Consultancy for study on Trespassing over Railway
Track in Mumbai Suburban area & remedial measures
thereon.
FINAL REPORT
“Western Railway: Kandivali”
Vol. III
July 2012
MRVC SIR JJCOA
CONSULTANCY CELL
FINAL REPORT
CONTENT
1. INTRODUCTION
1.1 BRIEF DESCRIPTION.
1.2 PRIMARY SURVEY.
1.3 REASONS OF TRESPASSING AT KANDIVALI
2. IDENTIFICATION OF TROUBLE SPOTS
2.1 IDENTIFIED TROUBLE SPOTS.
2.2 DRAWING INDICATING TROUBLE SPOT
3. SOLUTIONS
3.1 INTRODUCTION
3.2 SOLUTIONS TO DISCOURAGE TRESPASSING AT KANDIVALI.
3.3 DRAWING INDICATING SOLUTIONS
3.4 3D SKETCHES INDICATING SOLUTIONS
4. GENERAL ARRANGEMENT DRAWING
4.1 GENERAL ARRANGEMENT DRAWINGS
5. ESTIMATED COST
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -1- Sir JJCOA Consultancy Cell
CHAPTER 1
INTRODUCTION
1.1 BRIEF DESCRIPTION.
THIS IS A STATION IN THE WESTERN SUBURBAN RAILWAY LINE.
THIS STATION IS PREDOMINENTLY CHOSEN TO STUDYAND PREVENT
TRESPASSING THAT OCCURS LARGELY AT THE LEVELING CROSSING ADJACENT
TO THE SOUTHERN END OF THE PLATFORMS.
THIS STATION HAS IN ALL FOUR PLATFORMS.
KANDIVALI WEST IS LARGELY POPULATED AS COMPARED TO KANDIVALI EAST.
THERE IS A RAILWAY YARD ON THE EASTERN SIDE OF THE STATION WHICH IS
USED BY PEOPLE TO TRESPASS TO POISAR VILLAGE BEYOND THE YARD IN THE
EAST.
THERE ARE 2 FOBS. ONE AT SOUTHERN END AND OTHER AT MIDDLE OF
PLATFORM LENGTH.
THERE IS ONE ELEVATED TICKET WINDOW ON THE SOUTHERN FOB IN THE EAST.
THERE ARE TWO TICKET WINDOWS IN THE WEST
THE MAGNITUDE OF TRESPASSING PROBLEM AND THE REASONS OF TRESPASSING
AT KANDIVLI STATION HAVE BEEN STUDIED AT INCEPTION REPORT STAGE WHICH
HAVE BEEN PRESENTED TO MRVC AND ALSO SUBMITTED AS INCEPTION REPORT.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -2- Sir JJCOA Consultancy Cell
1.2 PRIMARY SURVEY. THE FOLLOWING PHOTOS INDICATE THE OBSERVED TRESPASSING LOCATIONS.
Like you, this man too, had a dream.
Like you, he too pushed his way into the crowded train.
Like you, he too wanted to get going before he got
delayed.
But unlike you, he slipped and fell in the gap
between the train and the platform at Kandivali
stationand eight bogies went over him.
Within seconds the 12-coach train passed and the
man somehow came out, unhurt, but too shocked
to speak after his near-death experience.
Kandivali is one of the most populated areas in the
suburbs of Mumbai. The population is exploding.
Out of the 4, only 2 platforms take the maximum
load of the commuters.
The access points which are blocked have been
customized in order to serve the trespassers.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -3- Sir JJCOA Consultancy Cell
Platform no.4 has only 2 proper entrance/exit points.
Both are at the extreme ends of the platforms. And
mainline trains come mainly on platforms 1 and 2.
Thus east side residents find trespassing convenient.
As the railway has not provided people with
appropriate entrances, people find their way out on
their own. People do not find these entrances illegal
and if asked about exit points, they count these ones
in!
The closed level crossing now leaves huge unused area at the south end of platform no.2/3 where
trespassers wait while a train passes.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -4- Sir JJCOA Consultancy Cell
1.3 REASONS OF TRESPASSING AT KANDIVALI
THE HEIGHT OF THE FOB IS VERY HIGH AND HENCE IS UNCOMFORTABLE EVEN FOR
NORMAL HEALTHY PERSON TO USE IT.
NUMBERS OF FOBS ARE INSUFFICIENT TO CATER TO THE PEAK HOUR NEEDS OF
PASSENGER TRAFFIC LEADING TO LOT OF OVERCROWDING ON THE FOB ITSELF.
LACK OF FACILITIES FOR PHYSICALLY HANDICAPPED PEOPLE & SENIOR CITIZENS;
LIKE ESCALATOR, RAMP, ETC.
SMALL RAMP AT BOTH THE ENDS OF THE PLATFORM ALSO ENCOURAGES
TRESPASSING.
LAST MINUTE ANNOUNCEMENT OF CHANGE IN THE PLATFORM SCHEDULE FOR
ARRIVAL / DEPARTURE OF THE TRAIN.
HUMAN SETTLEMENT ALONG THE TRACK ALSO LEADS TO REGULAR TRESPASSING
BY THE INHABITANTS.
EXCEPTIONAL CIRCUMSTANCES LIKE MEDICAL EMERGENCY, PERSON WITH HEAVY
LUGGAGE, ETC. LEADS TO COMPULSORY TRESPASSING.
RAG PICKERS ARE REGULAR TRESPASSERS.
INADEQUATE HEIGHT OF FENCING BETWEEN TRACKS ENCOURAGES PEOPLE TO
JUMP FROM PLATFORM ON TO THE TRACK & CLIMB THE FENCING TO REACH THE
OTHER PLATFORM, THUS LEADING TO SERIOUS TRESPASSING.
POOR CONNECTIVITY BETWEEN EAST AND WEST NEAR LEVEL-CROSSING. FOR EG.
FLYOVERS, SKYWALKS, ETC. THE TIME TAKEN TO CROSS FROM EAST TO WEST AND
VICE-VERSA USING FLYOVER IS VERY HIGH DUE TO HEAVY TRAFFIC LEADING OR
FORCING PEOPLE TO USE LEVEL- CROSSING.
NO PROPER ACCESS PROVIDED TO HUMAN SETTLEMENTS DUE TO WHICH RESIDENTS
HAVE NO CHOICE BUT TO USE RAILWAY TRACK CAUSING SERIOUS TRESPASSING.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -5- Sir JJCOA Consultancy Cell
CHAPTER 2
IDENTIFICATION OF TROUBLE SPOTS
A DETAILED STUDY FOR IDENTIFICATION OF TROUBLE SPOTS WAS CARRIED OUT
BY OUR TEAM WITH RESPECT TO AFOREMENTIONED REASONS FOR TRESPASSING.
2.1 A0IDENTIFIED TROUBLE SPOTS.
a. LEVEL-CROSSING AT THE SOUTH END OF THE STATION
b. IN THE VICINITY OF NORTH SIDE ENTRANCE BETWEEN PLATFORM NO 1 & 2.
NEAR THE MAIN TICKET WINDOW.
c. UNDER THE FOB NEAR THE MIDDLE OF PLATFORM NO.4
d. NORTH END OF THE PLATFORM NO.1 AND 2/3.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -6- Sir JJCOA Consultancy Cell
2.2DRAWING INDICATING TROUBLE SPOT IDENTIFIED TROUBLE SPOTS BASED ON ABOVE STUDY HAVE BEEN INDICATED IN THE
DRAWING NO:-
JJC/MRVC/TS/KAN_1.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -7- Sir JJCOA Consultancy Cell
CHAPTER 3
SOLUTIONS
3.1 INTRODUCTION THE MAGNITUDE OF THE TRESPASSING PROBLEM AND THE REASONS OF TRESPASSING
AT KANDIVLI STATION HAVE BEEN STUDIED AT INCEPTION REPORT STAGE WHICH
HAVE BEEN PRESENTED TO MRVC AND ALSO SUBMITTED AS INCEPTION REPORT.
IN PREVIOUS CHAPTER, TROUBLE SPOTS HAVE BEEN IDETIFIED WITH RESPECT TO
KANDIVALI STATION. HENCE SOLUTIONS TO DISCOURAGE TRESPASSING HAVE BEEN
WORKED OUT KEEPING IN MIND THE FOLLOWING FIVE MAIN POINTS:
FOB
RAILING
R.C.C. WALL
GREEN PATCH
RE-ORGANIZATION OF BUILT SPACES
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -8- Sir JJCOA Consultancy Cell
3.2SOLUTIONS TO DISCOURAGE TRESPASSING AT KANDIVALI:
1. BARRICADES SHOULD BE PROVIDED BETWEEN ALL THE PLATFORMS EXTENDING
UPTO 100M ON NORTH AND SOUTH END OF THE STATION.
2. PROVIDE AN F.O.B. AT THE NORTHERN END JOINING ALL PLATFORMS.
PEOPLE TRESPASS FROM NORTHERN END OF PLATFORM NO. 1 TO 2/3 AND 4.
THIS IS BECAUSE MAJORITY OF THE BUS STOPS ARE LOCATED JUST OUTSIDE THE NORTH END OF
PLATFORM NO.1 LEADING TO PEOPLE USING THIS ENTRANCE.
3. PROVIDE TICKET WINDOW AT NORTHERN ENTRANCE/ EXIT AT PLATFORM NO.1
AT THE EXISTING TOILET SPACE.
SINCE THERE IS NO TICKETING FACILTY AVAILABLE AT THE AFOREMENTIONED ENTRANCE,
PASSENGERES ARE FORCED TO WALK TILL THE TICKET COUNTER AT THE MIDDLE ENTRANCE.
4. PROVIDE GREEN PATCH (50M) BEYOND NORTHERN END OF PLATFORM NO.1
TO PROHIBIT PEOPLE FROM ALIGHTING DOWN ONTO THE TRACKS.
5. PROVIDE GREEN PATCH (100M) BEYOND NORTHERN END OF PLATFORM NO. 2/3
TO PREVENT TRESPASSING FROM PLATFORM NO.2/3 TO 4 TOWARDS EASTERN SETTLEMENTS.
6. PROVIDE GREEN PATCH BEYOND THE SOUTHERN END OF PLATFORM NO.1, 2/3
AND 4 BY 100M.
7. EXTENDING THE EXISTING SKYWALK IN THE EAST TOWARDS WEST AND
CONNECT IT TO EXISTING SOUTHERNMOST F.O.B (ALREADY UNDER-
CONSTRUCTION)
THIS WILL REOPEN THE BROKEN LINK BETWEEN EAST AND WEST,CAUSED BY THE CLOSURE OF
THE LEVEL CROSSING.
8. WIDEN THE SOUTHERN F.O.B. BY 6M.
SO AS TO CAPACITATE MORE NUMBER OF PEOPLE AND ENCOURAGE THEM TO USE THE AMENITY.
9. PROVIDE CONTINUOUS COMPOUND WALL ON THE EAST AND WEST OF THE PLATFORMS THIS WILL PREVENT PEOPLE FROM TRESPASSING.
10. RAILING AT NORTH END OF PLATFORM NO.4.
EXISTING AMENITIES:
1. PLATFORM NO.1- FOUR COMMERCIAL STALLS, TWO DRINKING WATER, ONE
TOILET, ONE BOOK STALL.
2. PLATFORM NO.2/3- TWO TOILETS.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -9- Sir JJCOA Consultancy Cell
SUGGESTED IMPROVEMENTS/ADDITIONS AMENITIES:
1. SHOW SIGNAGES
2. SHIFT ATM AND RELOCATE STALLS AT PLATFORM NO.1. TICKET HOUSE SHOULD
BE WIDENED NEAR RAILWAY QUARTERS.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -10- Sir JJCOA Consultancy Cell
3.3DRAWING INDICATING SOLUTIONS PROPOSED SOLUTIONS BASED ON ABOVE STUDY HAVE BEEN INDICATED IN THE
DRAWINGS AS SHOWN IN DRAWING NO:-
JJC/MRVC/S/KAN_1.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -11- Sir JJCOA Consultancy Cell
3.43D SKETCHES INDICATING SOLUTIONS FOR BETTER APPRECIATION OF THE 2D DRAWINGS, 3D SKETCHES HAVE BEEN
PREPARED INDICATING THE PROPOSED SOLUTION.
EXTENDING THE EXISTING SKYWALK IN THE EAST TOWARDS WEST AND CONNECT
IT TO EXISTING SOUTHERNMOST F.O.B.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -12- Sir JJCOA Consultancy Cell
PROVIDE AN F.O.B. AT THE NORTHERN END JOINING ALL PLATFORMS.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -13- Sir JJCOA Consultancy Cell
CHAPTER 4
GENERAL ARRANGEMENT DRAWING
WITH RESPECT TO THE MAJOR SOLUTIONS AS STATED IN PREVIOUS CHAPTERS,
GENERAL ARRANGEMENT DRAWINGS (G.A.D.) HAVE BEEN PREPARED TO BE USED FOR
ACTUAL EXECUTION AND COST ESTIMATION, KEEPING IN MIND SCHEDULE OF
DIMENSIONS (S.O.D.) RESTRICTION.
ENCLOSED HERE ARE THE DETAILED DRAWINGS OF PROPOSED
FOB
RE-ORGANIZATION OF BUILT SPACES
STAIRCASES
SKYWALK
SOLUTIONS PERTAINING TO GREEN PATCHES, RAILING, R.C.C. WALLS HAVE BEEN
PROVIDED AS GENERAL STANDARD DRAWINGS WHICH ARE A PART OF EXECUTIVE
SUMMARY.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -14- Sir JJCOA Consultancy Cell
4.1GENERAL ARRANGEMENT DRAWINGS DETAILS OF THE PROPOSED SOLUTIONS HAVE BEEN INDICATED IN DRAWING NO:-
JJC/MRVC/GAD/KAN_1.
JJC/MRVC/GAD/KAN_2.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -15- Sir JJCOA Consultancy Cell
CHAPTER 5
ESTIMATED COST
QUANTITES OF THE PROPOSED SOLUTIONS HAVE BEEN DERIVED BASED ON
GENERAL ARRANGEMENT DRAWINGS AND COST ESTIMATE HAS BEEN WORKED OUT AS
PER THE RATES SPECIFIED BY M.R.V.C.
KANDIVALI
LOCATION OF RAILING LENGTH OF RAILING WEIGHT/M COST/KG COST BETWEEN PLATFORM NO. 1 AND 2 659 M 24 KG RS. 75 1186200 BETWEEN PLATFORM NO. 3 AND 4 661 M 24 KG RS. 75 1189800
TOTAL 2376000
LOCATION OF RCC WALL LENGTH OF RCC
WALL CROSS-SECTIONAL
AERA COST/M3 COST
SOUTHERN SIDE OF PLATFORM NO. 1 72 M 0.95M2 RS.
12000 820800
SOUTHERN SIDE OF PLATFORM NO. 4 75 M 0.95M2 RS.
12000 855000
NORTHERN SIDE OF PLATFORM NO. 4 140 M 0.95M2 RS.
12000 1596000 TOTAL 3271800
LOCATION OF FOB WIDTH AREA COST/M2 COST PROPOSED FOB AT THE NORTHERN END
JOINING ALL PLATFORMS 6 M 442 SQ.M
RS. 40000
17680000
PROPOSED WIDENING OF FOB AT THE SOUTHERN END
6M 788 SQ.M RS.
40000 31520000
PROPOSED LINK FROM PUBLIC SKYWALK TO SOUTHERN MOST FOB
6M 145 SQ.M RS.
40000 NA
PROPOSED EXTENSION TO THE PROPOSED NORTHERN FOB IN THE EAST
6M 343 SQ.M RS.
40000 1372000
TOTAL 50572000
LOCATION OF GREEN PATCH AREA OF GREEN
PATCH PERIMETER OF RAILING COST/M2 COST
SOUTH END OF PLATFORM NO. 1 358 SQ.M 149 M RS. 400 143200 NORTH END OF PLATFROM NO. 1 234 SQ.M 76 M RS. 400 93600
SOUTH END OF PLATFORM NO. 2 & 3 1466 SQ.M 251 M RS. 400 186400 NORTH END OF PLATFROM NO. 2 & 3 875 SQ.M 175 M RS. 400 350000
SOUTH END OF PLATFORM NO. 4 370 SQ.M 112 M RS. 400 148000 TOTAL 921200
TOTAL COST AT KANDIVALI STATION 62361000 SAY Rs. 6.25Cr
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC -16- Sir JJCOA Consultancy Cell
LEGEND
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PROPOSED FOB ON NORTHERN ENDWHICH CONNECTS ALL PLATFORMS
PROPOSED AN EXTENSION TO EXISTINGSKYWALK ON EAST SIDE AND WIDENINGOF SOUTHERN MOST FOB ON SOUTHERNSIDE UPTO 6M WIDTH.
LEGEND
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
SOLUTION FOR KANDIVALI STATION1. BARRICADES SHOULD BE PROVIDED BETWEEN ALL THE PLATFORMS EXTENDING UPTO 100M
ON NORTH AND SOUTH END OF THE STATION.
2. PROVIDE AN F.O.B. AT THE NORTHERN END JOINING ALL PLATFORMS. PEOPLE TRESPASS FROM NORTHERN END OF PLATFORM NO. 1 TO 2/3 AND 4. THIS IS BECAUSE MAJORITY OF THE BUS STOPS ARE LOCATED JUST OUTSIDE THE NORTH END OF PLATFORM NO.1 LEADING TO PEOPLE USING THIS ENTRANCE.
3. PROVIDE TICKET WINDOW AT NORTHERN ENTRANCE/ EXIT AT PLATFORM NO.1 AT THEEXISTING TOILET SPACE.SINCE THERE IS NO TICKETING FACILTY AVAILABLE AT THE AFOREMENTIONED ENTRANCE, PASSENGERES ARE FORCED TOWALK TILL THE TICKET COUNTER AT THE MIDDLE ENTRANCE.
4. PROVIDE GREEN PATCH (50M) BEYOND NORTHERN END OF PLATFORM NO.1TO PROHIBIT PEOPLE FROM ALIGHTING DOWN ONTO THE TRACKS.
5. PROVIDE GREEN PATCH (100M) BEYOND NORTHERN END OF PLATFORM NO. 2/3 TO PREVENT TRESPASSING FROM PLATFORM NO.2/3 TO 4 TOWARDS EASTERN SETTLEMENTS.
6. PROVIDE GREEN PATCH BEYOND THE SOUTHERN END OF PLATFORM NO.1, 2/3 AND 4BY 100M.
7. EXTENDING THE EXISTING SKYWALK IN THE EAST TOWARDS WEST AND CONNECT IT TOEXISTING SOUTHERNMOST F.O.B. (ALREADY UNDER-CONSTRUCTION)
THIS WILL REOPEN THE BROKEN LINK BETWEEN EAST AND WEST,CAUSED BY THE CLOSURE OF THE LEVEL CROSSING.
8. WIDEN THE SOUTHERN F.O.B. BY 6M.SO AS TO CAPACITATE MORE NUMBER OF PEOPLE AND ENCOURAGE THEM TO USE THE AMENITY.
9. PROVIDE CONTINUOUS COMPOUND WALL ON THE EAST AND WEST OF THE PLATFORMSTHIS WILL PREVENT PEOPLE FROM TRESPASSING.
10. RAILING AT NORTH END OF PLATFORM NO.4 .
LEGEND
PROPOSE AN EXTENSION TO EXISTING SKYWALK ON EASTERNSIDE TO WEST (ALREADY UNDER-CONSTRUCTION) ANDWIDENING OF SOUTHERN MOST FOB ON SOUTHERNSIDE UPTO 6M WIDTH.
PROPOSED FOB ON NORTHERN END WHICH CONNECTS ALLPLATFORMS
EXISTING AMENITIES-
1. PLATFORM NO.1- FOUR COMMERCIAL STALLS,
TWO DRINKING WATER, ONE TOILET, ONE BOOK STALL
2. PLATFORM NO.2/3- TWO TOILETS
PROPOSAL ON AMENITIES-
1. SHOW SIGNAGES
2. SHIFT ATM AND RELOCATE STALLS AT PLATFORM NO.1.
TICKET HOUSE SHOULD BE WIDENED NEAR RAILWAY
QUARTERS.
1
IN
8
1
2
1
IN
8
1
2
1
IN
8
1
2
1
IN
8
1
2
1 IN
8
1
2
1 IN
8
1
2
TOI
CB.S
C
C
D.WCC
C
C
5.8559
16.0000
11.6431
3.7149
6.0000
6.0000
6.0000
12.5000
23.9039
6.0000
9.0140
15.1654
10
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT