    Submitted by Submitted To

    Department of Information

    Technology,

    Govt. of Arunachal Pradesh

    Detailed Project Report

    E-District Statewide Roll out Project

    Arunachal Pradesh

    Wipro Consulting Services: Confidential

    GOVERNMENT OF ARUNACHAL PRADESH

  • 8/13/2019 Final DPR_eDist Arunachal

    2/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 2

    Table of Contents

    Section-1: BACKGROUND & OTHER BASIC INFORMATION....................................... 4

    1.1 Title of the Project ........................................................................................................................ 4

    1.2 Pilot or Rollout.............................................................................................................................. 4

    1.3 Project Initiator details ................................................................................................................ 4

    1.4 State Designated Agency details ................................................................................................. 6

    1.5 Location of Project Implementation:........................................................................................... 6

    1.6 LIST OF ACRONYMS ...................................................................................................................... 7

    Section-2: Executive Summary .............................................................................................. 8

    2.1 DETAILS OF THE STAKEHOLDERS ................................................................................................. 8

    2.2 Highlight efficiencies envisaged to be enhanced for the services............................................ 122.3 Details of locations to be covered for state wide rollout......................................................... 15

    2.4 PROJECT ACTIVITIES AND TIMELINE .......................................................................................... 19

    2.5 TOTAL PROJECT COST ................................................................................................................. 24

    Section-3: State Information ................................................................................................ 25

    3.1 DETAILS OF THE DISTRICTS ......................................................................................................... 25

    3.2 OFFICERS INVOLVED IN PROCESSING THE SELECTED SERVICES IN THE DISTRICT.................... 30

    3.3 DETAILS OF DEGS ........................................................................................................................ 34

    3.4 DETAILS OF STATE E-GOVERNANCE INITIATIVES....................................................................... 35

    3.4.1 SDC ...................................................................................................................................... 35

    3.4.2 CSC ...................................................................................................................................... 36

    3.4.3 SWAN .................................................................................................................................. 37

    3.4.4 SSDG .................................................................................................................................... 41

    3.4.5 Other State MMPs .............................................................................................................. 43

    3.4.6 Status of SeMT .................................................................................................................... 43

    3.4.7 Status of any other e-Governance initiatives in the state................................................ 44

    3.4.8 Status of data digitization in the each district .................................................................. 45

    3.4.9 Status of Manual / electronically enabled Transactions District wise............................. 46

    Section- 4: PROJECT DETAILS AND IMPLEMENTATION MODEL ............................................. 47

    4.1 STAKEHOLDER ANALYSIS............................................................................................................ 47

  • 8/13/2019 Final DPR_eDist Arunachal

    3/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 3

    4.2 SERVICES AND SERVICE LEVELS.................................................................................................. 55

    4.3 IMPLEMENTATION STRATEGY ................................................................................................... 57

    4.4 Key Activities .............................................................................................................................. 59

    4.4.1 Hardware Assessment ....................................................................................................... 59

    4.4.2 Site Preparation .................................................................................................................. 64

    4.4.3 Data Digitization ................................................................................................................. 69

    4.4.4 Connectivity ........................................................................................................................ 71

    4.4.5 Training ............................................................................................................................... 74

    4.4.6 Awareness & Communication............................................................................................ 76

    4.4.7 State Program Management Unit...................................................................................... 77

    4.4.8 Support Service................................................................................................................... 78

    4.4.9 Application Development & Support ................................................................................ 81

    4.4.10 Seed Money to DeGS .......................................................................................................... 82

    4.4.11 STQC testing ........................................................................................................................ 82

    4.4.12 Impact Assessment ............................................................................................................. 83

    4.5 Other Details............................................................................................................................... 84

    4.5.1 Architecture Framework & Standards............................................................................... 84

    4.5.2 Network Architecture......................................................................................................... 86

    4.5.3 Conformance to security standards on data, network, software, etc.............................. 89

    4.5.4 Conformance to technological standards.......................................................................... 90

    4.5.5 Mechanism for ensuring compliance to service levels..................................................... 99

    4.5.6 Public Awareness Campaign, Citizen Feedback Mechanism............................................ 99

    4.5.7 Details of Monitoring, Evaluation and Assessment........................................................ 102

    4.6 PROJECT RISKS & MITIGATION MEASURES ............................................................................. 106

    4.6.1 Risk Analysis: .................................................................................................................... 106

    4.6.2 Mitigation Plan: ................................................................................................................ 108

    Section-5: OPERATION AND MAINTENANCE PHASE ............................................................ 110

    5.1 REVENUE MODEL TO SUSTAIN O&M PHASE........................................................................... 110

    5.2 Projected Revenue: District Wise ............................................................................................ 111

    5.3 Projected Operational Expenses.............................................................................................. 112

    5.4 Proposed Institutional arrangement for Operations & Maintenance Phase......................... 114

  • 8/13/2019 Final DPR_eDist Arunachal

    4/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 4

    Section-1: BACKGROUND & OTHER BASIC INFORMATION

    1.1 Title of the Project

    Detailed Project Report for State Wide Roll out of e-District Project, Government of Arunachal

    Pradesh

    1.2 Pilot or Rollout

    This project is the Rollout of the e-District Project in all the seventeen district of the Arunachal

    Pradesh.

    1.3 Project Initiator details

    a) Department/ Ministry initiating the project

    The project is an initiative of Department of information technology, Government of India under

    the NeGP, and is a Mission Mode Project.

    b) Background of the department/ ministry

    The Department of information technology, Government of India works with the visionof: e-

    Developmentof India as the engine for transition into a developed nation and an empoweredsociety

    The mission of the departmentis e-Development of India through multi pronged strategy of e-

    Infrastructure creation to facilitate and promote e-governance, promotion of Electronics &

    Information Technology- Information Technology Enabled Services (IT-ITeS) Industry, providing

    support for creation of Innovation / Research & Development (R&D), building Knowledge

    network and securing India's cyber space

    The department works with the following objectives:

    e-Government: Providing e-infrastructure for delivery of e-services. e-Industry:Promotion of electronics hardware manufacturing and IT-ITeS industry.

  • 8/13/2019 Final DPR_eDist Arunachal

    5/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 5

    e-Innovation / R & D: Providing Support for creation of Innovation Infrastructure inemerging areas of technology.

    e-Education:Providing support for development of e-Skills and Knowledge network. e-Security:Securing India's cyber space.

    Under the e-Governance, the department has initiated the National eGovernance Plan (NeGP)

    which is in pursuance of introducing e-Governance on a massive scale as enunciated in the

    National Common Minimum Programme. The vision of NeGP aims to Make all Government

    Services accessible to the common man in his locality, through common service delivery outlets

    and ensure efficiency, transparency and reliability of such services at affordable costs to realize

    the basic needs of the common man

    To realize this vision, 27 Central, State and Integrated Mission Mode Project (MMPs) along with8 support components have been identified and approved by Cabinet under NeGP, to enable

    and facilitate rapid introduction of e-Governance in the country, with focus on service delivery.

    As per the implementation strategy, an identified line Ministry/Department would define the

    service and service levels of their respective MMPs and develop detailed guidelines for achieving

    the same. e-Districtis 1 of the 27 Mission Mode Projects under NeGP under the Department of

    IT, GoI. e-District aims at providing support to the basic administrative unit i.e. District

    Administration to enable content development of G2C services, which would optimally

    leverage and utilize the three infrastructure pillars i.e. SWAN, SDC and CSC, to deliver services to

    the citizen at his doorstep.

    A core list of six categories of services has been identified at the national level, namely

    Certificates, Government Dues and Recovery, Revenue Court Cases, RTI/ Grievances Cases,

    Social Security and Public Distribution System. In addition, four service categories have been

    identified includingEducation, Health, Transport and Police. Front ends can be maintained at

    e-district portal once these departments back end computerization is over.

    c) Contact details:

    Address: Ministry of Communication & Information Technology (Govt. of India) Electronics

    Niketan, 6, CGO Complex, Lodhi Road, New Delhi: 11003

  • 8/13/2019 Final DPR_eDist Arunachal

    6/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 6

    1.4 State Designated Agency details

    a) Name of the State Designated Agency :State Council for IT and e-Governance (Department of

    Information Technology), Govt. of Arunachal Pradesh

    b) Date of Establishment (if applicable):

    c) Name and Job Title of the key contact person: Mr. S. De Sarkar, Director (IT) , State Council for

    IT and e-Governance (Department of Information Technology), Itanagar, Arunachal Pradesh

    d) Contact details :

    Address : State Council for IT and e-Governance (Department of InformationTechnology), Govt. of Arunachal Pradesh, ESS- Sector, Maung-Phi Complex, Itanagar,

    791113

    Fax : 0360-2290833 Landline : 0360-2212934 Email : [email protected]

    1.5 Location of Project Implementation:

    The e-District project will be implemented in sixteen District of the state of Arunachal Pradesh covering

    all the DC offices, ADC (HQ), SDO, Circle (HQ) and BDO offices. Thee detail list of office locations have

    been provided in subsequent sections.

  • 8/13/2019 Final DPR_eDist Arunachal

    7/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 7

    1.6 LIST OF ACRONYMS

    S.No. Term Definition

    1. ATR Action Taken Report2. BDO Block Development Officer3. BPR Business Process Re- Engineering4. CO Circle Officer5. CSC Common Service Center6. DC Deputy Commissioner7. DIO District Informatics Officer8. DIT Department of Information Technology9. DM Disaster Management10.

    G2B Government to Business

    11. G2C Government to Citizen12. G2G Government to Government13. GoM Government of Arunachal Pradesh14. GoI Government of India15. ICT Information, Communication & Technology16. LAN Local Area Network17. MCIT Ministry of Communication and Information Technology18. MMP Mission Mode Project19. NeGP National e-Governance Plan20. OBC Other Backward Classes21. PDS Public Distribution Services22. RC Ration Card23. RFP Request for Proposal24. SC Scheduled Caste25. SDC State Data Center26. ST Scheduled Tribe27. VC Village Council

  • 8/13/2019 Final DPR_eDist Arunachal

    8/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 8

    Section-2: Executive Summary

    2.1DETAILS OF THE STAKEHOLDERS

    Anybody who is affected by or can influence the programme/ project is called a stakeholder. The

    process of stakeholder identification/ interaction typically results in improved project effectiveness,

    efficiency, equity, sustainability, transparency and accountability. All the relevant stakeholders

    associated with the project are displayed in the below given diagram.

    1. Departments of IT, Govt. ofIndia

    2. State Government

    1. DistrictAdministration2. State Designated Agency

    3. District e-Governance Society

    1.Consultant

    2. Implementing Agency

    3. Project Assessment Partner Citizens

    e-District

  • 8/13/2019 Final DPR_eDist Arunachal

    9/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 9

    Stakeholder

    Group/Name

    Roles & Responsibilities

    Department of

    Information

    Technology (DIT),

    GoI

    a Frame and Issue Guidelinesb Receive and appraise proposals from the Statec Formation of Project Management Group (EPMG) to assist DIT in monitoring

    and assessing achievements by states

    d Provide technical assistance to the Statee Empanelment of consultants and IAf Support state/nodal agency in getting guidance /assistance technical or

    otherwise.

    The State

    Government a Identify a State Designated Agency (SDA) and a State Nodal Officer torepresent the State

    b To enter into necessary MoUs/agreements with DIT/other centralagencies/service providers for funding, defining service levels for identified

    services, ensuring service level adherence, implementation and sustainability

    of the pilot project and subsequent state wide rollout.c Issue instructions and ensure formation of District e-Governance Society in

    the Districts.

    d Provide State Financial Support as required /envisaged under the projecte Provide Infrastructure and other support to the State Designated Agency

    (SDA)

    f Take appropriate steps for legal changes required in implementing BPR foridentified services

    g To identify the project champion and ensuring complete involvement of theproject champion from start to the finish of the project

    District

    Administration

    To provide close tie-ups with all the stakeholders in the project, to provide

    commitment and support, help to bring-in the process changes and overallguidance to the project.

    State Designated

    Agency a Synchronize roll out of e-District with e-form, SSDG, State Portal, CSC,SWAN, SDC and receive and manage funds to ensure timely fund flow to

    implementing agencies

    b Coordinate and facilitate interactions between the project implementationpartners/consultants, State Government Departments, District

    Administration

    c Enable creation of a comprehensive State package for e-District and othertechnical support. Facilitate integration of the existing ICT enabled and other

    Government Schemes into the e-District

    d Facilitate administrative readiness and e-readiness of the Districte Facilitate selection of ISA and application Developer under the guidance of

    State Project Committee / Apex Committee

    f Draw up a comprehensive user charges policy and a sustainable road map forthe e district project for approval of the State Government.

    District e-

    Governance

    Society (DeGS)

    a Ensure close linkages and coordination amongst the various stakeholders inthe Project at field level.

  • 8/13/2019 Final DPR_eDist Arunachal

    10/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 10

    Stakeholder

    Group/Name

    Roles & Responsibilities

    b Provide overall guidance to the Project partners at District levelc Work closely with the ISA and Application Developer to undertake the field

    work, comprehend the requirements, document the observations, prepare

    roadmap, redesign the processesd Build capacity of the staff at various levels of the district administration. Workclosely with the technical solution provider for developing and customizing

    the software, implement the technical solution

    e To manage, supervise and implement backend computerization of partnerDepartments/Agencies

    f Support the Common Services Centers (CSCs), throughout the District forproviding G2C services as per the Service Level Agreements between

    Departments/ SDA for CSCs and the Service Center Agency.

    g Collect user charges as fixed by the State Government and keep auditedaccounts of the same.

    h Take all publicity measures and campaigning through media like TV, radio,newspaper, conferences, seminars, public meetings, banners and posters

    i Ensure delivery of services in the long termj Ensure an effective transaction-based revenue sharing arrangement during

    the Operation and Maintenance phase among all Stakeholders

    Project

    Consultants a Design an efficient and effective end to end service delivery processb Study the capacity building requirements and help create a facility for

    development of capacity including preparation of Change Management &

    Training plans, legal changes and draft Government Orders for the services

    identified under e-district

    c Suggest the functional requirements for the application, based on the BPRand review the System Requirement Specification (SRS) and System DesignDocuments (SDD) for the application development and submit their

    observation to the State Designated Agency.

    d Facilitate in conducting the User Acceptance Test (UAT). UAT is to beconducted by the Implementing Agency. Final sign off need to be given by the

    Users.

    e Supervise and assist the STQC for acceptance testing of the applicationf To assist State in the selection of System Integrator (Implementation Agency)

    from the DIT, GOI empanelled list.

    g To supervise the installation, commissioning of IT infrastructure at CentralServer Location and also at each district location. After the installation of

    infrastructure Consultant would submit their report to the District Nodal

    officer/collector. Final acceptance is to be given by the District Nodal

    Officer/District Collector.

    h Prepare RFP for Statewide rollout including works of Data Entry and Sitepreparation.

    i To provide one dedicated manpower at each district for project coordinationfor 3 years.

    j To supervise the rollout.k To design the post implementation guidelines including defining the role and

  • 8/13/2019 Final DPR_eDist Arunachal

    11/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 11

    Stakeholder

    Group/Name

    Roles & Responsibilities

    responsibilities of Joint Entity (PPP option) and its stake holders for Operation

    and Maintenance phase.

    l To handover the project to the above state Joint Entity.SystemIntegrator/

    Implementation

    Agency

    a Software Development including development of UAT procedures and testcases.

    b Procurement and commissioning of IT infrastructure,c Site preparation, data digitization and deployment of application in State

    Data Centre.

    d User Traininge Rollout in the Districtf Interface with front end delivery centres for applications go liveg Provide application and system support in SDC for eDistricth Provide help desk support during and after implementationi Provide hand hold support after implementation at district level

    ProjectAssessment

    Partner

    To carry out the field study in order to assess the impact of e delivery and givefeedback about the impediments and difficulties in the accessing the services and

    information

  • 8/13/2019 Final DPR_eDist Arunachal

    12/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 12

    2.2Highlight efficiencies envisaged to be enhanced for the services

    A problem or issue refers to any situation or matter that poses to be difficult for the Citizens, Businesses

    or Government in the process of obtaining services. The specific problem(s) or issue(s) faced by Citizens,

    Businesses or Governments that would be addressed by means of provision of improved services

    through this proposed project are:

    a) Unable to get easy access to government services for a common manb) Unable to get real time update on the status of the services requested by a common manc) Unavailability of a central data repository for the government resulting in delivery of services to

    a citizen in an inefficient manner

    d) Unavailability of instant MIS reports at various levels of governmente) Absence of a mechanism to control fraudulent practices adopted by citizens

    Following table describes the efficiencies proposed for the services to be taken in e-District initiative in

    the state of Arunachal Pradesh.

    Sl No. Service Categories SubServices Existing Service

    Level

    Proposed Service

    Level

    1 Certificates 1) Identity Card Minimum 7 days Maximum 2-3 days

    2) Income Certificates Minimum 7 days Maximum 2-3 days

    3) Permanent Resident

    Certificates

    Minimum 7 days Maximum 2-3 days

    4) Temporary Resident

    Certificates

    Minimum 7 days Maximum 2-3 days

    5) Caste Certificates (ST) Minimum 7 days Maximum 2-3 days

    6) Permanent Inner Line

    Pass (ILP)

    Maximum 7 days Maximum 2-3 days

    7)Temporary Inner Line Pass

    (ILP)

    Maximum 3 days Maximum 2-3 days

    8) Domicile Certificates Maximum 7 days Maximum 2-3 days

    9) Gapping Certificate Minimum 7 Days Maximum 2-3 days

    10)Birth Certificate Maximum 7 days Maximum 2-3 days

    11)Death Certificate Maximum 7 days Maximum 2-3 days

    12)Issuance of Employment

    card

    Maximum 21 days Maximum 7-8 days

    13)Marriage Certificate Maximum 7 days Maximum 2-3 days

    14)Character Certificate Maximum 3-4 days Maximum 1 days

  • 8/13/2019 Final DPR_eDist Arunachal

    13/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 13

    15)Medical Fitness

    Certificate

    Maximum 7 days Maximum 2-3 days

    2 Land Management 1) Issuance of the Land

    Possession Certificate

    Minimum 20-25

    days

    Maximum 7-10

    days

    2) Issuance of the Land

    Allotment Certificate

    Minimum 20-25

    days

    Maximum 7-10

    days

    3) Issuance of the

    Mortgage Certificate

    Minimum 20-25

    days

    Maximum 7-10

    days

    4) Tax Collection

    Certificate

    Minimum 20-25

    days

    Maximum 2-3 days

    5) Generation of Notice for

    Default

    Minimum 20-25

    days

    Maximum 7-10

    days

    6) Property Deed Certificate Minimum 20-25

    days

    Maximum 7-10

    days

    3 Social Welfare 1. Old Age Pension Maximum 7 days Maximum 2-3 days2. Family Benefit Scheme Maximum 14 days Maximum 2-3 days

    3. Disability Certificate Maximum 14 days Maximum 2-3 days

    4 RTI/Grievances

    Services

    1) Providing information Maximum 7 days Maximum 2-3 days

    2) Grievance and

    Complaints related services

    Maximum 7 days Maximum 2-3 days

    5 Arms license 1) Issue of New License Minimum 7-14

    days after getting

    police verification

    report.

    Maximum 2-3 days

    2) Issue of Duplicate /

    Modification of License

    Minimum 7-14

    days

    Maximum 2-3 days

    3) Renewal of License Minimum 7-14

    days

    Maximum 2-3 days

    6 PDS 1) Addition of Name Minimum 14 days Maximum 2-3 days

    2) Deletion of Name Minimum 14 days Maximum 2-3 days

    3) Change of Address Minimum 14 days Maximum 2-3 days

    7 Issuance of Trade

    License

    1) Application for new

    Trade License

    Minimum 7 days Maximum 2-3 days

    2) Renewal of Trade

    License

    Minimum 7 days Maximum 2-3 days

    3) Inclusion of Items Minimum 7 days Maximum 2-3 days

  • 8/13/2019 Final DPR_eDist Arunachal

    14/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 14

    4) Deletion of Items Minimum 7 days Maximum 2-3 days

    8 Election 1) Application for New

    Name

    Maximum 7 days Maximum 2-3 days

    2) Application for Deletion

    of Name

    Maximum 7 days Maximum 2-3 days

    3) Application for

    Correction of field

    Maximum 7 days Maximum 2-3 days

    4) Application for

    Transposition

    Maximum 7 days Maximum 2-3 days

  • 8/13/2019 Final DPR_eDist Arunachal

    15/116

    2.3Details of locations to be covered for state wide rollout

    The project will be implemented across all districts in Arunachal Pradesh which includes the respective DC offices and rest of the locations

    mentioned in the following table:

    Sl.No Name of the

    DC Office

    ADC HG SDO office EAC HQ Circle HQ BDO Office

    1. Tawang 1. Jang2. Lumla 1. Mukto2. Thingbu

    3. Zemithang4. Dudhnagar5. Kitpi6. Bongkhar7. Lhou

    1. Tawang2. Lumla3. Jang4. Mukto5. Kitpi6. Zemithang

    2. West

    Kameng

    1. Singchung2. Dirang3. Thrizno4. Kalagtang

    1. Rupa 1. Bhalukpong2. Nafra 1. Jamir2. Balemu

    3. Thembang4. Shergaon5. Kamengbari-Delmara

    1. Dirang2. Thrizino3. Kalaktang4. Nefra5. Singchung

    3. East Kameng 1. Seijosa2. Chayngtajo

    1. Pakke-Kesang2. Bameng3. Bana (Direct)

    1. Lada2. Sewa3. Pipu-Dipu4. Khenewa5. Richukrong6. Veo7. Dissang-Passo8. Gyawe Purang9. Passa Valley

    1. Seppa2. Bameng3. Chayang-Tajo4. Pakke-Kessang5. Bana6. Pipu7. Seijosa8. Khenewa

    4. Papum Pare 1. Sagalee 1. Kimin2. Balijan3. Doimukh4. Mengio

    1. Leporinag2. Toru3. Taraso4. Sangduo

    1. Doimukh2. Sagalee3. Mengio4. Balijan

  • 8/13/2019 Final DPR_eDist Arunachal

    16/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 16

    5. Kakoi6. Gumto7. Sil Sango8. Parang

    5. Kimin

    5. Capital

    Complex

    1. Itanagar2. Naharlagun 1. Banderdewa

    6. Lower

    Subansiri

    1. Raga2. Yachuli 1. Pistana2. Dollugmukh

    3. Kamporijo4. Yazali5. Old Ziro6. Deed

    1. Ziro-I2. Yachuli3. Raga

    7. Kurung

    Kumey

    1. Pania2. Nyapin3. Tali4. Patuk

    1. Palin2. Changbang3. Sangram4. Sarli5. Damin6. Parsi-Parlo7. Phassang8. Yangte9. Gangte10.Pipsorang11.Tarak-Lengde

    1. Palin2. Chambang3. Nyapin4. Damin5. Koloriang6. Tali7. Sangram8. Sarli9. Pipsorang10.Parsi Parlo

    8. Upper

    Subansiri

    1. Siyum (H.Q.at Kodokha)

    1. Nacho2. Baririjo

    1. Dumporijo 1. Taliha2. Giba3. Taksing4. Limekang5. Puchigeko6. Payeng7. Gusar8. Reer-Yapu9. Gite-Ripa

    1. Daporijo2. Giba3. Dumporijo4. Taliha5. Nacho6. Siyum7. Baririjo8. Puchi Geku9. Lime King

  • 8/13/2019 Final DPR_eDist Arunachal

    17/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 17

    10.Maro9. West Siang 1. Mechuka

    2. Basar3. Rumgong4. Yomcha5. Kamba

    1. Likabali 1. Liromoba2. Gensi3. Tribin4. Tato5. Monigong6. Kayang

    1. Payum2. Darak3. Kangku4. Pidi5. Jonolomoba6. New Daring7. Bagra8. Sibe9. Kombo

    1. Along (West)2. Rumgong3. Basar4. Gensi5. Liromoba6. Kaying-Payum7. Mechuka8. Along (East)9. Manigaon10.Likabali11.Tirbin12.Darak

    10. East Siang 1. Nari2. Boleng3. Mebo

    1. Ruksin 1. Pangin2. Koyu3. Riga

    1. Bilat2. Rebo-Perging3. New Seren4. Oyan5. Kora6. Kabang7. Namsing8. Yagrung

    1. Pasighat2. Mebo3. Nari4. Pangin5. Ruksin6. Riga

    11. Upper Siang 1. Tutung 1. Maryiang 1. Geku 1. Gelling2. Singa3. Jengging4. Palling5. Katan6. Migging7. Mopam(Adi Pasi)

    1. Jengging2. Maryiang3. Yingkiong4. Tuting5. Geku6. Payingdem

    12. Dibang

    Valley

    1. Anelih2. Etalin3. Mipi4. Aruzoo

    1. Anini2. Anelih3. Etalin

  • 8/13/2019 Final DPR_eDist Arunachal

    18/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 18

    5. Dambuen13. Lower

    Dibang

    Valley

    1. Hunli2. Dambuk 1. Deasli2. Kronli

    3. Koronu4. Tinali (Paglam)5. Dambuen

    1. Desali2. Roing3. Dambuk

    14. Lohit (Tezu) 1. Namsai 1. Lekang(Mahadevpur)

    2.

    Chowkham

    1. Wakro2. Sunpura3.

    Paying4. Lathao

    1. Tezu2. Namsai3.

    Wakro4. Mahadevpur

    5. Chowkham15. Anjaw

    (Hawai)

    1. Hayiliang 1. Kibithoo2. Changlagam3. Walong4. Manchal5. Goiliang6. Metengliang

    1. Hayuliang2. Hawai3. Chaglagam4. Manchal

    16. Changlang

    (Changlang)

    1. Miao2. Jairampur3. Bordumsa

    1. Namgpong 1. Namtok2. Diyun3. Manmao4. Khimyong

    1. Tikhak Remi Putok2. Vijaynagar3. Kharsang4. Yatdam5. Lyngok- Longti6. Renuk

    1. Changlang2. Nampong3. Miao4. Bordumsa5. Khimiyang6. Manmao7. Diyum

    17. Tirap

    (Khonsa)

    1. Deomali 1. Laju 1. Dadam2. Soha3. Chubam4. Borduria5. Katang

    1. Namsang / Deomali2. Laju3. Khonsa

    18 Longding 1. Kanubari 1. Pongchau2. Wakka3. Pumao4. Lawnu

    1. Wakka2. Pongchau3. Kanubari4. Niausa

  • 8/13/2019 Final DPR_eDist Arunachal

    19/116

    2.4PROJECT ACTIVITIES AND TIMELINE

    As per Section 8: Milestones & Time Linesof the Guidelines for National Rollout of e-District MMP

    project time limit for implementation for those states which have been implementing pilot project shall

    be two year from the date of issue of Administrative Approval by DIT which is applicable for the State of

    Arunachal Pradesh as well. An indicative overall time frame is given below for all the key activities that

    could be performed at various stages of the project. Some activities are to be taken care parallel in order

    to adhere to the timely implementation of the project.

    ACTIVITY GROUP ACTIVITIES TIMELINE In

    Month

    Project

    Development

    Approval of DPR by DIT, GoI T0

    Selection of State PMU (Project Consultants) T1

    Current State Assessment Study T1 + 2

    BPR & Gap Assessment T1 + 4

    Data Migration & Digitization Plan T1 + 5

    Training & Change Management Plan T1 + 6

    Issue of Government Orders T1 + 8

    Functional Requirement Specifications (FRS) foradditional services

    T1 + 7

    RFP preparation and approval T1 + 10

    Selection of System integrator T1 + 11

    Project

    Implementation

    Approval of Software Requirement Specification (SRS) T1 + 13

    Site preparation for e-District project T1 + 14

    Hardware procurement & Commissioning T1 + 15

    Customisation and Development of Software Application T1 + 17

    Third party application audit by STQC T1+18

    User Acceptance Testing of e-District application T1 + 19

    Completion of Training & Change Management activities T1 + 19

    Digitization of Historical data T1 + 20

  • 8/13/2019 Final DPR_eDist Arunachal

    20/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 20

    Following assumptions were taken into consideration while preparing the overall time frame for the

    project.

    a) As per Section 8: Milestones & Timelinesproject handover from State PMU to joint entity willbe during the Project Post Implementation Phase. Therefore after the implementation period 1

    year is kept for the project handover from the Project Consultant to the Joint Entity

    b) As per Section 6.8.2 . (G): System Implementation it is mentioned States need to ensure thatthe System Integrator be also made part of the Joint Entity to be formed for Post

    Implementation O&M phase. Accordingly timeline for formation of Joint Entity is calculated

    c) As per Section 6.7.2 Common RFP for Selection of System Integrator Both existing SystemIntegrators and new system Integrators will quote the rates with 3 years Support Cost including

    Help Desk support at state level. Hence support period is calculated from the implementation

    phase (2nd

    year onwards) which will continue till the project closure. Timeline for Project closure

    report from State Government to DIT is calculated accordingly.

    Deployment of e-District application at SDC T1 + 22

    Go-Live of e-District application T1 + 24

    Project Post

    Implementation

    Constitution of Joint Entity for (O&M) of e-District project T1 + 25

    Project handover from Project Consultant to Joint Entity T1 + 38

    Citizen Satisfaction Survey 1 T1 + 32

    Post Go-Live project assessment T1 + 38

    Citizen Satisfaction Survey 2 T1 + 42

    Project closure report from State Government to DIT T1 + 48

  • 8/13/2019 Final DPR_eDist Arunachal

    21/116

    Sl.No Project Activity Timeline of Activities in Months(M)

    M

    1

    M

    2

    M

    3

    M

    4

    M

    5

    M

    6

    M

    7

    M

    8

    M

    9

    M

    10

    M

    11

    M

    12

    M

    13

    M

    14

    M

    15

    M

    16

    M

    17

    M

    18

    M

    19

    M

    20

    M

    21

    M

    22

    M

    23

    M

    24

    1 Selection of

    State PMU

    (Project

    Consultants)

    2 Current State

    Assessment

    Study

    3 BPR & Gap

    Assessment

    4 Data Migration

    & Digitization

    Plan

    5 Training &

    Change

    Management

    Plan

    6 Issue of

    Government

    Orders

    7 Functional

    RequirementSpecifications

    (FRS) for

    additional

    services

    8 RFP

    preparation

    and approval

    9 Selection of

    System

    integrator

  • 8/13/2019 Final DPR_eDist Arunachal

    22/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 22

    10 Approval of

    Software

    Requirement

    Specification

    (SRS)

    11 Site

    preparation for

    e-District

    project

    12 Hardware

    procurement &

    Commissioning

    13 Customisation

    and

    Development

    of Software

    Application

    14 Third party

    application

    audit by STQC

    15 User

    Acceptance

    Testing of e-

    Districtapplication

    16 Completion of

    Training &

    Change

    Management

    activities

    17 Digitization of

    Historical data

    18 Deployment of

  • 8/13/2019 Final DPR_eDist Arunachal

    23/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 23

    e-District

    application at

    SDC

    19 Go-Live of e-

    District

    application

  • 8/13/2019 Final DPR_eDist Arunachal

    24/116

    2.5TOTAL PROJECT COST

    All cost is in Rs. Lakhs

    ITEM DESCRIPTION Year 1 Year 2 Year 3 Year 4 TOTALIT INFRASTRUCTURE

    Hardware at District Level 1451.56 0 0 1451.56

    Systems at SDC 175 0.00 0 0 175.00

    Systems Support 0 24 24 24 72.00

    Connectivity 0 406.69 0 0 406.69

    APPLICATION SOFTWARE

    Software for Pilot States 60 0 0 60

    Third Party/ STQC Testing 35 0 0 35

    Application Support 0 18 18 18 54

    Training 285.6 0 0 0 285.6

    Seed Money to eGov Society 170 0 0 0 170

    Site Preparation 496.53 0 0 0 496.53

    Data Digitization 893.69 0 0 0 893.69

    PROGRAM & PROJECT MANAGEMENT

    State Project Management Unit 77 77 77 0 231

    Project Manager for 3 years 0 102 102 102 306

    AWARENESS & COMMUNICATION

    Awareness & Communication at State

    Level

    10 5 5 0 20

    Awareness & Communication at District

    Level

    2.55 2.55

    ASSESSMENT

    Impact Assessment 0 0 7.5 7.5 15

    CONTINGENCY

    District:- 3% of Total Ditrict Level Cost 0 60.19 30.09 30.09 120.38

    State (SDA):- 3% of Total State Level Cost 9.93 9.93 19.86

    GRAND TOTAL 3666.862 702.81 263.56 181.60 4814.86

  • 8/13/2019 Final DPR_eDist Arunachal

    25/116

    Section-3: State Information

    3.1 DETAILS OF THE DISTRICTS

    Following is the detailed information about all the districts of State of Arunachal Pradesh where the Roll-out of the e-District

    application will take place.

    Sl

    No.

    Name of

    District

    Populatio

    n (2001

    Census

    Data)

    Area (in

    Sq Kms

    )

    Name of all Offices

    ADC HQ SDO HQ EAC HQ CO HQ Block HQ

    1. Tawang 49950 2172 1. Jang2. Lumla 1. Mukto2. Thingbu

    3. Zemithang4. Dudhnagar5. Kitpi6. Bongkhar7. Lhou

    1. Tawang2. Lumla3. Jang4. Mukto5. Kitpi6. Zemithang

    2. West

    Kameng

    87013 7422 1. Singchung2. Dirang3. Thrizno4. Kalagtang

    1. Rupa 1. Bhalukpong2. Nafra

    1. Jamir2. Balemu3. Thembang4. Shergaon5. Kamengbari

    -Delmara

    1. Dirang2. Thrizino3. Kalaktang4. Nefra5. Singchung

    3. East

    Kameng

    78413 4134 1. Seijosa2. Chayngtajo

    1. Pakke-Kesang2. Bameng3. Bana (Direct)

    1. Lada2. Sewa3. Pipu-Dipu4. Khenewa5. Richukrong

    1. Seppa2. Bameng3. Chayang-

    Tajo

    4. Pakke-

  • 8/13/2019 Final DPR_eDist Arunachal

    26/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 26

    6. Veo7. Dissang-

    Passo

    8. GyawePurang

    9. Passa Valley

    Kessang

    5. Bana6. Pipu7. Seijosa8. Khenewa

    4. Papum

    Pare

    176385 3462 1. Sagalee 1. Kimin2. Balijan3. Doimukh4. Mengio

    1. Leporinag2. Toru3. Taraso4. Sangduo5. Kakoi6. Gumto7. Sil Sango8. Parang

    1. Doimukh2. Sagalee3. Mengio4. Balijan5. Kimin

    5. Capital

    Complex

    1. Itanagar2. Naharlagun 1. Banderdewa

    6. Lower

    Subansiri

    82839 3508 1. Raga2. Yachuli 1. Pistana2. Dollugmu-

    kh

    3. Kamporijo4. Yazali5. Old Ziro6. Deed

    1. Ziro-I2. Yachuli3. Raga

    7. Kurung

    Kamey

    89717 6040 1. Pania2. Nyapin3. Tali4. Patuk

    1. Palin2. Changbang3. Sangram4. Sarli5. Damin6. Parsi-Parlo7. Phassang8. Yangte9. Gangte

    1. Palin2. Chambang3. Nyapin4. Damin5. Koloriang6. Tali7. Sangram8. Sarli9. Pipsorang

  • 8/13/2019 Final DPR_eDist Arunachal

    27/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 27

    10.Pipsorang11.Tarak-

    Lengde

    10.Parsi Parlo

    8. Upper

    Subansiri

    83205 7032 1. Siyum (H.Q.at Kodokha)

    1. Nacho2. Baririjo

    1. Dumporijo 1. Taliha2. Giba3. Taksing4. Limekang5. Puchigeko6. Payeng7. Gusar8. Reer-Yapu9. Gite-Ripa10.Maro

    1. Daporijo2. Giba3. Dumporijo4. Taliha5. Nacho6. Siyum7. Baririjo8. Puchi Geku9. Lime King

    9. West Siang 112272 8325 1. Mechuka2. Basar3. Rumgong4. Yomcha5. Kamba

    1. Likabali 1. Liromoba2. Gensi3. Tribin4. Tato5. Monigong6. Kayang7.

    1. Payum2. Darak3. Kangku4. Pidi5. Jonolomoba6. New Daring7. Bagra8. Sibe9. Kombo

    1. Along(West)

    2. Rumgong3. Basar4. Gensi5. Liromoba6. Kaying-

    Payum

    7. Mechuka8. Along

    (East)9. Manigaon10.Likabali11.Tirbin12.Darak

    10. East Siang 99019 3603 1. Nari2. Boleng3. Mebo

    1. Ruksin 1. Pangin2. Koyu3. Riga

    1. Bilat2. Rebo-

    Perging

    3. New Seren4. Oyan5. Kora

    1. Pasighat2. Mebo3. Nari4. Pangin5. Ruksin6. Riga

  • 8/13/2019 Final DPR_eDist Arunachal

    28/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 28

    6. Kabang7. Namsing8. Yagrung

    11. Upper

    Siang

    35289 6590 1. Tutung 1. Maryiang 1. Geku 1. Gelling2. Singa3. Jengging4. Palling5. Katan6. Migging7. Mopam

    (Adi Pasi)

    1. Jengging2. Maryiang3. Yingkiong4. Tuting5. Geku6. Payingdem

    12. Dibang

    Valley

    7948 9129 1. Anelih2. Etalin3. Mipi4. Aruzoo5. Dambuen

    1. Anini2. Anelih3. Etalin

    13. Lower

    Dibang

    Valley

    53986 3900 1. Hunli2. Dambuk 1. Deasli2. Kronli

    3. Koronu4. Tinali

    (Paglam)

    5. Dambuen

    1. Desali2. Roing3. Dambuk

    14. Lohit

    (Tezu)

    145538 5212 1. Namsai 1. Lekang(Mahadevpur)

    2. Chowkham1. Wakro2. Sunpura3. Paying4. Lathao

    1. Tezu2. Namsai3. Wakro4. Mahadevp

    ur

    5. Chowkham15. Anjaw

    (Hawai)

    21089 6190 1. Hayiliang 1. Kibithoo2. Changlagam3. Walong4. Manchal5. Goiliang6. Metenglian

    1. Hayuliang2. Hawai3. Chaglagam4. Manchal

  • 8/13/2019 Final DPR_eDist Arunachal

    29/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 29

    g

    16. Changlang 147951 4662 1. Miao2. Jairampur3. Bordumsa

    1. Namgpong 1. Namtok2. Diyun3. Manmao4. Khimyong

    1. Tikhak RemiPutok

    2. Vijaynagar3. Kharsang4. Yatdam5. Lyngok-

    Longti

    6. Renuk

    1. Changlang2. Nampong3. Miao4. Bordumsa5. Khimiyang6. Manmao7. Diyum

    17. Tirap

    (Khonsa)

    111997 2362 1. Deomail 1. Laju 1. Dadam2. Soha3. Chubam4. Borduria5. Katang

    1. Namsang /Deomali

    2. Laju3. Khonsa

    18 Longding 1. Kanubari 1. Pumao2. Pongchau3. Wakka4. Lawnu

    1. Wakka2. Pongchau3. Kanubari4. Niausa

  • 8/13/2019 Final DPR_eDist Arunachal

    30/116

    3.2 OFFICERS INVOLVED IN PROCESSING THE SELECTED SERVICES IN THE

    DISTRICT

    Sl No. Service Categories SubServices OFFICERSDESIGNATION

    OFFICE LOCATION

    1 Certificates 1) Identity Card Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    2) Income Certificates Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    3) Permanent Resident

    Certificates

    Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    4) Temporary Resident

    Certificates

    Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    5) Caste Certificates (ST) Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    6) Permanent Inner Line

    Pass (ILP)

    Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    7)Temporary Inner Line Pass(ILP)

    Receiving Clerk,Forwarding Clerk,

    Branch Officer, DC

    DC Office

    8) Domicile Certificates Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    9) Gapping Certificate Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    10)Birth Certificate Receiving Clerk,

    Forwarding Clerk,District Statistical

    Officer

    DC Office

    11)Death Certificate Receiving Clerk,

    Forwarding Clerk,

    District Statistical

    Officer

    DC Office

    12)Issuance of Employment Receiving Clerk, DC Office

  • 8/13/2019 Final DPR_eDist Arunachal

    31/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 31

    card Forwarding Clerk,

    District Employment

    Officer

    13)Marriage Certificate Receiving Clerk,

    Forwarding Clerk,

    District Marriage

    officer

    DC Office

    14)Character Certificate Receiving Clerk,

    Forwarding Clerk,

    DC

    DC Office

    15)Medical Fitness

    Certificate

    Receiving Clerk,

    Forwarding Clerk,

    District Medical

    Officer

    DC Office

    2 Land Management 1) Issuance of the Land

    Possession Certificate

    Receiving Clerk,

    Forwarding Clerk,

    Branch Officer(LRSO), DC

    DC Office

    2) Issuance of the Land

    Allotment Certificate

    Receiving Clerk,

    Forwarding Clerk,

    Branch Officer

    (LRSO), DC

    DC Office

    3) Issuance of the

    Mortgage Certificate

    Receiving Clerk,

    Forwarding Clerk,

    Branch Officer

    (LRSO), DC

    DC Office

    4) Tax CollectionCertificate

    Receiving Clerk,Forwarding Clerk,

    Branch Officer

    (LRSO), DC

    DC Office

    5) Generation of Notice for

    Default

    Receiving Clerk,

    Forwarding Clerk,

    Branch Officer

    (LRSO), DC

    DC Office

    6) Property Deed Certificate Receiving Clerk,

    Forwarding Clerk,

    Branch Officer(LRSO), DC

    DC Office

    3 Social Welfare 1. Old Age Pension Receiving Clerk,

    Forwarding Clerk,

    District Social

    Welfare Officer

    (CDPO)

    DC Office

  • 8/13/2019 Final DPR_eDist Arunachal

    32/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 32

    2. Family Benefit Scheme Receiving Clerk,

    Forwarding Clerk,

    District Social

    Welfare Officer

    (CDPO)

    DC Office

    3. Disability Certificate Receiving Clerk,

    Forwarding Clerk,

    District Social

    Welfare Officer

    (CDPO)

    DC Office

    4 RTI/Grievances

    Services

    1) Providing information Receiving Clerk,

    Forwarding Clerk,

    Branch Officer

    (LRSO), DC

    DC Office

    2) Grievance and

    Complaints related services

    Receiving Clerk,

    Forwarding Clerk,

    Branch Officer

    (LRSO), DC

    DC Office

    5 Arms license 1) Issue of New License Receiving Clerk,

    Forwarding Clerk,

    Branch Officer

    (Judicial), DC

    DC Office

    2) Issue of Duplicate /

    Modification of License

    Receiving Clerk,

    Forwarding Clerk,

    Branch Officer

    (Judicial), DC

    DC Office

    3) Renewal of License Receiving Clerk,

    Forwarding Clerk,

    Branch Officer

    (Judicial), DC

    DC Office

    6 PDS 1) Addition of Name Receiving Clerk,

    Forwarding Clerk,

    District FCS Officer

    DC Office

    2) Deletion of Name Receiving Clerk,

    Forwarding Clerk,District FCS Officer

    DC Office

    3) Change of Address Receiving Clerk,

    Forwarding Clerk,

    District FCS Officer

    DC Office

    7 Issuance of Trade

    License

    1) Application for new

    Trade License

    Receiving Clerk,

    Forwarding Clerk,

    DC Office

  • 8/13/2019 Final DPR_eDist Arunachal

    33/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 33

    Branch Officer, DC

    2) Renewal of Trade

    License

    Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    3) Inclusion of Items Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    4) Deletion of Items Receiving Clerk,

    Forwarding Clerk,

    Branch Officer, DC

    DC Office

    8 Election 1) Application for New

    Name

    Receiving Clerk,

    Forwarding Clerk,

    Electoral

    Registration Officer

    DC Office

    2) Application for Deletion

    of Name

    Receiving Clerk,

    Forwarding Clerk,

    Electoral

    Registration Officer

    DC Office

    3) Application for

    Correction of field

    Receiving Clerk,

    Forwarding Clerk,

    Electoral

    Registration Officer

    DC Office

    4) Application for

    Transposition

    Receiving Clerk,

    Forwarding Clerk,Electoral

    Registration Officer

    DC Office

  • 8/13/2019 Final DPR_eDist Arunachal

    34/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 34

    3.3 DETAILS OF DEGS

    The Arunachal Pradesh has Sixteen districts where the e-District implementation project to be taken up.

    The DeGS in all the district has already been formed. Following are the members of the DeGS.

    Representatives Position

    DC Chairman

    ADC Convener

    DIO, NIC Member

    DDSC Member

    GM (BSNL) Member

    Director (Education Member

    Project Director Member

    DMO Member

    Other District Specific Official (To be

    chosen by District)

    Member

  • 8/13/2019 Final DPR_eDist Arunachal

    35/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 35

    3.4 DETAILS OF STATE E-GOVERNANCE INITIATIVES

    3.4.1 SDC

    SDC is envisioned as the Shared, reliable and secure infrastructure services centre for hosting and

    managing the e-Governance Applications of State and its constituent departments. SDC is envisaged to

    establish a robust infrastructure to enable the Government to deliver the services quickly and effectively

    to its stakeholders. The proposed State Data Centre, connected to the State Wide Area Network

    (SWAN), shall provide the access to the e-Governance applications & Services to Government employees

    through Intranet and to the citizens through public Internet/CSCs etc. Through such a Shared Service

    Centre implemented and managed by a competent Implementation Agency, the individual departments

    can focus more on the service delivery rather than on the issues surrounding the Infrastructure.

    Arunachal State Data Center (MSDC) is to be established under NeGP for storing all kinds of information

    relating to Government. This project is to be implemented through State Council for IT and e-

    Governance (Department of Information Technology), Govt. of Arunachal Pradesh over a period of 5

    years. The Request for Proposal (RFP) for the selection of Implementation Agency has been approved by

    the DIT, Govt. of India and the RFP will be soon published in leading Daily news papers. The site for SDC

    has been selected in the State Council for IT and e-Governance (Department of Information Technology),

    Govt. of Arunachal Pradesh, owned by the state Govt.

    Status of SDC Status of DRS Likely date of

    commissioning

    Whether SDC has adequate space

    and IT resources for eDistrict project

    The RFP for the

    selection of

    implementation

    partner is

    Approved and

    the RFP will be

    published

    shortly

    The work is

    yet to be

    initiated

    The project

    duration of the

    project is 34

    months from

    the date of

    commencement

    The envisaged SDC will have

    adequate space and IT resources for

    e-District project.

  • 8/13/2019 Final DPR_eDist Arunachal

    36/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 36

    3.4.2 CSC

    The CSC project has been initiated for which the State Council for IT and e-Governance under

    Department of Information Technology, Govt. of Arunachal Pradesh has been nominated as the StateDesignated Agency and M/s Calance S/w is responsible for implementing the project in the state. The

    present status of CSC implementation is as below. It may be noted that out of sixteen districts, seven

    districts have 70 percent CSC operational and as per the Department of IT, Govt. of Arunachal Pradesh,

    another five district will achieve the same in another three months.

    State District Commissioned CSC Registered CSC

    As on 31st

    July 2011

    ArunachalPradesh

    Anjaw 1 0Changlang 14 11

    Upper Dibang Valley 1 0

    East Kameng 8 1

    East Siang 19 15

    Kurung Kumey 5 1

    Lohit 18 16

    Lower Dibang Valley 10 7

    Lower Subansiri 13 11

    Papumpare 27 22

    Tawang 6 3

    Tirap 11 5

    Upper Siang 6 3

    Upper Subansiri 11 4

    West Kameng 19 13

    West Siang 18 8

    Total 187 120

  • 8/13/2019 Final DPR_eDist Arunachal

    37/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 37

    3.4.3 SWAN

    The Department of IT proposed to establish Arunachal State Wide Area Network under NEGP which will

    interconnect all the Blocks, Sub-Divisions, Districts, and State capital through high speed data

    communication line. This project is being implemented in PPP model over a period of 5 years.. The

    Selection of Network Operator in BOOT Model for Arunachal SWAN has been completed and the work is

    already started. The SHQ at Itanagar and all the sixteen District Head quarter POP barring one is already

    live . The status of BHQ implementation is stated below.

    Sl.

    No.

    Name

    of

    Districts

    BLOs Type of

    Connectivity

    BSNL Connectivity

    (LL/BB/VSAT)

    Installation

    1

    PapumPare

    Sagalee LL LL Installed

    2 Balijan LL LL Installed3 Kimin LL LL Installed & commissioned

    4 Doimukh LL LL Installed & commissioned

    5 Mengio VSAT NA Installed

    6 Leporiang VSAT NA Installed

    7 Toru VSAT LL Installed

    8 Banderdewa LL LL Installed & commissioned

    9 Taraso VSAT NA Installed

    10

    EastSiang

    Boleng LL LL Not installed

    11 Ruksin LL LL Installed & commissioned

    12 Nari LL LL Not installed

    13 Mebo LL LL Installed14 Pangin LL LL Not installed

    15 Riga VSAT LL Not installed

    16 Bilat LL LL Installed

    17 Koyu VSAT NA Not installed

    18 Rebo-Perging VSAT NA Not installed

    19 Sille Oyan LL LL Installed & commissioned

    20 New-Seren VSAT NA Installed & activated

    21

    LowerDibangVa

    lley

    Dambuk LL RM Installed

    22 Hunli LL NA Installed

    23 Desali VSAT NA Not installed(Repeated

    site)24 Roiing LL LL Installed

    25 Dambuk LL NA Not installed(Repeated

    site)

    26 Koronu VSAT NA Installed & activated

    27 Desali VSAT NA Not installed

    28 Paglam VSAT NA Installed

  • 8/13/2019 Final DPR_eDist Arunachal

    38/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 38

    29 Kronli VSAT NA Not installed

    30

    Lohit

    Namsai LL LL Installed & commissioned

    31 Lekang LL LL Installed

    32 Wakro LL LL Installed & commissioned

    33 Chowkham LL LL Installed & commissioned

    34 Piyong LL LL Installed

    35 Sunpura LL LL Installed

    36 Lathao LL LL Installed

    37

    Anjaw

    Hayuliang LL VSAT Installed

    38 Goiliang LL VSAT Not installed

    39 Chagalagaon LL VSAT Not installed

    40 Kibithoo LL VSAT Installed

    41 Wallong LL VSAT Installed

    42 Manchal LL VSAT Not installed

    43

    Chang

    lang

    Miao LL LL Installed

    44 Bordumsa LL VSAT Installed

    45 Nampong LL LL Installed

    46 Jairampur LL LL/BB Installed

    47 Namtok LL VSAT Installed

    48 Khimiyang LL VSAT Installed

    49 Tikhak Remi

    Putok

    LL VSAT Not installed

    50 Vijoynagar LL VSAT Not installed

    51 Manmao LL VSAT Installed

    52 Kharsang LL LL Installed

    53 Diyun LL LL Installed

    54 Yatdam LL VSAT Installed

    55

    Tirap

    Longding LL VSAT Installed

    56 Deomali LL LL Installed

    57 Khanubari LL LL Not installed

    58 Punchao LL VSAT Installed59 Laju LL VSAT Installed

    60 Pumao LL VSAT Not installed

    61 Wakka LL VSAT Not installed

  • 8/13/2019 Final DPR_eDist Arunachal

    39/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 39

    62 Dadam LL VSAT Not installed

    63 Soha LL VSAT Not installed

    64

    Dibang

    Va

    lley

    Alinye VSAT NA Not installed

    65 Etalin VSAT NA Installed & activated

    66 Mipi VSAT NA Installed

    67 Aruzu VSAT NA Not installed

    68

    UpperSiang

    Tuting LL VSAT Installed

    69 Mariyang LL VSAT Installed

    70 Geku LL LL Installed

    71 Jengging LL VSAT Installed

    72 Mopom VSAT NA Not installed

    73 Katan VSAT NA Installed

    74 Gelling VSAT NA Not installed

    75 Singga VSAT NA Not installed

    76 Paling VSAT NA Not installed

    77 Migging VSAT NA Not installed

    78

    WestSiang

    Mechuka LL VSAT Installed

    79 Basar LL LL Installed

    80 Rumgong LL VSAT Installed

    81 Yomcha LL VSAT Installed

    82 Likabali LL LL Installed & commissioned

    83 Kamba LL LL Installed

    84 Gensi LL LL Installed

    85 Liromoba VSAT NA Installed & activated

    86 Kaying VSAT LL Installed & activated

    87 Along(East) LL LL Installed & commissioned

    88 Monigong VSAT NA Not installed

    89 Tiribin LL LL Installed

    90 Tato VSAT NA Installed & activated

    91 Darak VSAT NA Installed & activated

    92 Kangku VSAT NA Not installed

    93 Pidi VSAT NA Not installed

    94 Daring LL LL Installed

    95 Bagra VSAT LL Installed & activated

    96 Payum VSAT NA Not installed

    97 Jomlo Mobuk VSAT NA Installed & activated

    98 Sibe VSAT NA Not installed

  • 8/13/2019 Final DPR_eDist Arunachal

    40/116

  • 8/13/2019 Final DPR_eDist Arunachal

    41/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 41

    135 Khenewa VSAT NA Installed

    136 Veo(Pijirang) VSAT NA Installed

    137 Richukhrong VSAT NA Installed

    138 Sawa VSAT NA Not installed

    139 Dissing Passo VSAT NA Not installed

    140 Lada VSAT NA Not installed

    141 Gyawe Purang VSAT NA Not installed

    142

    WestKameng

    Rupa LL LL Installed

    143 Thrizino LL VSAT Installed

    144 Singchung VSAT LL Installed & activated

    145 Bhalukpong LL LL Installed

    146 Nafra LL LL Installed

    147 Kalaktang LL LL Installed

    148 Dirang LL BB Installed

    149 Jameri VSAT LL Installed & activated

    150 Thembang VSAT NA Not installed

    151 Shergaon LL LL Installed

    152 Balemu VSAT NA Installed & activated

    153

    Tawang

    Jang LL LL/BB Not installed

    154 Lumla LL BB Installed

    155 Mukto LL LL Installed

    156 Dudunghar VSAT NA Installed

    157 Zemithang LL VSAT Installed

    158 Kitpi VSAT NA Installed & activated

    159 Bongkhar VSAT NA Not installed

    160 Thingbu VSAT NA Not installed

    3.4.4 SSDG

    One of the goals of the State Government is to cooperate, collaborate and integrate information across

    different departments in the State. To simplify the above task, the concept of e- Governance Service

    Delivery Gateways has been conceptualized that will act as standard based messaging switches and

    provide seamless interoperability and exchange of data across the departments

    This State Portal project has been formulated under the National e- Governance Plan (NeGP) to fulfill

    the vision of providing easy and convenient services to the citizens through remote access primarily

    through Common Service Centers (CSCs) and enabling the State Portal (by implementing the key

    components State Portal viz. SSDG, electronic Form (eForms), Application and Computing

    Infrastructure).

  • 8/13/2019 Final DPR_eDist Arunachal

    42/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 42

    Status of SSDG

    in the StateStatus of State Portal Vendor Has been selected for Implementation.

    Services under eForm for

    each district

    Services already

    implemented

    Services still to be implemented

    NA 1) Registration of Non-Matriculate

    Candidate at Employment Exchange

    2) Registration of Matriculate Candidate at

    Employment Exchange

    3) Registration of Technical Candidate at

    Employment Exchange

    4) Issuance of Soil health Card

    5) Issuance dealer Certificate ofRegistration to sell Fertilizer

    6) Grant of License to Sell/Exhibit

    Agriculture product

    7) Issuance of Old-Age Pension

    8) Application for Beneficiary under

    National Benefit Scheme

    9) Application for Beneficiary under Ex-

    Gratia Scheme

    10)Issuance of Land Possession Certificate

    11)Issuance of Land Allotment Certificate

    12)Application for Mutation

    13)Application for New Registration in

    Electoral Roll

    14)Application for Inclusion of Name in

    Electoral Roll

    15)Application for Objection against

    Inclusion of Name in Electoral Roll

  • 8/13/2019 Final DPR_eDist Arunachal

    43/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 43

    3.4.5 Other State MMPs

    SNo Name ofState MMP

    Status No ofDistrict

    covered

    ProjectCost in

    INRProject

    Conceptual

    ized

    DPR

    approved

    Under

    Implementa

    tion

    Post Impl.

    1 CT-MMP Yes Yes Yes NA 8 1045.21

    Lakh

    2 CCTNS Yes Yes Yes NA 8 2100

    Lakhs

    3.4.6 Status of SeMT

    The State e-Governance Mission Team of Arunachal Pradesh has the following representatives from the

    state government side, who for the core committee.

    Representatives Position

    Secretary, IT Chairman

    Director, IT Member Secretary

    SIO, NIC (Arunachal Pradesh) Member

    Rep. of Depts. taking up e-Governance

    Projects under NeGP

    Invitee

    Currently Department of IT, Arunachal Pradesh hasnt engaged any consultant as the state is under the

    process of selection of consultants for various positions and various levels under the NeGD.

  • 8/13/2019 Final DPR_eDist Arunachal

    44/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 44

    3.4.7 Status of any other e-Governance initiatives in the state

    i. Jan Subidha Center:

    The Department of Planning, Government of Arunachal Pradesh in collaboration with NIC State

    unit Arunachal Pradesh is executing a project for delivery of the certificates. The following

    Certificates are been provided using the application.

    Sl No Name of the Certificate

    1. Identity Card

    2. Income Certificates

    3. Permanent Resident Certificates

    4. Temporary Resident Certificates

    5. Caste Certificates (ST)

    6. Permanent Inner Line Pass (ILP)

    7. Temporary Inner Line Pass (ILP)

    8. Domicile Certificates

    9. Other District Specific Certificate like Gapping Certificate

    However the present application which is running in all the DC offices has the following

    problems

    i) The application is running in Client-Server model and dont have Web enabled Architecture.

    Thus it can not be leveraged outside the specific office where it is running.

    ii) All the DC offices running the application have separate copy of the Databases and they are

    not interlinked.

    iii) Security of the application is very minimum.

    iv) Digital Signature, Authenticity features of the application are missing.

  • 8/13/2019 Final DPR_eDist Arunachal

    45/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 45

    3.4.8 Status of data digitization in the each district

    SlNo

    Location Name of Service Status Remark

    1.

    All the District of

    Arunachal Pradesh

    Identity Card 100% Digitized

    2. Income Certificates 100% Digitized

    3. Permanent Resident Certificates 100% Digitized

    4. Temporary Resident Certificates 100% Digitized

    5. Caste Certificates (ST) 100% Digitized

    6. Permanent Inner Line Pass (ILP) 100% Digitized

    7. Temporary Inner Line Pass (ILP) 100% Digitized

    8. Domicile Certificates 100% Digitized

    9. Other District Specific Certificate like

    Gapping Certificate

    100% Digitized

  • 8/13/2019 Final DPR_eDist Arunachal

    46/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 46

    3.4.9 Status of Manual / electronically enabled Transactions District wise

    Status of e transactions for the services gone live under Jan-subidha Center is as below:

    S. No Name of Service 2010-11

    ManualTransactions

    Transactionsof e-delivered

    1. Identity Card NA 3002. Income Certificates NA 2503. Permanent Resident Certificates NA 25004. Temporary Resident Certificates NA 12005. Caste Certificates (ST) NA 70006. Permanent Inner Line Pass (ILP) NA 40007. Temporary Inner Line Pass (ILP) NA 6008. Domicile Certificates NA NA9. Other District Specific Certificate like

    Gapping Certificate

    NA 400

    Since the Jansubidha Services was line only in the year 2011, hence there is no online

    transaction for the services in the year 2008-2009. The above transaction is the average per

    district.

  • 8/13/2019 Final DPR_eDist Arunachal

    47/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 47

    Section- 4: PROJECT DETAILS AND IMPLEMENTATION MODEL

    4.1 STAKEHOLDER ANALYSIS

    Anybody who is affected by or can influence the programme/ project is called a stakeholder. The

    process of stakeholder identification/ interaction typically results in improved project effectiveness,

    efficiency, equity, sustainability, transparency and accountability. All the relevant stakeholders

    associated with the project are displayed in the below given diagram.

    E DistrictProject

    DistrictAdministrat

    ion

    StateGovernment

    DIT, GoI

    SystemIntegrator

    ProjectConsultants

    StateDesignated

    Agency

    ProjectAssessment

    Partner

    DeGS

  • 8/13/2019 Final DPR_eDist Arunachal

    48/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 48

    STAKEHOLDER

    GROUP/NAME

    ROLES & RESPONSIBILITIES LEVEL OF INFLUENCE

    Department of

    Information

    Technology

    (DIT), GoI

    a. Frame and Issue Guidelinesb. Receive and appraise proposals from the

    State

    c. Formation of Project ManagementGroup (EPMG) to assist DIT in

    monitoring and assessing achievements

    by states

    d. Provide technical assistance to the Statee. Empanelment of consultants and IAf. Support state/nodal agency in getting

    guidance /assistance technical or

    otherwise.

    HIGH

    The State

    Government

    a. Identify a State Designated Agency (SDA)and a State Nodal Officer to represent

    the State

    b. To enter into necessaryMoUs/agreements with DIT/other

    central agencies/service providers for

    funding, defining service levels for

    identified services, ensuring service level

    adherence, implementation and

    sustainability of the pilot project and

    subsequent state wide rollout.c. Issue instructions and ensure formation

    of District e-Governance Society in the

    Districts.

    d. Provide State Financial Support as

    HIGH

  • 8/13/2019 Final DPR_eDist Arunachal

    49/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 49

    STAKEHOLDER

    GROUP/NAME

    ROLES & RESPONSIBILITIES LEVEL OF INFLUENCE

    required /envisaged under the project

    e. Provide Infrastructure and other supportto the State Designated Agency (SDA)

    f. Take appropriate steps for legal changesrequired in implementing BPR for

    identified services

    g. To identify the project champion andensuring complete involvement of the

    project champion from start to the finish

    of the project

    District

    Administration

    To provide close tie-ups with all the stakeholders

    in the project, to provide commitment and

    support, help to bring-in the process changes

    and overall guidance to the project.

    HIGH

    State

    Designated

    Agency

    a. Synchronize roll out of e-District withe-form, SSDG, State Portal, CSC, SWAN,

    SDC and receive and manage funds to

    ensure timely fund flow to

    implementing agencies

    b. Coordinate and facilitate interactionsbetween the project implementation

    partners/consultants, State Government

    Departments, District Administration

    c. Enable creation of a comprehensiveState package for e-District and other

    technical support. Facilitate integration

    of the existing ICT enabled and other

    HIGH

  • 8/13/2019 Final DPR_eDist Arunachal

    50/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 50

    STAKEHOLDER

    GROUP/NAME

    ROLES & RESPONSIBILITIES LEVEL OF INFLUENCE

    Government Schemes into the e-

    District

    d. Facilitate administrative readiness ande-readiness of the District

    e. Facilitate selection of ISA andapplication Developer under the

    guidance of State Project Committee /

    Apex Committee

    f. Draw up a comprehensive user chargespolicy and a sustainable road map for

    the e district project for approval of the

    State Government.

    District e-

    Governance

    Society (DeGS)

    a. Ensure close linkages and coordinationamongst the various stakeholders in the

    Project at field level.

    b. Provide overall guidance to the Projectpartners at District level

    c. Work closely with the ISA andApplication Developer to undertake the

    field work, comprehend the

    requirements, document the

    observations, prepare roadmap,

    redesign the processes

    d. Build capacity of the staff at variouslevels of the district administration.

    Work closely with the technical solution

    provider for developing and customizing

    the software, implement the technical

    MEDIUM

  • 8/13/2019 Final DPR_eDist Arunachal

    51/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 51

    STAKEHOLDER

    GROUP/NAME

    ROLES & RESPONSIBILITIES LEVEL OF INFLUENCE

    solution

    e. To manage, supervise and implementbackend computerization of partner

    Departments/Agencies

    f. Support the Common Services Centers(CSCs), throughout the District for

    providing G2C services as per the Service

    Level Agreements between

    Departments/ SDA for CSCs and the

    Service Center Agency.

    g. Collect user charges as fixed by the StateGovernment and keep audited accounts

    of the same.

    h. Take all publicity measures andcampaigning through media like TV,

    radio, newspaper, conferences,

    seminars, public meetings, banners and

    posters

    i. Ensure delivery of services in the longterm

    j. Ensure an effective transaction-basedrevenue sharing arrangement during the

    Operation and Maintenance phase

    among all Stakeholders

    Project

    Consultants

    a. Design an efficient and effective end toend service delivery process

    b. Study the capacity buildingrequirements and help create a facility

    HIGH

  • 8/13/2019 Final DPR_eDist Arunachal

    52/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 52

    STAKEHOLDER

    GROUP/NAME

    ROLES & RESPONSIBILITIES LEVEL OF INFLUENCE

    for development of capacity including

    preparation of Change Management &

    Training plans, legal changes and draft

    Government Orders for the services

    identified under e-district

    c. Suggest the functional requirements forthe application, based on the BPR and

    review the System Requirement

    Specification (SRS) and System Design

    Documents (SDD) for the application

    development and submit their

    observation to the State Designated

    Agency.

    d. Facilitate in conducting the UserAcceptance Test (UAT). UAT is to be

    conducted by the Implementing Agency.

    Final sign off need to be given by the

    Users.

    e. Supervise and assist the STQC foracceptance testing of the application

    f. To assist State in the selection of SystemIntegrator (Implementation Agency)

    from the DIT, GOI empanelled list.

    g. To supervise the installation,commissioning of IT infrastructure at

    Central Server Location and also at each

    district location. After the installation of

    infrastructure Consultant would submit

    their report to the District Nodal

  • 8/13/2019 Final DPR_eDist Arunachal

    53/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 53

    STAKEHOLDER

    GROUP/NAME

    ROLES & RESPONSIBILITIES LEVEL OF INFLUENCE

    officer/collector. Final acceptance is to

    be given by the District Nodal

    Officer/District Collector.

    h. Prepare RFP for Statewide rolloutincluding works of Data Entry and Site

    preparation.

    i. To provide one dedicated manpower ateach district for project coordination for

    3 years.

    j. To supervise the rollout.k. To design the post implementation

    guidelines including defining the role

    and responsibilities of Joint Entity (PPP

    option) and its stake holders for

    Operation and Maintenance phase.

    l. To handover the project to the abovestate Joint Entity.

    System

    Integrator/

    Implementation

    Agency

    a. Software Development includingdevelopment of UAT procedures and

    test cases.

    b. Procurement and commissioning of ITinfrastructure,

    c. Site preparation, data digitization anddeployment of application in State Data

    Centre.

    d. User Traininge. Rollout in the Districtf. Interface with front end delivery centers

    HIGH

  • 8/13/2019 Final DPR_eDist Arunachal

    54/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 54

    STAKEHOLDER

    GROUP/NAME

    ROLES & RESPONSIBILITIES LEVEL OF INFLUENCE

    for applications go live

    g. Provide application and system supportin SDC for e-District

    h. Provide help desk support during andafter implementation

    i. Provide hand hold support afterimplementation at district level

    Project

    Assessment

    Partner

    To carry out the field study in order to assess the

    impact of e delivery and give feedback about the

    impediments and difficulties in the accessing the

    services and information

    MEDIUM

  • 8/13/2019 Final DPR_eDist Arunachal

    55/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 55

    4.2 SERVICES AND SERVICE LEVELS

    Government of India has identified 5 service categories (Issue of certificates, Social welfare schemes,

    Revenue Court, Ration Card, RTI services) at the national level which shall be taken up for

    implementation by the states. As per the discussion with the DC offices following sub-services have

    been taken into consideration under these core categories along with two additional services during the

    implementation of the project in Arunachal Pradesh.

    Sl No. Service Categories SubServices Existing Service Level

    1 Certificates 1) Identity Card Minimum 7 days

    2) Income Certificates Minimum 7 days

    3) Permanent Resident Certificates Minimum 7 days

    4) Temporary Resident Certificates Minimum 7 days

    5) Caste Certificates (ST) Minimum 7 days

    6) Permanent Inner Line Pass (ILP) Maximum 7 days

    7)Temporary Inner Line Pass (ILP) Maximum 3 days

    8) Domicile Certificates Maximum 7 days

    9) Gapping Certificate Minimum 7 Days

    2 Land Management 1) Issuance of the Land Possession

    Certificate

    Minimum 20-25 days

    5) Issuance of the Land Allotment

    Certificate

    Minimum 20-25 days

    6) Issuance of the Mortgage Certificate Minimum 20-25 days

    7) Tax Collection Certificate Minimum 20-25 days

    5) Generation of Notice for Default Minimum 20-25 days

    6) Property Deed Certificate Minimum 20-25 days

    3 Social Welfare 1. Old Age Pension Maximum 7 days

    2. Family Benefit Scheme Maximum 14 days

    3. Disability Certificate Maximum 14 days

    4 RTI/Grievances

    Services

    1) Providing information Maximum 7 days

    2) Grievance and Complaints relatedservices

    Maximum 7 days

    5 Arms license 1) Issue of New License Minimum 7-14 days after

    getting police verification

    report.

  • 8/13/2019 Final DPR_eDist Arunachal

    56/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 56

    2) Issue of Duplicate / Modification of

    License

    Minimum 7-14 days

    3) Renewal of License Minimum 7-14 days

    6 PDS 1) Addition of Name Minimum 14 days

    4) Deletion of Name Minimum 14 days

    5) Change of Address Minimum 14 days

    7 Issuance of Trade

    License

    5) Application for new Trade License Minimum 7 days

    6) Renewal of Trade License Minimum 7 days

    7) Inclusion of Items Minimum 7 days

    8) Deletion of Items Minimum 7 days

    8 Election 5) Application for New Name Maximum 7 days

    6) Application for Deletion of Name Maximum 7 days

    7) Application for Correction of field Maximum 7 days

    8) Application for Transposition Maximum 7 days

    9 Population

    Registration

    1) Birth Certificate Maximum 7 days

    2) Death Certificate Maximum 7 days

    10 Miscellaneous 1) Issuance of Employment card Maximum 21 days

    2) Marriage Certificate Maximum 7 days

    3) Character Certificate Maximum 3-4 days

    4) Medical Fitness Certificate Maximum 7 days

  • 8/13/2019 Final DPR_eDist Arunachal

    57/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 57

    Implementation PhaseDevelopment of

    ApplicationInstallation of IT

    InfrastructureUser Training

    Development Phase

    Preparation of RFP Capacity BuildingWorkshop Selection of Vendor

    Design Phase

    Finalization of ServicesBusiness Process

    ReengineeringLegal Changes

    Inception Phase

    Selection of Consultant As-IS Assessment

    4.3 IMPLEMENTATION STRATEGY

    i. Identification/Notification of State Agencies:

    The State Department of IT, Govt. of Arunachal Pradesh needs to identify a nodal

    agency called SDA (State Designated Agency) for successful implementation of the

    project in the state.

    ii. Preparation & approval of Detailed Project Report (DPR):

    Following the preparation of the DPR, it will be submitted to the DIT, GoI for approval.

    On administrative and financial approval and the same would be communicated to the

    State / State Designated Agency for project initiation.

    iii. Selection of the Implementation Support Agency(ISA)

    The State will select the project consultant from the DIT empanelled list, who would be assigned

    by DIT, GoI for the estimated Project period, who will be responsible for providing day to day

    implementation support to

    iv. Finalization of Service Levels and Business Process Reengineering (BPR)

    Prior to the start of the implementation, for the identified services which have been included

    for the rollout , the State will undertake a comprehensive study of the existing processes for

    service delivery, to identify areas for improvement across the selected services. This

  • 8/13/2019 Final DPR_eDist Arunachal

    58/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 58

    improvement would be aimed at achieving service levels for each of the service, to be approved

    by the State as a standard prior to the actual implementation of the pilot. The following

    documents need to be prepared and submitted:

    a) Documentation of the existing process of service delivery across the e-District Servicesb) Existing Services Levelsc) Proposed Service Levels, based upon benchmarking / opportunities for improvementd) Identification of Business Process Reengineering requirement to achieve the proposed

    service levels, including areas where legal changes would be required.

    e) Documentation of To-Be Process maps in line with the BPR proposedf) Cost Benefit Analysis of the proposed changes

    v. Project Implementation

    Following the State approval of the service levels and BPR required for implementing, the DeGSwould initiate the development of the following documents:

    i. BPR and Change Management Planii. IT Infrastructure Up gradation Plan

    iii. Procurement and Financial Management Planiv. Site Preparation Planv. Functional Requirement Specifications for the re-engineered Processes

    vi. System Design Document and SRSvii. Training Requirement

    At the same time the SDA would also initiate steps for the identification of a technical partner as

    the Application Developer. The activities relating to procurement, site identification,

    preparation, and installation of hardware would have to be simultaneously coordinated by the

    implementing agencies both at the State and district level. Imparting the training is an crucial

    component which will be carried out simultaneously.

    The SDA/DeGS would ensure data digitization of requisite records by within the agreed time

    frame. The SDA/DeGS would ensure development, completion and successful testing of

    application software by the Application Developer. The SDA/DeGS would ensure end-to-end

    implementation of the project within the project timeline and cost.

    vi.Independent Outcome Assessment: Following the implementation of the project, the

    independent assessment of the outcome of the project in line with the outcome envisaged will

    be carried out by the appoint a third party by DIT

  • 8/13/2019 Final DPR_eDist Arunachal

    59/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 59

    4.4 Key Activities

    4.4.1 Hardware Assessment

    The hardware assessment includes the hardware required at the DC office, Sub-Division Office and Block

    offices. The figures mentioned here are indicative and is based on the users responsible for processing

    the application under a particular service. The hardware assessment also includes the requirement of

    digital signature. Operating System License, Antivirus License and MS-Office license has also been taken

    into consideration. As per the National Rollout guideline of e-District MMP Section 6.8.2. (B);the IT

    infrastructure created under SDC, SWAN, CSC, State Portal, SSDG and any other MMP should be

    leveraged for the Implementation of e-District Project. This has been given due diligence and final

    hardware requirement have come up after considering all the initiatives . Required licenses will be

    provided for the infrastructure available at the SDC for efficient helpdesk management and performance

    management of e-District application. Bill of Material of hardware required at each office is mentioned

    in the below given table. (The numbers mentioned here are indicative).

    Existing Hardware at DC Office

    Sl

    No.

    Section Desktop Printer

    /MFP

    Remark

    1. DC Cell 3 3 IT Infrastructure is around three year old and

    there is no Maintenance contract exists.2. Election Cell 6 3 IT Infrastructure is around three year old and

    there is no Maintenance contract exists.

    3 Land 3 2 IT Infrastructure is around five year old and

    there is no Maintenance contract exists.

    4 Judicial 2 1 IT Infrastructure is around Five year old and

    there is no Maintenance contract exists.

    5 PDS Cell 2 1 IT Infrastructure is around three year old and

    there is no Maintenance contract exists.

    6 Jan-Subidha 6 6 IT Infrastructure is around one year old and

    there is no Maintenance contract exists.

  • 8/13/2019 Final DPR_eDist Arunachal

    60/116

    Detailed Project Report for State wide Roll-Out of Project e-District

    Wipro LTD 60

    Though as per the above table some Desktop Computers, Printers exists in the DC offices but many of

    them are over 5 years old and dont have any maintenance contract. Thus it is proposed that all the DC

    offices, ADC (HQ) offices, SDO/EAC(HQ) offices, Circle Offices and BDO offices will have set of new

    infrastructure to implement the project.

    The Existing Manpower at the District Administration:

    District Name DC Office ADC Office Circle office EAC BDO office

    East Kameng 92 14 2 3 8

    Changlang 130 16 2 3 8

    Lohit (Tezu) 84 13 2 3 8

    Upper Siang 160 18 2 3 14

    Tawang 126 16 2 3 7

    East Siang 58 13 3 3 5

    Anjaw 56 15 3 3 5

    a. Estimated Hardware Requirement at DC office:

    Item/Component Qty in Numbers Cost per unit Total Cost

    Laptop (Including OS License) 1 50000 50000

    Desktop (including OS and UPS) 20 45000 900000

    Printer 6 8000 48000

    MFPs 8 20000 160000

    Digital Signature 21 750 15750

    Antivirus Software License (3 years) 21 3600 75600

    MS-Office License 21 15000 315000

    10 KVA Generator Set 1 1000000 1000000

    Total Cost for each DC office 2564350

    Total Cost for 17 DC office (In Rs. Lakhs) 435.94

    * The Requirement is indicative for costing purpose. Actual requirement to be finalized after To-Be

    Exercise.

  • 8/13/2019 Final DPR_eDist Arunachal

    61/116

    Detailed Project Report