23
NEBOSH International General Certificate In Occupational Health and Safety UNIT IGC3: HEALTH AND SAFETY PRACTICAL APPLICATION Student Name: TRIMURTHULU KAKI Student Number: 00332912 Date of Submission:

Final Project Igc 3

  • Upload
    murthy

  • View
    5.999

  • Download
    2.224

Embed Size (px)

DESCRIPTION

HI

Citation preview

Page 1: Final Project Igc 3

NEBOSH International General CertificateIn Occupational Health and Safety

UNIT IGC3: HEALTH AND SAFETY PRACTICAL APPLICATION

Student Name: TRIMURTHULU KAKI

Student Number: 00332912

Date of Submission:

Page 2: Final Project Igc 3

APPENDIX 1

GC3 – The Health and Safety Practical Application

Candidate and course provider declarations:

For completion by the candidate:

I declare that the work submitted for this practical application assessment i.e. The completed observation sheets and the report to management, is my own work. I recognise that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) ____________________________________

Signature ____________________________________

Date ____________________________________

For completion by a course provider representative (eg internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognise that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) ____________________________________

Signature ____________________________________

Date ____________________________________

For completion by the course provider’s internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) ____________________________________

Signature ____________________________________

Date ____________________________________

NB: This declaration must be completed in full, submitted and retained with the candidate’s script. If this declaration is not submitted the candidate’s result may be declared void.

Page 3: Final Project Igc 3

APPENDIX 3

GC3 – THE HEALTH AND Assessor’s marking sheetSAFETY PRACTICAL APPLICATION

Date of practical application Name of assessor

Course provider number

Course provider name

Student number 00332912 Student name TRIMURTHULU KAKI

CriteriaMaximum

marks available

Assessor’s marks

awarded

NEBOSH moderated

marks (if different)

1 Completion of observation sheets

1.1 Range and outline of hazards and consequences 15

1.2 Identification of suitable control measures and timescales 15

2 Report - Introduction and Executive Summary

2.1 Introduction providing an overview of the chosen area 5

2.2 Executive summary 5

3 Report - Main findings of the inspection

3.1 Quality of interpretation of findings 15

3.2 Identification of possible breaches of legislation and/or standards 5

3.3 Persuasiveness / conciseness / technical content 10

4 Report - Conclusions and Recommendations

4.1Clear and concise conclusions which are clearly related to report findings and are effective in convincing management to take action

15

4.2Recommendations which present realistic actions to improve health and safety in the chosen area

15

TOTAL MARKS 100

Page 4: Final Project Igc 3

Outcome: PASS (60% or more) REFER (less than 60%)

Date assessed ____ / ____ / ____

Assessor’s signature ______________________

Date received by course provider ____ / ____ / ____

Date received by NEBOSH

(if applicable) _____ / _____ / _____

Assessor’s additional comments on the practical application:

ASSESSED BY (name in block letters) _________________________________________________

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

NEBOSH USE ONLY

NEBOSH Moderator’s comments:

Page 5: Final Project Igc 3

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation SAFETY PRACTICAL APPLICATION sheet

Sheet number of _____

Student name ph____________________________________ Student number __________________

Place inspected _____________________________________ Date of inspection ___ / _____ / _____

Observations Control measures TimescaleHazards and consequence Immediate and longer term actions

1. Fall of material, tools and persons into the excavation of 10 feet depth due to lack of edge protection causing bone fractures to workers, head injuries, cuts and bruises.

2. Fall of workers and objects from the scaffold at a height of 30 meters due the poor surface (uneven floor) and no guard rail, outriggers broken, the braces and toe boards have large gaps on the work platform causing major head injuries and impact on the workers.

3. Failure and toppling of mobile crane from the oil spillages and wet surfaces in the construction site leading to collisions with workers and structures causing fatalities and property damage.

Immediate action:To provide to provision of signage and authorized peoples only.

Long term action:To build the hydraulic shore on the ditch of 10 feet sides to protects the cave. And its protects the slip and trips hazard for the employees

Immediate action:Provision of guard rails, toe boards, securing tools, replace the platforms.

Regular inspections.

Long term action: All the scaffold materials purchase by the component person and using all the safety for scaffold erection.

Revise the risk assessments and permits.

Immediate action:

Clean up spillagesCautions for wet floors and spillages Pre use checks foe mobile cranes.

Long term action:

Maintenance of the equipment.Competent operator.

One day

One month

One day

One day

One week

One week

Regularly

Every month

Page 6: Final Project Igc 3

4.Severe back pains and musculoskeletal disorders while workers carrying manually cement bags, bricks and sand causing hernia, muscle cramps and slipped disc.

5. In the construction site the workers are handling concrete mixer without hopper. As a result workers inhale cement and dust that may lead to respiratory problems and asphyxiation.

6. In construction site workers are donging concrete mixer work in hot weather condition in open area under the sun. The workers have been exposed to dehydration and heat stroke.

7. In the site the worker cutting the concrete slab by using electric disc cutter machine. The disk may contact with body of the person that may cause abrasion and that leads to major injuries.

8. In the work site workers doing floor polishing work on 1st floor .the machine generates heavy noise that may cause hearing problems such as temporary loss of hearing or tinnitus.

Communication between all the operators.Immediately action: To the supervisor are takes responsibility and instruct the worker carry the safe worker capability of load limit. Long term action: The organising recognised the manually handling workers and how to handle the manual workers organisation training for all the manual handling workers tell to the manual techniques and maximum weight that one can carry and consequences if they exceed the weight limitsImmediate action:Provide respiratory protective equipment.Provide hopper for mixingLong term action: Conduct health surveillance programme

Immediate action: Provide frequently breaks and job rotation methods.

Long term action: Proper instructions on workers work schedule

Immediate action: The work site supervisors are strictly followed the policy rules and to instruct the worker to use ppe like gloves, goggles, shoes and not wearing loose clothing to protect to hazards from the work equipment.

Long term action:To provides workers training,

instructions,informations and supervision and demonstrating videos to the workers on procedures of operating electric cutters

Immediate action: Provide appropriate PPE such as ear muffs and ear buds to protect form noise. Long term action: The origination should purchase less noise generating equipment. Training should provide to the worker on awareness on the hazards of the equipment.

1 day

One month

1 day

4 weeks

One day

5days

1 month

1 day

1day

1 week

Page 7: Final Project Igc 3

9. In the work site workers are using hand jacker to cut the concrete slab, were exposed to vibration. Because of vibration the worker may face a problem of vibration white fingers, muscle weakening and joint damage.

10.In the construction area one worker doing a painting work at 6th

floor outer side of building. Worker does not worn any personal respiratory equipment. Inhalation of paint causes respiratory problems, irritation to skin, and burning sensation in the eyes.

11.Observed that there is no directional sign boards and area having many blind spots .heavy loaded vehicles are loading and unloading construction material and taking vehicles reverse direction without banks man help , while reversing vehicle may hit the workers or collide with other vehicles and that leads to injuries and property damage.

Immediate action: Introduce worker shift rotation system

Long term action:training and instruction on working methods requiredWork in presence of supervision.

Immediate action: Ensure to give temporary mask to prevent inhalation of paints and goggles to prevent eyes Long term action:Ensure to give full face respirator.

Immediate action: To providers of the vehicle side mirrors on all blind corners and banks man. And the driver can foresee the visibility of vehicles and workers movements.

Long term action:Introduce one way traffic system and drive in & drive out

One day

1 week

1 week

4 days

2 days

2 weeks

Page 8: Final Project Igc 3

12.In the ware house of construction site Workers performing iron pipes unloading work in a awkward position ,this may cause back pain ,prolapsed discs, injuries cuts etc.

13. I observed the workers in the construction site were shouting each other and they are blaming each other. Here the other workers disturb and damage work because of loss of working time. Some workers may lead to stress.

14. In the ware house of construction site under poor lighting workers needs to get construction materials from the warehouse. Lack good lighting, workers may slips trips and may also falls inside the warehouse, resulting injuries such as head injury, bone fracture, piercing of any sharp laid item on floor.

15. In the work site emergency fire exit door has been obstructed with a wooden material. Which can obstruct the walk or running in emergency and that leads to severe injuries by fall and trips.

16. I am observed in a construction site area there are nearly 10 LPG gas cylinders are stored. And the worker are doing welding work on top of the cylinders. Here the welding sparks ejected are falling on the gas cylinders. This may cause large fire and explosion that leads to third degree burn injuries, and many people may lose their lives also. Here not only workers, but other people such as visitors, office workers and surrounding living propels also injured.

Immediate action: Perform unloading work in open place and then put in warehouse

Long term action: Make warehouse spacious by maintaining good storage methods, and provide place for loading and unloading work.

Immediate action:Conduct counselling programme to individuals.Long term action:Introduce and maintain zero tolerance policy.Check workers background during recruitment time.

Immediate action: To be provides a clear lighting in the ware house so that workers can carry out work easily.

Long term action: To providing natural lighting and regular house keeping

Immediate action: To remove the obstruction objects from the emergency fire exit door.

Long term action: Maintain good house keeping And provide proper training and fire drills.

Immediate action: To stop the welding work immediately and cover the area with fire retracing materials. Take a gas cylinders away from work site.

Long term action: The welding activities carry out by competent persons only. Do the major parts of welding at separate place and assemble can be done at required area. To give a training, instruction, information and supervision properly.

1 day

3 days

1day

1week

1day

1 week

1 day

2 weeks

1 day

10days

Page 9: Final Project Igc 3

17. In the construction site, at the ground floor workers are working on to fit the lift. The work area is wet and water also. Here the welding activity performed in wet conditions to fix the lift. Here the welding machine cord and power supply cables are laying on the wet floor can cause to electrical shock and burns to workers.

18. In the construction site workers working with sand, bricks, cement and rocks, inhalation of dust of these materials cause respiratory problems and also cause skin allergies.

19. In the construction site area workers are doing electrical works on the 2nd floor , wires of equipment trailing on floor .By the trailing cables there may be a chances of fall and trip leading to bone fractures and head injuries

20.In the construction site’s cellar area the carpenter performing wood work of doors for building. The carpenters using bench mounted circular saw, the machine don’t have any guard. And those peoples are working manual chopping of the wood materials and it makes a lot of noise and dust also, but they are not using any ear protection, hand gloves and face masks. Circular saw causes cuts and severing

21 In the construction site workers are doing excavation around the underground drainage to be 4 feet depth has no protected by barriers and sign boards it may causes to falling people by slip, topple of excavator. Peoples have injured death to serious injury but not limited to bone breaks or factures.

Immediate action: Welding cords to be laid away from wet conditions and to maintenance good housekeeping.

Long term action: The working area should be kept clean and dry to be maintained by the maintenance staff and regular checking by competent person.

Immediate action: To control the dust particles by the water damping down. And using the respirators.

Long term action: To be provided a well-ventilated area and sufficient and suitable personal protect equipment and provide dust catch filter face masks also provided.

Immediate action: Immediately remove all trailing cables from the walking areas and positioned in secure place.

Long term action: To be provide a training and shows a videos to workers about the accidents relating to trailing cables.

Immediate action:Add adjustable top guard fitted above the blade and provide a suitable PPE.

Long term action: To provide a proper training about the bench mounted circular saw. And the properly inspection by the competent person and routine inspection.

Immediate action: To stop the excavation work activities.

Long term action: To provides barrier along with the excavation area. And provide adequate training on safety practices of excavation process and policy.

One day

Within 1 day

1 day

1 month

monthly

1 month

1 day

2 weeks

1day

1week

Page 10: Final Project Igc 3

22. In the construction site area a big generator realises lot of smoke. Here the workers are effected by the smoke, inhalation of smoke causes respiratory problems, high blood pressure.

23. In the work site worker are painted outside of the building by using scaffold. I am observed the scaffold is not erected on the flat surface, worker are not using guard rails braces are not well fitted. There is no toe board’s .here the hazard is collapse the scaffold due to improper fitting and may falls from objects causes. The worker are not using even PPE also.

24. In the construction site on the 1st floor the worker are polished by the grinding. Here the workers are helpers are caused sparks are flying and lead to eye injury and skin burns.

25. In the construction site, near the excavation area has main electric power supply for the entire construction site. Here this area was not protected and no signage of danger being placed that can lead to electrocution, burns, death and fall from height due to throw off can cause serious injury of bone fractures and head injuries.

Immediate action:Workers are using suitable personal protect equipment.

Long term action: To be build a smoke exist fans and using local exhaust ventilation by using filters and by using smoke chimney or ducts. Good servicing maintenance of generator.

Immediate action: Make surface flat and place sole boardsProvide with guard rails & toe boards and make braces well fitLong term action: Alteration needed must be done by competent person and do regular inspection.

Immediate action: In the work activity area should be isolated and people should be provided with face shield, coveralls.

Long term action: Training should be provided to the workers on safe grinding activity.

Immediate action: To be put a danger signage boards.

Long term action: To be barricade the area from the excavation by isolating lock out – tag out system.Require permit to work.

1 day

1 month

Immediately

1 month

Immediately

1 day

1 day

1 week

Page 11: Final Project Igc 3

26. In the construction site organisation has provided locker facility for each and every one separately for men and women.

27. Observed the first aid provisions were appropriate and accessible to the workers at the site with the complete kit.

28. Provision of drinking water facility at each floor and clearly indicated with sign boards and can easily access.

29. I am observed that each floor have fire fighting lines, sprinklers and smoke detectors. In the Warehouse area maintained fire cylinders.

30. In the work site separate toilets for men and women, and maintaining neat & clean. Here the provision of hand wash liquids, soaps,

It promotes recovery, prevents deterioration and preserves life during emergencies.

Good working atmosphere for employees and ability to work with moral.

Continue

APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report templateSAFETY PRACTICAL APPLICATION

Page 12: Final Project Igc 3

Student number_____________________________________

Location___________________________________________ Date of review / /

Structure report under the following headings:

Introduction including overview of area inspected and activities taking place

The above report follows the health and safety inspection in the biggest construction projects of RUSHITA CONSTRUSTIONS. It is a real estate company in Visakhapatnam, Andhra Pradesh, India. It is. Here the indoor and outdoor activities and storage of raw materials and marketing of the flats Clients consultations, site visitors other peoples. In the construction the total number of worker is 70 peoples nearly and it is a 10 cores project. Here total 9 floors and 36 apartments. I am inspecting in the work site areas warehouse and construction buildings at the time 10 am to 12 noon on 09-04-2016.

The activities being performed are Workers are doing in the ground level excavation, Workers are carrying manual handling by the raw materials, and Workers are doing outdoor activities such as outside painting of the building by using scaffold and cherry picker and spray guns. In door activities are welding at the lift fitting at a wet floor area by using power. Carpenters are working ground floor doing wood work activities by using bench mounted circular saw without any guards. Near the excavation beside the power supply transformer without any barricades and sign boards. Warehouse indoor activities and safe stacking and storing of construction materials such as cement in the warehouse and welding roads, bricks, and wood separate storage area. In the warehouse are vehicles are loading and unloading and also taking reversing when the corners without stoppage and without banks men and blind sports directions are not there. Worker are manual handling of carrying cement and bricks construction materials. Poor lighting at the ware house and ventilation at the cement storage area.

Some workers are using personal protect equipment, All the welfare facilities are provided. The site engineer, managers and supervisors are doing her activities they are wearing different colours of helmets, all the floor maintained fire fighting lines, fire cylinders sprinklers, smoke detectors. This report is clearly inspection report to highlight the areas of construction site and existing health and safety hazards and to reduce the accidents and incidents statistics, and minted of the health and safety policy. To be minted safe system of work, safe plant and machinery, safe system of work environment to be provided. To follow the minimum welfare facilities and reduced the accidents such as “0” percentage accident, injuries and fatalities. And finally to check whether it meets the legal standards.

Page 13: Final Project Igc 3

APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report templateSAFETY PRACTICAL APPLICATION

Student number_____________________________________

Location___________________________________________ Date of review / /

Executive Summary

I thanks to the RUSHITA construction for giving me the opportunity to carry out the health and safety inspection. It’s appreciated that the construction site has good practices like

Drinking water facility at each floor level for employees hot and cold option according to the worker need. Locker facility allocated for employees separately according to their needs and nearest to the work place area workers easy to access. First aid appropriate and accessible to with workers at the site with the complete kit. In this site each floor has minted fire fighting lines and sprinklers and smoke detectors. Toilets have been maintained clean and tidy with all provision to the workers like soaps, hand wash liquids etc.

In the construction site I am observed some major hazards. The management has to look and rectify issues they are Scaffold is not erected on the flat surface, no guard rails, braces and it is not fitted properly. Not follow the safety rules such as toe boards have huge gaps can lead to scaffold collapse. Peoples and object fall from height. Workers are working at high risk of the excavation of storage of fire fighting safety (sump) here the construction of hydraulic shoring or any wood sheet and iron sheet are not at this area. In the welders are doing her welding activities closer the LPG storage area. Which can lead to expose and fire causes form several injuries and property damage. In the warehouse transport peoples are not stopping at the blind corners and can lead to collision with other vehicle and workers also. Here the no banks men. It is May cause death and property damages. In this are one of the worker has painted outside of the building at 9th floor. He didn’t have any edge protection and safety belt. He is using only boatswains chair and brushes only.

The above observation breaches the following legal compliances Acts are:1. Indian factory Act 1948 section 32C-subsection 3e2. Fire prevention and fire safety Act 1986 by the government of India.3. Scaffolding and lifting Act 1912 and regulation 1950.4. Indian electricity Act and rules 1956 rule 29.5. Chemical regulation 1990 (No 177).6. Control of substances hazards to health (COSHH 2002).7. Safety and health in construction convention (C167 ) capital ILO

Therefore I recommend the management to improve the training, information, instruction and supervision and safe methods of working practices especially on fire, scaffold, excavation, electrical and chemical related work activate

APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report templateSAFETY PRACTICAL APPLICATION

Page 14: Final Project Igc 3

Student number_____________________________________

Location___________________________________________ Date of review / /

Main findings of the inspection

1. Fire hazard (Observation no: 16)

In the construction site workers are working welding the rods which is closer to gas cylinders (LPG) storage area and sparks while welding can contact with the LPG gas lead s to cause fire and explosion property damage and mass casualties in the workplace. Here the loss of origination may casualties and property damage cost Rs 100000/- and other indirect costs of court fines.

Which breaches the international legislation of convention C167 safety and health in construction convention in 1988 Article no 167 and fire protection and prevention Act1997.Indian factory act 1948 section 32C-subsection 3e.Fire prevention and fire safety act 1986 by the government of India.

Recommendation:

The origination to be provided a separate covered welding area. The whole construction site where all welding works can be take place separately. Which eventually presents mass casualties and property damage. It is may be cost of the 50000/-.

2. Scaffold collapse, falling of people and objects (observation no: 2, 23) In the construction major accidents may causes scaffolds collapse, falling from edges and Falling objects. Scaffold being used by the workers at construction site different types of heights and even surface area also, out riggers were broken and not being replaced, toe board have huge gaps and some braces been missing and other peoples are not fitted properly which may lead to collapse of scaffold, falling of people and object form height can lead to injured seriously from head injury to muscle stress and pains. The international legislation of convention C167- health and safety in construction in 1988 article no 167 and health and safety at work 1974 (HASWA).Scaffolding and lifting act 1912 and regulation 1950.

Recommendation:

The origination peoples are selected the competent persons to makes scaffold be perfect using purpose. And purchase of new scaffold materials. And provide safety nets at working area. To be saved the many peoples life and prevents falling of objects and collapsing of scaffold which would cost 70000/-

3. Excavation or caves (observation no: 1)

In the site area worker are ditch of 10feet in depth excavation. Here water to be storage because of any fire fighting issues (sump) on the building area in the futures and it is an Act of law. I am found

Page 15: Final Project Igc 3

there is no protection form the excavation peoples slip and fall into the ditch as well as there is no protection and signage boards. In the ILO legislation of convention C 167 safety and health in construction convention in 1988 Article no 167.Safety and health in construction convention (C167) capital ILO.

Recommendation: Here the origination should provide Hydraulic shoring of trench would prevent workers to fall from height by slip or soil to cave in and would cost approximately 20000/- and it is easier to fix by one person and can be used for new upcoming projects.

4. Electrician hazard (observation no: 17, 25) In the work site, the main electric power supply for the entire construction site that located near the excavation area is unprotected and no signage of danger being placed, can lead to electrocution, shocks, burns and death. In the secondary effects such as fall from height due to throw off can cause serious injury of bone fractures and head injury.

The breaches of the law Indian electricity act and rules 1956 rule 29.

Recommendation:Management should allocate resources for barricading the high danger electricity power supply area by isolating and that would cost around Rs18000/- .can prevent burns, electrocution and even death .Danger Signage boards should also positioned near the power supply area.

5. Chemical Hazard Observation No: 10 Painter was working at 6th floor outside the building by using spray. These spray paints forms small droplets in the atmosphere and creates volatile vapours around working area and the person working there may inhale of these volatile paint vapour which lead to suffocation and respiratory problems and leading to heath issues and acute effects. It also cause skin cancers and burning sensation in eyes

In breaches law Chemicals regulation, 1990 (No 177) and Control of substances hazards to health (COSHH 2002) Recommendation:Management have to ensure that worker are wearing respiratory protective equipment to prevent respiratory problems, coveralls to prevent from skin allergies and goggles to protect eyes. These protective equipment would cost approx. Rs25000/-

APPENDIX 5

Page 16: Final Project Igc 3

UNIT GC3 – THE HEALTH AND Candidate report templateSAFETY PRACTICAL APPLICATION

Student number_____________________________________

Location___________________________________________ Date of review / /

Conclusions

In this construction origination I am observed my health and safety knowledge find major problems in this origination. In this origination major findings needs to be immediate action towards the safety of workers from health and safety management. These are excavation falling peoples, electricity shocks and burners, fire explosion, collision with vehicle pedestrians at warehouse by vehicles or forklifts which can be controlled and followed the safety policy and rules.

Other safety concerns such as manual handling, vibration, noise, stress, biological effect, chemical exposure, heat, stress, lighting and ventilation can also be controlled with suitable preventive control measures which also recommended on the observation sheet.

The workforces were seemed to be very happily because of the origination to be followed welfare facilities such as locker, first aid provisions, drinking water, rest room ,toilet facilities both men and women separately and smoker zones areas. The origination is followed the health and safety policy is maimed sufficiently. And finally I would request to the management please takes any accidental issue may be occur in the site take immediately action on the suitable recommendation for the good implementation of health and safety culture. The origination people should be followed by the International labour origination acts and minted.

APPENDIX 5

Page 17: Final Project Igc 3

UNIT GC3 – THE HEALTH AND Candidate report templateSAFETY PRACTICAL APPLICATION

Student number_____________________________________

Location___________________________________________ Date of review / /

Recommendations – include as a table in the following format:

Recommendation Likely resource implications Priority Target date

Observation No:2 & 23Purchase of new scaffold materials select the competent person training to all scaffold employees

Purchase new scaffold material cost 50000/-

Training by a competent person cost around Rs 8000/- per hour

2hours training to employees

High One month

Observation No:1Trench for the excavation Hydraulic shoring to prevent fall of edges

Hydraulic shoring it may be cost of 25000/- High

1 month

Observation No:161Cover the welding area with fire retardant materials

2 Damp the work area

3. Fire extinguishers

Cost of fire retardant material Rs 2000/-

Cost of fire extinguisher Rs 3000/-

high 1 month

Observation No:10Painting at outside of the building area.to be provided with RPE, Coveralls, Goggles

Cost of RPE ,Coveralls and goggles cost around Rs 25000/- High 1 day

Observation No:17&25 Barricade the high voltage main power supply in the construction area.

Place Danger sign boards

Here the cost of the barricade would be Rs 5000/-

Sign board cost Rs 500/-

High 1 month