In-Situ Sediment
Dredge(+/- Resuspension
Controls)
Pipe or BargeTransport
Size Separation
Holding/SettlingFacility
Dewatering
Treat Water
WaterSolids
Discharge
Process Sediment
Railcar/Barge
Transport
TSCA-/Non-TSCADisposal
FIGURE
1
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
NOTES:
1. Dotted outline box represents optional element
HUDSON RIVER REMEDIATION
CONCEPTUAL PROCESS FLOW
TREATABILITY STUDIES WORK PLAN
FIGURE
2
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
MECHANICALLY DREDGED AND MECHANICALLY
OFFLOADED CONCEPTUAL PROCESS FLOW
AND ASSOCIATED TREATABILITY TESTS
TREATABILITY STUDIES WORK PLAN
In-Situ Sediment
MechanicallyDredge Sediment
Mechanically OffloadDredged Material
Barge Transport
Water Removal
from Barge
MixingChemical
Addition
Sediment toDewater
Water Holding
Settling
Filtration
Carbon Adsorption
Discharge
Sediment Removed
from Barge
- Storage/TransportationStability ShakerTest
- Stabilization/Solidification Tests
- Paint Filter Test
SolidificationAgent
Staging & Testing
Solidified Cake
Railcar/Barge
Transport
TSCA/Non-TSCADisposal
WaterSolids
Solids
NOTES:
1. Green oval outline represents a treatability study test.
- Dredged MaterialSlurry Simulation M1
FIGURE
3
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
TREATABILITY STUDIES WORK PLAN
In-Situ Sediment
Hydraulically orMechanically
Dredge Sediment
Hydraulically OffloadDredged Material
Pipe or BargeTransport
Size Separation
Holding/SettlingFacility
Dewatering
Press Filtrate
Mixing
- Polymer Jar Tests- Column Settling Tests
- Size Separation Tests- Drainage Tests
- Carbon Column Tests- Rapid Small-ScaleColumn Tests
Water Holding
Chemical Addition
Settling
Filtration
Carbon Adsorption
Discharge
- Multi-MediaFiltration Tests
- Polymer Jar Tests- Primary SedimentationTests
- Mixing Energy Study
Dewatered Cake
- Storage/TransportationStability Shaker Test
- Paint Filter Test- Cake Release Tests- Cake Solids vs.Time Tests
SolidificationAgent
Staging & Testing
Solidified Cake
- Dredged MaterialSlurry SimulationH1 & H2
- Dredge Elutriate Test
- High-Volume Plate &Frame Filter Press Tests
- Plate & Frame Filter Test- Buchner Funnel Tests- Mixing Sub-Study- Dewatering PolymerScreening Tests
- Preferred Polymer Test- Centrifuge Test
Railcar/BargeTransport
TSCA/Non-TSCADisposal
WaterSolids
Solids
NOTES:1. Green oval outline represents a treatability study test.
HYDRAULICALLY DREDGED OR MECHANICALLYDREDGED AND HYDRAULICALLY OFFLOADED
CONCEPTUAL PROCESS FLOW AND ASSOCIATEDTREATABILITY TESTS
- Stabilization/Solidification Tests
FIGURE
11
TREATABILITY STUDY TEST
FLOW DIAGRAM DREDGED MATERIAL
SLURRY SIMULATION M1 TESTS
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
NOTES:
1. [1a(1)] = Refers to DQO and data and measurement in Table 2.
2. M1= 80:20 solids: water (volumetric basis)TREATABILITY STUDIES WORK PLAN
Dredged material slurrysimulation M1S1
Dredged material slurryM1S2simulation
Dredged material slurryM1S3simulation
Dredged material slurryM1S4simulation
Slurry Slurry Slurry Slurry
Yes Yes Yes Yes
No No No No
Water Water Water WaterSediment Sediment Sediment Sediment
Solids Solids Solids Solids
Collect and analyzesediment sample S4 andwater sample [1a & 1b]
Collect and analyzesediment sample S3 andwater sample [1a & 1b]
Collect and analyzesediment sample S2 andwater sample [1a & 1b]
Collect and analyzesediment sample S1 andwater sample [1a & 1b]
Performstorage/transportation
stability shakertests [6a]
Performstorage/transportation
stability shakertests [6a]
Performstorage/transportation
stability shakertests [6a]
Performstorage/transportation
stability shakertests [6a]
Performstabilization/solidification
tests [4a(1)]
Performstabilization/solidification
tests [4a(1)]
Performstabilization/solidification
tests [4a(1)]
Performstabilization/solidification
tests [4a(1)]
Prepare dredged materialslurry simulation (M1S1)with sediment sample S1
and water sample[2a]
Prepare dredged materialslurry simulation (M1S2)with sediment sample S2
and water sample[2a]
Prepare dredged materialslurry simulation (M1S3)with sediment sample S3
and water sample[2a]
Prepare dredged materialslurry simulation (M1S4)with sediment sample S4
and water sample[2a]
Passpaint filter
test ? [4a(1)]
Passpaint filter
test ? [4a(1)]
Passpaint filter
test ? [4a(1)]
Passpaint filter
test ? [4a(1)]
FIGURE
12
TREATABILITY STUDY TEST
FLOW DIAGRAM DREDGED MATERIAL
SLURRY SIMULATION H1S1 TESTS
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
NOTES:
1. [1a(1)] = Refers to DQO and data and measurement in Table 2.
2. H1 = 25:75 solids: water (weight proportions)TREATABILITY STUDIES WORK PLAN
Dredged material slurrysimulation H1S1
WaterSediment
Slurry
Filtrate
Filtrate
Results
Results
Cake
Solids
Solids
Coarse
Fraction
Collect and analyzesediment sample S1 andwater sample [1a & 1b]
Performstorage/transportation
stability shakertests [6a]
Perform high-volumeplate & frame filter press
tests [4b(3b)]
Performstabilization/solidification
tests [4b(4)]
Perform mixing energytests [4b(5)]
Perform sizeseparation tests [4b(1a)]
Perform drainagetests [4b(1b)]
Perform polymerscreening tests [5a(1)]
Perform rapidsmall-scale column
tests [5a(3)]
Perform column settlingtests [5a(1)]
Perform multi-mediafiltration tests [5a(2)]
Perform carboncolumn tests [5a(3)]
Prepare dredged materialslurry simulation (H1S1)with sediment sample S1
and water sample[2b]
Perform dewateringpolymer screening
tests [4b(3a)]
Yes
NoPass
paint filtertest ? [4b(4)]
FIGURE
13
TREATABILITY STUDY TEST
FLOW DIAGRAM DREDGED MATERIAL
SLURRY SIMULATION H1S2 TESTS
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
NOTES:
1. [1a(1)] = Refers to DQO and data and measurement in Table 2.
2. H1 = 25:75 solids: water (weight proportions)TREATABILITY STUDIES WORK PLAN
Perform mixing energytests [4b(5)]
Perform jar tests[4b(2a)]
Perform plate & framefilter test [4b(3b)]
Perform cake releasescreening tests [4b(3a)]
Perform preferredpolymer confirmation
tests [4b(3a)]
Perform primarysedimentation tests
[4b(2b)]
Coarse
Fraction
Fine
Fraction
Perform sizeseparation tests [4b(1a)]
Perform drainagetests [4b(1b)]
Dredged material slurrysimulation H1S2
WaterSediment
Slurry
Collect and analyzesediment sample S2 andwater sample [1a & 1b]
Prepare dredged materialslurry simulation (H1S2)with sediment sample S2
and water sample[2b]
FIGURE
14
TREATABILITY STUDY TEST
FLOW DIAGRAM DREDGED MATERIAL
SLURRY SIMULATION H1S3 TESTS
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
NOTES:
1. [1a(1)] = Refers to DQO and data and measurement in Table 2.
2. H1 = 25:75 solids: water (weight proportions)TREATABILITY STUDIES WORK PLAN
Dredged material slurrysimulation H1S3
WaterSediment
Collect and analyzesediment sample S3 andwater sample [1a & 1b]
Prepare dredged materialslurry simulation (H1S3)with sediment sample S3
and water sample[2b]
Slurry
Perform dewateringpolymer screening
test [4b(3a)]
Filtrate
Solids
Filtrate
Perform high-volumeplate & frame filter press
tests [4b(3b)]
Perform polymerscreening tests [5a(1)]
Perform rapidsmall-scale column tests
[5a(3)]
Perform column settlingtests [5a(1)]
Perform multi-mediafiltration tests [5a(2)]
Perform carboncolumn tests [5a(3)]
Perform mixingsub-study [4b(3a)]
Perform jar tests[4b(2a)]
Perform cake solidsvs. time tests [4b(3b)]
Perform cake releasescreening tests [4b(3a)]
Solids
Performstorage/transportation
stability shakertests [6a]
Performstabilization/solidification
tests [4b(4)]
Perform plate & framefilter test [4b(3b)]
Perform primarysedimentation tests
[4b(2b)]
Results
Results
Yes
No
Passpaint filter
test ? [4b(4)]
FIGURE
15
TREATABILITY STUDY TEST
FLOW DIAGRAM DREDGED MATERIAL
SLURRY SIMULATION H1S4 TESTS
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
NOTES:
1. [1a(1)] = Refers to DQO and data and measurement in Table 2.
2. H1 = 25:75 solids: water (weight proportions)TREATABILITY STUDIES WORK PLAN
Dredged material slurrysimulation H1S4
WaterSediment
Slurry
Filtrate
Filtrate
Solids
Collect and analyzesediment sample S4 andwater sample [1a & 1b]
Performstorage/transportation
stability shaker tests [6a]
Perform high-volumeplate & frame filter press
tests [4b(3b)]
Performstabilization/solidification
tests [4b(4)]
Perform polymerscreening tests [5a(1)]
Perform column settlingtests [5a(1)]
Perform multi-mediafiltration tests [5a(2)]
Perform carboncolumn tests [5a(3)]
Prepare dredged materialslurry simulation (H1S4)with sediment sample S4
and water sample[2b]
Perform centrifugetests [4b(3c)]
Perform dewateringpolymer screening
tests [4b(3a)]
Results
Cake
Solids
Yes
No
Perform rapidsmall-scale column tests
[5a(3)]
Passpaint filter
test ? [4b(4)]
FIGURE
16
TREATABILITY STUDY TEST
FLOW DIAGRAM DREDGED MATERIAL
SLURRY SIMULATION H2S1 TESTS
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
NOTES:
1. [1a(1)] = Refers to DQO and data and measurement in Table 2.
2. H2 = 5:95 solids: water (weight proportions)TREATABILITY STUDIES WORK PLAN
Dredged material slurrysimulation H2S1
WaterSediment
Collect and analyzesediment sample S1 andwater sample [1a & 1b]
Prepare dredged materialslurry simulation (H2S1)with sediment sample S1
and water sample[2c]
Slurry
Filtrate
Filtrate
Perform high-volumeplate & frame filter press
tests [4c(3b)]
Perform polymerscreening tests [5a(1)]
Perform column settlingtests [5a(1)]
Perform multi-mediafiltration tests [5a(2)]
Perform carboncolumn tests [5a(3)]
Perform mixingsub-study [4c(3a)]
Perform jar tests[4c(2a)]
Perform cake solidsvs. time tests [4c(3b)]
Perform cake releasetests [4c(3a)]
Perform mixing energytests [4c(5)]
Solids
Performstorage/transportation
stability shakertests [6a]
Performstabilization/solidification
tests [4c(4)]
Perform dewateringpolymer screening
test [4c(3a)]
Results
Yes
No
Perform rapidsmall-scale column tests
[5a(3)]
Coarse
Fraction
Perform sizeseparation tests [4c(1a)]
Perform drainagetests [4c(1b)]
Passpaint filter
test ? [4c(4)]
FIGURE
17
TREATABILITY STUDY TEST
FLOW DIAGRAM DREDGED MATERIAL
SLURRY SIMULATION H2S2 TESTS
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
NOTES:
1. [1a(1)] = Refers to DQO and data and measurement in Table 2.
2. H2 = 5:95 solids: water (weight proportions)TREATABILITY STUDIES WORK PLAN
Dredged material slurrysimulation H2S2
WaterSediment
Slurry
Collect and analyzesediment sample S2 andwater sample [1a &1b]
Prepare dredged materialslurry simulation (H2S2)with sediment sample S2
water sampleand [2c]
Perform dewateringpolymer screening
tests [4c(3a)]
Filtrate
Filtrate
Perform high-volumeplate & frame filter press
tests [4c(3b)]
Perform polymerscreening tests [5a(1)]
Perform column settlingtests [5a(1)]
Perform multi-mediafiltration tests [5a(2)]
Perform carboncolumn tests [5a(3)]
Perform mixing energytests [4c(5)]
Settled Solids
Results
Perform mixingsub-study [4c(3a)]
Results
Perform rapidsmall-scale column tests
[5a(3)]
Perform jar tests[4c(2a)]
Perform plate & framefilter test [4c(3b)]
Coarse
Fraction
Fine
Fraction
Perform sizeseparation tests [4c(1a)]
Perform drainagetests [4c(1b)]
Perform primarysedimentation tests
[4c(2b)]
FIGURE
18
TREATABILITY STUDY TEST
FLOW DIAGRAM DREDGED MATERIAL
SLURRY SIMULATION H2S3 TESTS
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
NOTES:
1. [1a(1)] = Refers to DQO and data and measurement in Table 2.
2. H2 = 5:95 solids: water (weight proportions)TREATABILITY STUDIES WORK PLAN
Dredged material slurrysimulation H2S3
WaterSediment
Slurry
Collect and analyzesediment sample S3 andwater sample [1a &1b]
Prepare dredged materialslurry simulation (H2S3)with sediment sample S3
and water sample[2c]
Perform preferredpolymer tests [4c(3a)]
Filtrate
Filtrate
Solids
Performstorage/transportation
stability shakertests [6a]
Perform high-volumeplate & frame filter press
tests [4c(3b)]
Performstabilization/solidification
tests [4c(4)]
Perform polymerscreening tests [5a(1)]
Perform column settlingtests [5a(1)]
Perform multi-mediafiltration tests [5a(2)]
Perform carboncolumn tests [5a(3)]
Perform centrifugetests [4c(3c)]
Perform cake releasetests [4c(3a)]
Perform cake solidsvs. time tests [4c(3b)]
Perform mixed energytests [4c(5)]
Results
Results
Cake
Solids
Yes
No
Perform rapidsmall-scale column tests
[5a(3)]
Perform jar tests[4c(2a)]
Perform primarysedimentation tests
[4c(2b)]
Passpaint filter
test ? [4c(4)]
FIGURE
19
TREATABILITY STUDY TEST
FLOW DIAGRAM DREDGED MATERIAL
SLURRY SIMULATION H2S4 TESTS
GENERAL ELECTRIC COMPANYHUDSON RIVER PCBS SUPERFUND SITE
NOTES:
1. [1a(1)] = Refers to DQO and data and measurement in Table 2.
2. H2 = 5:95 solids: water (weight proportions)TREATABILITY STUDIES WORK PLAN
Dredged material slurrysimulation H2S4
WaterSediment
Slurry
Collect and analyzesediment sample S4 andwater sample [1a & 1b]
Prepare dredged materialslurry simulation (H2S4)with sediment sample S4
and water sample[2c]
Perform plate & framefilter test [4c(3b)]
Filtrate
Filtrate
SolidsSettled Solids
Performstorage/transportation
stability shaker tests [6a]
Perform high-volumeplate & frame filter press
tests [4c(3b)]
Performstabilization/solidification
tests [4c(4)]
Perform polymerscreening tests [5a(1)]
Perform column settlingtests [5a(1)]
Perform multi-mediafiltration tests [5a(2)]
Perform carboncolumn tests [5a(3)]
Results
ResultsPerform dewateringpolymer screening
tests [4c(3a)]
Perform primarysedimentation tests
[4c(2b)]
Perform centrifugetests [4c(3c)]
Cake
Solids
Yes
No
Perform rapidsmall-scale column tests
[5a(3)]
Passpaint filter
test ? [4c(4)]