via a secured network.

Energy Human Machine Interface (eHMI) applications for DoD building facility operations.

Lack of a UI such that users can rapidly build their own visualization screens containing charts and 3D graphics.

Lack of functionality for generating comprehensive reports that can be sent in real time to the facility team.

Lack of a standard and common building operation interface that can be integrated with the BMS in all DoD buildings

A Scalable Process for Building Data Collection

Page 183: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 167 May 2013

Lack of a systematic process to automatically extract building reference data from

industry standard data files (e.g., IFC and gbXML). Lack of a robust, scalable and standardized way to collect and store both static and

operation dynamic data throughout a building lifecycle. Lack of a robust and scalable way to automatically transfer building information from

legacy drawings to building energy applications. This list aims to help the reader to understand clearly what the gaps are within the current baseline/standard that may preclude this technology from being applied or what similar building features and systems make this technology readily applicable. 2. What is the “state of the art” today? The state of the art today is summarized as follows:

The aBEMS augments an existing BMS with additional sensors/meters and uses a reduced-order building reference model and diagnostic software to make performance deviations visible.

Existing systems do not provide a viable means to quantify the value of a proposed HVAC operation strategy, or a methodology to quantify the value of different strategies. This system employs a physics-based ROM based sensitivity study that is useful to estimate the economic value of different HVAC operation strategies.

Compared to purely rule-based technologies such as PACRATa, this system uses a scalable physics based ROM together with data mining such as probabilistic graphical network and other data mining techniques for rigorous energy diagnosis.

Existing systems do not provide a means to calculate and visualize the energy impact due to faults.

3. How will the project advance the state of the art? Refer to answers to Question 2. 4. What are the technical and economic performance objectives? The objective of this project is to demonstrate an advanced building energy management system that enables facility managers to visualize building energy performance, diagnose building energy faults, and assess alternative, energy efficient HVAC operation strategies. The technical and economic performance objectives are described as follows:

>20% reduction in building total energy consumption (over baseline) >15% reduction in building peak demand energy (over baseline) >20% reduction in building total equivalent CO2 emissions (over baseline) >10% reduction in HVAC equipment energy consumption (over baseline) >10% reduction in lighting or plug loads (over baseline) Predicted building loads difference (absolute error) between detailed model and ROM

within +/- 10% Overall building energy consumption accuracy within +/-15% (ROM vs. measurement)

a Friedman, H. and M.A. Piette, A Comparative Guide to Emerging Diagnostic Tools for Large Commercial HVAC Systems, LBNL Report 48629, LBNL, Berkeley CA, May 2001.

Page 184: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 168 May 2013

HVAC equipment energy consumption accuracy within +/-10% at the rated conditions (ROM vs. measurement)

85% of faults identified are classified correctly (during 3-month demonstration period) Simple payback time is less than 5 years24 SIR is greater than 1.25.

5. What are the performance results? The assessment of the major performance objectives is summarized as follows:

Greater than 20% savings was demonstrated for building energy consumption by improving facility manager decision support to diagnose energy faults and prioritize alternative, energy efficient operation strategies

A ROM library for building envelope and HVAC equipment has been developed, validated and tested by using demonstration buildings at Naval Station Great Lakes.

A prototype toolkit to seamlessly and automatically transfer a Building Information Model (BIM) to a Building Energy Model (BEM) has been developed and tested. This dramatically reduced the time to create a BEM (50% time reduction).

A tool chain for a scalable probabilistic graphical model based energy diagnostics has been established, tested and demonstrated. Greater than 15% energy savings was achieved by correcting AHU economizer faults.

A ROM based HVAC operation sensitivity study has been implemented and greater than 20% energy savings was identified by pre-cooling/preheating the building, resetting chilled water supply temperature setpoints, resetting zone temperature setpoints, and optimizing outside air flow rate in the demonstration buildings.

A visualization dashboard for building performance energy monitoring, HVAC operation strategies prioritization and energy diagnostics has been developed and deployed in demonstration buildings at Naval Station Great Lakes. This dashboard provides an effective way for building facility managers to perform building performance decision-making.

Faults and issues identified by the advanced building energy management system were valued by the facility team because the tool provided additional visibility into the building operation that was not provided by the existing traditional building management system. This additional information allowed the facility team to identify previously unknown operational issues and prioritize their maintenance actions

6. What are the findings and recommendations? By using scalable probabilistic graphic model based FDD algorithms, the following faults were detected and diagnosed from the demonstrated sites: Building 7230 (Drill Hall) and Building 7113/7114.

Economizer faults: Approximately 2,000 CFM more outside air intake during non-economizer modes (Building 7230)

Lighting faults: lights on during unoccupied hours (Building 7230) Economizer faults: The control sequence of operation was incorrect due to errors in the

enthalpy calculations. This caused significantly more outside air intake during hot summer days (e.g., 100% vs. minimal outside air intake) (Building 7113/7114).

24 DoD Energy Managers Handbook http://www.wbdg.org/ccb/DOD/DOD4/dodemhb.pdf

Page 185: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 169 May 2013

Economizer faults: Outside air fraction was not minimal in the heating mode (Building 7113/7114).

Absorption chiller issues: Chiller 1 was turned off due to operational issues during the whole demonstration period. Chiller 2 had issues related to a leaky steam pipe and, steam valve oscillation. Chilled water temperature setpoints could not be maintained during hot summer days, consequently, the AHU supply temperature setpoints and room temperature setpoints could not be maintained ( Building 7113/7114)

The following HVAC operation strategies were evaluated by using ROM based integrated building model:

Pre-cooling and pre-heating (Building 7230). Chilled water supply temperature setpoint reset (Building 7230). Zone temperature setpoint reset (Building 7113/7114). Out air fraction optimal control (Building 7113/7114).

7. What should DoD consider when implementing the technology? During the demonstration process at Naval Station Great Lakes, the maturity of the different technology elements have been assessed with gaps identified that impact the successful deployment of a building energy performance monitoring and diagnostics system. After the completion of the Naval Station Great Lakes demonstration, it is recommended that the following list of activities should occur to ensure widespread technology deployment at the DoD.

Develop low cost and scalable building energy monitoring systems. Implement a robust and scalable middleware for DoD buildings. Deploy a secured DoD network for energy efficient buildings. Integrate Energy Human Machine Interface (eHMI) applications for DoD building

facility operations. Implement a scalable process for DoD building data collection.

8. What products are on the market or will emerge soon? During the demonstration, the UTC stage-gated technology and product development processes have been applied to begin to transition the technology into a commercial product. The advanced building energy management system can be a part of a new BMS product or can be applied as an overlay on an existing BMS. To support a large-scale DoD deployment, UTRC has been engaging expertise from UTC businesses:

Automated Logic Corporation (ALC) – The demonstrated technology elements including BMS integration (middleware), energy diagnostics, and HVAC operation sensitivity analysis can be integrated into the ALC WebCTRL BMS.

NORESCO provides energy services to DoD facilities worldwide.

9. How much will the technology cost in terms of time, people and money to install, operate and maintain?

The table below provides the high level summary for cost structure using Building 7113/7114 as an example to deploy the proposed aBEMS.

Page 186: FINAL REPORT - DTICFINAL REPORT Scalable Deployment of Advanced Building Energy Management Systems ESTCP Project EW-201015 MAY 2013 Veronica Adetola Sunil Ahuja Trevor Bailey Bing

ESTCP Final Report EW-1015 170 May 2013

Cost Element Estimated Costs ($)

Hardware capital costs $70,919 Installation costs $79,210 Consumables N/A

Facility operational costs N/A

Maintenance One day per year ($1000) Hardware lifetime 0

Operator training One day ($1,000)

10. What policies and standards should DoD adjust to improve adoption of the

technology? The DoD should begin to publish guidelines and standards in the following areas to facilitate the deployment of advanced building energy management systems across DoD buildings and facilities:

A design guideline to determine the minimum set of sensors/meters required to deploy a comprehensive energy monitoring system for both new construction and retrofit of existing buildings. This guideline should include a check list of sensors/meters and decision flow charts for different HVAC systems.

A guideline to establish a secured and integrated DoD network for building applications. A standard to share building energy usage data via a secured network using native

communication protocols such as BACnet and LonWorks etc. A standardized process to automatically collect building information from available

references and transfer them to building energy applications such as building energy models.