LITERATURE STUDY
•GALLERY•MINITHEATRE•AUDIOVISUAL ROOM•BLACKBOX ROOM
MelissaDeeptiShani
ShalakhaHelena
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 2/99
Kansas City ArtInstitute
INA ABRAMOVIC - GALLERY 1988
MARINA ABRAMOVIC - GALLER
Corcoran Gallery of Art
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 3/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 4/99
Galleries
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 5/99
1. exhibition rooms,
2. office
3. Auditorium
4. Storage space5. multiple-use event spaces
6. Spaces for refreshments, rest rooms etc(optional)
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 6/99
Leeds Art Gallery Exhibiton Room
Office space, AdvocateGallery, England
Guggenheim Museum, Bilbao Auditorium
Metropolitan museum of ar
Los Angeles CountryMuseum of Artrefreshment space
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 7/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 8/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 9/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 10/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 11/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 12/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 13/99
Berlins new national gallery by MiersVan de Rohe Stirling’s Staatsgalerie
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 14/99
Provide a central orientation space-anatrium
ate Modern, Herzog & de Meuron“so that people don’t feel lost”
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 15/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 16/99
• Words• Colour coding and
pictograms
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 17/99
National Soaring Museum, NYC
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 18/99
Research Store – with appropriateconditions like controlled
environments
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 19/99
Walls:•Uninterrupted surfaces•Fabric-covered or plasterboard-clad
hardboardFloors:•Quiet, comfortable, attractive, hard-wearing,light-reflective and capable of taking heavy
loads.•Wood, stone or carpet- most suitable.
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 20/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 21/99
Appropriate viewing level
Suitable light Presentation of information
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 22/99
Compatibility with the object
Backgrounds Innovations like screen systems
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 23/99
Hinged- side access Hinged-front access Top Hinged
Sliding front 2 Sliding panels Sliding upwards
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 24/99
Sliding downwards Lift-off front Demountable case system
Rear Access Hood case
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 25/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 26/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 27/99
working lights
emergencylighting
display lighting
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 28/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 29/99
1) Wall washing 2) Downlighting
3) Uplighting
4) Diffused5) Directional spot
6) Lighting of pale objects
7) Increased illuminatifor dark objects
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 30/99
office: 300 ambient, 500 task
demonstration theatre: seating area 300,
demonstration area 600
exhibition hall: 500/300/100 workshop:200/500/750
circulation areas 200, shop 600, toilets 150.
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 31/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 32/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 33/99
glare
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 34/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 35/99
Fire
Theft and damage
Water sprinkler system
Pulsing water mist
Barriers
Infra-red movement detectors
CCTV systems
Display cases
Deadlocks, non removable hinges
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 36/99
Vandalism•Shatterproof glass or Perspex should be
considered for casing valuable objects
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 37/99
NAPIER MUSEUM, KERALA
Case Study
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 38/99
History of Napier Museum
• Indo-Saracenic structure
• Built in 1857. Presently, 150 yearsold.
• In 1874, named after the Maharaja of Travancore.
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 39/99
Architect and Influences
• Designed & overseen by a Britisharchitect, Chisholm.
• Chinese, Mughal, Kerala & Italianinfluences.
• Unique architectural style - gothicroof; minarets.
• Yellow scalloped arches, frieze &lattice work, beautiful carvedbalconies.
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 40/99
HVAC
• Natural A.C.
• Lush observatory gardens, in thestyle of Chinese & Mughal & Kerala'stradition.
• Blue, pink, yellow, red & white usedin roofs & minarets.
Obj di l i h
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 41/99
Objects on display in theMuseum
• Sculptures in bronze & stone
• Carvings of wood & ivory
•
Kuftgiri works• Traditional musical instruments
• Coins, lamps etc.
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 42/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 43/99
AUDITORIUM
Entrance
halls
Foyers
Boxoffice
Cloakroom
Toilets
CorridorStairway
s
Mainseating
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 44/99
Main stage,wings,
backstage
OPTIONAL
Shop,restaurant
, bar
Exhibitionspace
Officespaces
Kitchen,staffroom
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 45/99
T= 800-1150 mmC1 = 60 mm
C2= 120mm
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 46/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 47/99
Special Effects in 5D cinema:•Lightning•Rain•Snow•Smoke•Bubble•Vibration•Spray• Jet•Leg sweep
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 48/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 49/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 50/99
Fixed,
seminar
Jury room ,
courtroom
Faculty only,
modular
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 51/99
Screen Height = the furthestallowable viewing position/5.3
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 52/99
Connections –plugpoints
storage
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 53/99
Acoustic tile ceiling
Carpet for acoustics
Venetian blinds De-humidifiers
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 54/99
Of i d
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 55/99
FLOOR
Fireresistant,
non-reflectiive
Non-slippery,
Trapdoors
LIFTS
Basement
Min. Headroom-2.5m
Easy access
StageRaised, tilted,
revolted
Often raised to1100mm abv.
Lvl of auditorium
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 56/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 57/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 58/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 59/99
- SHORNOOR – KALAMANDALAM
-GOA- KALA ACADEMY, GOA
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 60/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 61/99
Inaugurated by Shri G. Kathikeyan Hon. Minister for Cultural Affairs on 6th July,
2001
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 62/99
Steel posts- Barricades Ht. approx. 75 cm Concrete walls and one side top panelling
glass Source of light- 1 tubelight Upper window openings - lots of natural
light
Exhibits have sensor system Adjascent to the gallery- Cultural tourism
office and a beautiful courtyard
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 63/99
Outside the gallery – an area to showcasepictures of artforms and artefacts like chatti
A mini library showcase of books related tothe culture and traditoons of the exhibits in
art gallery Type of exhibits- Kathakali veshams and
various art forms (statues)
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 64/99
Various Kathakali
exhibits
Window openings
Barricades
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 65/99
Water SupplyMotor starting point- room behind gallery 10 HB motor pumping from bore wellWater tank capacity 1 lakh litersDistributed to various buildings namelyhostels, quarters , offices etc.Water used for all purposes. No separate
sources usedWater pumping lines laid undergroundSpecial inlets for waste water disposals
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 66/99
WaterDrainage
System
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 67/99
RainWaterDrainage
S stem
GuttersStorage tank
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 68/99
Water Supply System
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 69/99
Direct connection from KSEB Hence no current..works on generator Generator room behind dance class Generator cables laid underground KSEB Transformers- 3 phase line- over
entire compund of kalamandalam Meters provided in evry building
Inside compund- approx- 31 electric posts Powercuts- Half and hour (morn. and eve)
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 70/99
Old Motor Shed
Generator Room
Generator room-inside
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 71/99
Main Electric Posts from
KSEB
Electric Circuit Boards-Gallery; Hostel
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 72/99
Fire extinguishers provided in Hostels Offices Koothambalam Rest – open buildings – less provocation of
fire Airconditioning systems
Vice Chancellor’s room Computer room Guest room
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 73/99
Rest – offices have fans and teachingfacilities depend on natural ventilation
Toilets- approx total 100 Septic tanks- covered with underground
slab Separate for respective buildings Rain water harvesting system – Tank with
chakari, stones, mannal
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 74/99
Tubelights
Floodlights
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 75/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 76/99
PLAN OF KALA ACADEMY, GO
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 77/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 78/99
Used for experimental productions Designed for music concerts, meetings,
amateur performances ,press functions Easy to change backgrounds Acoustically treated No backstage Entre black setting
Recording studio
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 79/99
PLAN
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 80/99
1. Seating capacity without chair …250seats
2. Seating capacity with chair …
170seats3. No. of green room/dressing room …1
4. General light arrangement with onehalogen/flood of 1000w with dimmer
Floor, ceiling ,wall -black
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 81/99
2Emergency exitLeft -small accessDoorRight- proper routeDefinedExtra door – not op
Led lighting
Pro ector oint Surveillance camer
2 sets of 41 chairs Thick foam, coir material
Behind area for storage-I piano, extra plastic-chairs
St
AC duct
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 82/99
V
Recording studio
Storage room
14 plugpoints
4 speakers1 emergency light2 spotlight1 surveillance camera1 sprinklers18 vents
5 alarm systems
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 83/99
• Height of room – varies from 2.9 to 4.5 m
• 24 lights- main area of the room• CFL lamps with transluscent glass• Behind area of the hall – different
coloured glass on CFL lighting• Curved wall for proper acoustics
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 84/99
Description
1.Running wall space for display - 51 runningmts
2.Carpet area of the Gallery approx. -165 sq.mts
3. Three mobile display panels to be used onboth sides(each having a space of 4 * 1.5 mts)
4.Height of the Eaves board
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 85/99
PLAN
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 86/99
Paintings- landscape and portrait andsculptures
Acrylic on canvas/paper Oil on canvas 0.6 to 1 m lengths in size 1 fire extinguisher
2 general floodlights with stan
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 87/99
Ceiling- normal concrete
with plastering
No proper barricades
Flooring-tile
Hooks and pipes – hanging exhibits
• 10 flood lights
for exhibits
5 tubelights
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 88/99
Led light to help walk in d
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 89/99
6 light fixtures- CFL lamps 8 speakers Telephone systems 7 specially designed chairs 2 sprinklers 2 alarm systems Flooring soft – coirmat
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 90/99
Adjacent to preview room, working as a subsidiary
Water tank placed near theparking area – provided by waterdept
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 91/99
dept.Wells with inbuilt tanks
Incase of water supply shortage- tank
Fire hydrant supply
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 92/99
Surface drains- rainwater collection
Normal systems of water dispos
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 93/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 94/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 95/99
Electricity- municipality –electric dept
Water hydrants externally placed
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 96/99
Safety- smoke alarmsfire sprinklers
Fire Hydrant externally placed
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 97/99
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 98/99
3 floors- specified area for toilets
Server roomOperator lines 200 lines – intercoms placed
CCTV cameras
Spl. Guards (lady security also) Metal detectors Police forces for spl. Functions Bomb squad with dog sniffers
7/29/2019 FINAL Design Major-lit Study
http://slidepdf.com/reader/full/final-design-major-lit-study 99/99
The Architect’s Handbook edited by Quentin Pickard RIBA
Time savers http://www.lib.uchicago.edu/e/reg/using/facilities/avroom.html http://www.cksc.edu.ph/facilities1.html http://kalyanaresort.com/gallery.php http://www.si.edu/mci/english/professional_development/past_courses_
And various sites from the net Thesis studies