Phases of the Project

•Analysis and Design

•Development/Construction

•Testing/Defect Fixing

Page 3: Final Project Presentation[1]

Analysis and Design

Page 4: Final Project Presentation[1]

INTERNAL- 4 -

ETVX for Analysis and Design

Entry:

- NSEP Case Study

- Standards and guidelines for Use cases,Sequence diagram,SRS.

Activities:

- Requirement Analysis

• Analyzing the problems and identifying requirements that would solve the stated problems

- Preparation of Use-Cases

- Preparation of HLD like Domain diagram,class diagram

- Preparation of LLD like sequence diagram

- Creation and finalization of database design

- Preparation of SRS document

- Preparation of the first draft of System Test Plan(STP)

Page 5: Final Project Presentation[1]

INTERNAL- 5 -

ETVX for Analysis and Design

Verification/Validation:

- Review the SRS document

- Review of HLD and LLD

- Review the System Test Plan

Exit:

- SRS document is complete

- Reviewed HLD and LLD exists

- Database Design document is prepared

- Initial version of the System Test plan exists

Work Items/Deliverable:

- SRS Document

- Sequence diagram

Document Name SVN Link

SRS Document v1.0 https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/document/

Page 6: Final Project Presentation[1]

Development/Construction

Page 7: Final Project Presentation[1]

INTERNAL- 7 -

ETVX for Development/ConstructionEntry:

- SRS, HLD and LLD documents are available.

- Database design document is available.

- Standards for construction are available.

Activities:

- Conduct meeting for code design of development phase

- Prepare detailed plan for development phase(Sub-module division and assigning tasks)

- Development of application is done based on SRS and design documents

Document Name SVN Link

SRS document v1.1 https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/document/

Database design document v1.0 https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/project/groupB.sql

Page 8: Final Project Presentation[1]

INTERNAL- 8 -

ETVX for Development/Construction

- Conduct Project Status Report meeting

- Prepare Project Status Report

- Conduct team meeting for casual analysis

Verification/Validation:

- Review/Walk through the code

- Review the unit test results

- Review of code against Code review checklist.

Document Name SVN Link

Programs https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/project/nsep_account_management/

Code review checklist https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupa/document/EQA/

Page 9: Final Project Presentation[1]

INTERNAL- 9 -

ETVX for Development/ConstructionExit:

- Reviewed code is available

- Unit tested programs are available.

Work Items/Deliverables:

Document Name SVN Link

Programs https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/project/nsep_account_management/

SRS document v1.1

Code review checklist https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupa/document/EQA/

Page 10: Final Project Presentation[1]

Testing/Defect Fixing

Page 11: Final Project Presentation[1]

INTERNAL- 11 -

ETVX for Testing/Defect Fixing

Entry:

- Program code is obtained

- Traceability matrix, Program code, Functional test cases

Document Name SVN Link

SRS document v1.1

Program https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/project/nsep_account_management/

Page 12: Final Project Presentation[1]

INTERNAL- 12 -

ETVX for Testing/Defect Fixing

Activities:

- Testing and defect fixing of the developed application is done

- Code review document is prepared

- Conduct System Test

- Prepare Unit test cases by refining Functional test cases

- Prepare Defect log

- Log defects in Bug tracker

- Fix defects and log the same in Bug tracker

Verification/Validation:

- Reviewing the System Test Plan.

- Reviewing the defect log.

Page 13: Final Project Presentation[1]

INTERNAL- 13 -

ETVX for Testing/Defect Fixing

Exit:

- System Test Plan is updated.

- Defect log is created.

Work Items/Deliverable:

Document Name SVN Link

Defect Log v1.0 https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupa/document/Defect%20Logs/