NOVEMBER 2019 FILLING STATION FEASIBILITY STUDY PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324JR, MONTANA GARDENS, PRETORIA C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE (Revision 1)

FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

  • Upload
    others

  • View
    19

  • Download
    6

Embed Size (px)

Citation preview

Page 1: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

                          

    

 

NOVEMBER 2019     

 FILLING STATION FEASIBILITY STUDY   

PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA  C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE  

(Revision 1) 

Page 2: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    2 

     

                         

Issue/revision  Revision 0   Revision 1  Revision 2  Revision 3 

Remarks  Draft for Comments   Future Road Planning 

included  

   

Date  November 2019  November 2019     

Prepared by  J.M. van Rooyen  J.M. van Rooyen     

Checked by  E.D. Kotze (Pr. Tech Eng)  E.D. Kotze (Pr. Tech Eng)     

Signature 

   

   

Project number  19053  19053     

File reference  Z:/PROJECTS/19001‐

19099/ 

Z:/PROJECTS/19001‐

19099/  

 

EDL Engineers (Pty) Ltd 1st Floor, Block D 

The Village Office Park 

c/o Glenwood Rd & Oberon Ave, 

Fearie Glen, 0043 

Cell:   +27 (0)83 564 1563 

Tel:   +27 (0)87 897 5074/5/6 

Email:   [email protected] Website:  www.edlengineers.co.za 

 

Page 3: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    3 

CONTENTS

1  Introduction & Study Area 5 

1.1  Introduction  5 

1.2  Study Area  5 

1.3  Population growth in the study area  6 

1.4  Traffic growth within the Study Area  6 

1.5  Future Roads  6 

1.6  Evaluation of the Study Site  7 

2  Impact on Existing Sites 8 

2.1  Competitor Sites  8 

2.2  Catchment Markets  8 

2.3  Competitor Sites Investigation  9 

2.4  Impact on existing sites  12 

2.5  Conclusion on Competitor Stations  13 

3  Estimated Sales of Proposed Site 14 

3.1  2019 Traffic Demand Count  14 

3.2  2019 Traffic Demand (ADT)  14 

3.3  Average Fill (F)  15 

3.4  Interception Rates (p)  15 

3.5  Full trading days in a month  17 

3.6  Expected Monthly Sales  17 

4  Feasibility of Proposed Site 19 

5  Other Traffic Engineering Considerations 20 

5.1  Impact on Traffic Flow past the site (Safety)  20 

5.2  Delivery Vehicle Path  21 

6  Conclusions 22 

   

Page 4: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    4 

  

 Tables 

Table 1  Expected Shared Traffic 

Table 2  Impact on Surrounding Sites – Lost Fuel Sales 

Table 3  Expected Interception Rates 

Table 4  Estimated Fuel Sales per Month 

 Figures 

Figure 1  Locality Plan 

Figure 2  Competitor Sites 

Figure 3  Existing 2019 (24 Hr) Traffic Volumes 

 

Drawings 

Drawing No:    19053/AL/01 Rev 1 Proposed Access Layout 

 

Annexures 

Annexure A:  Competitor Filling Stations Photos 

Annexure B:  Traffic Counts 

Page 5: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    5 

 

1 Introduction & Study Area 

1.1 Introduction 

EDL Engineers (Pty) Ltd have been appointed to investigate a site for the development of a filling station. An investigation was undertaken to prepare a study for the opening and operation of a filling station on the proposed site, which is situated on Portion 288 of the Farm Hartebeestfontein 324‐JR on the south eastern corner of the intersection of Enkeldoorn  Avenue  and  Bougianvillea  Drive  in  Montana  Gardens,  Pretoria.  The evaluation was for a standard filling station with a canopy covered forecourt, at least 4 pump islands with a number of pumps (min. 8 x 4) selling petrol and diesel fuels as well as a modern convenience store, all on a site that has enough space to accommodate all of the abovementioned amenities.  

The purpose of the study  is to determine whether the proposed site  is feasible for the opening and operation of a modern, benchmark filling station and to estimate the Litres of Fuel that will be sold monthly. The study also considers the development viability by assessing  the projected volume of  fuel  to be  sold and possible  impact on  competitor filling stations. 

This  feasibility  report  takes  certain  physical  characteristics  into  account  based  on observations during  the  site  inspection  as well  as  surveyed  traffic  volumes  and  then makes  reasonable  assumptions  on  possible  access  options.  Please  note  that  the approval of access, licensing, land use issues, building plans etc. is outside the scope of this feasibility report and therefore these implementation issues cannot be guaranteed. The developer of the  facility must therefore still get all the required approvals  for the filling  station development on  this  site,  including  (but not  limited  to)  the  items  listed above.  

 

1.2 Study Area 

The  proposed  site,  as  mentioned,  is  located  on  Portion  288  of  the  Farm Hartebeestfontein 324‐JR on the south eastern corner of the intersection of Enkeldoorn Avenue  and  Bougianvillea  Drive  in Montana  Gardens,  Pretoria.  The  site  is  currently undeveloped with some higher density  residential areas to the north, east and south. Some  Agricultural  holdings  are  still  undeveloped  to  the west  of  the  site.  The major transit  route of  Sefako Makgatho Drive  is  situated  approx. 1.25km  to  the  south. The major  retail  areas of Kolonnade  Shopping Centre  and Kolonnade  retail park  are both less than 1.5km directly south of the site. 

Enkeldoorn  Avenue  is  under  jurisdiction  of  the  City  of  Tshwane  Metropolitan Municipality. This road will form the western boundary of the site. This road functions as  a  collector  street  and main  connection  between  Sefako Makgatho  Drive  and  the surrounding residential areas. 

Bougianvillea  Drive  is  under  jurisdiction  of  the  City  of  Tshwane  Metropolitan Municipality. This road will form the northern boundary of the site. This road functions as  an  access  road  to  the many  residential  estates  between  Enkeldoorn  Avenue  and Breed Street. 

The location of the site is indicated on the locality map in Figure 1. 

 

Page 6: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    6 

1.3 Population growth in the study area 

As can be seen by the Graph below, the population growth for the area of Tshwane Region 2, has been positive every year since 2011 and  from 333 083 people has grown to about 393  186  people  in  2019.  This  calculates  to  an  average  population  growth  of  just  over 2.095% per annum. This is based on data from Statistics South Africa and from the census data obtained from City of Tshwane.  

330000

340000

350000

360000

370000

380000

390000

400000

2011 2012 2013 2014 2015 2016 2017 2018 2019

  

 

1.4 Traffic growth within the Study Area 

Precise  traffic  growth patterns were not analyzed nor  calculated  in depth  for  this report.  Due  to  the  expanding  residential  areas,  the  retail  centres  and  the main transient  routes  in  the  area  as well  as  the  developable  land  available  in  the  area surrounding  the  site, an average of 3.0% annual  traffic growth  rate was assumed over the next 3 years for the study area.  

 

1.5 Future Roads 

Future planning in the area includes the extension of 3rd Road to Enkeldoorn Avenue and a traffic circle at the planned intersection of 3rd Road and Enkeldoorn Avenue. 

The  traffic circle at  the  intersection of Enkeldoorn Avenue and Bougainvillea Drive will also be moved more to the east, with Enkeldoorn Avenue being realigned for the new traffic circle positions. 

Details are shown on Drawing 19053/AL/01. 

 

Page 7: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    7 

1.6 Evaluation of the Study Site 

The subject site was  investigated, and a qualitative assessment was made, and the site was ranked according to the following descriptions: 

 

◘ Visibility: Being  located on a collector route between several  larger residential estates  and  Sefako  Makgatho  Drive,  with  some  natural  obstructions  and developments impairing the visibility, the site is visible to passing traffic from a moderate distance. The visibility can thus be described as GOOD; 

◘ Location:  The  study  site  is  located  at  the  junction  between  a  collector  road (Enkeldoorn  Avenue)  and  an  access  road  (Bougianvillea  Drive),  between  the residential  areas  and  the  Sefako  Makgatho  Drive  transient  corridor.  The location of the site is considered to be GOOD; 

◘ Access: Both Enkeldoorn Avenue and Bougianvillea Drive is under jurisdiction of the municipality. Enkeldoorn Avenue is planned to be upgraded and realigned, with two new traffic circles at the intersections of Bougainvillea Drive and at 3rd Road. Access to the site can potentially be provided from Bougainvillea Drive as a  full  access  and  from  Enkeldoorn Avenue  as  a  left‐in only  access  and  it  can hence be concluded that this access layout can be described as GOOD; 

◘ Trading Market: The trading market  is described as GOOD, as  it will consist of the daily commuters and local traffic between the residential areas and Sefako Makgatho Drive. 

◘ Competitor Stations: There are a few existing filling stations situated on Sefako Makgatho Drive, of which 5 are within 3km  radius  from  the  site. There are 2 other sites within a 3km radius, one on Amandelboom Road and one on Braam Pretorius Street. There  is also one possible new  (future)  filling station  located within  1km  to  the  west.  The  study  site  is  thus  rated  AVERAGE  in  terms  of competitors; 

◘ Traffic Volumes: The survey  indicated high volumes passing  the proposed site and  the  exposure  to  traffic  can  thus  be  described  as  GOOD;  but  with  the planned  traffic  circles,  access  from  Enkeldoorn  Avenue  will  mainly  be  from southbound traffic 

Considering the criteria discussed above, it can be concluded that the study site has GOOD trading potential. 

Very Poor  Poor  Average  Good  Very Good 

Page 8: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    8 

 

2 Impact on Existing Sites 

2.1 Competitor Sites 

To determine the impact on surrounding sites, it is typical to look at the filling stations sharing the same and adjacent local markets as well as filling stations located along the same routes. This guideline is used by various departments, major fuel companies and agencies.  A  radius  of  3km  is  normally  looked  at  in  an  urban  environment,  as more impact on the competitors is expected, the closer they are located to the proposed site. In the case where the site is located along a rural arterial or major arterial, it is typical to look further as the area of  influence  is stretched along a much  longer distance due to transient traffic traveling between towns and settlements.  

 

As this site is located within a portion of a metropolitan, eight (8) existing sites within a 1km  to  3km  radius  were  deemed  relevant  for  this  study.  Figure  2  depicts  these competitor  filling  stations  in  relation  to  the  proposed  site  as well  as  the  applicable catchment markets. 

 

2.2 Catchment Markets 

Physical man‐made barriers (such as freeways, railways, airports etc.) or natural barriers (such as mountains,  rivers or dams)  create different markets  (catchment areas)  for a site. For this study, types of commuters (local vs transient) were also used to divide the study area into the following markets: 

◘ A: The commuter and local market of Montana Gardens 

◘ B: The commuter and local market of Zambezi Country Estate 

◘ C: The local market of Montana 

 

 

Page 9: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    9 

2.3 Competitor Sites Investigation 

 

The exact reasons on how drivers make their decisions at which filling station to fill up is not known, but it is influenced by the same factors determining the turn‐in percentage (interception  rate)  to  be  discussed  in  Section  3.3.  Other  agencies,  such  as  the Department of Energy,  consider passing  road users’  access  to petroleum products  at existing  filling stations and not all  the  factors  influencing  the  interception  rate. These factors  will  determine  the  moving  market  factor  (i.e.  when  the  study  site  gains customers from other existing stations). 

Research  indicates  several  factors  that  influence  the  moving  market  between competing  filling  stations. Different petrol brands play  a  very  small  role  in  consumer motivations.  The  price  of  the  convenience  store  goods  plays  a  limited  role  in  re‐patronage. Aesthetic factors impact on re‐patronage and total customer experience (i.e. the  interception  rate  factors  mentioned  previously)  lead  people  to  become  more frequent  patrons  of  a  filling  station.  In  short,  it  is  the  station  that  delivers  the  best overall experience and service to customers that outperforms competitors. 

 

The  assessment  of  the  impact  the  proposed  filling  station will  have  on  other  filling stations in the area was mainly based on the shared traffic streams, but all other factors discussed have  also been  considered.  It  is  important  to note  that  shared  traffic only gives an indication of the daily traffic movement patterns between stations. 

The following existing filling stations have been deemed relevant for this study and the distances to the site have been measured along each road to the competitors: 

(i) CALTEX Amandelboom Motors – 1.5km From Site 

This older filling station is situated on at the corner of Amandelboom Street and Crevillea Street, east of the intersection of Amandelboom Street and Dr Van Der Merwe  Road.  This  site  has  two  full  accesses.  This  site  offers  four  (4)  pump islands selling petrol and diesel  fuels, and one  (1)  remote pump selling diesel exclusively. Average fills were recorded at 15 litres per vehicle. This site offers a small sized, modern convenience store. Other amenities at the premises include an  FNB,  Standard  Bank  and  Capitec  ATM,  also  an  on‐site  car wash.  Nearby businesses include a Spar and Tops, a Pharmacy and a Burger Take Away. Please refer to Photo 1 in Annexure B. 

 

(ii) SASOL Kolonnade – 1.6km from Site 

This older  filling  station  is  situated on  the  southern  side of  Sefako Makgatho Drive,  it  can be  reached by means of  a  Left‐in and  Left‐out access on  Sefako Makgatho Drive, no  access  is  available  from  the  Kolonnade  shopping  centre. This  site  is  320m  west  of  the  intersection  of  Sefako  Makgatho  Drive  and Enkeldoorn Avenue and can be clearly seen from Sefako Makgatho Drive. This site  offers  four  (4)  pump  islands  selling  petrol  and  diesel  fuels.  Average  fills recorded at 18  litres per vehicle. This site offers a medium convenience store. Other amenities at the premises include an FNB and ABSA ATM, as well as a car wash and Marko Stores Collection Point. Nearby shops  include  the Kolonnade Shopping Centre. Please refer to Photo 2 in Annexure B. 

Page 10: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    10 

 

(iii) SASOL Zambezi North – 2.1km from Site 

This older  filling  station  is  situated on  the northern  side of  Sefako Makgatho Drive,  it  can be  reached by means of  a  Left‐in and  Left‐out access on  Sefako Makgatho Drive. This site  is 350m east of the  intersection of Sefako Makgatho Drive and Dr Swanepoel Road and can be clearly seen  from Sefako Makgatho Drive. This site offers  four  (4) pump  islands selling petrol and diesel  fuels, and one (1) remote pump selling diesel exclusively. Average fills recorded at 19 litres per vehicle. This site offers a medium convenience store. Other amenities at the premises include an FNB and ABSA ATM. Nearby shops includes a car dealership and a small business park. Please refer to Photo 3 in Annexure B. 

 

(iv) ENGEN Montana Crossing – 2.6km from Site 

This older  filling  station  is  situated on  the northern  side of  Sefako Makgatho Drive,  it  can be  reached by means of  a  Left‐in and  Left‐out access on  Sefako Makgatho Drive, no  access  is  available  from  the  shopping  centre. This  site  is 190m west  of  the  intersection  of  Sefako Makgatho  Drive  and Dr  Swanepoel Road and can be clearly seen from Sefako Makgatho Drive. This site offers four (4)  pump  islands  selling  petrol  and  diesel  fuels.  Average  fills  recorded  at  24 litres per vehicle. This site offers a medium convenience store. Other amenities at the premises include an ABSA (Cash Express) ATM. Nearby shops includes the Montana Crossing Shopping Centre, Hokaai Meat Market and a Wimpy Drive‐Thru. Please refer to Photo 4 in Annexure B. 

 

(v) ENGEN Magalieskruin – 2.8km from Site 

This dated filling station  is situated on Braam Pretorius Street. The site can be reached by means of two (2) full accesses from Braam Pretorius Street and one access  from  the adjacent  Shops/Restaurant. This  filling  station has a medium sized  convenience  store,  car wash  and  an  FNB ATM. Other  amenities nearby include  a  Burger  Bistro  Restaurant  and  some  smaller  line  shops.  This  filling station comprise of four (4) pump islands selling petrol and diesel fuels. Average fills were measured at 27 litres per vehicle. Please refer to Photo 5 in Annexure B. 

 

(vi) BP Zambezi Junction – 3.2km from Site 

This filling station is currently being demolished, to be rebuilt. This filling station is on the northern side of Sefako Makgatho Drive, it can be reached by means of a Left‐in and Left‐out access on Sefako Makgatho Drive. Nearby shops  include the centres of Zambezi Junction and Montana Value Centre, no access to either of these centres can be taken from the filling station. Please refer to Photo 6 in Annexure B. 

 

Page 11: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    11 

(vii) SHELL Montana Park – 3.3km from Site 

This older  filling  station  is  situated on  the  southern  side of  Sefako Makgatho Drive,  it  can be  reached by means of  a  Left‐in and  Left‐out access on  Sefako Makgatho Drive, no access is available from the adjacent retail centres. This site offers three (3) pump  islands selling petrol and diesel fuels, and one (1) pump selling diesel exclusively. Average fills recorded at 23 litres per vehicle. This site offers a medium convenience store. Other amenities at the premises include an FNB  and  ABSA  ATM  and  a  Torrador  Coffee  Shop.  Nearby  shops  include  a Builder’s Warehouse, Bathroom Bizarre and a Hyundai Dealership. Please refer to Photo 7 in Annexure B. 

 

(viii) Possible Future Station – 1.4km from Site 

There  is a  filling station planned on the north western side the  intersection of Dr Van Der Merwe Road and Rooibos Road. This filling station is still in the early planning phase and only a future possibility, but will be a modern site and will have a small impact on the subject site (refer to Table 1 and 2). Please refer to Photo 8 in Annexure B. 

 

Page 12: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    12 

2.4 Impact on existing sites 

An  estimation of  the  shared  traffic between  the  study  site  and  the  abovementioned existing competitor stations  is summarised  in Table 1. Shared traffic can be accurately calculated by  conducting  traffic  counts at  intersections  closest  to  competitor  stations and  other  intersections where  traffic  can  be  diverted.  In  lieu  of  such  information,  a percentage  of  shared  traffic  is  assumed  based  on  EDL’s  experience with  conducting feasibility studies and knowledge regarding traffic movement in the study area. 

Table 1: Expected Shared Traffic 

SITE  FILLING STATION 

POTENTIAL 

PASS‐BY 

TRAFFIC 

(VEH/DAY) 

POTENTIAL TRAFFIC 

SHARED WITH NEW 

FILLING STATION 

(VEH/DAY) 

PERCENTAGE OF 

TOTAL TRAFFIC 

SHARED (%) 

GENERAL 

COMMENTS 

1  CALTEX Amandelboom Motors  16000  4000  25 Older Filling Station with small shop and 

nearby Spar 

2  SASOL Kolonnade  20 000  1000  5 Older Filling Station on main transient 

route 

3  SASOL Zambezi North  20 000  1500  7.5 Older Filling Station on main transient 

route 

4  ENGEN Montana Crossing  20 000  1500  7.5 Older Filling Station on main transient 

route 

5  ENGEN Magalieskruin  14500  290  2 

Older filling station 

with number of 

shops nearby 

6  BP Zambezi Junction  20 000  1500  7.5 

Filling Station 

(under construction) 

on main transient 

route 

7  SHELL Montana Park  20 000  1500  7.5 

Older Filling Station 

on main transient 

route 

Future Filling Station 

Rooibos Road & Dr Van Der 

Merwe Road 

16500  1650  10 Planned Filling 

Station 

 Note that the traffic shared between existing stations and the study site does not imply the  same or  proportional  percentage  of  lost  fuel  sales.  Passing  road  users  are more likely  to  purchase  fuel  or  turn  into  a  filling  station  based  on  the  overall  aesthetic perception of  the  facility and  the quality of  service offered. The  station’s  location,  its accesses,  available  amenities,  visibility,  site  layout  and  overall  convenience  offered influence  the  loss of  fuel sales when competing against a new, modern competitor. A summary of the potential loss in fuel sales is indicated in Table 2. 

Page 13: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    13 

Table 2: Impact on Surrounding Sites – Lost of Fuel Sales 

SITE  FILLING STATION 

PRESENT 

ESTIMATED FUEL 

SALE VOLUME 

POTENTIAL (LPM) 

MOVING 

MARKET 

FACTOR 

(%) 

LOST FUEL 

SALES IF 

DEVELOPMENT 

IS BUILT (LPM) 

(PRESENT FUEL 

SALES) – (LOST 

FUEL) (LPM) 

3 YEAR FUTURE SALES FROM 

LOST FUELS (LPM) 

CALTEX 

Amandelboom 

Motors 

350 000  12  42 000  308 000  336 500 

2  SASOL Kolonnade  400 000  5  20 000  380 000  415 200 

3 SASOL Zambezi 

North 410 000  5  20 500  385 000  420 700 

4 ENGEN Montana 

Crossing 380 000  5  19 000  361 000  394 500 

5 ENGEN 

Magalieskruin 390 000  <5  ‐  ‐  ‐ 

6 BP Zambezi 

Juncttion 410 000  5  20 500  389 500  425 600 

7 SHELL Montana 

Park 400 000  5  20 000  380 000  415 200 

8 Future Filling 

Station 320 000  5  16 000  304 000  332 200 

TOTAL  158 000     

 

The development and operation of  the proposed  filling  station will have an  initial impact on a number of filling stations in the study area, but considering the shared traffic and different markets catered  for by each one of these competitor stations, this  impact should not  irreparably  jeopardise these businesses as they have a  large transient market and this development mainly caters  for a different portion of the local market.  

The  subject  site will mainly  serve  traffic within  the area of Montana Gardens and traffic between the residential areas and Sefako Makgatho Drive  

 

2.5 Conclusion on Competitor Stations 

From Table 1, it can be concluded that ± 158 000 liters per month will be lost by the competitor sites identified, due to the new proposed filling station. The CALTEX Amandelboom Filling Station site will be the most affected but will be able to recover most of the lost sales within 3 to 4 years after the proposed filling station is constructed. The balance of the expected fuel sales in a month will mainly be gained from the residential areas surrounding the site, and from passing vehicles that currently fill‐up elsewhere (outside the study area). 

Page 14: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    14 

 

3 Estimated Sales of Proposed Site 

The  following  empirical  formula  is  used  by  the  fuel  industry  to  calculate  the  expected average Liters of fuel to be sold in a month: 

L = ADT × F × p × d  

 

Liters per month (L)  =  [Vehicles per day passing the site (ADT)] 

              x 

[Average fuel fill per vehicle (F.)]  

             x 

[Percentage  vehicles  of  pass‐by  traffic  turning  into  the site(p)] 

             x  

[Average full normal trading days in a month (d)] 

 

Each of the factors used in the calculation formula for fuel sales shown above, are discussed in the following subsections of this chapter.  

3.1 2019 Traffic Demand Count 

Traffic Counts were used  to determine the  traffic demand and  traffic volumes  for  the study area. A classified count was conducted by EDL  in October at  the  intersection of Enkeldoorn Avenue and Bougianvillea Drive as indicated in Figure 1. 

The detailed traffic count report is attached as Annexure C. 

The  Average  Daily  Traffic  (ADT)  currently  travelling  through  this  intersection  is approximately 16 248 vehicles per day, with heavy vehicles constituting approximately 1.1% of the daily traffic and Taxi’s about 2.9% of the daily traffic. 

The daily  traffic  flows were broken down  in  the different directions, as  shown  in  the next Sub‐chapter. 

3.2 2019 Traffic Demand (ADT) 

The 13‐hour classified traffic count that was conducted by EDL Engineers was done on the 2nd of October 2019 at the intersection of Enkeldoorn Avenue and Bougianvillea Drive, as indicated in Figure 1. These counts were converted to 24‐hour counts and broken up into different traffic streams as shown below: 

◘ 5 645 veh/day northbound on Enkeldoorn Avenue past the site (Negative);  

◘ 5 874 veh/day westbound on Bougianvillea Drive past the site;  

◘ 2 598 veh/day eastbound on Bougianvillea Drive past the site (Negative); 

◘  2 131veh/day southbound on Enkeldoorn Avenue past the site 

From the traffic count (2019), the site is exposed to an ADT of approx. 16 248 veh/day travelling  in  all  directions  along  Enkeldoorn  Avenue  and  Bougianvillea  Drive  at  the intersection where the filling station is proposed. 

Page 15: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    15 

 

3.3 Average Fill (F) 

The average fill at a site varies depending on the type of traffic it is exposed to, with higher  fills  generally  encountered  at  sites  exposed  to more  transient  traffic  and lower fills for local traffic. Lower fills can also be expected for sites situated in lower income areas, for older sites and higher fills in more affluent (high income) areas.  

In  order  to  get  an  indication  of  the  average  fill  in  die  study  area,  a  survey was conducted at the relevant sites where fill volumes were recorded, and the facilities provided  at  each  station  recorded.  The  survey  indicated  an  average  fill  at  similar stations of approximately 15 – 27 litres per vehicle. For the purpose of the study, an average  fill  of  20  litres  per  vehicle  was  deemed  appropriate  adopted  for  the calculations of the subject site. 

 

3.4 Interception Rates (p) 

The turn‐in percentages (interception rates) are determined  inter alia by the following factors: 

◘ Convenience (clean new facility and easily accessible); 

◘ Visibility (good/long time to decide whether to use the facility or not); 

◘ The amount of passer‐by traffic (as per traffic count); 

◘ Type of  traffic  (transient,  commuter or  local;  income  level of  the  area  also  a factor); 

◘ Other nearby filling stations (distances to competitor sites); 

◘ Service provided to public (car wash, convenience shop, A.T.M. etc); 

◘ Good accesses (proper deceleration and acceleration lanes); 

◘ Location (homebound and work bound and surrounding area); 

◘ Site layout (large enough to provide easy site circulation) 

 

From  previous  site  surveys  and  experience  with  existing  and  new  filling  station developments,  it  has  been  determined  that  there  is  a  relationship  between  the interception rate and the passing traffic volumes of a site. This relationship is illustrated by the graph below. The expected interception rates for the proposed development are also indicated on the graph and tabulated in Table 3 on the next page. The interception rates for traffic flow on the opposite side of the road from the filling station is lower as vehicles need to cross traffic to enter the filling station. 

 

 

 

 

 

 

 

Page 16: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    16 

 

 

Table 3: Expected Interception Rates 

ADT = 16 248 VEH/DAY PASSING THE SITE 

ROAD AND DIRECTION TRAFFIC VOLUME 

(VEH/DAY) 

ADOPTED INTERCEPTION 

RATE  

Northbound on Enkeldoorn Ave past the site (Negative Traffic) 

5 645  1.0% 

Westbound on Bougianvillea Dr past the site (Positive Traffic) 

5 874  4.0% 

Eastbound on Bougianvillea Dr past the site (Negative Traffic) 

2598  3.0% 

Southbound on Enkeldoorn Ave past the site (Positive Traffic) 

2131  6.0% 

 

As can be seen on the Interception Rate vs ADT graph, the interception rates expected for  the  subject  site  varies  on  Enkeldoorn  Avenue  and  Bougianvillea  Drive.  Lower interception  rates  are  expected  for  the  traffic  travelling  on  the  opposite  side  of  the street, which will have to turn across oncoming traffic (negative traffic).  

 

 

 

 

 

 

ENKELDOORN AVENUE NORTHBOUND 

ENKELDOORN AVENUE SOUTHBOUND 

BOUGIANVILLEA DRIVE EASTBOUND BOUGIANVILLEA DRIVE WESTBOUND 

Page 17: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    17 

3.5 Full trading days in a month 

The  definition  of  full  (normal)  trading  days  in  a month  is  the  number  of  typical weekday sales in a month. A typical weekday is a Tuesday, Wednesday or a Thursday during a week with no school holidays or public holidays. If there was no variation in the traffic, there would have been 30.5 (365/12) full normal trading days in a month. If, for example, the weekend traffic demand  is  lower than during the week, the full normal  trading  days  in  a month  becomes  less.  It  is  thus wrong  to  assume  that  a default value of 30.5 days should be used since a 24‐hour  facility will be operated each day of the month.  

Traffic patterns  in the study area largely determine the number of trading days per month. For filling stations situated  in areas  largely exposed to commuter traffic, 26 full trading days in a month can be expected. The 26 days is based on the fact that a Saturday and Sunday each only count for only half a trade day, resulting in only 6 full days of trading each week.  

With  the  nearby  vicinity  of  large  developments  and  attractions  generating  higher traffic on Saturdays and Sundays.  It  is expected  that 28  trading days per month  is appropriate and was therefore assumed for the proposed filling station.  

 

3.6 Expected Monthly Sales 

For new developments  a  general  guideline  is used when  estimating  fuel  sales  for future  years.  It  is  commonly  found  that  the  full potential of a  filling  station’s  fuel sales is not reached during the first year of operation. Only during the third year the full (100%) potential is normally reached.  

In‐depth calculations  for diesel sales were not conducted separately  for  this study. The average fills on diesel is more than that of petrol, but the profit per litre is lower. It was  thus assumed that  the typical profit on diesel transactions will be similar to the profit on petrol transactions. Diesel sales normally constitute only 5 – 20% of the total  fuel  sales,  depending  on  the %  Heavy  Vehicles  and  there  are  usually  other competitors  that already cater  for  the diesel market, by offering  reward programs and discounts as well as 30 day accounts.  

For the purpose of this study and considering the surrounding area and the very low percentage  of  heavy  vehicles  passing  the  site,  it  was  estimated  that  diesel transactions will account  for approximately only 10% of  the monthly  fuel  sales. A summary of the estimated fuel sales is presented in Table 4 on the next page. 

 

Page 18: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    18 

Table 4: Estimated Fuel Sales per month 

Montana Gardens (Enkeldoorn Ave/Bougianvillea Dr)

N OR TH SOU TH EA ST W EST

Traffic Flow (Vehicles per Day) 5,645 2,131 2,598 5,874

Average Fill (Litres per Day) 20.0 20.0 20.0 20.0

Trading Days (Days per Month) 28 28 28 28

Interception Rate (%) 1.00% 6.00% 3.00% 4.00%

SUB -T OT A L 31,612 71,602 43,646 131,578

SA LES P OT EN T IA L

278,438

ANNUAL FORECAST - MONTHLY SALES POTENTIAL

T OT A L

P ercentageo f P o tent ia l

Gro wthR ate

P etro l D ieselLIT R ES

P ER M ON T H

1 2020 90% 3.00% 232,300 25,811 258,112

2 2021 95% 3.00% 252,562 28,062 280,625

3 2022 100% 3.00% 273,831 30,426 304,256

103,214 175,224

YEA R

P ER IOD P OT EN T IA L GR OWT H EST IM A T ED LIT R ES

M ON T H LY SA LES P OT EN T IA L

MOVEMENT

ALL VEHICLESB o ugianvillea D rEnkeldo o rn A ve

  

Major  fuel companies generally  regard a new site  feasible  if  the  fuel sales volume forecast  indicates  that more  than  300  000  litres  of  fuel will  be  sold  per month. Considering  the expected  fuel sales  tabulated  in Table 4  to be slightly higher  than 300 000  litres by the 3rd year of operations,  it can be concluded that the proposed site will  be  feasible  for  the development of  a  filling  station  for  all  the  larger  fuel companies,  (such  as  SASOL,  TOTAL,  ENGEN,  BP,  SHELL,  etc.)  on  the  corner  of Enkeldoorn Avenue and Bougianvillea Drive, in Montana Gardens, Pretoria.  

 

 

Access Road West 

Page 19: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    19 

 

4 Feasibility of Proposed Site 

We  have  previously  consulted with  filling  station  developers  and  considered  several  new filling  station  development  cases  for  minimum  monthly  fuel  sales  thresholds  and  for development costs. Table 4 below provides a summary of the typical costs associated with a new, modern  filling station development  located on a site roughly  like  the proposed  filling station.  

Table 5: Typical Costs of a New Filling Station 

COST ITEM  COST  COST 

1.  ZONED PROPERTY    R 4 500 000.00 

1.1 Rights, EIA, Licenses, etc.  R 900 000.00   

1.2 Land Cost  R 2 500 000.00   

1.3 Developer Profit  R 500 000.00   

1.4 Bulk Service Contribution  R 350 000.00   

2.  CIVIL ENGINEERING CONTRACT    R 4 400 000.00 

2.1 Access (External Roads)  R 2 000 000.00   

2.2 Internal Roads (incl. paving & kerbs) 

R 1 500 000.00   

2.3 Earthworks  R 750 000.00   

2.4 Services  R 150 000.00   

3.  BUILDER’S CONTRACT    R4 300 000.00 

3.1 Building  R 1 350 000.00   

3.2 Canopy  R 1 000 000.00   

3.3 Signage  R 120 000.00   

3.4 Shop Fitting  R 350 000.00   

3.5 Computer & CCTV System  R 230 000.00   

3.6 Generator  R 250 000.00   

4.  OTHER    R 1 450 000.00 

4.1 Franchise Fee  R 250 000.00   

4.2 Professional Fees  R 950 000.00   

4.3 Gardens, Irrigation and Fencing  R 250 000.00   

TOTAL  R 14 650 000.00  

The  cost variation of a  filling  station development  is  largely  influenced by  the  cost of  the zoned property, the size of the site and the civil engineering works (mainly the cost of the earthworks and the accesses). Major fuel companies generally regard such a site feasible  if the projected fuel sales are in the region of 300 000 liters per month, depending on several factors, but this is not cast in stone and various fuel companies have different views on the required minimum fuel sales thresholds.   Given the expected fuel sales  in year 3, tabulated  in Table 4  (304 000  liters per month),  it can  be  concluded  that  the  proposed  filling  station  will  be  feasible  for  the  larger  fuel companies as the projected fuel sales are more than 300 00 litres per month. 

Page 20: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    20 

 

5 Other Traffic Engineering Considerations 

5.1 Impact on Traffic Flow past the site (Safety) 

Road  authorities  have  in  the  past  identified  the  possible  negative  impact  a  filling station can have on the traffic flow past a site. After proper research and the  input from various experienced  traffic engineers,  the BB2 design manual and Guidelines for Access to Filling Stations were compiled to ensure the construction of proper and safe accesses to filling stations.  

A ‘Full’ Access is proposed on Enkeldoorn Avenue, and on Bougianvillea Drive a ‘Full’ Access is also proposed. 

The  impact  of  the  proposed  filling  station  on  the  existing  traffic  flow  must  be considered for the following two phases:  

(i) During the Construction Phase 

During  the construction phase, construction vehicles or even abnormal vehicles or delivery vehicles could affect and/or disrupt current traffic flows. During this phase possible traffic congestion or  increase  in congestion, temporary obstructions  in the roadway and the influence on adjacent developments must be considered. 

 

(ii) During the Operational Phase 

During  the  operational  phase  the  existing  traffic  flow  patterns  on  the  roadways adjacent  to  the proposed  site are expected  to vary and  change over  time.   Filling stations  are  developments  that  intercept  trips  from  the  background  traffic  as opposed to other developments that generate additional trips.   The  interception of traffic could cause minor disruptions if not considered thoroughly.   

 

The following issues should be considered to minimize the possible negative impacts that  the  proposed  filling  station  might  have  on  the  passing  traffic  during  the operational phase: 

 

◘ The detail design of the proposed filling station should adhere to the prescribed specifications (and subsequent approvals) of the applicable road authorities; 

◘ Care  should be  taken pertaining  to  the placing of  signage  in  the proximity of access points to the proposed filling station; 

◘ Issues  pertaining  to  surface  damage  and  poor  condition  of  the  roads  in proximity  of  the  site  should  be  reported  to  the  applicable  authority  and custodian of the respective roads; and 

◘ Appropriate road signs and traffic markings should be  implemented at the site to ensure safe and convenient access for passing traffic on both roads. 

 

It can be concluded  that  the existing  traffic passing  the  site will not be negatively affected by the proposed filling station’s operations, as the issues mentioned above will be addressed by proper access design standards, turning and deceleration lanes (if applicable) as well as appropriate signage. 

Page 21: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    21 

 

5.2 Delivery Vehicle Path 

Like road safety, the path of the delivery vehicle is also evaluated by the road authority. The geometric standards adopted in the design manuals allow for a fuel delivery vehicle to enter and exit a site safely. Typically, the entrance lane width should be at least 5m wide,  to  accommodate  a  Single  Unit  +  Trailer  Heavy  Vehicle.  For  light  vehicles  a minimum width of only 3.5m is required. 

It  can  be  concluded  that  the  proposed  site will  be  able  to  accommodate  such  fuel delivery vehicles. 

 

Page 22: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    22 

 

6 Conclusions 

The following conclusions were made regarding the proposed filling station: 

◘ The expected fuel sales for the proposed filling station development  is summarized in Table 4. The estimated  fuel  sales  for  the proposed  filling  station’s  third year of operation is approximately 304 000 litres per month. 

◘ The proposed filling station is expected take a total of 158 000 L/month from the 8 competitor sites (Table 2). The proposed site will have an initial negative impact on a number of existing  filling  stations  in  the  study  area, but  considering  the different markets and traffic streams catered for by each of the existing filling stations as well as  the  distances  away  from  the  proposed  filling  station,  the  impact  should  not irreparably  jeopardize  these businesses and with  the positive  traffic growth  in  the area, will  be  able  to  recover within  3  –  4  years  of  the  new  Filling  Station  being implemented. 

◘ One ‘Full’ access is proposed from Bougainvillea Drive and one ‘Left‐in only’ access is proposed from Enkeldoorn Avenue on the southern approach, details are shown on Drawing 19053/AL/01 Rev 1. 

 

General Conclusion 

Major fuel companies generally regard a new site feasible if the fuel sales are more than 300 000  litres  sold per month. Regarding  the proposed  site,  as  the monthly volume as summarized in Table 4 is estimated at 304 000 litres per month by the 3rd year of operation, the proposed site will be feasible for all of the fuel companies. 

 

Considering  the expected  fuel sales  tabulated  in Table 4,  it can be concluded  that the proposed site will indeed be feasible for the development of a filling station. 

 

Page 23: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    23 

 

  Figures  

Figure 1  Locality Plan  

Figure 2  Competitor Sites 

Figure 3  Existing 2019 (24 Hr) Traffic Volumes 

Page 24: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

SITE

MONTANA

PARK

MONTANA

GARDENS

TO

JO

HA

NN

ES

BU

RG

TO

P

OL

OK

W

AN

E

EN

KE

LD

OO

RN

A

VE

NU

E

BO

UG

AIN

VIL

LE

A D

RIV

E

N1

MONTANA

S

E

F

A

K

O

M

A

K

G

A

T

H

O

D

R

IV

E

PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324-JR LOCALITY

19053

FIG 1EDL ENGINEERS

AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SITE:
Page 25: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

SITE

1 KM3 KM

MONTANA

PARK

MONTANA

GARDENS

T

O

J

O

H

A

N

N

E

S

B

U

R

G

TO

P

OL

OK

WA

NE

EN

KE

LD

OO

RN

A

VE

NU

E

BO

UG

AIN

VIL

LE

A D

RIV

E

N1

MONTANA

S

E

F

A

K

O

M

A

K

G

A

T

H

O

D

R

IV

E

MONTANA A.H.

CHRISTIAANVILLE A.H.

WONDERBOOM

AIRPORT

MONDUSTRIA

DOORNPOORT

ZAMBEZI COUNTRY ESTATE

(MONTANA GARDENS)

DR

S

WA

NE

PO

EL

R

OA

D

BR

AA

M

PR

ET

OR

IUS

ST

RE

ET

MAGALIESKRUIN

PUMULANI A.H.

1

2

34

5

6

7

B

C

A

8

EDL CONSULTING ENGINEERS

1st Floor, Block D

The Village Office Park

C/O Glenwood Rd & Oberon Ave,

Fearie Glen, 0043

Tel: 087 897 5074/5/6

[email protected]

www.edlengineers.co.za

PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324-JR

MAIN ROUTES AND COMPETITOR SITES

FIGURE 2 19053 16/10/2019

1:20000 JMvR E.D. KOTZE 0

COMPETITOR SITES

NO. SITE

1 CALTEX AMANDELBOOM MOTORS 1.5km

2 SASOL KOLONNADE 1.6km

3 SASOL ZAMBEZI NORTH 2.1km

4 ENGEN MONTANA CROSSING 2.6km

5 ENGEN MAGALIESKRUIN 2.8km

6 BP ZAMBEZI JUNCTION 3.2km

7 SHELL MONTANA PARK 3.3km

8 POSSIBLE FUTURE STATION 1.4km

A LOCAL MARKET OF MONTANA GARDENS

B

OOCAL MARKET OF ZAMBEZI COUNTRY

ESTATE

C LOCAL MARKET OF MONTANA

AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE.
AutoCAD SHX Text
REVISION.
AutoCAD SHX Text
CHECKED.
AutoCAD SHX Text
DRAWN.
AutoCAD SHX Text
SCALE AT A3.
Page 26: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

SITE

EN

KE

LD

OO

RN

A

VE

NU

E

BO

UG

AIN

VIL

LE

A D

RIV

E

S

E

F

A

K

O

M

A

K

G

A

T

H

O

D

R

IV

E

FIG 3EDL ENGINEERS

PORTION 288 HARTEBEESTFONTEIN 324-JR EXISTING 2019 24-HOUR TRAFFIC

19053

2131

2598

36662208

2248

3397

AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SITE:
Page 27: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    24 

   Drawings  

 

Drawing No:    19053/AL/01 Rev 1 Proposed Access Layout  

 

 

 

Page 28: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

1.31

12.742

6.175

Max 90° Horiz

Max 10° Vert

6.65 1.31

Lock to lock time

1.701

4.49

1.475 2.8 1.1

Oil Tanker

Overall Length 15.461m

Overall Width 2.500m

Overall Body Height 3.396m

Min Body Ground Clearance 0.320m

Max Track Width 2.500m

4.00s

Kerb to Kerb Turning Radius 6.500m

4

I

S

L

A

N

D

C

A

N

O

P

Y

5

.

5

0

Resident

Exit

Visitor

Gate

house

RM

7.1T

60.0

5.1

5

.

0

35.0

R

2

0

.

0

R

1

5

.

0

R

1

5

.

0

R20.0

R2

R1

O

il T

a

n

k

e

r

70.0

95.0

80.0

R3

R3

BO

U

G

AIN

VILLE

A D

R

IV

E

EN

KE

LD

O

O

R

N

A

VE

N

U

E

PROPOSED

FILLING STATION

PROPOSED

RESIDENTIAL DEVELOPMENT

AS PER TIA BY EDL ENGINEERS DATED DECEMBER 2019

PROPOSED

LEFT-IN ACCESS

PROPOSED FUTURE

TRAFFIC CIRCLE

PROPOSED FUTURE

TRAFFIC CIRCLE

PROPOSED KERBED

MEDIAN (SHORT TERM)

PROPOSED KERBED

MEDIAN (LONG TERM)

R

2

0

.

0

R

2

.

0

5

.

0

5

.

0

3.4

5.0

30.0

3.4

6

.

0

LEGEND

PROPOSED ACCESS AND LAY-BYE LAYOUTS

FUTURE ROAD PLANNING AND ALIGNMENT

EXTERNAL PLANNED ACCESS

EDL CONSULTING ENGINEERS

1st Floor, Block D

The Village Office Park

C/O Glenwood Rd & Oberon Ave,

Fearie Glen, 0043

Tel: 087 897 5074/5/6

[email protected]

www.edlengineers.co.za

PORTION 288 HATEBEESTFONTEIN 324-JR

PROPOSED ACCESS LAYOUT

19053/AL/01 19053 04/12/2019

1:1000 JMvR E.D. KOTZE 1

NOTE:

PROPOSED TRAFFIC CIRCLES BY TSHWANE METROPOLITAN MUNICIPALITY AS PREPARED BY VIRTUAL CONSULTING ENGINEERS ON DRAWING NR. P9096-PD-011-RD-001.

AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
19
AutoCAD SHX Text
18
AutoCAD SHX Text
FILLERS
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE.
AutoCAD SHX Text
REVISION.
AutoCAD SHX Text
CHECKED.
AutoCAD SHX Text
DRAWN.
AutoCAD SHX Text
SCALE AT A3.
Page 29: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    25 

   Annexures  

Annexure A  Competitor Filling Station Photos 

Annexure B  Traffic Count Report 

Page 30: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    26 

   Annexure A  

Competitor Filling Station Photos 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 31: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    27 

Photo 1: CALTEX AMANDELBOOM MOTORS 

 

 

 

 

 

 

 

 

 

Photo 2: SASOL KOLONNADE 

 

 

 

 

 

 

 

 

 

Photo 3: SASOL ZAMBEZI NORTH 

 

 

 

 

 

 

 

 

 

Page 32: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    28 

Photo 4: ENGEN MONTANA CROSSING 

 

 

 

 

 

 

 

 

 

Photo 5: ENGEN MAGALIESKRUIN 

 

 

 

 

 

 

 

 

 

Photo 6: BP ZAMBEZI JUNCTION 

 

 

 

 

 

 

 

 

 

Page 33: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    29 

Photo 7: SHELL MONTANA PARK 

 

 

 

 

 

 

 

 

 

Photo 8: POSSIBLE FUTURE FILLING STATION 

 

 

 

 

 

 

 

 

 

Page 34: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

FILLING STATION FEASIBILITY STUDY  (Rev 1) PORTION 288 OF THE FARM HARTEBEESTFONTEIN 324‐JR, MONTANA GARDENS, PRETORIA (C/O ENKELDOORN AVENUE & BOUGAINVILLEA DRIVE) 

 

  EDL ENGINEERS (PTY) LTD    30 

   Annexure C  

Traffic Count Report 

 

Page 35: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

TRAFFIC COUNT REPORT

ONE DAY CLASSIFIED 1 INTERSECTION

PROPOSED FILLING STATION

COUNT DATE WEDNESDAY 02 OCTOBER 2019

DATE APPROVED MONDAY 14 OCTOBER 2019

PROJECT ENGINEERS EBEN KOTZE

PR. TECH

JOHN M. VAN ROOYENB.Eng

PROJECT NUMBER 19053

MONTANA, PRETORIA, GAUTENG

INTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TRAFFIC COUNT

EDL Engineers (Pty) Ltd1st Floor, Block DThe Village Office ParkC/o Glenwood Rd & Oberon Ave,Fearie Glen, 0043Cell: +27 (0)83 564 1563Tel: +27 (0)87 897 5074/5/6Email: [email protected]

Page 36: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

PROJECT INFORMATION

PROJECT DETAILS

EDL PROJECT NAMEINTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TRAFFIC COUNT

PROJECT TYPE PROPOSED FILLING STATION

SITE LOCATION MONTANA, PRETORIA, GAUTENG

TRAFFIC COUNT INFORMATION 1 INTERSECTION COUNTED :

INTERSECTION 1 ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE

TYPE OF SURVEY 13 HOURS CLASSIFIED

COUNT DATE WEDNESDAY 02 OCTOBER 2019

PROJECT TEAM

MANAGING DIRECTOR EBEN KOTZE

PR. TECH

E-MAIL ADDRESS [email protected]

DATE APPROVED MONDAY 14 OCTOBER 2019

DIRECTOR SIGNATURE

PROJECT ENGINEER JOHN M. VAN ROOYEN

B.Eng

PROJECT NUMBER 19053

DATA COUNT REFERENCE EDL-PTA-1

CLIENT DETAILS

CLIENT NAME

Project Information Page 2 of 12

Page 37: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

1. SITE LOCATION 4

FIGURE 1 : LOCALITY PLAN ............................................................................ 4

2. TRAFFIC COUNT : INTERSECTION 1 5

ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE

FIGURE 2 A : TRAFFIC MOVEMENT ................................................................. 6

Summary of All Vehicles ....................................................................................... 7

Light Vehicles ...................................................................................................... 8

Taxis ................................................................................................................... 9

Heavy Vehicles .................................................................................................... 10

Summary Chart of All Vehicles ............................................................................ 11

0

FIGURE 2 C : TRAFFIC MOVEMENT ................................................................. 23

Summary of All Vehicles ....................................................................................... 24

Light Vehicles ...................................................................................................... 25

Taxis ................................................................................................................... 26

Heavy Vehicles .................................................................................................... 27

Summary Chart of All Vehicles ............................................................................ 28

Page 38: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

INTERSECTION 1 FIGURE NUMBER

LOCALITY PLAN 1

PROJECT CHECKED BY PROJECT

EBEN KOTZE 19053INTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TRAFFIC COUNT

ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE

SITE LOCATION

LEGEND:

TRAFFIC COUNT POSITIONS

FIG 1 Locality Plan Page 4 of 12

Page 39: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

PROJECT NAMEINTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TRAFFIC COUNT

INTERSECTION 1 ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE

COUNT DATE WEDNESDAY 02 OCTOBER 2019

TYPE OF SURVEY 13 HOURS CLASSIFIED

INT

ER

SE

CT

ION

1E

NK

ELD

OO

RN

AV

EN

UE

& B

OU

GIA

NV

ILLE

A D

RIV

E

Page 40: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

1

PROJECT

ENKELDOORN 

AVENUE

ESTIMATED 24HR TRAFFIC

2,208

3,666

TRAFFIC MOVEMENT

2,131

2,598

16,248

BOUGIANVILLEA 

DRIVE

ENKELDOORN 

AVENUE

INTERSECTION 1

ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE

PROJECT

INTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TRAFFIC COUNT

3,397

2,248

19053

FIGURE

TRAFFIC MOVEMENT

CHECKED BY

EBEN KOTZE

NUMBER

FIG 2A Traffic Movement Page 6 of 12

Page 41: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

TRAFFIC COUNT INTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TRAFFIC COUNTINTERSECTION 1 ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE

TYPE OF SURVEY

COUNT DATE WEDNESDAY 02 OCTOBER 2019 Project No. 19053

START END 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

06:00 06:15 0 29 41 46 0 8 74 37 0 0 0 0 235

06:15 06:30 0 30 39 52 0 17 90 38 0 0 0 0 266

06:30 06:45 0 24 62 79 0 28 80 38 0 0 0 0 311

06:45 07:00 0 29 66 113 0 31 81 51 0 0 0 0 371

07:00 07:15 0 46 66 84 0 41 83 61 0 0 0 0 381

07:15 07:30 0 28 77 72 0 34 97 43 0 0 0 0 351

07:30 07:45 0 30 55 77 0 27 75 45 0 0 0 0 309

07:45 08:00 0 38 49 63 0 23 79 45 0 0 0 0 297

08:00 08:15 0 26 34 53 0 22 35 8 0 0 0 0 178

08:15 08:30 0 32 34 58 0 25 65 43 0 0 0 0 257

08:30 08:45 0 22 24 61 0 26 49 25 0 0 0 0 207

08:45 09:00 0 16 31 47 0 29 48 37 0 0 0 0 208

09:00 09:15 0 19 28 61 0 17 39 33 0 0 0 0 197

09:15 09:30 0 25 26 62 0 16 37 31 0 0 0 0 197

09:30 09:45 0 25 33 49 0 21 23 26 0 0 0 0 177

09:45 10:00 0 25 39 43 0 15 37 33 0 0 0 0 192

10:00 10:15 0 30 40 44 0 31 24 37 0 0 0 0 206

10:15 10:30 0 31 51 42 0 11 28 31 0 0 0 0 194

10:30 10:45 0 28 39 43 0 19 29 34 0 0 0 0 192

10:45 11:00 0 25 44 43 0 21 29 31 0 0 0 0 193

11:00 11:15 0 23 46 45 0 26 28 30 0 0 0 0 198

11:15 11:30 0 34 43 53 0 21 30 29 0 0 0 0 210

11:30 11:45 0 27 45 49 0 24 27 20 0 0 0 0 192

11:45 12:00 0 27 46 44 0 13 33 31 0 0 0 0 194

12:00 12:15 0 32 45 33 0 31 32 26 0 0 0 0 199

12:15 12:30 0 27 42 62 0 26 18 31 0 0 0 0 206

12:30 12:45 0 31 54 49 0 34 26 23 0 0 0 0 217

12:45 13:00 0 39 48 44 0 33 26 26 0 0 0 0 216

13:00 13:15 0 29 48 51 0 18 22 35 0 0 0 0 203

13:15 13:30 0 34 43 62 0 35 29 47 0 0 0 0 250

13:30 13:45 0 34 48 45 0 21 24 31 0 0 0 0 203

13:45 14:00 0 34 61 62 0 29 22 30 0 0 0 0 238

14:00 14:15 0 35 70 62 0 20 31 31 0 0 0 0 249

14:15 14:30 0 38 53 64 0 41 31 33 0 0 0 0 260

14:30 14:45 0 30 71 60 0 29 36 40 0 0 0 0 266

14:45 15:00 0 38 54 70 0 31 41 38 0 0 0 0 272

15:00 15:15 0 37 58 50 0 47 38 34 0 0 0 0 264

15:15 15:30 0 39 53 57 0 57 28 35 0 0 0 0 269

15:30 15:45 0 44 77 65 0 33 33 35 0 0 0 0 287

15:45 16:00 0 46 65 64 0 51 27 36 0 0 0 0 289

16:00 16:15 0 44 69 71 0 68 27 41 0 0 0 0 320

16:15 16:30 0 56 69 71 0 72 45 40 0 0 0 0 353

16:30 16:45 0 66 84 88 0 84 44 31 0 0 0 0 397

16:45 17:00 0 73 73 66 0 62 46 45 0 0 0 0 365

17:00 17:15 0 59 84 78 0 77 37 35 0 0 0 0 370

17:15 17:30 0 52 70 77 0 67 46 30 0 0 0 0 342

17:30 17:45 0 58 80 60 0 71 46 33 0 0 0 0 348

17:45 18:00 0 53 78 61 0 66 42 34 0 0 0 0 334

18:00 18:15 0 50 79 63 0 59 53 33 0 0 0 0 337

18:15 18:30 0 44 86 54 0 57 36 30 0 0 0 0 307

18:30 18:45 0 40 52 51 0 42 34 34 0 0 0 0 253

18:45 19:00 0 42 59 32 0 33 25 22 0 0 0 0 213

0 1,873 2,831 3,055 0 1,840 2,165 1,776 0 0 0 0 13,540

0 2,248 3,397 3,666 0 2,208 2,598 2,131 0 0 0 0 16,248

TOTALEST. 24 HR

13 HOURS CLASSIFIED

SUMMARY OF ALL VEHICLEST I M E NORTHBOUND WESTBOUND SOUTHBOUND EASTBOUND

IC1 All Vehicles Page 7 of 12

Page 42: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

TRAFFIC COUNT INTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TRAFFIC COUNTINTERSECTION 1 ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE

TYPE OF SURVEY

COUNT DATE WEDNESDAY 02 OCTOBER 2019 Project No. 19053

TRAFFIC MOVEMENT : LIGHT VEHICLES

START END 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

06:00 06:15 0 20 40 45 0 8 70 35 0 0 0 0 218

06:15 06:30 0 20 35 47 0 16 83 32 0 0 0 0 233

06:30 06:45 0 19 60 76 0 25 77 34 0 0 0 0 291

06:45 07:00 0 23 65 107 0 30 78 47 0 0 0 0 350

07:00 07:15 0 40 65 83 0 40 80 57 0 0 0 0 365

07:15 07:30 0 23 76 71 0 33 95 36 0 0 0 0 334

07:30 07:45 0 23 54 77 0 21 73 37 0 0 0 0 285

07:45 08:00 0 31 48 61 0 20 77 39 0 0 0 0 276

08:00 08:15 0 22 34 52 0 22 35 7 0 0 0 0 172

08:15 08:30 0 29 34 57 0 25 64 38 0 0 0 0 247

08:30 08:45 0 16 24 61 0 25 49 23 0 0 0 0 198

08:45 09:00 0 15 31 47 0 29 48 32 0 0 0 0 202

09:00 09:15 0 17 28 60 0 17 37 33 0 0 0 0 192

09:15 09:30 0 25 25 61 0 14 34 29 0 0 0 0 188

09:30 09:45 0 23 31 49 0 21 22 26 0 0 0 0 172

09:45 10:00 0 25 39 43 0 14 37 32 0 0 0 0 190

10:00 10:15 0 30 39 43 0 29 24 36 0 0 0 0 201

10:15 10:30 0 28 51 42 0 11 27 29 0 0 0 0 188

10:30 10:45 0 26 39 43 0 19 29 32 0 0 0 0 188

10:45 11:00 0 24 43 41 0 20 27 30 0 0 0 0 185

11:00 11:15 0 22 45 43 0 26 27 30 0 0 0 0 193

11:15 11:30 0 32 43 51 0 21 28 26 0 0 0 0 201

11:30 11:45 0 26 43 48 0 21 25 19 0 0 0 0 182

11:45 12:00 0 24 45 43 0 12 31 29 0 0 0 0 184

12:00 12:15 0 30 44 31 0 31 31 26 0 0 0 0 193

12:15 12:30 0 26 42 61 0 24 18 29 0 0 0 0 200

12:30 12:45 0 29 54 48 0 32 26 22 0 0 0 0 211

12:45 13:00 0 38 47 44 0 33 26 25 0 0 0 0 213

13:00 13:15 0 27 47 50 0 18 22 33 0 0 0 0 197

13:15 13:30 0 31 42 62 0 33 28 46 0 0 0 0 242

13:30 13:45 0 30 47 44 0 21 23 25 0 0 0 0 190

13:45 14:00 0 31 61 62 0 29 21 28 0 0 0 0 232

14:00 14:15 0 35 69 62 0 19 30 28 0 0 0 0 243

14:15 14:30 0 35 52 62 0 36 27 32 0 0 0 0 244

14:30 14:45 0 27 67 56 0 27 34 33 0 0 0 0 244

14:45 15:00 0 35 52 69 0 25 37 33 0 0 0 0 251

15:00 15:15 0 36 55 49 0 43 38 31 0 0 0 0 252

15:15 15:30 0 39 51 52 0 55 26 30 0 0 0 0 253

15:30 15:45 0 42 75 63 0 32 32 32 0 0 0 0 276

15:45 16:00 0 40 60 63 0 49 27 31 0 0 0 0 270

16:00 16:15 0 43 68 66 0 66 27 40 0 0 0 0 310

16:15 16:30 0 54 68 70 0 72 44 34 0 0 0 0 342

16:30 16:45 0 64 83 84 0 81 43 30 0 0 0 0 385

16:45 17:00 0 71 72 63 0 61 46 43 0 0 0 0 356

17:00 17:15 0 57 82 77 0 77 36 32 0 0 0 0 361

17:15 17:30 0 50 70 77 0 67 46 30 0 0 0 0 340

17:30 17:45 0 56 79 59 0 69 46 30 0 0 0 0 339

17:45 18:00 0 51 77 59 0 66 41 32 0 0 0 0 326

18:00 18:15 0 44 78 59 0 59 52 31 0 0 0 0 323

18:15 18:30 0 41 86 53 0 56 36 28 0 0 0 0 300

18:30 18:45 0 38 51 51 0 41 34 32 0 0 0 0 247

18:45 19:00 0 40 59 32 0 33 25 19 0 0 0 0 208

0 1,723 2,775 2,979 0 1,774 2,099 1,633 0 0 0 0 12,983

0 2,068 3,330 3,575 0 2,129 2,519 1,960 0 0 0 0 15,580

13 HOURS CLASSIFIED

T I M E NORTHBOUND WESTBOUND SOUTHBOUND

TOTAL

EASTBOUND

EST. 24 HR

IC1 Light Vehicles Page 8 of 12

Page 43: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

TRAFFIC COUNT INTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TRAFFIC COUNTINTERSECTION 1 ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE

TYPE OF SURVEY

COUNT DATE WEDNESDAY 02 OCTOBER 2019 Project No. 19053

TRAFFIC MOVEMENT : TAXIS

START END 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

06:00 06:15 0 7 1 1 0 0 4 0 0 0 0 0 13

06:15 06:30 0 10 4 5 0 1 7 5 0 0 0 0 32

06:30 06:45 0 5 2 3 0 3 3 3 0 0 0 0 19

06:45 07:00 0 6 1 5 0 1 3 4 0 0 0 0 20

07:00 07:15 0 6 1 1 0 1 2 4 0 0 0 0 15

07:15 07:30 0 5 0 1 0 1 1 7 0 0 0 0 15

07:30 07:45 0 6 1 0 0 3 2 8 0 0 0 0 20

07:45 08:00 0 7 0 1 0 2 1 5 0 0 0 0 16

08:00 08:15 0 4 0 0 0 0 0 1 0 0 0 0 5

08:15 08:30 0 3 0 0 0 0 1 3 0 0 0 0 7

08:30 08:45 0 4 0 0 0 0 0 0 0 0 0 0 4

08:45 09:00 0 1 0 0 0 0 0 2 0 0 0 0 3

09:00 09:15 0 1 0 1 0 0 0 0 0 0 0 0 2

09:15 09:30 0 0 1 0 0 0 0 1 0 0 0 0 2

09:30 09:45 0 2 1 0 0 0 0 0 0 0 0 0 3

09:45 10:00 0 0 0 0 0 0 0 1 0 0 0 0 1

10:00 10:15 0 0 1 0 0 0 0 1 0 0 0 0 2

10:15 10:30 0 2 0 0 0 0 0 0 0 0 0 0 2

10:30 10:45 0 1 0 0 0 0 0 2 0 0 0 0 3

10:45 11:00 0 1 1 0 0 0 0 0 0 0 0 0 2

11:00 11:15 0 1 1 0 0 0 1 0 0 0 0 0 3

11:15 11:30 0 1 0 1 0 0 1 2 0 0 0 0 5

11:30 11:45 0 1 2 0 0 0 0 0 0 0 0 0 3

11:45 12:00 0 1 0 1 0 1 0 2 0 0 0 0 5

12:00 12:15 0 2 1 1 0 0 0 0 0 0 0 0 4

12:15 12:30 0 1 0 1 0 1 0 2 0 0 0 0 5

12:30 12:45 0 2 0 0 0 0 0 0 0 0 0 0 2

12:45 13:00 0 1 1 0 0 0 0 1 0 0 0 0 3

13:00 13:15 0 0 1 0 0 0 0 1 0 0 0 0 2

13:15 13:30 0 2 0 0 0 1 0 1 0 0 0 0 4

13:30 13:45 0 4 1 1 0 0 0 4 0 0 0 0 10

13:45 14:00 0 1 0 0 0 0 0 1 0 0 0 0 2

14:00 14:15 0 0 1 0 0 1 0 2 0 0 0 0 4

14:15 14:30 0 2 1 2 0 3 3 1 0 0 0 0 12

14:30 14:45 0 1 3 4 0 2 1 7 0 0 0 0 18

14:45 15:00 0 2 1 0 0 4 1 3 0 0 0 0 11

15:00 15:15 0 0 3 1 0 2 0 2 0 0 0 0 8

15:15 15:30 0 0 0 3 0 1 1 3 0 0 0 0 8

15:30 15:45 0 1 1 1 0 1 0 3 0 0 0 0 7

15:45 16:00 0 5 4 1 0 2 0 3 0 0 0 0 15

16:00 16:15 0 1 1 2 0 0 0 1 0 0 0 0 5

16:15 16:30 0 2 0 1 0 0 1 5 0 0 0 0 9

16:30 16:45 0 2 1 2 0 1 1 1 0 0 0 0 8

16:45 17:00 0 2 1 2 0 1 0 2 0 0 0 0 8

17:00 17:15 0 1 2 1 0 0 1 2 0 0 0 0 7

17:15 17:30 0 1 0 0 0 0 0 0 0 0 0 0 1

17:30 17:45 0 2 0 1 0 1 0 2 0 0 0 0 6

17:45 18:00 0 2 1 0 0 0 1 2 0 0 0 0 6

18:00 18:15 0 4 1 4 0 0 1 1 0 0 0 0 11

18:15 18:30 0 2 0 1 0 1 0 2 0 0 0 0 6

18:30 18:45 0 2 1 0 0 1 0 1 0 0 0 0 5

18:45 19:00 0 2 0 0 0 0 0 3 0 0 0 0 5

0 122 43 49 0 36 37 107 0 0 0 0 394

0 146 52 59 0 43 44 128 0 0 0 0 473

13 HOURS CLASSIFIED

T I M E NORTHBOUND WESTBOUND SOUTHBOUND

TOTAL

EASTBOUND

EST. 24 HR

IC1 Taxis Page 9 of 12

Page 44: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

TRAFFIC COUNT INTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TRAFFIC COUNTINTERSECTION 1 ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE

TYPE OF SURVEY

COUNT DATE WEDNESDAY 02 OCTOBER 2019 Project No. 19053

TRAFFIC MOVEMENT : HEAVY VEHICLES

START END 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

06:00 06:15 0 2 0 0 0 0 0 2 0 0 0 0 4

06:15 06:30 0 0 0 0 0 0 0 1 0 0 0 0 1

06:30 06:45 0 0 0 0 0 0 0 1 0 0 0 0 1

06:45 07:00 0 0 0 1 0 0 0 0 0 0 0 0 1

07:00 07:15 0 0 0 0 0 0 1 0 0 0 0 0 1

07:15 07:30 0 0 1 0 0 0 1 0 0 0 0 0 2

07:30 07:45 0 1 0 0 0 3 0 0 0 0 0 0 4

07:45 08:00 0 0 1 1 0 1 1 1 0 0 0 0 5

08:00 08:15 0 0 0 1 0 0 0 0 0 0 0 0 1

08:15 08:30 0 0 0 1 0 0 0 2 0 0 0 0 3

08:30 08:45 0 2 0 0 0 1 0 2 0 0 0 0 5

08:45 09:00 0 0 0 0 0 0 0 3 0 0 0 0 3

09:00 09:15 0 1 0 0 0 0 2 0 0 0 0 0 3

09:15 09:30 0 0 0 1 0 2 3 1 0 0 0 0 7

09:30 09:45 0 0 1 0 0 0 1 0 0 0 0 0 2

09:45 10:00 0 0 0 0 0 1 0 0 0 0 0 0 1

10:00 10:15 0 0 0 1 0 2 0 0 0 0 0 0 3

10:15 10:30 0 1 0 0 0 0 1 2 0 0 0 0 4

10:30 10:45 0 1 0 0 0 0 0 0 0 0 0 0 1

10:45 11:00 0 0 0 2 0 1 2 1 0 0 0 0 6

11:00 11:15 0 0 0 2 0 0 0 0 0 0 0 0 2

11:15 11:30 0 1 0 1 0 0 1 1 0 0 0 0 4

11:30 11:45 0 0 0 1 0 3 2 1 0 0 0 0 7

11:45 12:00 0 2 1 0 0 0 2 0 0 0 0 0 5

12:00 12:15 0 0 0 1 0 0 1 0 0 0 0 0 2

12:15 12:30 0 0 0 0 0 1 0 0 0 0 0 0 1

12:30 12:45 0 0 0 1 0 2 0 1 0 0 0 0 4

12:45 13:00 0 0 0 0 0 0 0 0 0 0 0 0 0

13:00 13:15 0 2 0 1 0 0 0 1 0 0 0 0 4

13:15 13:30 0 1 1 0 0 1 1 0 0 0 0 0 4

13:30 13:45 0 0 0 0 0 0 1 2 0 0 0 0 3

13:45 14:00 0 2 0 0 0 0 1 1 0 0 0 0 4

14:00 14:15 0 0 0 0 0 0 1 1 0 0 0 0 2

14:15 14:30 0 1 0 0 0 2 1 0 0 0 0 0 4

14:30 14:45 0 2 1 0 0 0 1 0 0 0 0 0 4

14:45 15:00 0 1 1 1 0 2 3 2 0 0 0 0 10

15:00 15:15 0 1 0 0 0 2 0 1 0 0 0 0 4

15:15 15:30 0 0 2 2 0 1 1 2 0 0 0 0 8

15:30 15:45 0 1 1 1 0 0 1 0 0 0 0 0 4

15:45 16:00 0 1 1 0 0 0 0 2 0 0 0 0 4

16:00 16:15 0 0 0 3 0 2 0 0 0 0 0 0 5

16:15 16:30 0 0 1 0 0 0 0 1 0 0 0 0 2

16:30 16:45 0 0 0 2 0 2 0 0 0 0 0 0 4

16:45 17:00 0 0 0 1 0 0 0 0 0 0 0 0 1

17:00 17:15 0 1 0 0 0 0 0 1 0 0 0 0 2

17:15 17:30 0 1 0 0 0 0 0 0 0 0 0 0 1

17:30 17:45 0 0 1 0 0 1 0 1 0 0 0 0 3

17:45 18:00 0 0 0 2 0 0 0 0 0 0 0 0 2

18:00 18:15 0 2 0 0 0 0 0 1 0 0 0 0 3

18:15 18:30 0 1 0 0 0 0 0 0 0 0 0 0 1

18:30 18:45 0 0 0 0 0 0 0 1 0 0 0 0 1

18:45 19:00 0 0 0 0 0 0 0 0 0 0 0 0 0

0 28 0 27 0 30 29 36 0 0 0 0 163

0 34 0 32 0 36 35 43 0 0 0 0 180

13 HOURS CLASSIFIED

T I M E NORTHBOUND WESTBOUND SOUTHBOUND

TOTAL

EASTBOUND

EST. 24 HR

IC1 Heavy Vehicles Page 10 of 12

Page 45: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

TRAFFIC COUNT INTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TYPE OF SURVEY 13 HOURS CLASSIFIED PROJECT NUMBER

INTERSECTION 1 ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE COUNT DATE WEDNESDAY 02 OCTOBER 2019 19053

SUMMARY OF ALL VEHICLES23

5

266

311

371 38

1

351

309

297

178

257

207

208

197

197

177 19

2 206

194

192

193 198 21

0

192

194 199 20

6 217

216

203

250

203

238 24

9 260 26

6 272

264 269

287

289

320

353

397

365 370

342 34

8

334

337

307

253

213

0

100

200

300

400

500

06:0

0

07:0

0

08:0

0

09:0

0

10:0

0

11:0

0

12:0

0

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

TR

AF

FIC

MO

VE

ME

NT

TRAFFIC PER 15 MINUTE PERIOD

IC1 Summary Charts Page 11 of 12

Page 46: FILLING STATION FEASIBILITY STUDY · filling station feasibility study (rev 1) portion 288 of the farm hartebeestfontein 324‐jr, montana gardens, pretoria (c/o enkeldoorn avenue

TRAFFIC COUNT INTERSECTION OF ENKELDOORN AVE AND BOUGIANVILLEA DR TYPE OF SURVEY 13 HOURS CLASSIFIED PROJECT No.

INTERSECTION 1 ENKELDOORN AVENUE & BOUGIANVILLEA DRIVE COUNT DATE WEDNESDAY 02 OCTOBER 2019 19053

SUMMARISED BREAKDOWN OF ALL VEHICLES

TAXIS

HEAVY VEHICLES

LIGHT VEHICLES

218 23

329

135

0 365

334

285

276

172

247

198

202

192

188

172 19

0 201

188

188

185

193

201

182

184

193

200 211

213

197

242

190

232 243

244

244

251

252

253 27

627

0 310 34

238

535

636

134

033

932

632

330

024

720

8

0

100

200

300

400

500

06:

00

07:

00

08:

00

09:

00

10:

00

11:

00

12:

00

13:

00

14:

00

15:

00

16:

00

17:

00

18:

00

1332

19 2015 15

2016

5 7 4 3 2 2 3 1 2 2 3 2 3 5 3 5 4 5 2 3 2 410

2 412

1811 8 8 7

155

9 8 8 71

6 611

6 5 5

0

100

06:

00

07:

00

08:

00

09:

00

10:

00

11:

00

12:

00

13:

00

14:

00

15:

00

16:

00

17:

00

18:

00

41 1 1 1 2 4 51 3 5 3 3

72 1 3 41

62 4

7 52 14

04 4 3 4 2 4 4

104

84 4 5

2 41 2 1 3 2 3 1 1 0

0

100

06:

00

07:

00

08:

00

09:

00

10:

00

11:

00

12:

00

13:

00

14:

00

15:

00

16:

00

17:

00

18:

00

IC1 Summary Charts Page 12 of 12