9
Identification and Practical Formulae for Soft Soils in Cohesif, Development for Small Deformation in Table Form By Rudi Iskandar (NRP : 2006110) Medan, June 13th, 2011 Thesis :

Final Exam for SOM Candidate Rev

Embed Size (px)

Citation preview

Page 1: Final Exam for SOM Candidate Rev

8/4/2019 Final Exam for SOM Candidate Rev

http://slidepdf.com/reader/full/final-exam-for-som-candidate-rev 1/9

Identification and Practical Formulae for Soft Soilsin Cohesif, Development for Small Deformation in

Table FormBy Rudi Iskandar (NRP : 2006110)

Medan, June 13th, 2011

Thesis :

Page 2: Final Exam for SOM Candidate Rev

8/4/2019 Final Exam for SOM Candidate Rev

http://slidepdf.com/reader/full/final-exam-for-som-candidate-rev 2/9

Abstraction of Thesis

For topological factor and also geological from the

Soil forms of South Sumatera which are mostly is soft

Soils area, make some difficulties for Constractors especiallyfor SOM beginner who has minimum experiences for 

identification to have better solutions to accomplish their jobs.

So it should be necessary to have a guidelines to developsoft soils problems. This table erase the gap of experience

between professional and beginner SOM.

Page 3: Final Exam for SOM Candidate Rev

8/4/2019 Final Exam for SOM Candidate Rev

http://slidepdf.com/reader/full/final-exam-for-som-candidate-rev 3/9

Soft soils, can be a clay or silt which has N<4 for 

standard Penetration Test or organical soils like swamp

which has high water content. And also, for sand which

has N<10 (Mekanika Tanah & Teknik Pondasi - Dr. Ir.

Suyono Sosrodarsono & Kazuto Nakazawa, cetakan

keenam)

Definition

Page 4: Final Exam for SOM Candidate Rev

8/4/2019 Final Exam for SOM Candidate Rev

http://slidepdf.com/reader/full/final-exam-for-som-candidate-rev 4/9

Page 5: Final Exam for SOM Candidate Rev

8/4/2019 Final Exam for SOM Candidate Rev

http://slidepdf.com/reader/full/final-exam-for-som-candidate-rev 5/9

Scheme of Works

Survey  Survey for buildingpositioning  Survey of soils, materialsand etc 

Planning Identification for

soils

Needs

someactions 

Using Choosen

Method

Re-planning 

Yes 

Actions  Action for

Planning 

Action of 

works 

Structure for soil

burden 

Supervising

for worls 

Maintenance  Maintenance and

Management Immediate corrective action 

No 

Page 6: Final Exam for SOM Candidate Rev

8/4/2019 Final Exam for SOM Candidate Rev

http://slidepdf.com/reader/full/final-exam-for-som-candidate-rev 6/9

Problems  Settlements  Bearing Capacity and

Stability 

Lainnya 

Caused Acted Forces Total settlements atau

differs settlements in

dam or installations;

Negative frictions to

foundation

Settlement from

consolidation from near

burden position or from

building weight

Failure and displacement

soils of foundation

Fallen Bearing Capacity of 

building

Displacement and

Cracking building caused

by eccentrical force and

soils pressure from

building weight

Vibration from traffic

Liquefaction soils from

earthquake

Leaking from foundation

soils of dams .

Excavations Soils settlement near the

excavation

Settlement from

consolidation in soils

foundation because of 

water level

Failure of dams

Raisen of bed excavation

Increasing for soils

pressure and

premeability of soils

Filtering of water

absorpsion

Quicksand, piping

Identification Problems

Page 7: Final Exam for SOM Candidate Rev

8/4/2019 Final Exam for SOM Candidate Rev

http://slidepdf.com/reader/full/final-exam-for-som-candidate-rev 7/9

Soft Soils development for cohesif soils :•Surface Development Method

•Surface Drainage Method•Sand Mat Method•Sheet Materials/Geotextile Method

•Displacement Method•Counterweight Fill Method•Counterweight Fill Constantly Method

•Preloading Method•Water Reduction Method

•Vertical Drainage Method•Sand Drainage Method•Cardboard Wicks Method

•Thick Sand Coloumn Method

Some Table forms for identification and actions forsoft soils development can be shown as below

Page 8: Final Exam for SOM Candidate Rev

8/4/2019 Final Exam for SOM Candidate Rev

http://slidepdf.com/reader/full/final-exam-for-som-candidate-rev 8/9

Recommendation Identification needs to choose what caused and

whether in line/coheren with planning or not.

Combining one or more of the methods to have a

better results in cost, quality and time is a must.

SOM who has strong identification and has know

many method for problems in the field, especially

for soft soils, will have advantages to have moreprice contract/addendum, better in quality (safety in

settlement and failure) and also minimize for time

accomplish.

Page 9: Final Exam for SOM Candidate Rev

8/4/2019 Final Exam for SOM Candidate Rev

http://slidepdf.com/reader/full/final-exam-for-som-candidate-rev 9/9

THANK YOU