    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DESIGN OBJECTIVES

    Statement of the ProblemSeven BTS sites, with one considered as the Hub station are to be connected in a ring

    topology considering a fiber in the loop system. The hub station is located Masambong, Quezon

    City and the six base transceiver stations are located within Del Monte Avenue, Roosevelt

    Avenue and West Avenue, Quezon City. The team is to connect the hub and the base

    transceiver stations and provide within this Fiber in the loop system an FOC service facility.

    The Objectives of the Outside Plant design are as follows:

    y To design an outside plant using fiber optic cables that will provide the seven stations ina synchronous digital hierarchy ring employing underground, aerial connection or

    combination of the two.

    y To propose an outside plant design using fiber optic cables via a ring topology to provideconnection on six base transceiver stations with one acting as the hub. The hub is

    located at Masambong Quezon City and the others are distributed within the areas of

    Del Monte Avenue, Roosevelt Avenue and West Avenue, Quezon City

    y To design a fiber optic transmission system that will meet the required loading of thetopology mentioned earlier.

    y And most importantly, to be able to apply what we have learned in our lecture class andbe able to utilize what we have learned in order to design an outside plant employing

    fiber in the loop system as prescribed by the instructor.

  • 8/9/2019 Final Documentation_Outside Plant Design

    2/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DESIGN PROCEDURES

    PLANNING

    o Plotting the location of the base transceiver station on a street map.o Visiting the location for site surveying.o Identifying the shortest cable route linking the stations creating a ring topology with no

    common pole used and intersection within the connections.

    FIELD WORK

    o Locating the hub to start the field survey.o Familiarizing the assigned area hub station and base transceiver stations.o Verifying the field if aerial cable installation is allowed.o Measuring distances of each post to be installed in the area of route.o Identifying the following information for each post.

    o type of posto type of extension armo type of guyo exact location and distances for each posto if new pole is needed

    DOCUMENTATION

    o Gathering all the data from the field survey.o Drawing the detailed engineering plan.o

    Choosing properly the equipment to be used based from the design requirements (e.g.STM, fiber optic cable, etc.).

    o Computing for the fiber optic transmission power budget.o Identifying the bill of material.o Compiling and finalizing the documentation parts.

  • 8/9/2019 Final Documentation_Outside Plant Design

    3/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DESIGN ASSUMPTIONS

    The following are the restrictions and guidelines for this design:

    y Any pole can be used.y Any commercially available materials may be used.y Consider green fields and blue skies.y Provide different cable routes in employing the ring topology.y Use Single Mode Fiber Optic Cable.y Fiber optic cable cutting length is 2km/reel.y Utilize short haul or long SDH design or EPON.y The telephone, switch or PBX, router if there is any, and multiplexer equipment may

    freely be chosen by the designer provided they work together seamlessly.

    y E1/TDM, SDH, PDH or Ethernet may be used as transmission carrier.

  • 8/9/2019 Final Documentation_Outside Plant Design

    4/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

    BTS1-HUB

    BTS4

    BTS3

    BTS2

    BTS5

    BTS6

    BTS7

  • 8/9/2019 Final Documentation_Outside Plant Design

    5/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    TRANSMISSION NETWORK

    BTS2(Tolentino)

    BTS3

    (Paltok)

    BTS6(Baler, QC)

    BTS5(Examiner)

    BTS4

    (OneExecutive

    Office)

    BTS7(Roosevelt)

    BTS1-HUB(Masambong)

    STM-4

  • 8/9/2019 Final Documentation_Outside Plant Design

    6/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    TRANSMISSION NETWORK COMPUTATION

    Choose STM-4 SDH ring since STM-4 has a capacity of 252 E1/622 Mbps.

    Group 1 E1 Loading

    BTS SitesGSM 900 GSM 1800 3G HSPA Broadband BTS Address

    Masambong (Hub) 2 3 4 4 40MbpsCorumi St. cor. Wayan St.,

    Bo. Masambong, Quezon

    City

    Tolentino QC 2 3 4 4 40MbpsDel Monte Avenue corner

    Tolentino, Quezon City

    Paltok 2 3 4 4 40MbpsNFA Bldg. Del Monte Ave.

    cor. Aragon St. Paltok

    One Executive Office 2 3 4 4 40MbpsWest Avenue cor Col.

    Martinez St., Quezon City,

    Metro Manila

    Examiner 2 3 4 4 40Mbps#67 West Ave. cor. Examiner

    St., Paltok

    Baler QC 2 3 4 4 40MbpsMiller Avenue cor. Bayaya

    St. Brgy. Bungad

    Roosevelt 2 3 4 4 40MbpsPMI College Building,

    Roosevelt Ave., Quezon City

    Total 14 21 28 28 280Mbps

  • 8/9/2019 Final Documentation_Outside Plant Design

    7/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Assumptions

    Fade margin is 5dB

    A splicing every 3km will be considered

    Short-haul transmission

    Equipment Specifications (based from manufacturers data sheet)

    Single Mode Fiber Optic Cable Attenuation (at 1310 nm) 0.35 dB/km

    Maximum Transmit Power -8 dBm

    Minimum Receiver Sensitivity -28 dBm

    Connector Loss 0.2 dB

    Splicing Loss 0.15 dB/splice

    Fade Margin 5 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    8/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 1 Masambong (HUB) to Tolentino

    Total Distance = 735.6 m

    Power Budget

    Power Budget = Max Transmit Power Receive Threshold

    Power Budget = -8 dBm (-28 dBm)

    Power Budget = 20 dB

    Total Link Loss

    Total Link Loss = FOC Loss + Connector Loss + Splicing Loss + Fade Margin

    FOC Loss = Total Distance x FOC Attenuation

    FOC Loss = 0.7356km x 0.35 dB/km

    FOC Loss = 0.25746 dB

    Connector Loss = Connector Loss x No. of Connectors

    Connector Loss = 0.2 dB x 2

    Connector Loss = 0.4 dB

    Splicing Loss = Splicing Loss x No. of Splice

    Splicing Loss = 0.15 dB x 0

    Splicing Loss = 0 dB

    Fade Margin = 5 dB

    Total Link Loss = 0.25746 dB + 0.4 dB + 0dB + 5 dB

    Total Link Loss =5.65746 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    9/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Power Margin

    Power Margin = Power Budget Total Link Loss

    Power Margin = 20 dB 5.65746 dB

    Power Margin = 14.34254 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    10/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 2 Tolentino to Paltok

    Total Distance = 619.31 m

    Power Budget

    Power Budget = Max Transmit Power Receive Threshold

    Power Budget = -8 dBm (-28 dBm)

    Power Budget = 20 dB

    Total Link Loss

    Total Link Loss = FOC Loss + Connector Loss + Splicing Loss + Fade Margin

    FOC Loss = Total Distance x FOC Attenuation

    FOC Loss = 0.61931 km x 0.35 dB/km

    FOC Loss = 0.2166 dB

    Connector Loss = Connector Loss x No. of Connectors

    Connector Loss = 0.2 dB x 2

    Connector Loss = 0.4 dB

    Splicing Loss = Splicing Loss x No. of Splice

    Splicing Loss = 0.15 dB x 1

    Splicing Loss = 0.15 dB

    Fade Margin = 5 dB

    Total Link Loss = 0.2166 dB + 0.4 dB + 0.15 dB + 5 dB

    Total Link Loss = 5.7666 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    11/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Power Margin

    Power Margin = Power Budget Total Link Loss

    Power Margin = 20 dB 5.7666 dB

    Power Margin = 14.2334 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    12/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 3 Paltok to Baler, QC

    Total Distance = 1242.6 m

    Power Budget

    Power Budget = Max Transmit Power Receive Threshold

    Power Budget = -8 dBm (-28 dBm)

    Power Budget = 20 dB

    Total Link Loss

    Total Link Loss = FOC Loss + Connector Loss + Splicing Loss + Fade Margin

    FOC Loss = Total Distance x FOC Attenuation

    FOC Loss = 1.2426 km x 0.35 dB/km

    FOC Loss = 0.43491 dB

    Connector Loss = Connector Loss x No. of Connectors

    Connector Loss = 0.2 dB x 2

    Connector Loss = 0.4 dB

    Splicing Loss = Splicing Loss x No. of Splice

    Splicing Loss = 0.15 dB x 0

    Splicing Loss = 0 dB

    Fade Margin = 5 dB

    Total Link Loss = 0.4349 dB + 0.4 dB + 0 dB + 5 dB

    Total Link Loss = 5.8349 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    13/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Power Margin

    Power Margin = Power Budget Total Link Loss

    Power Margin = 20 dB 5.8349 dB

    Power Margin = 14.1651 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    14/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 4 Baler to Examiner

    Total Distance = 958.2 m

    Power Budget

    Power Budget = Max Transmit Power Receive Threshold

    Power Budget = -8 dBm (-28 dBm)

    Power Budget = 20 dB

    Total Link Loss

    Total Link Loss = FOC Loss + Connector Loss + Splicing Loss + Fade Margin

    FOC Loss = Total Distance x FOC Attenuation

    FOC Loss = 0.9582 km x 0.35 dB/km

    FOC Loss = 0.33537 dB

    Connector Loss = Connector Loss x No. of Connectors

    Connector Loss = 0.2 dB x 2

    Connector Loss = 0.4 dB

    Splicing Loss = Splicing Loss x No. of Splice

    Splicing Loss = 0.15 dB x 1

    Splicing Loss = 0.15 dB

    Fade Margin = 5 dB

    Total Link Loss = 0.33537 dB + 0.4 dB + 0.15 dB + 5 dB

    Total Link Loss = 5.88537 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    15/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Power Margin

    Power Margin = Power Budget Total Link Loss

    Power Margin = 20 dB 5.88537 dB

    Power Margin = 14.11463 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    16/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 5 Examiner to One Executive Office

    Total Distance = 890.7 m

    Power Budget

    Power Budget = Max Transmit Power Receive Threshold

    Power Budget = -8 dBm (-28 dBm)

    Power Budget = 20 dB

    Total Link Loss

    Total Link Loss = FOC Loss + Connector Loss + Splicing Loss + Fade Margin

    FOC Loss = Total Distance x FOC Attenuation

    FOC Loss = 0.8907 km x 0.35 dB/km

    FOC Loss = 0.3117 dB

    Connector Loss = Connector Loss x No. of Connectors

    Connector Loss = 0.2 dB x 2

    Connector Loss = 0.4 dB

    Splicing Loss = Splicing Loss x No. of Splice

    Splicing Loss = 0.15 dB x 0

    Splicing Loss = 0 dB

    Fade Margin = 5 dB

    Total Link Loss = 0.3117 dB + 0.4 dB + 0 dB + 5 dB

    Total Link Loss = 5.7117 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    17/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Power Margin

    Power Margin = Power Budget Total Link Loss

    Power Margin = 20 dB 5.7117 dB

    Power Margin = 14.2883 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    18/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 6 One Executive Office to Roosevelt

    Total Distance = 1032 m

    Power Budget

    Power Budget = Max Transmit Power Receive Threshold

    Power Budget = -8 dBm (-28 dBm)

    Power Budget = 20 dB

    Total Link Loss

    Total Link Loss = FOC Loss + Connector Loss + Splicing Loss + Fade Margin

    FOC Loss = Total Distance x FOC Attenuation

    FOC Loss = 1.032 km x 0.35 dB/km

    FOC Loss = 0.3612 dB

    Connector Loss = Connector Loss x No. of Connectors

    Connector Loss = 0.2 dB x 2

    Connector Loss = 0.4 dB

    Splicing Loss = Splicing Loss x No. of Splice

    Splicing Loss = 0.15 dB x 1

    Splicing Loss = 0.15 dB

    Fade Margin = 5 dB

    Total Link Loss = 0.3612 dB + 0.4 dB + 0.15 dB + 5 dB

    Total Link Loss = 5.9112 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    19/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Power Margin

    Power Margin = Power Budget Total Link Loss

    Power Margin = 20 dB 5.9112 dB

    Power Margin = 14.0888 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    20/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 7 Roosevelt to Masambong (HUB)

    Total Distance = 2692.2 m

    Power Budget

    Power Budget = Max Transmit Power Receive Threshold

    Power Budget = -8 dBm (-28 dBm)

    Power Budget = 20 dB

    Total Link Loss

    Total Link Loss = FOC Loss + Connector Loss + Splicing Loss + Fade Margin

    FOC Loss = Total Distance x FOC Attenuation

    FOC Loss = 2.6292 km x 0.35 dB/km

    FOC Loss = 0.9202 dB

    Connector Loss = Connector Loss x No. of Connectors

    Connector Loss = 0.2 dB x 2

    Connector Loss = 0.4 dB

    Splicing Loss = Splicing Loss x No. of Splice

    Splicing Loss = 0.15 dB x 2

    Splicing Loss = 0.3 dB

    Fade Margin = 5 dB

    Total Link Loss = 0.9202 dB + 0.4 dB + 0.3 dB + 5 dB

    Total Link Loss = 6.6202 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    21/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Power Margin

    Power Margin = Power Budget Total Link Loss

    Power Margin = 20 dB 6.6202 dB

    Power Margin = 13.3798 dB

  • 8/9/2019 Final Documentation_Outside Plant Design

    22/100

    MAPA INSTITUTE OF TECHNOLOGY Communications 5 Design:Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DETAILED OUTSIDE PLANT DESIGN

  • 8/9/2019 Final Documentation_Outside Plant Design

    23/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

    SINGLE- LINE DIAGRAM

  • 8/9/2019 Final Documentation_Outside Plant Design

    24/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    25/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    26/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    27/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    28/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    29/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    30/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    31/100

  • 8/9/2019 Final Documentation_Outside Plant Design

    32/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    33/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    34/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    35/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    36/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    37/100

    MAPA INSTITUTE OF TECHNOLOGYCommuni

    S C H O O L O F E E - E c E - C p E

  • 8/9/2019 Final Documentation_Outside Plant Design

    38/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    BILL OF MATERIALS

    ITEM NO. DESCRIPTION QUANTITY UNIT

    1Standard ADSS-Single Mode Fiber Optic Cable

    (2km/reel)5 reels

    2Cisco 7600 Series 1-Port Channelized OC-12/STM-4 to

    DS3/E3 OSM Multiplexer7 pcs.

    3SC Zirconia Ferrule 126um/3mm (cladding/jacket) Single

    Mode Connector19 pcs.

    4 44 Extension Arm 138 pcs

    5 26 Extension Arm 55 pcs.6 Sidewalk Guy 168 pcs.

    7 Side Guy 6 pcs.

    8 Messenger Guy 5 pcs.

    10-pin Alley Arm 36 Pcs.

  • 8/9/2019 Final Documentation_Outside Plant Design

    39/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    POLE PICTURES

    Link 1 Masambong (HUB) to Tolentino

    CR1

    CR2

    CR3

    DM1

  • 8/9/2019 Final Documentation_Outside Plant Design

    40/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DM2

    DM3

    DM4

    DM5

  • 8/9/2019 Final Documentation_Outside Plant Design

    41/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DM6

    DM7

    DM8

    DM9

  • 8/9/2019 Final Documentation_Outside Plant Design

    42/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DM10

    DM11

    DM12

    DM13

  • 8/9/2019 Final Documentation_Outside Plant Design

    43/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DM14

    DM15

    DM16

    DM17

  • 8/9/2019 Final Documentation_Outside Plant Design

    44/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DM18

    DM19

    PROPOSED POLE

    BTS1

  • 8/9/2019 Final Documentation_Outside Plant Design

    45/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 2 Tolentino to Paltok

    DM20

    DM21

    DM22

    DM23

  • 8/9/2019 Final Documentation_Outside Plant Design

    46/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DM24

    DM25

    DM26

    DM27

  • 8/9/2019 Final Documentation_Outside Plant Design

    47/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DM28

    DM29

    DM30

    DM31

  • 8/9/2019 Final Documentation_Outside Plant Design

    48/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DM32

    DM33

    DM34

    DM35

  • 8/9/2019 Final Documentation_Outside Plant Design

    49/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    DM36

    PROPOSED POLE

    DM37

    AR1

    BTS2-PALTOK

  • 8/9/2019 Final Documentation_Outside Plant Design

    50/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 3 Paltok to Baler, QC

    AR2

    AR3

    AR4

    AR5

  • 8/9/2019 Final Documentation_Outside Plant Design

    51/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    AR6

    AR7

    AR8

    PM1

  • 8/9/2019 Final Documentation_Outside Plant Design

    52/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    PM2

    PM3

    JJL1

    JJL2

  • 8/9/2019 Final Documentation_Outside Plant Design

    53/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    JJL3

    JJL4

    JJL5

    JJL6

  • 8/9/2019 Final Documentation_Outside Plant Design

    54/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    JJL7

    JJL8

    JJL9

    JJL10

  • 8/9/2019 Final Documentation_Outside Plant Design

    55/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    JJL11

    JL12

    JJL13

    JJL14

  • 8/9/2019 Final Documentation_Outside Plant Design

    56/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    JL15

    JJL16

    BY1

    BY2

  • 8/9/2019 Final Documentation_Outside Plant Design

    57/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    BY3

    BY4

    BY5

    BY6

  • 8/9/2019 Final Documentation_Outside Plant Design

    58/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    BY7

    BY8

    ML1

    PROPOSED POLE

    ML2

  • 8/9/2019 Final Documentation_Outside Plant Design

    59/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    BTS3-BALER QC

  • 8/9/2019 Final Documentation_Outside Plant Design

    60/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 4 Baler QC to Examiner

    ML3

    ML4

    ML5

    ML6

  • 8/9/2019 Final Documentation_Outside Plant Design

    61/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    ML7

    ML8

    ML9

    ML10

  • 8/9/2019 Final Documentation_Outside Plant Design

    62/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    ML11

    ML12

    ML13

    ML14

  • 8/9/2019 Final Documentation_Outside Plant Design

    63/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    ML15

    ML16

    ML17

    ML18

  • 8/9/2019 Final Documentation_Outside Plant Design

    64/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    ML19

    PROPOSED POLE

    ML20

    WA1

    WA2

  • 8/9/2019 Final Documentation_Outside Plant Design

    65/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    WA3

    WA4

    WA5

    WA6

  • 8/9/2019 Final Documentation_Outside Plant Design

    66/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    WA7

    WA8

    WA9

    BTS4-EXAMINER

  • 8/9/2019 Final Documentation_Outside Plant Design

    67/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 5 Examiner to One

    Executive Office

    WA10

    WA11

    WA12

    WA13

  • 8/9/2019 Final Documentation_Outside Plant Design

    68/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    WA14

    WA15

    WA16

    WA17

  • 8/9/2019 Final Documentation_Outside Plant Design

    69/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    WA18

    WA19

    WA20

    WA21

  • 8/9/2019 Final Documentation_Outside Plant Design

    70/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    WA22

    WA23

    WA24

    WA25

  • 8/9/2019 Final Documentation_Outside Plant Design

    71/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    WA26

    WA27

    WA28

    WA29

  • 8/9/2019 Final Documentation_Outside Plant Design

    72/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    WA30

    WA31

    BTS5-ONE EXECUTIVE OFFICE

  • 8/9/2019 Final Documentation_Outside Plant Design

    73/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 6 One Executive Office to

    Roosevelt

    WA32

    WA33

    QA1

    QA2

  • 8/9/2019 Final Documentation_Outside Plant Design

    74/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    QA3

    QA4

    QA5

    QA6

  • 8/9/2019 Final Documentation_Outside Plant Design

    75/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    QA7

    QA8

    QA9

    QA10

  • 8/9/2019 Final Documentation_Outside Plant Design

    76/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    QA11

    QA12

    QA13

    QA14

  • 8/9/2019 Final Documentation_Outside Plant Design

    77/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    QA15

    PROPOSED POLE

    QA16

    QA17

    QA18

  • 8/9/2019 Final Documentation_Outside Plant Design

    78/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    QA19

    QA20

    QA21

    QA22

  • 8/9/2019 Final Documentation_Outside Plant Design

    79/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    QA23

    QA24

    QA25

    RV1

  • 8/9/2019 Final Documentation_Outside Plant Design

    80/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    RV2

    PROPOSED POLE

    GL1

    BTS6 ROOSEVELT

  • 8/9/2019 Final Documentation_Outside Plant Design

    81/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    Link 7 Roosevelt to

    Masambong (HUB)

    GL2

    GL3

    GL4

    GL5

  • 8/9/2019 Final Documentation_Outside Plant Design

    82/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GL6

    GL7

    GL8

    GL9

  • 8/9/2019 Final Documentation_Outside Plant Design

    83/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GL10

    GL11

    GL12

    PROPOSED POLE

    QA26

  • 8/9/2019 Final Documentation_Outside Plant Design

    84/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    QA27

    QA28

    QA29

    QA30

  • 8/9/2019 Final Documentation_Outside Plant Design

    85/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    QA31

    QA32

    QA33

    QA34

  • 8/9/2019 Final Documentation_Outside Plant Design

    86/100

  • 8/9/2019 Final Documentation_Outside Plant Design

    87/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GA3

    GA4

    GA5

    GA6

  • 8/9/2019 Final Documentation_Outside Plant Design

    88/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GA7

    PROPOESED POLE

    GA8

    GA9

    GA10

  • 8/9/2019 Final Documentation_Outside Plant Design

    89/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GA11

    PROPOSED POLE

    GA12

    Proposed Pole

    GA13

    GA14

  • 8/9/2019 Final Documentation_Outside Plant Design

    90/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GA15

    GA16

    GA17

    GA18

  • 8/9/2019 Final Documentation_Outside Plant Design

    91/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GA19

    GA20

    GA21

    PROPOSED POLE

    GA22

  • 8/9/2019 Final Documentation_Outside Plant Design

    92/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GA23

    GA24

    GA25

    GA26

  • 8/9/2019 Final Documentation_Outside Plant Design

    93/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GA27

    GA28

    GA29

    GA30

  • 8/9/2019 Final Documentation_Outside Plant Design

    94/100

  • 8/9/2019 Final Documentation_Outside Plant Design

    95/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GA35

    PROPOSED POLE

    GA36

    GA37

    GA38

  • 8/9/2019 Final Documentation_Outside Plant Design

    96/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    GA39

    GA40

    PROPOSED POLE

    WY1

    PROPOSED POLE

    WY2

    PROPOSED POLE

  • 8/9/2019 Final Documentation_Outside Plant Design

    97/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    WY3

    WY4

    WY5

    WY6

  • 8/9/2019 Final Documentation_Outside Plant Design

    98/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    WY7

    WY8

    HUB-WAYAN

  • 8/9/2019 Final Documentation_Outside Plant Design

    99/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    S C H O O L O F E E - E c E - C p E Page

    ATTTACHMENTS

    (BROCHURES AND GROUP PICTURE)

  • 8/9/2019 Final Documentation_Outside Plant Design

    100/100

    MAPA INSTITUTE OF TECHNOLOGYCommunications 5 Design:

    Outside Plant Design

    TABLE OF CONTENTS

    1. Design Objectives 12. Design Procedures 23. Assumptions 34. Vicinity Map 45. Transmission Network ` 5

    y Transmission Network Computation 66. Detailed OSP Design 227. Bill of Materials 388. Pole Pictures 399. Attachments 99

    y Brochuresy Group Picture