ENTRY
Floor Plan
2 BHK Unit(Super Area: 1235 sq.ft.) Drawing + Dining Room 2 Bedroom 1 Kitchen 2 Toilet 1 Study Room 2 Balconies
Disclaimer : All specifications, design, layout, images, conditions are only indicative and some of these can be changed at the discretion of the builder/architect/authority. These are purely conceptual and constitute no legal offerings. 1 sq. mt. = 10.764 sq. ft.
ENTR
Y
Floor Plan
Disclaimer : All specifications, design, layout, images, conditions are only indicative and some of these can be changed at the discretion of the builder/architect/authority. These are purely conceptual and constitute no legal offerings. 1 sq. mt. = 10.764 sq. ft.
3 BHK Unit(Super Area: 1535 sq.ft.) Drawing + Dining Room 3 Bedroom 1 Kitchen 2 Toilet 1 Puja Room 5 Balconies
Price List
Call: 9268570713www.saviourindia.com
S. No.
1
2
Unit
2 BHK + Study Room
3 BHK + Puja Room
Saleable Area
1235 sq. ft.
1535 sq. ft.
B.S.P (Flexi Plan)
3300/- per sq. ft.
S. No.
1
2
3
4
5
Floor
Ground - 2nd
3rd - 5th
6th - 9th
10th - 13th
14th and Above
Covered Car Parking
Club Membership
Park View Charges
Interest Free Maintenance Security (Refer Note 3)
Electric Connection Charges (Refer Note 5)
Power Backup (Refer Note 6)
Terms & Conditions:
1. Price list and payment plan can be changed at the sole discretion of the company.2. There is no price escalation for the booked apartments.3. IFMS @ Rs.25/ per sq. ft. will be applicable at the time of possession.4. Services Tax shall be charged extra for each payment.5. Electric Connection Charges Mandatory 3 KVA for 2 BHK; 5 KVA for 3 BHK.6. Power Backup 1KVA Mandatory for both 2 BHK + 3 BHK.7. Cheques / Demand Drafts / RTGS in favor of “SAVIOUR BUILDERS PVT. LTD.” payable at Delhi.
Rs. 295.000/-
Rs. 100.000/-
Rs. 50 per sq.ft
Rs. 25 per sq.ft
Rs. 10.000/- PER KVA
Rs. 25.000/- PER KVA
PLC (Rs. Per Sq. Ft.)
200
150
100
50
NIL
PREFERENTIAL LOCATION CHARGES (FLOOR WISE PLC)
EXTRA CHARGES
Booking Amount
Excavation
On Completion of basement
3rd Floor SLAB
6th Floor SLAB
10th Floor SLAB
14th Floor SLAB
On Super Structure
On Plaster Work
On Possession
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
PAYMENT PLAN (FLEXI PAYMENT PLAN)
Possession date 30 months from the excavation date and an extended fit out period of 6 months
W.E.F : 20 March 2015