Final Design Meeting September 25, 2014 Creating Bridges As Art® 1 Welcome & Introductions Terry Ward - Project Manager 2

Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Final Design Meeting September 25, 2014

Creating Bridges As Art®

1

Welcome & Introductions

Terry Ward - Project Manager

2

Page 2: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

VQRC Final Design Meetings

Meeting Date Items for Discussion

Final Design Meeting #1

February 4, 2014 Bridge Piers and Overlooks

Final Design Meeting #2

March 18, 2014Bridge Pier Refinements

Abutments, Retaining Walls and Pedestrian Railing

Final Design Meeting #3

May 20, 2014Abutment and Railing

Refinements, Bridge Color, Aesthetic Lighting

Final Design Meeting #4

TodayBridge Lighting, Trail Update,

Feature Refinements, Summary/Next Steps

3

Bridge Lighting

4

Page 3: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck Lighting

5

Deck Lighting - Concept from Preliminary Design VQRC Meetings

Replicate historic light poles (approaches) and down lights (within truss)

New bridge: Pole mounted LED lights on barrier between sidewalk and roadway. Enhanced pole and luminaire preferred

6

Page 4: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck Lighting - Light Pole Configuration

7

Deck Lighting - Light Pole ConfigurationOption 1: Light Provided By Roadway Fixtures

Roadway lights

8

Page 5: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck Lighting - Light Pole ConfigurationOption 1: Light Provided By Roadway Fixtures

9

Deck Lighting - Pedestrian/TrailOption 1: Light Provided By Roadway Fixtures

10

Page 6: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck Lighting - Pedestrian/TrailOption 1: Light Provided By Roadway Fixtures

11

Deck Lighting - Light Pole ConfigurationOption 2: Light Provided By Roadway Fixtures Plus Separate Trail Fixture At Each Overlook

Trail Lights

Roadway lights

12

Page 7: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck Lighting - Light Pole ConfigurationOption 2: Light Provided By Roadway Fixtures Plus Separate Trail Fixture At Each Overlook

13

Deck Lighting - Pedestrian/TrailOption 2: Light Provided By Roadway Fixtures Plus Separate Trail Fixture At Each Overlook

14

Page 8: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck Lighting - Pedestrian/TrailOption 2: Light Provided By Roadway Fixtures Plus Separate Trail Fixture At Each Overlook

15

Deck Lighting - Light Pole ConfigurationOption 3: Separate Light Fixture For Roadway And Trail

Roadway Lights

Separate Trail Lights

Trail Lights

16

Page 9: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck Lighting - Light Pole ConfigurationOption 3: Separate Light Fixture For Roadway And Trail

17

Deck Lighting - Pedestrian/TrailOption 3: Separate Light Fixture For Roadway And Trail

18

Page 10: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck Lighting - Pedestrian/TrailOption 3: Separate Light Fixture For Roadway And Trail

19

Deck Lighting - Pedestrian/Trail Discussion

20

Page 11: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck LightingPedestrian/Trail Preferences

21

Deck Lighting - LED Fixtures

MnDOT Standard LED

Enhanced Fixture Type A

Enhanced Fixture Type B

22

Page 12: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

MnDOT Standard LED FixturesNext To Planned Fixture For Existing Bridge

Fixture Planned for Existing Bridge MnDOT Standard LED Fixture

23

MnDOT Standard LED Fixtures

24

Page 13: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

MnDOT Standard LED Fixtures

25

Enhanced Fixture Type ANext To Planned Fixture For Existing Bridge

Fixture Planned for Existing Bridge Enhanced Fixture Type A

26

Page 14: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Enhanced Fixture Type A

27

Enhanced Fixture Type A

28

Page 15: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Fixture Planned for Existing Bridge Enhanced Fixture Type B

Enhanced Fixture Type BNext To Planned Fixture For Existing Bridge

29

Enhanced Fixture Type B

30

Page 16: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Enhanced Fixture Type B

31

Deck Lighting Fixture Discussion

MnDOT Standard LED

Enhanced Fixture Type A

Enhanced Fixture Type B

Fixture Planned for Existing Bridge

Option for New Bridge

Fixture Planned for Existing Bridge

Option for New Bridge

Fixture Planned for Existing Bridge

Option for New Bridge

32

Page 17: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck LightingFixtures Preferences

33

Main Span Unit Aesthetic Lighting

34

Page 18: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Existing Bridge Aesthetic Lighting

LED dimable white lights

Light truss interior by washing interior side of truss members with light

(Renderings from Preliminary Design VQRC Meetings)

35

Existing Bridge Aesthetic Lighting

Wash of light on pier faces

(Renderings from Preliminary Design VQRC Meetings)

Wash of light on pier faces

36

Page 19: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Span Unit Aesthetic Lighting

Concepts to be finalized in Final Design Implementation to be agreed/coordinated between MnDOT and City

Wash of light on bottom of box girderLight interior

faces of main river piers

(Renderings from Preliminary Design VQRC Meetings)

New Bridge Initial Concept

37

Main Pier Lighting

38

Page 20: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Pier Lighting - Locations

Main River Piers(with overlooks)

Main Transition Piers

Latsch Island Winona

39

Bridge Overall View

40

Page 21: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Pier Lighting

41

Main Pier LightingOption 1 - Floodlights on sides and interior of twin wall columns with wash on bottom soffit of superstructure

42

Page 22: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Pier LightingOption 2 - Same as Option 1 plus two additional floodlights under overlook

43

Main Pier LightingOption 3 - Same as Option 2 plus linear outline of pier curves

44

Page 23: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Transition Pier Lighting

45

Transition Pier Lighting - Locations

Main River Piers(with overlooks)

Main Transition Piers

Latsch Island Winona

46

Page 24: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Bridge Overall View

47

Transition Pier

48

Page 25: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Transition Pier Lighting

Option A - No Lights

Option B - Floodlights on sides (Downlights)

49

Transition Pier LightingOption C - Floodlights on sides with wash on bottom soffit of superstructure

50

Page 26: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Span Unit Aesthetic LightingMain Pier Option 1 with Transition Pier (No Lights)

51

Main Span Unit Aesthetic LightingMain Pier Option 1 with Transition Pier Floodlights on Sides (Downlights)

52

Page 27: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Span Unit Aesthetic LightingMain Pier Option 1 with Transition Pier Floodlights on Sides and Light Wash on Superstructure

53

Main Span Unit Aesthetic LightingMain Pier Option 2 with Transition Pier (No Lights)

54

Page 28: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Span Unit Aesthetic LightingMain Pier Option 2 with Transition Pier Floodlights on Sides (Downlights)

55

Main Span Unit Aesthetic LightingMain Pier Option 2 with Transition Pier Floodlights on Sides and Light Wash on Superstructure

56

Page 29: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Span Unit Aesthetic LightingMain Pier Option 3 with Transition Pier (No Lights)

57

Main Span Unit Aesthetic LightingMain Pier Option 3with Transition Pier Floodlights on Sides (Downlights)

58

Page 30: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Span Unit Aesthetic LightingMain Pier Option 3with Transition Pier Floodlights on Sides and Light Wash on Superstructure

59

Option 1 with Transition Pier Floodlights on Sides (Downlights)

Option 1 with Transition Pier (No Lights)

Option 1 with Transition Pier Floodlights on Sides & Light Wash on Superstructure

60

Page 31: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Option 2 with Transition Pier Floodlights on Sides (Downlights)

Option 2 with Transition Pier (No Lights)

Option 2 with Transition Pier Floodlights on Sides & Light Wash on Superstructure

61

Option 3 with Transition Pier Floodlights on Sides (Downlights)

Option 3 with Transition Pier Floodlights on Sides & Light Wash on Superstructure

Option 3 with Transition Pier (No Lights)

62

Page 32: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Span Unit Aesthetic Lighting Discussion

Floodlights on Sides (Downlights)

Transition Pier (No Lights)

Floodlights on Sides & Light Wash on Superstructure

Option 2

Floodlights on Sides (Downlights)

Floodlights on Sides (Downlights)

Floodlights on Sides & Light Wash on Superstructure

Floodlights on Sides & Light Wash on Superstructure

Option 1

Transition Pier (No Lights) Transition Pier (No Lights)

Option 3

63

Main Span Unit Aesthetic Lighting Preferences

64

Page 33: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

South Abutment Lighting

65

South Abutment

66

Page 34: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

South Abutment

67

South Abutment Lighting Options

Option 1 Wash of Light

on Insets

Option 2 Spotlights on

Insets

Option 3Wash of Light on

Abutment Wall

68

Page 35: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

South Abutment LightingOption 1 - Wash of Light on Insets

69

South Abutment LightingOption 1 - Wash of Light on Insets

70

Page 36: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

South Abutment LightingOption 2 - Spotlights on Inset

71

South Abutment LightingOption 2 - Spotlights on Inset

72

Page 37: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

South Abutment LightingOption 3 - Wash of Light on Abutment Wall

73

South Abutment LightingOption 3 - Wash of Light on Abutment Wall

74

Page 38: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

South Abutment Lighting Discussion

Option 1 Wash of Light

on Insets

Option 2 Spotlights on

Insets

Option 3Wash of Light on

Abutment Wall

75

South Abutment Lighting Preferences

76

Page 39: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Pedestrian Trail Update

77

South Side Trails in Winona

(Image from Preliminary Design VQRC Meeting)

78

Page 40: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

North Side Trails on Latsch Island

Existing North Abutment

79

Existing North Abutment

80

Page 41: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Existing North Abutment

81

North Side Trails on Latsch Island

Rendering View

82

Page 42: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Latsch Island Trail Slope TreatmentStone Concrete

83

Page 43: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Latsch Island Trail Railing/Slope TreatmentOption 1 - Chain Link with Stone

85

Latsch Island Trail Railing/Slope TreatmentOption 1 - Chain Link with Concrete

86

Page 44: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Latsch Island Trail Railing/Slope TreatmentOption 2 - Enhanced Chain Link with Concrete

88

Page 45: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Latsch Island Trail Railing/Slope TreatmentOption 3 - Ornamental Metal with Concrete

90

Page 46: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Latsch Island Trail Railing/Slope Treatment DiscussionOption 1

Chain Link with Stone

Chain Link with Concrete

Option 2 Enhanced Chain Link

with Stone

Enhanced Chain Link with Concrete

Option 3Ornamental Metal

with Stone

Ornamental Metal with Concrete

91

Latsch Island Trail Railing/Slope Treatment Preferences

MINNESOTADE

PA

RT

ME

NT OF TRANSPO

RTA

TIO

N

92

Page 47: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Existing Historic Bridge (Bridge 5900) Update

Keith Molnau - Design Manager

93

Feature Refinements

94

Page 48: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Bridge ColorColor of existing historical bridge was sampled at various locations and times with color samples and photographs

Existing bridge color has variations

Rehabilitated bridge will have color similar to matched existing color

New bridge color to be selected for palette of compatible colors

95

Existing Bridge Color

96

Page 49: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Match Existing Bridge Color (with photo)

Existing Bridge Color177,165,146

97

Match Existing Bridge Color (color samples)

MnDOT Standard “Pearl Gray”

MnDOT Standard “Light Buff”

MnDOT Color Match Bridge 5900 Coating

MnDOT Color Match Bridge5900 Aged Concrete

98

Page 50: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Light Buff #33522Aged Concrete #23525

Photo Match

Surface Match #27722 Pearl Gray #26622

Match Existing

Bridge

99

Railing Color

Existing historic bridge truss and railing metal will be flat finish metallic color

New bridge railings will be metallic color with blue wave on pedestrian railing

100

Page 51: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Railing colorExact railing color on new bridge to be determined from palette of compatible colors with historic bridge

Comments?101

Entry Sign/MonumentMnDOT to discuss further with City of Winona

102

Page 52: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Summary of Preferred Features

103

VQRC Final Design Meetings

Meeting Date Items for Discussion

Final Design Meeting #1

February 4, 2014 Bridge Piers and Overlooks

Final Design Meeting #2

March 18, 2014Bridge Pier Refinements

Abutments, Retaining Walls and Pedestrian Railing

Final Design Meeting #3

May 20, 2014Abutment and Railing

Refinements, Bridge Color, Aesthetic Lighting

Final Design Meeting #4

TodayBridge Lighting, Trail Update,

Feature Refinements, Summary/Next Steps

104

Page 53: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Bridge Pier and Overlook Preferences

105

Bridge Pier Types

Main River Piers(with overlooks)

Main Transition Piers

Beam Piers

Flat Slab Transition Pier

Flat Slab Piers

Beam Piers

Latsch Island Winona

Five basic pier types:

106

Page 54: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main River Piers

107

Bridge Pier Types

Main River Piers(with overlooks)

Main Transition Piers

Beam Piers

Flat Slab Transition Pier

Flat Slab Piers

Beam Piers

Latsch Island Winona

Five basic pier types:

108

Page 55: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Main Transition Piers

109

Bridge Pier Types

Main River Piers(with overlooks)

Main Transition Piers

Beam Piers

Flat Slab Transition Pier

Flat Slab Piers

Beam Piers

Latsch Island Winona

Five basic pier types:

110

Page 56: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Beam Piers

111

Bridge Pier Types

Main River Piers(with overlooks)

Main Transition Piers

Beam Piers

Flat Slab Transition Pier

Flat Slab Piers

Beam Piers

Latsch Island Winona

Five basic pier types:

112

Page 57: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Flat Slab Transition Pier

113

Bridge Pier Types

Main River Piers(with overlooks)

Main Transition Piers

Beam Piers

Flat Slab Transition Pier

Flat Slab Piers

Beam Piers

Latsch Island Winona

Five basic pier types:

114

Page 58: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Flat Slab Pier

115

Abutment/Retaining Wall Preferences

116

Page 59: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

South Abutment and Retaining Wall (North Abutment Similar)

117

Abutment Connection Preferences

118

Page 60: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

South Abutment Connection Wall

119

Pedestrian Railing and Curb Preferences

120

Page 61: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Pedestrian Railing

Main River Piers(with overlooks)

RR Tracks

Latsch Island Winona

Three pedestrian railing types: 4’- 6” High Typical Railing6’- 0” High Typical Railing

* 6’ - 0” high railing approved by railroad (8’- 0” normally required)

4’ - 6” High Railing 6’ - 0” High Railing*

121

Typical 4’-6” Railing (Concrete Curb)

122

Page 62: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Typical 6’-0” Railing

123

Railing At Overlooks

124

Page 63: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Railing At Overlooks

125

Bridge/ Railing Color

126

Page 64: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Light Buff #33522Aged Concrete #23525

Photo Match

Surface Match #27722 Pearl Gray #26622

Match Existing

Bridge

127

Railing Color

Metallic Color

Powder Coated For Long Life & Low Maintenance

Blue

128

Page 65: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Bridge Lighting

129

Deck Lighting - Pedestrian/Trail

130

Page 66: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Deck Lighting Fixture

MnDOT Standard LED

Enhanced Fixture Type A

Enhanced Fixture Type B

Fixture Planned for Existing Bridge

Option for New Bridge

Fixture Planned for Existing Bridge

Option for New Bridge

Fixture Planned for Existing Bridge

Option for New Bridge

131

Main Span Unit Aesthetic Lighting Discussion

Floodlights on Sides (Downlights)

Transition Pier (No Lights)

Floodlights on Sides & Light Wash on Superstructure

Option 2

Floodlights on Sides (Downlights)

Floodlights on Sides (Downlights)

Floodlights on Sides & Light Wash on Superstructure

Floodlights on Sides & Light Wash on Superstructure

Option 1

Transition Pier (No Lights) Transition Pier (No Lights)

Option 3

132

Page 67: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

South Abutment Lighting

Option 1 Wash of Light

on Insets

Option 2 Spotlights on

Insets

Option 3Wash of Light on

Abutment Wall

133

Latsch Island Trail Railing/Slope TreatmentOption 1

Chain Link with Stone

Chain Link with Concrete

Option 2 Enhanced Chain Link

with Stone

Enhanced Chain Link with Concrete

Option 3Ornamental Metal

with Stone

Ornamental Metal with Concrete

134

Page 68: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Next Steps and Timeline

Construction will be in four (4) main stages:

Stage 1 Bridge 85851 (New) and site demolition

Stage 2 Roadway

Stage 3 Bridge 5900 (Rehabilitate existing)

Stage 4 Roadway/Landscaping

135

Construction StagingStage 1 - Bridge No. 85851 (New) & Site Demolition

136

Page 69: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Construction StagingStage 2 - Bridge No. 85851 (New) & Site Demolition

137

Construction StagingStage 2 - Roadway

138

Page 70: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Construction StagingStage 2 - Roadway

139

Construction StagingStage 3 - Bridge No. 5900

140

Page 71: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Construction StagingStage 3 - Bridge No. 5900

141

Construction StagingStage 4 - Roadway/Landscaping

142

Page 72: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Construction StagingStage 4 - Roadway/Landscaping

143

Current Construction ActivityConstruction access on the levee near Pier 10

144

Page 73: Final Design Meeting - MnDOT › winonabridge › docs › vqc › ... · VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting #1 February 4, 2014 Bridge

Current Construction ActivityMain Pier 11 cofferdam construction

145

Current Construction ActivityConstruction laydown area on Latsch Island

146