Production OperationManagement Final Term Assignment
Muhammad Ali
5/17/2012
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 2/22
Department of Management Sciences,
Superior University, Lahore
2
Submitted to:
Submitted by:
Rabia Riffat 11527
Waseem Iqbal 11545
Mirza Shehzad Shouket 11541
Muhammad Faheem 11534
Mubashir Nisar 11540
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 3/22
Department of Management Sciences,
Superior University, Lahore
3
This is one of the greatest blessing of ALLAH, ALMIGHTY that able to complete this Production Operation Management Assignment.
Assignment would like to express their gratitude to
those who directly and indirectly helped them in the completion of this study. We are sure that this assignment will help us in future during our practice life .
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 4/22
Department of Management Sciences,
Superior University, Lahore
4
We dedicated our each and every effort to
Almighty Allah
The lord of lords
And
Holy prophet Hazrat Muhammad (PBUH)
The cause of the creation of the universe
Honorable and Respected Mr. Muhammad Ali
Whose kind guidance and encouragement helped us to reach at this
Stage
Our affectionate and loving Parents,
Whose guidance and prayers proved a beam of light?
In the darkness of life at every moment
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 5/22
Department of Management Sciences,
Superior University, Lahore
5
“TABLE OF CONTENT”
1) Executive Summary……………………………………………….
2) Introduction……………………………………………………..
i) History………………….
3) Production Process…………………………………………………..
i) MAIN RM SOURCE……………………………………………………
ii) Brass Store……………………………………………………….
iii) Tip Making Section………………………………………………
iv) Tip making Process…………………………………………………….
v) Ink Store………………………………………………………………
vi) Plastic Store………………………………………………………..
vii) Tube Making Section………………………………………………….
viii) Tube Making Process………………………………………………….
ix) Color, Plastic and Oil Mixing Process……………………………………
x) Injection Moulding/Manufacturing process of parts of pen………..
xi) Printing Process…………………………………………..
xii) Assembly Line……………………………………………………..
4) Capacity Analysis………………………………………………………………….
i) Barrels……………………………………………………………
ii) Pusher……………………………………………………………..
iii) Tube…………………………………………………………………….
iv) Tip………………………………………………………………………….
5) Location Analysis…………………………………………………………………………..
6) Quality Management Techniques………………………………………………………
7) Product Design………………………………………………………………………………..
8) Demand forecast on 1st
Year……………………………………………………………..
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 6/22
Department of Management Sciences,
Superior University, Lahore
6
A ballpoint pen is a writing tool which features a tip that is automatically refreshed with
ink. It consists of an exactly formed metal ball seated in a socket below a reservoir of ink. As the pen is moved along a writing surface, ink is delivered. Even though ballpoint
pens were first patented in the late nineteenth century, they only started to reach
commercial significance in the early 1950s. Now, ballpoint pens dominate the writing
instrument market, selling over one hundred million pens each year worldwide.
The idea of a ballpoint pen had been around for many years, it took three different
discoverer and almost 60 years to grow this modern writing instrument. The first
document granting for this innovation was issued on October 30, 1888, to a man named
John J. Loud. His ballpoint pen consisted of a tiny rotating ball heading or aim that was
constantly covered with ink by a reservoir above it. While this innovation worked, it was
not well suited for paper because it leaked and caused smearing. Two other
discoverers, Ladislas Biro and his brother Georg, improved on Loud's innovation and
patented their own version, which became the first commercially significant ballpointpen. These pens still leaked, but not as badly and also they became popular worldwide
and reaching the height of sales in 1944. The next year another discoverer, Baron
Marcel Bich, finally solved the leakage problem and began manufacturing pens in Paris.
Over the years, many improvements have been made in the technology and quality of
the various parts of the pen, such as the ink, the ball, the reservoir, and the body.
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 7/22
Department of Management Sciences,
Superior University, Lahore
7
Production Process:
Main RM Stores (Primary
Store)
Brass Store Ink Store Plastic Store Color store Lubrication Oil
Store
Tip Marketing
Section
Tip Making
Process
Lubrication
Process of Tips
Tube Making
Section
Color, Plastic & Oil
Mixing Process
Tube Making
Process
Filling of Tubes &
fitting of Tips
Process
Injection Moulding/
Manufacturing Process of Parts
of Pen
Printing Process
Assembly of All Components
Finished Form of Ball point Pen
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 8/22
Department of Management Sciences,
Superior University, Lahore
8
In every production company the process of production has a core value regarding the
manufacturing of product.if production process will not well than chances of failures can
occur because it depend on the process. The product we have chosen his production
process will be as under /following:
First of all we will store all the raw materials in main raw material stores. After that from
where raw materials will be further send to sub stores.
First of all oil store and brass store will start work together from where wires of brass will
be send to tip making section according to the demand in tip making section.
From brass store wires will be send to tip making section where dimensions of wires will
be check properly, for this purpose microscopes and gauges will be use to verify that
dimensions are according to standard. Iftip making section will found that wire are not
according to predefined standard than it will be rejected for tip making. Only attested /
verified brass wires will be send for making of tips.
Brass wires will be bringing from tip making section. During the tip making process
quality of tips will be check after a few period of time. The quality checking of tips will bethe approval that tips are according to the standard which was pre defined and meet to
our quality.
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 9/22
Department of Management Sciences,
Superior University, Lahore
9
In ink store cans of ink will be stored and those cans will contain all colors of ink which
will be used in the filling of tubes. After making the tips and tubes they will be send to a
combine section where the process of filling the tubes with ink and fitting of tips in tubes
will be done.
In plastic store there will be different types of plastic materials will be the store. The
major two types of plastic materials will be stored in the plastic store from which one will
the purpose of making the tubes and the other one is for the purpose of exterior or
casing of the ball point pen.
Tube making section will contain the plastic bags for making the tubes.
In the process of tube making their will be cutters they will make the process of cuttingthe tubes. Tubes will be very hard and cold so we will need to make them soft and semi
mold form so that the cutting process will become easy. For the purpose to make soft
the tubes hot waterline will be add at the back side of the cutter. To make the water hot
heaters will be used at different temperatures. After making the tubes they will send to
another unit where the process of fitting the tips into the tubes will be done.
Now the riffles are ready. The one part of ball point pen is finished. Where the other part
of ball point pen is left to manufacture and complete.
To make the casing of ball point pen the very first process is start’s from the mixing of
colors, Plastic Material and Oil Mixing. These three things will be mix in a separate unit.
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 10/22
Department of Management Sciences,
Superior University, Lahore
10
For this Purpose color store and oil store will be situated closely because oil will be
stored in the drums. The purpose to make these two sections closely is that movement
or transportation of plastic drums within the working place or manufacturing unit can
difficult.
After mixing process of color, plastic and oil, now the major process will be done and
that will be the manufacturing of barrels, Caps, Plug, Indicator and Nozzles.
The manufacturing process or every component will be done on injection molding
machine. Different type ofplastic materials will have the different properties. Some are
need pre heating before using and some can be use without preheating cold and hot
water will be circulate in the molds and heater will be melt the plastic material. Every
plastic material will be operating on different heat.
After making the exterior the next step will be the printing of name of our brand on
barrels and Caps. For this purpose printing section will perform the process of printing.
After making the all parts of ball point pen the final process is the assembling of all parts
in bring in the shape of pen. An assembly line will be used for this purpose where riffles
will be fit into the barrels, caps will be fit on the top of the barrels and plugs will be fit on
the bottom of the barrels.
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 11/22
Department of Management Sciences,
Superior University, Lahore
11
20 Cavity Mold
Cycle time 20 Second
60 Barrel in One minute
3600 Barrel in one Hour
86400 Barrel in 24 Hours (3 Shift)
2592000 Barrels in one Month
30 minute waste due to load shading = 46,800 Barrels
4 Holidays in a month = 345,600 Barrels
3,92,400 Barrels
Less: Maintenance of machine
8 hour *1 Shift (3600) (28,800 Barrels)
Absent Operator
8 Hours * 1 Shift (3600) (28,800 Barrels)(57,600) Barrels
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 12/22
Department of Management Sciences,
Superior University, Lahore
12
Note:
24 Hours manufacturing will be done
3 Shifts will be work
Each Shift will be of 8 Hours
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 13/22
Department of Management Sciences,
Superior University, Lahore
13
20 Cavity Mold
Cycle time 20 Second
72 Pushers in one minute
4,320 in one hour
103,680 in 24 Hours (3 Shifts)
3,110,400 in one month
30 minutes waste due to load shading 56,160 Pushers
4 Holidays 414,720 Pushers
470,880 Pushers
Less: Maintenance of Machine
8 hours * 1 Shift (4,320) 34,560 Pushers
Absent Operators
8 hours * 1 Shift (4,320) 34,560 Pushers(69,120) Pushers
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 14/22
Department of Management Sciences,
Superior University, Lahore
14
Per Minute 122
Per Hour 7,320
24 Hours (30 * 175000) 5,250,000
Load shading 4 Hour * 6 time 24 Hour per Day
Load Shading per month (24 * 26) 624 minutes
Per month waste due to Load shading (122 * 624) (76,128) Tubes
Holidays (4 days * 175,000) (700,000) Tubes
(776128)Tubes
Less: Holidays (15 Days * 175,000) (2,625,000) Tubes
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 15/22
Department of Management Sciences,
Superior University, Lahore
15
70 tips per minute
Per hour production of tip’s (70*60) = 4200
Per day production of tip’s (24*4200) = 100800
Per month production (100800*30) = 3024000
Production losses due to 4 holiday’s (4*100800) = 403200
30minute’s production losses due to load shedding = 54600 (457,800) Tips
8 hour loss of production due to maintenance of machine= 4,200
8 hours loss of production due to absenteeism of operator = 4,200(67,200) Tips
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 16/22
Department of Management Sciences,
Superior University, Lahore
16
Per minute 60 Ballpoint
Per Hour (60 Minutes * 60 ball point) 3600 ball point
24 Hours (3600 Ball point * 24 Hours) 86400 Ball point
1 Month (86400 Ball point * 30 Days) 2592000 Ball point
30 minute waste daily (30 * 26 Days) 780 minutes
Load shading (780 * 60) (46,800) Ball Point
Holidays (4 * 86400) (345,600) Ball Point
(392,400) Ball Point
16 hours waste due absentees of Labour 57,600 Ball point
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 17/22
Department of Management Sciences,
Superior University, Lahore
17
Location for business is very important factor for a business and selection of location is
also important for establish the business. Regarding the selection of location we
decided that we will establish our production unit in sundar industrial estate. The reason
to select this industrial estate is that it is the established estate of industries where
already has an atmosphere of business. Another reason is to choose this location that
taxes of government in this estate are less as compared to other industrial estates. So
we will able to pay fewer taxes to the government. As well as price of purchase the
place will be less and reasonable as compared to other industrial estate. Another
important thing is that cost of transportation will be less. As well as load shading of
electricity will be less as compared to other places. Everybody knows in Pakistan about
sundar estates. The target of selling and buying can be achieved easily. There is thevicinity of sundar is populated area. There is facility of Gass, Electricity, Petrol, School
and College. There inside of industry we will make the parking area and Park as well as
for the employees. They can rent and spend their extra time in pleasant environment.
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 18/22
Department of Management Sciences,
Superior University, Lahore
18
Another reason to select this location that it will be a positive impact on people and
attitude of people will be positive because community of this area knows very well that
what industry is. If we will choose the urban area to install our manufacturing unit than it
can possible that people of that area feel or think obnoxious because due to
manufacturing unit their will noising and people will not like the noising. So when we will
install our unit in this industrial estate attitude and behavior of people of this will not be
negative.The location of our company is very helpful and supportive for our business.
The climate is moral excellence the weather of riwand is providing assistance for our
business transactions and also not interposes in our production matters. We easily find
everything for daily routine; also the work place is utile for business. We capable toacquire raw materials by roads and railway and it is also easy to commercial exchange
for goods and services. There is no problem of transportation so we with ease go one
place to other with the purpose of business or any other assistance.
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 19/22
Department of Management Sciences,
Superior University, Lahore
19
To improve the quality of product there is always need that we apply some techniques
regarding management of quality. This quality will help us to increase the quality of our
product and minimize the failure point of our product.
The quality management techniques that we will use those will be following:
Quality control department will work during all the processes.
Quality of tips will be check and maintain through QC inspectors.
Quality of tubes during the process will be check. Dimension of tubes will check
according to the sale.
Barrels, Caps, Plugs, Nozzles and indicators will be check after every 2 Hours
through QC inspectors.
Quality of products will be check after every 2 hours by QC inspectors. They will check
the every step of production in quality control laboratory where quality will be match with
standards. Quality of tips will be check through microscopes and dimensions of tubes
will be check through digital vernier Callipers. Writing Capacity or consumption capacity
of pens will be check on film of paper. A very important thing which will be check that
color of writing of pens and color of barrels will be check according to the standard of
master color. As well as fitting of riffles into barrels and fitting of tips into tube will be
check properly in a shift 4 times. In addition operator of machine who will be
manufacture the parts of ball point pen. He will also check and maintain the quality of
components or casing.
The quality of pen elements is checked during all manufacturing stages. From way back
thousands of parts are made each day, review each one is impossible. Accordingly, lineinspectors also take random samples of pen pieces at sure time intervals and check to
ensure that they meet set specifications for size, shape, and consistency. And the
primary testing method is visual inspection, although more rigorous measurements are
also made. Various types of measuring equipment are available. Length measurements
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 20/22
Department of Management Sciences,
Superior University, Lahore
20
are made with a vernier caliper, a micrometer, or a microscope. For each one differ in
accuracy and application. To test the term of surface coatings, an optical flat or surface
gauge may be used.
Like the solid pieces of the pens, quality tests are also performed on the liquid batches
of ink. After all the fixing or mixtures are added to the batch, and a sample is taken to
the Quality Control (QC) laboratory for testing. Physical characteristics are checked to
make sure the batch adheres to the specifications outlined in the formula command.
The QC group runs tests such as pH finding, viscosity checks, and appearance
evaluations. So if the batch is found to be "out of spec," adjustments can be made. For
example, colors can be adjusted by adding more dye.
Additionally to these specific tests, line inspectors are also posted at each form of
manufacture. They visually inspect the elements as they are made and also check for
things such as inadequately filled ink reservoirs, deformed pens, and incorrectly
assembled parts. Random samples of the final product are also tested to ensure a
batch of pens writes correctly.
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 21/22
Department of Management Sciences,
Superior University, Lahore
21
There are three types of Forecasting
1: Judgmental Techniques
2: Time Series Techniques
3: Associative Models
Now we are going to discuss the judgmental techniques in detail:
“Judgmental Techniques is defined as that which uses nature along with other
resources to forecast what may happen. Executive decisions can be made on the bases
of these feelings. Goes beyond simply statistical techniques and encompasses what
people believe is going to happen. It is in the area of instinct, interdepartmental
committees, market research and executive opinion.”
Judgmental forecasting technique based on opinion which we get from different people,
management, staff and also are the executive. By judgmental forecasting techniques we
don’t need any type of past and future data.
The use of judgmental technique is that we going to start a new business because we
have no past data that we going to make forecasting on the bases of past data. When
we have no past data we get different type of opinion from different persons for our
forecasting. In judgmental forecasting we don’t need any type of future data.
In judgmental forecasting techniques we get different opinion from different persons. In
this technique we get we get opinion from sales persons that how they going to sale in a
month and if they sell a maximum sale then this point going to increase the sale of thecompany by targeting his maximum sale. Sometimes we get opinion from outsiders
because they are also doing the same work and they will give us a better feedback
according to his field.
7/30/2019 Final Assignment POM
http://slidepdf.com/reader/full/final-assignment-pom 22/22
Department of Management Sciences,
Superior University, Lahore
22
Beside this we also get opinion from our management and staff. Our executive also
guides us in a better way that how ever do in a proper way.